Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Channel Resources Ltd.

Publié le 16 avril 2012

Mankarga 5 Drilling Results Reinforce Size and Growth Potential at Ta

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Burkina Faso |

Marketwire

 
 
Channel Resources Ltd.
TSX VENTURE: CHU
Other Recent News | Printer Friendly Version

April 16, 2012
Channel Resources: Mankarga 5 Drilling Results Reinforce Size and Growth Potential at Tanlouka Gold Project, Burkina Faso

Highlights: 66 metres of 1.18 grams gold per tonne ("g/t Au") including 18 metres of 3.27 g/t Au; 72 metres of 2.12 g/t Au including 12 metres of 8.66 g/t Au

VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 16, 2012) - Channel Resources Ltd. ("Channel" or the "Company") (TSX VENTURE:CHU) is pleased to report additional assay results from its 15,000 metre core definition drilling program on the Mankarga 5 gold deposit at the Tanlouka Gold Project ("Tanlouka") in Burkina Faso, West Africa.

Most of the results reported in this release are from infill holes along nominal 100 metre spaced lines and targeting extensions of previously encountered mineralized structures. Highlighted intersections from this set of results include holes Tan12-DD67 and Tan12-DD68, both drilled on Section 600SW and collared approximately 50 metres apart. With Tan12-DD67 undercutting Tan12-DD68, these holes intersected the main mineralized structure at 75 metres vertical depth (66 metres of 1.18 g/t Au in hole Tan12-DD68) and 125 metres vertical depth (72 metres of 2.12 g/t Au in hole Tan12-DD67). The main mineralized zone on this section is believed to extend from surface to a minimum 150 meters vertical depth.

Results from sections 900SW to 1500SW may indicate that the Mankarga 5 structure could be turning to take on a more westerly orientation. Future drill programs will test this theory, following on trends established by regional gold-in-soil anomalies, and a possible link to the Mankarga 1 target, where previous reverse circulation drilling encountered high grade mineralization including intersections of 38 metres of 3.09 g/t Au in Tan10-RC10 and 12 metres of 21.25 g/t Au in Tan10-RC12.

North-East Extension to Mankarga 5

Hole Tan12-DD62, collared on section 1300NE and to the northwest of the main drilled trend, encountered numerous mineralized intersections from surface to 219.5 metres down-hole, the best being 18 metres of 1.77 g/t Au including 1.5 metres of 12.17 g/t Au. Future surface trenching and drilling programs will investigate this possible northeastward extension of the Mankarga 5 deposit, where geophysical interpretations indicate potential for a further 500 metres of strike length.

As reported previously, the core-drilling program has now been completed, with over 15,400 metres in 71 holes drilled. Assay results have now been reported for an aggregate of 12,049 metres of core (78% of total program) from 53 holes, including 1,892 metres from the nine holes reported in this release.

The drilling program has so far delineated a mineralized zone that is over 2 kilometres long and up to 300 metres wide on the northeast-trending Mankarga 5 structure. The main objectives of this program have been to provide a geological and structural context for the deposit, to further expand the zone and to support the deposit's maiden resource estimate, which is expected later in the spring of 2012. Mineralized zones are steeply dipping to the northwest, the majority extending from surface, and reported widths for all holes drilled at -50 degrees to azimuth 120 degrees (southeast) are believed to be in the range of 80 - 90% of true width. The deposit remains open along strike and to-depth, with mineralization encountered to a vertical depth of approximately 200 metres in the current program.

Detailed results from seven holes reported in this release are presented in order of their location on eight sections on the Mankarga 5 grid in Appendix A to this release, and can be viewed on a drill hole location map presented on the Company's website at http://www.channelresources.ca/i/pdf/CHUmap041612.pdf. Mankarga 5 cross sections are also available for download at http://www.channelresources.ca/s/Tanlouka.asp. Please refer to Channel's drilling, sampling and assay reporting practices below the results tables for further information on how the results are reported.

Note re QA/QC Testing Procedures

Channel Resources Ltd. maintains a rigorous quality control program involving the use of duplicate samples and blanks and certified gold standards from an accredited Canadian laboratory in every batch of 20 samples. Core samples are assayed using standard fire assay techniques on a 50-gram charge with an atomic absorption finish by SGS Burkina Faso SA and Abilab Burkina SARL (ALS Laboratory Group) in Ouagadougou, Burkina Faso. RC samples discussed in this release were assayed using the same methods at Abilab Burkina SARL (ALS Laboratory Group) in Ouagadougou. The drilling program is supervised by John Adams, P.Geo., a qualified person as defined by NI 43-101, who has reviewed the contents of this news release.

Some of the statements contained herein are forward-looking statements, which involve known and unknown risks and uncertainties. Without limitation, statements regarding potential mineralization and resources, exploration results, and future plans and objectives of the Company are forward-looking statements that involve various degrees of risk. The following are important factors that could cause the Company's actual results to differ materially from those expressed or implied by such forward-looking statements: changes in the price of minerals, general market conditions, risks inherent in mineral exploration, risks associated with development, construction and mining operations, the uncertainty of future profitability and the uncertainty of access to additional capital. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking statements or the foregoing list of factors, whether as a result of new information or future events or otherwise. Further disclosure on risk factors is available in the Company's various corporate filings at www.sedar.com.

APPENDIX A - Significant Assay Results

Presented in Order of Section Line from SW to NE

----------------------------------------------------------------------------
                            Interval (metres)   Intercept   Weighted Average
Hole Number                     From       To    (metres)     Grade (g/t Au)
----------------------------------------------------------------------------
                                                                            
Section 1400 SW                                                             
----------------------------------------------------------------------------
Tan11-DD56                        90     93.4         3.4               0.72
                           -------------------------------------------------
Hole length 201m               103.5    111.0         7.5               0.67
                           -------------------------------------------------
-50 degrees /120                                                            
 degrees azimuth               171.0    174.0         3.0               0.43
                           -------------------------------------------------
                                                                            
----------------------------------------------------------------------------
                                                                            
Section 600 SW                                                              
----------------------------------------------------------------------------
Tan12-DD67                     114.0    186.0        72.0               2.12
                           -------------------------------------------------
Hole length 273m   includes    162.0    174.0        12.0               8.66
                           -------------------------------------------------
-50 degrees /120                                                            
 degrees azimuth                                                           
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Tan12-DD68                      49.5     63.0        13.5               0.43
                           -------------------------------------------------
Hole length 201m                66.0    132.0        66.0               1.18
                           -------------------------------------------------
-50 degrees /120                                                            
 degrees azimuth  includes      85.5    103.5        18.0               3.27
----------------------------------------------------------------------------
                                                                            
Section 000                                                                 
----------------------------------------------------------------------------
Tan12-DD70                      25.5     40.5          15               0.52
                           -------------------------------------------------
Hole length 180m   includes     25.5     31.5         6.0               1.13
                           -------------------------------------------------
-50 degrees /120                                                            
 degrees azimuth                48.0     70.5        22.5               0.83
                           -------------------------------------------------
                   includes     51.0     58.5         7.5               1.55
                           -------------------------------------------------
                                75.0     88.5        13.5               1.00
----------------------------------------------------------------------------
                                                                            
Section 650 NE                                                              
----------------------------------------------------------------------------
Tan11-DD42                       1.5     11.0         9.5               0.68
                           -------------------------------------------------
Hole length 168m                30.5     62.0        31.5               0.53
                           -------------------------------------------------
-50 degrees /120                                                            
 degrees azimuth                69.5     90.5        21.0               1.25
                           -------------------------------------------------
                                94.5     99.0         4.5               0.48
----------------------------------------------------------------------------
                                                                            
Section 1300 NE                                                             
----------------------------------------------------------------------------
Tan12-DD62                       9.5     15.5           6               0.45
                           -------------------------------------------------
Hole length 251m                47.0     65.0        18.0               1.77
                           -------------------------------------------------
-50 degrees /120                                                            
 degrees azimuth  includes      53.0     54.5         1.5              12.15
                           -------------------------------------------------
                                74.0     75.5         1.5               0.77
                           -------------------------------------------------
                               119.0    122.0         3.0               0.45
                           -------------------------------------------------
                               213.5    219.5         6.0               0.67
----------------------------------------------------------------------------
 
n.b: No significant intersections were encountered in the following holes: Tan11-DD54 on section 1500SW, Tan11-DD60 on section 1100SW and Tan11-DD59 on section 1000SW.

Drilling, sampling and reporting practices:

--  All hole collars are set to dip at -50 degrees to their respective
    azimuths. 
--  Core holes are sampled geologically with a maximum sample interval of
    1.5 metres. 
--  "Mineralized rock" is defined as rock with a grade of over 0.10 g/t Au. 
--  "Significant assay results" is defined as samples, or series of
    consecutive samples, with grade thickness (i.e. weighted average gold
    grades multiplied by their intervals), of greater than 1.0. 
--  The amount of internal waste (i.e. with a grade of less than 0.10 g/t
    Au) included in a reported mineralized interval does not exceed 10%. 
--  No top cut has been applied to the individual grades before weighted
    average grades have been calculated. 
--  Unless otherwise stated, reported intersections are downhole lengths.
    True widths, other than as estimated on each section, shall be
    determined once geological modeling of the zone has been completed.
 



Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Channel Resources Ltd.
Colin McAleenan
President & CEO
604.684.7098
Fax: 604.684.7079

or

Channel Resources Ltd.
Cyrus Ameli
Senior Vice President
604.684.7098
Fax: 604.684.7079
info@channelresources.ca
www.channelresources.ca

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer


If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click .
Données et statistiques pour les pays mentionnés : Burkina Faso | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Burkina Faso | Tous

Channel Resources Ltd.

EXPLORATEUR
CODE : CHU.V
ISIN : CA15916P1053
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Channel Res. est une société d’exploration minière d'or basée au Canada.

Channel Res. détient divers projets d'exploration au Burkina Faso, au Canada et en Equateur.

Ses principaux projets en exploration sont FOX CREEK et WEST BIENVILLE au Canada, TANLOUKA et NAOUBE au Burkina Faso et EL MOZO en Equateur.

Channel Res. est cotée au Canada. Sa capitalisation boursière aujourd'hui est 5,4 millions CA$ (4,8 millions US$, 3,5 millions €).

La valeur de son action a atteint son plus haut niveau récent le 05 novembre 2010 à 0,45 CA$, et son plus bas niveau récent le 09 août 2013 à 0,01 CA$.

Channel Res. possède 119 349 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Channel Resources Ltd.
07/05/2010Closes Private Placement Financing
10/02/2010Closes Private Placement Financing
29/01/2010Announces Non-Brokered Private Placement Financing
13/01/2010Announces Oversubscription of Private Placement
22/12/2009Conducts Partial Closing of Private Placement Financing
02/12/2009Announces Non-Brokered Private Placement Financing
11/12/2008Appoints IBK Capital Corp to Lead Private Placement Financin...
31/10/2007 Closes Final Tranche of Private Placement Financing
Attributions d'options de Channel Resources Ltd.
25/02/2011Grant of 500,000 options at $ 0,21 per share
25/03/2010Welcomes Dr. Richard Schutte to Board of Directors, Grants S...
10/11/2009Appoints Frank Crerie and Richard Schutte to Advisory Commit...
Nominations de Channel Resources Ltd.
27/06/2013Appoints Archie Nesbitt Non-Executive Chairman
24/01/2012Appoints Archibald J. Nesbitt, LLB as Director
25/02/2011Appoints Stephen Rea to Board of Directors
15/11/2007 Appoints Chief Financial Officer
Rapports Financiers de Channel Resources Ltd.
28/05/2010Announces Change to Board of Directors and Filing of Second ...
27/08/2009Files Third Quarter Financial Statements, Extends Warrants
Projets de Channel Resources Ltd.
20/03/2013(Tanlouka)Ltd=2E: Tanlouka Gold Project Ready for Next Growth Cycle
12/07/2012Reports Positive Metallurgical Results for the Mankarga 5 De...
30/04/2012(Fox Creek)Earns 100% Interest in Fox Creek Mineral Brine Project & Fil...
05/03/2012(Tanlouka)Infill Drilling Continues to Define Mankarga 5 Zone at Tanlo...
09/02/2012(Tanlouka)Infill Drilling Continues to Define Mankarga 5 Zone at Tanlo...
11/01/2012(Tanlouka)Drilling Continues to Expand =?ISO-8859-1?Q?=20Mankarga=205=...
14/09/2011(Tanlouka)Results From Core Drilling Program On Mankarga 5 Deposit at ...
16/06/2011(Tanlouka)Commences 15,000 Metre Core Drilling Program at Tanlouka Gol...
17/05/2011(Tanlouka)to Commence 15,000 Metre Core Drilling Program at Tanlouka G...
27/04/2011(Tanlouka)Extends Mankarga 5 Strike Length to 1.85 Kilometres at Tanlo...
07/04/2011(Tanlouka)Reports Metallic Screen Assay Results From Tanlouka Gold Pro...
24/03/2011(Tanlouka)Mankarga 5 Gold Deposit Strike Length Now 1.5 Kilometres at ...
17/08/2010(Tanlouka)Makes New Gold Discovery at Tanlouka Project, Burkina Faso
07/10/2009(Fox Creek)Confirms Multi-Product Mineral Potential at Fox Creek Brine ...
17/08/2009(Fox Creek)Initiates Sampling Program at Fox Creek Lithium / Potash Bri...
24/02/2009(Fox Creek)Enters into Option Agreement to Acquire 100% of Fox Creek Li...
21/05/2008(West Bienville) Expands & Advances West Bienville Uranium Project, Complete...
23/04/2008(El Mozo)Defers Exploration Activities in Ecuador
29/02/2008(El Mozo) Reports on Mozo Project Drilling and Metallurgical Results
14/02/2008(Bombore)Initial Resource Estimate Issued for Bombore Gold Project, B...
14/12/2007(El Mozo)Completes Drilling at El Mozo, Discovers Radiometric Anomaly...
18/10/2007(El Mozo) Commences Drill Program at El Mozo Gold Project, Ecuador
Communiqués de Presse de Channel Resources Ltd.
26/09/2013and West African Resources Execute Definitive Agreement
25/04/2013Adopts Advance Notice Policy
31/08/2012Reports Drilling Results for Mankarga 1 and Mankarga 1-South...
19/07/2012(Tanlouka)Announces Maiden Resource Estimate for Tanlouka Gold Project...
04/07/2012Reports Final Drilling Results for Mankarga 5 Resource Estim...
23/05/2012Drilling Results Continue to Enhance Potential of Mankarga 5...
16/04/2012Mankarga 5 Drilling Results Reinforce Size and Growth Potent...
19/03/2012(Fox Creek)Announces Maiden Resource Estimate for Fox Creek Mineral Bri...
03/10/2011Announces Senior Management Appointments
03/06/2011(Tanlouka)Reports Drill Results & Geophysical Extensions to Mankarga 5...
06/05/2011Announces Closing of $7 Million Bought Deal Private Placemen...
08/04/2011Announces $5 Million Bought Deal Private Placement
14/07/2010Provides Operational Update
30/06/2010Announces Changes to Board of Directors
26/01/2010Adds Five New Lithium Brine Permits to Alberta Portfolio
23/12/2009Files Annual Financial Statements
23/01/2009Files Annual Financial Statements
12/11/2008Enters Into Letter of Intent for Option to Acquire Alberta L...
30/07/2008Update
21/01/2008 Issues Options, Files Annual Financial Statements
28/09/2007Advances El Mozo, Tanlouka and West Bienville Projects
10/09/2007FN Series drilling program confirms new zone of gold mineral...
04/09/2007 and Azimut Sign Letter of Intent on West Bienville Uranium ...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (CHU.V)
0,045+0.00%
TSX-V
CA$ 0,045
23/01 15:53 -
0%
Cours préc. Ouverture
0,045 0,040
Bas haut
0,040 0,045
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,045 -%
Volume var. 1 mois
428 500 -%
24hGold TrendPower© : 44
Produit
Développe
Recherche Gold - Lithium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,68 AU$+0,33%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,22 US$-0,33%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,52 GBX-0,76%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$+0,00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,48 CA$+1,54%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,26 CA$+4,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,23 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
53,08 US$+0,70%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :