Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

African Gold Group Inc.

Publié le 20 mars 2012

March 20/2012

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Burkina Faso | Canada | Ghana | Mali |
 
African Gold Group

 

Northern Step Out Hole Intercepts 70 Meters Of 1.83 g/t Au & 45 Meters Of 1.79 g/t Au, Hole Ends In Mineralization

ROBUST GROWTH CONTINUES AT ZONE 1 NORTH - KOBADA, MALI

TORONTO, CANADA, March 20, 2012 - African Gold Group, Inc., ("AGG" or the "Company") is pleased to report the analytical results for eight, near surface (oxide), reverse circulation (RC), step-out drill holes from the Company's Kobada, Mali gold project. All eight holes represent northern step out holes that were collared up to 200 meters north of AGG's current, 43-101, Zone 1, inferred resource.

Near Surface (Oxide) Drill Highlights From Northern Step-Out Holes Include:

  • KBRC12-006: 70 m @ 1.83 g/t Au & 45 m @ 1.79 g/t Au,  ended in mineralization

  • KBRC12-003: 27 m @ 0.47 g/t Au & 84 m @ 1.26 g/t Au, ended in mineralization

  • KBRC12-004: 21 m @ 1.07 g/t & 9 m @ 1.80 Au

  • KBRC12-005: 21 m @ 1.15 g/t Au

Click Here to view the Northern Step Outs PR1 1100S to 900S

The assay results detailing the 8 near surface, (oxide) northern step-out RC holes that were collared up to 200 meters north of the Zone 1 resource are listed in Table 1 below:

TABLE 1

Section


Hole ID
 
From (m) To (m) Length (m) AU (g/t) EOH (m) AZIMUTH  (Deg. TN) Hole Objective
1000S KBRC 12-001 5 20 15 0.98 117 200 Test Zone 1 North extension
950S KBRC 12-002 10 17 7 1.60 111 200 Test Zone 1 North extension
    34 37 3 0.30      
    58 61 3 1.01      
    70 73 3 0.45      
    92 95 3 0.85     Hole Ended in mineralization
950S KBRC 12-003 9 29 20 0.55 129 200 Test Zone 1 North extension
    45 129 84 1.26     Hole Ended in mineralization
950S KBRC 12-004 0 21 21 1.07     Test Zone 1 North extension
    34 37 3 0.31      
    50 59 9 1.80      
900S KBRC 12-005 11 16 5 1.09 129 200 Test Zone 1 North extension
    31 52 21 1.15      
  including 42 43 1 13.37      
    82 85 3 0.41      
    93 108 15 0.33      
    115 122 7 1.25      
900S KBRC 12-006 16 86 70 1.83 141 200 Test Zone 1 North extension
  including 17 18 1 15.50      
    96 141 45 1.79      
  including 139 141 2 15.56      
  including 140 141 1 18.58     Hole Ended in mineralization
900S KBRC 12-007 2 15 13 0.64 129 200 Test Zone 1 North extension
    40 45 5 0.37      
    54 72 18 0.76      
    91 104 13 0.35      
    116 120 4 0.52      
900S KBRC 12-008. 3 14 11 0.89 123 200 Test Zone 1 North extension
    66 71 5 0.73      
    106 109 3 0.30      
  1. Significant drilled intercepts have a minimum length of 3m at 0.3 g/t or the product "Length X Grade" greater than 0.9   g.m/t. Intercepts are drilled lengths and may not be true width within a structure dipping 70 degrees to 80 degrees

  2. Up to 7 m of horizontal "waste" included within mineralized intercept

AGG's management is most encouraged with today's drill results as they represent the continuation of significant drill intercepts encountered within the near surface, oxidized profile of the deposit. More specifically, AGG reported near surface drill results for six RC drill holes that were collared up to 100 meters north of the Zone 1, 43-101 resource in a press release dated November 15, 2011.

Highlight drill intercepts from the first set of northern step out holes, collared up to 100 meters north of the Zone 1, 43-101 resource, reported November 15, 2011 included:

  • KBRC11-189: 112 m @ 2.14 g/t Au, incl, 1 m @ 90.19 g/t Au, ended in mineralization

  • KBRC11-192: 88 m @ 1.66 g/t Au, incl 2 m @ 25.60 g/t Au

  • KBRC11-191: 55 m @ 0.79 g/t Au, incl 1 m @ 15.06 g/t Au

  • KBRC11-190: 42 m @ 0.96 g/t Au, incl 1 m @ 12.42 g/t Au

  • KBRC11-193: 12m @ 0.89 g/t Au, ended in mineralization

"We continue to remain focused on development of the near surface oxidized resource at our Kobada gold project. Today's results clearly show the continuing presence of robust gold mineralization extending as far as 200 meters north of our current Zone 1 resource, where highlight hole KBRC12-003, collared directly on strike from KBRC11-189, intercepted 70 meters at 1.83 g/t Au and 45 meters at 1.79 g/t Au. Both of these holes ended in mineralization," states AGG Vice President, Exploration, Dr. Kevin Downing.

"In addition to demonstrating a strike extension of at least 200 meters north, the holes released here define  a mineralized corridor that exceeds 100 meters in lateral width that is associated with an oxidation depth in the magnitude of 100 vertical meters. The mineralization contained within these northern step out holes is well distributed down several of the holes, and is as strong as any gold mineralization encountered in the Zone 1 resource to date."

"We are very optimistic that mineralization of this strength will continue as our drill program extends further north, along strike," announces Downing. "In this region of our Zone 1 deposit, we are observing that the depth of drilling that is required to encounter fresh rock continues to be in excess of 140m down hole. As a result, we expect that our northern step out holes will have a very positive impact on our 2012 revised resource estimate," concludes Downing.

 

Kobada Review

On July 14, 2011 AGG announced the results of a positive NI 43-101 Preliminary Economic Assessment (the "PEA" or the "Study") that evaluates the potential of an open pit, bulk mining model, utilizing a gravity recovery process plant, at the Company's Kobada (Mali) gold project. The PEA incorporates and includes drill data up to the end of December, 2010. There is no drill data from the 2011 campaign included in the PEA. More specifically, the PEA does not incorporate drill data for the northern extension holes that hold potential to extend Zone 1 up to 2 kilometers north of the Zone 1 deposit, in addition, the PEA does not incorporate the 2011 southern holes that hold potential to extend Zone 1 up to 1.55 kilometers south of the Zone 1 deposit, nor does the Study include any potential from the newly discovered Foroko North deposit, the newly discovered Termite Zone or the recently announced Gosso discovery zone, the latter three discovery zones being separate and distinct structures from Zone 1

Project Economics - Base Case

 

The PEA estimates an after-tax Net Present Value (NPV) of US$216.9 million from commencement of construction and an after-tax Internal Rate Of Return (IRR) of 90.57% using a base case of US$1,100 per ounce of gold and a discount rate of 5%.

The Kobada project base case is for processing 20,000 tonnes per day for a total of 7,000,000 tonnes per year in a gravity process plant that is projected to recover 87.9% of the gold contained in 41,750,000 tonnes of lateritic material assaying 0.64 g/t Au, for average annual production of 126,600 ounces of gold for the first five years of operation. The average annual operating cost is calculated to be US$8.27/t for the first five years of operation with a CAPEX of US$122,500,000. The project produces gold at the direct cost of US$470.90 per ounce. The Study demonstrates that the Kobada gold project is economically optimized by adopting bulk mining versus selective mining. The direct implications of bulk mining are demonstrated in a substantial increase in tonnage and recoverable gold but with an associated decrease in the average gold grade. Please visit www.africangoldgroup.com to review the entire content of AGG's July 13, 2011 press release announcing the results of the positive Preliminary Economic Assessment.

Sampling - QA/QC Program

RC cuttings are recovered at the bottom outlet of the RC rig cyclone into 50-kg capacity poly-weave bags to recover the cuttings from each 1 meter of drill penetration.  Each one meter sample weighs an average of approximately 19 to 23 kg.  Each sample is passed through a 3-tier Jones Riffler (1 to 8 split), the samples are riffled twice to obtain from 3 to 5 kg of cuttings which are put in a numbered sample bag. Each bag is sealed and picked up on site by ALS Chemex Laboratories  for delivery to its Burkina Faso facilities.  The remaining 14 to 18 kg of cuttings (field rejects) are stored in camp under tarps to protect the bags against the elements.

Original samples are analyzed using Leachwell on 2 kg of pulp.  Leachwell is a bottle roll cyanidation procedure with the addition of a catalyst to speed up gold dissolution.  A QA/QC program is in place and includes:  blank (1 in 20 samples), duplicates (1 in 20), standards (1 in 20), external lab checks (1 in 30) and two different analytical procedures checks (1 in 100).

Under the guidelines of National Instrument 43-101, the qualified person for the Kobada Gold Project is Mr. Pierre Lalande, P. Geo. Mr. Lalande is a member of the Association of Professional Geoscientists of Ontario and has reviewed and approved the contents of this news release.

African Gold Group, Inc., based in Toronto, Canada, is engaged in the identification, acquisition and exploration of prospective gold projects that are situated along significant gold trends within West Africa. To date, the Company controls a total of eleven gold concessions that are consolidated in four distinct stand alone exploration projects. Three of these projects are located in Ghana and one project (Kobada) is  located in Mali, West Africa.

Mineral resources that are not mineral reserves do not have demonstrated economic viability. The preliminary assessment includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary assessment will be realized.

Additional Information is available on the Company's website at www.africangoldgroup.com and on www.sedar.com and through the Company's offices at:  Sun Life Financial Tower, Suite 2518, 150 King St. West, Toronto, Canada M5H 1J9

On Behalf of the Board:
Michael A. J. Nikiforuk

President, Director

FOR FURTHER INFORMATION PLEASE CONTACT:

African Gold Group, Inc.
Michael A. J. Nikiforuk
(647) 288-0453
majn@africangoldgroup.com


The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release

 

Communication Design by Independent Development Inc.




Powered by Joobi
Données et statistiques pour les pays mentionnés : Burkina Faso | Canada | Ghana | Mali | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Burkina Faso | Canada | Ghana | Mali | Tous

African Gold Group Inc.

EXPLORATEUR
CODE : AGG.V
ISIN : CA00829A1066
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

African Gold Group est une société d’exploration minière d'or basée au Canada.

African Gold Group détient divers projets d'exploration au Ghana.

Ses principaux projets en exploration sont BAGOE - EAST, BAGOE - WEST et KOBADA au Mali et NYANKUMASI, MANKRANHO et ASANKRANGWA au Ghana.

African Gold Group est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 48,9 millions CA$ (39,1 millions US$, 34,3 millions €).

La valeur de son action a atteint son plus haut niveau récent le 02 avril 2004 à 3,40 CA$, et son plus bas niveau récent le 12 avril 2019 à 0,01 CA$.

African Gold Group possède 326 100 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de African Gold Group Inc.
18/03/2015Announces Closing of Private Placement
11/03/2015Announces Private Placement
05/09/2013Announces the Closing of $1,500,000 Private Placement Offeri...
20/03/2006private placement of up to 4 million shares
Attributions d'options de African Gold Group Inc.
05/04/2011, Engages Torrey Hills Capital for Investor Relations
Projets de African Gold Group Inc.
23/08/2013(Kobada)Clarifies Disclosure on Kobada, Mali Gold Project Press Rele...
03/05/2010(Asankrangwa)Airborne Survey Of Asankrangwa Holdings -- Contiguous And O...
08/04/2010(Asankrangwa)To Commence Airborne Survey Of Asankrangwa Holdings -- Conti...
18/02/2010(Kobada)Drilling At Kobada, Mali Focused On Surpassing 1,000,000 Oz ...
20/01/2010(Kobada)Multi-Phase Work Program Focused on Surpassing 1,000,000 oz ...
24/03/2010(Kobada)Intersects 18 Meters of 7.04 G/T Au In Zone 1 and 21 Meters ...
28/10/2009(Mankranho)Newmont Confirms Structures That Host Yamfo North-East & Sub...
23/09/2009(Kobada)Kobada "Zone 1" Resources Estimate Will Increase
21/05/2008(Kobada)Files Initial 43-101 Mineral Resources Estimate For "Zone 1"...
09/04/2008(Kobada)Intercepts 9 Meters Of 25.8 G Au/T
Mineralization Identi...
02/04/2008Releases Initial 43-101 Mineral Resources Estimate for "Zone...
18/03/2008(Kobada)Diamond Drilling Set To Test Multiple Structures Parallel To...
06/03/2008(Bagoe - East)Randgold Resources Reports Rab Drilling Is Underway At Bagoe...
Communiqués de Presse de African Gold Group Inc.
06/01/2016African Gold Group, Inc. Announces Sale of Ghanian Assets fo...
28/10/2015African Gold Group, Inc. Announces Metalurgical Test Work Co...
03/09/2015African Gold Group Announces Closing of Private Placement
05/08/2015African Gold Group, Inc. Announces Grant of Kobada Mining Li...
08/07/2015African Gold Group, Inc. Announces Election of Mr. Georges C...
06/02/2015African Gold Group to Participate in "Doing Business in Mali...
22/01/2015African Gold Group Closes Second Non-Brokered Private Placem...
14/01/2015African Gold Group Closes Non-Brokered Private Placement for...
23/12/2014African Gold Group, Inc. Announces Filing of Preliminary Eco...
25/11/2014African Gold Group, Inc.: Updated Preliminary Economic Asses...
29/10/2014Kobada Metallurgy Test Work Confirms 85.2% Gold Recovery for...
28/10/2014African Gold Group Unaware of Any Material Change
04/09/2014AGG Appoints David Brown as Company Chairman
29/07/2014African Gold Group Updates on Kobada Feasibility Study
23/07/2014African Gold Group Inc. Completes 2014 Kobada Field Season-B...
17/07/2014African Gold Group, Inc., Appoints Misha Collins Feasibility...
09/07/2014African Gold Group, Inc., Kobada Feasibility Study Work to M...
19/06/2014African Gold Group, Inc.: Bulk Sampling Results Identifies S...
22/05/2014African Gold Group Closes Over-Subscribed Non-Brokered Priva...
29/04/2014African Gold Group Strengthens Mine Development Team With th...
25/03/2014African Gold Group, Inc. Announces Early Warrant Exercise In...
22/10/2013(Kobada), Engineering Team Mobilizes to Commence Metallurgical Test ...
08/07/2013Annual and Special Shareholder Meeting
20/06/2013letter Press Release June 18 2013
18/06/2013(Kobada)Updated Resources Estimate for Kobada Gold Project Surges to...
29/05/2013KBRC12-160 Intercepts 75 Meters of 3.06 g/t Au; KBRC12-201 I...
29/05/2013KBRC12-160 Intercepts 75 Meters of 3.06 g/t Au; KBRC12-201 I...
15/05/2013KBRC12-084 Intercepts 69 Meters of 2.37 g/t Au; KBRC12-066 I...
08/05/2013Feasibility Study Drilling on 25 Meter Centers Pushes Au Min...
25/03/2013IGE Resources calls for Extra General Meeting, related to th...
05/02/2013(Mankranho)Completes Sale of Mankranho, Ghana Concession for US$4,000,0...
05/11/2012Pope & Company Initiates Equity Research Coverage on African...
10/10/2012(Mankranho)Announces Sale of Mankranho, Ghana Concession for US$4,000,0...
01/05/2012May 01/2012
29/03/2012March 29/2012
20/03/2012March 20/2012
29/11/2011Nov 30/11
26/10/2011Featured In The Financial Post,
25/10/2011Oct 25/11
14/09/2011Sept 14/11
25/08/2011Featured In The Financial Post, Mining News
13/07/2011July 13/11
13/07/2011Positive Preliminary Economic Assessment Generates $216.9 Mi...
01/06/2011June 01/11
01/06/2011Southern Step Out Hole Intercepts 96 Meters of 1.35 g/t Au f...
05/04/2011April 05/11
29/03/2011March 29/11
22/03/2011March 22/ 11
22/03/201167 RC Drill Holes Shipped to Lab; 3,980 m of Trench Results ...
16/03/2011Re-Adopts Shareholder Rights Plan
29/04/2008 included in The Gold Newsletter, April 2008 Edition
16/04/2008Trenching Returns 84 Meters Of 3.0 G Au/T, Including 36 Mete...
25/02/2008 Retains AGORACOM To Provide Google Search Engine IR Program...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (AGG.V)OTHER OTC (AGGFF)
0,150+0.00%0,080+0.00%
TSX-V
CA$ 0,150
03/08 10:30 -
0%
Cours préc. Ouverture
0,150 0,150
Bas haut
0,145 0,150
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,150 -%
Volume var. 1 mois
76 091 -%
24hGold TrendPower© : 20
Produit
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 25/03/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20227,14%0,200,08
2021-20,00%0,200,11
2020-40,68%0,380,10
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,97 US$+0,92%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,41 CA$+1,26%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,18 CA$-3,86%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,84 CA$-1,08%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,60 US$+0,91%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :