Mindoro Resources Ltd

Publié le 19 février 2013

Mindoro Provides an Update on the TVI Joint Venture Projects

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Calcium | Copper | Nickel | Philippines | Report |
HOME CORPORATE NEWS PROJECTS INVESTORS CAREERS CONTACT
13-Feb-13

Mindoro Provides an Update on the TVI Joint Venture Projects


MELBOURNE, AUSTRALIA, February 13, 2013 - Mindoro Resources Ltd. (TSXV: MIO; ASX: MDO; Frankfurt: WKN 906167) ("Mindoro") is pleased to provide an update on the joint venture projects with TVI Pacific Inc. (TSX:TVI) (OTCQX:TVIPF) ("TVI"), and its Philippines operating subsidiary TVIRD. Mindoro and TVI have signed four joint venture agreements, previously announced on July 6, Sept. 7 and Sept. 27, 2012, relating to the Agata and Pan de Azucar mining projects located in the Philippines on the Islands of Mindanao and Panay, respectively. The joint ventures present TVI and Mindoro with multiple growth opportunities for near-term and medium-term cash flow generating potential. Under the agreements TVIRD may earn up to a 60% interest and will act as operator of the projects. A management committee composed of senior management members of both TVIRD and Mindoro will oversee each of the projects.
  • Growth opportunities include:
    • near-term high iron (Fe) laterite direct shipping ore (DSO) operation
    • near-term limestone DSO operation
    • medium-term pyrite material DSO operation
    • medium-term lime production facility
    • medium-term nickel (Ni) processing plant
  • Development planning/permits are well-advanced for the high iron and limestone DSO operations, both with potential to generate near-term cash flow.
  • Project Execution/Technology Development team fast-tracking Ni processing plant using low-capex leaching technology.
  • Ni processing plant capex is expected to be less than US$100 million; estimated opex approximately US$4 per lb Ni, assuming use of imported sulphuric acid.
  • Pan de Azucar pyrite deposit being evaluated for both DSO of pyrite material and production of sulphuric acid for the Agata Ni processing plant to further reduce opex.
Mindoro currently holds a 75% interest in the Agata and Pan de Azucar projects and has the option to acquire an additional 25% in the Agata Project from its partner Minimax Mineral Exploration Corporation. If all options are exercised, TVI will have a 60% interest in the Agata Project and Mindoro 40%. Mindoro will be carried to production for the DSO stage, and through feasibility study for the processing stage.

Tony Climie, PGeol., and CEO of Mindoro, comments, "We are delighted with the rapid progress being made by the operator TVI, the exciting development opportunities unfolding, and the potential for early cash flow. After many years of assembling and advancing our Philippine project portfolio it is especially gratifying to see these approaching fruition".

In a TVI news release on the joint venture progress, Mr Clifford M. James, Chairman and CEO of TVI stated, "These projects comprise a pipeline of potentially long-life assets, capable of substantial, growing and continuous cash flow generation, which are expected to propel the company into a strong mid-sized, diversified miner. These are exciting opportunities and represent a major step forward for TVI."

TVIRD, as the operator of the projects, brings to the table a proven management team capable of project execution (the Project Execution/Technology Development team), on time and on budget. The Project Execution/Technology Development team for the Mindoro joint venture projects is composed of highly skilled technical experts who are familiar with the assets and the type of processing plant technology expected to be used.

Prior extensive pre-feasibility and engineering works have been conducted on the Mindoro properties. These reports can be accessed on Mindoro's website at www.mindoro.com or under Mindoro's profile on SEDAR at www.sedar.com.

Map 1: Philippines: Agata (Island of Mindanao) and Pan de Azucar Mining (Island of Panay) Project Locations

AGATA MINING PROJECT

Map 2: Agata Mining Project -- Site Layout


The Agata mining project, located on the Island of Mindanao, includes the following opportunities:
  • a near-term high iron laterite DSO operation
  • a near-term limestone DSO operation
  • a medium-term lime production facility
  • a medium-term nickel processing plant project
Historical estimates of mineral resources and mineral reserves at Agata are set out in the technical report entitled "Technical Report for the Agata Nickel Laterite Project, Mindanao, Philippines" dated 20 December 2011 prepared by Ausenco for Mindoro (the "Agata Report"). Key assumptions, parameters and methods used to prepare the historical estimates are set out in the Agata Report, which uses the categories required by NI 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). The historical drilling by Mindoro referenced in the Agata Report was 682 drill holes for 12,252 metres in the main Agata North resource and 199 holes for 2,605 metres in Agata South resource. High Iron and Limestone DSO Operations/Lime Production Facility Both the high iron DSO and the limestone DSO operations are near-term opportunities that have the potential to generate strong cash flows beginning in late 2013 (contingent on, among other things, receipt of permits in a timely manner). The high iron laterite and limestone deposits occur up to 1 kilometre from the coast, which is expected to positively impact transportation costs due to the close proximity of the mine pit to the port. The upper portions of the laterite profile comprise the ferruginous zone and limonite zone, both rich in iron. It is estimated that there are approximately 7 million wet metric tonnes (wmt) of high iron material with iron grades ranging between 45% and 52%. These historical estimates are set out in the Agata Report referred to above. The deposit is expected to be developed as a surface mining operation with the high iron material most probably sold to the Chinese iron ore market. Beneath the ferruginous and limonite zone is the higher nickel grade saprolite zone, which will be the dominant feed for a new nickel processing facility currently under consideration by the Project Execution/Technology Development team. The high iron DSO operation would be expected to generate early cash flow until the nickel processing plant is built and becomes operational, but shipments are expected to continue after this until the high iron material is exhausted. The high iron DSO operation already has an existing Environmental Compliance Certificate (ECC); however, other permits such as a port permit and a Declaration of Mining Feasibility are also required. The limestone occurring at the coast is a massive recrystallized limestone of very high purity levels with calcium carbonate (CaCO3) of greater than 95% according to the Agata Report. Five (5) holes were drilled into the limestone horizon by Mindoro but the number of holes drilled is not considered sufficient to classify a mineral resource. The limestone is estimated in the Agata Report to be up to 50 metres thick. The potential quantity and grade is conceptual in nature, because there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. The initial plan is to develop a resource, and mine and ship limestone DSO utilizing the infrastructure developed initially for the high iron DSO operation. Currently no permits are in place for mining the limestone. Since the quality of limestone quarried at Agata is expected to be high, the Project Execution/Technology Development team also plans to construct a lime production facility at the Agata project site. The lime produced would be used in the nickel processing plant, offsetting the costs of imported lime while also creating potential for some to be sold. The lime processing facility is a medium-term project currently expected to come online at the beginning of 2015 pending the receipt of all required permits, among other things. The development plans and initial pre-development activities for the two DSO operations are underway and include:
  1. For the high iron DSO operation:
    • the preparation of compliance reports to regulators
    • land acquisition for the port facilities and roads
    • planning and design for port construction
    • road/infrastructure design and construction plans
    • initial pre-development activities, including initial road construction and camp development
    • confirming markets for products
    • mine development planning
    • community relations
  2. For the Limestone DSO operation:
    • further drilling on the limestone deposits to delineate resource to NI 43-101 standards
    • preliminary concepts and mining plans for the limestone
    • confirming markets for limestone and lime products
    • metallurgical test works
An update to the NI 43-101 report prepared originally for Mindoro, together with a scoping study on both the high iron and Limestone operations are also initially planned and are to be followed by feasibility studies.

Agata Nickel (Ni) Processing Plant

The Agata Ni processing plant is a medium-term growth opportunity, which TVI expects could come into production in mid-2015, dependent on such things as a successful metallurgical testing program and pending receipt of the required permits. The plant would initially be designed to have a 20-year life, and would be built in modules with the ability to add capacity over time by adding further modules to increase throughput and Ni production. The Project Execution/ Technology Development team is proposing the use of innovative, low cost leaching and downstream Ni recovery and purification technology rather than the traditional high cost HPAL processes used in the laterite nickel industry. TVIRD's team of technical staff engaged to deal with the Mindoro joint venture projects have substantial expertise in this leaching and downstream Ni recovery and purification technology and their expertise will be used to fast-track the processing plant.

The laterite feed to the processing plant comprising limonite material and saprolite material would be mixed with sulphuric acid and undergo numerous steps to ultimately produce a nickel hydroxide product. This intermediate nickel product could either be sold as is or further processed to produce metallic nickel. The estimated capital cost for the nickel processing plant plus associated infrastructure (port, water, power, etc.) is expected to be less than US$100 million. The cash operating costs are estimated to be approximately US$4 per lb Ni (approximately US$9,000/t Ni), assuming the use of imported sulphuric acid. If the Pan de Azucar pyrite project can be successfully commercialized (refer below), then the opportunity exists to self-produce sulphuric acid at the nickel plant site, thereby further reducing operating costs, and with the added benefits of by-product electricity and steam.

Site infrastructure is excellent with local sources of labour, fresh water and power (supplemented by back-up generators). The processing plant will be located within two kilometres of the port, thereby simplifying acid transport and other logistics, as well as keeping operating costs down. Deep water for ships up to 50,000 tonne capacity occurs within 250 metres of the coastline.

A number of activities relating to the Agata Ni Processing Plant are underway and include:
  • internal project feasibility scoping including previous relevant Mindoro scoping work
  • external laboratory testing at BGRIMM of a representative bulk ore sample taken from the Agata Ni deposit, including:
    • crushing and grinding tests
    • pre-leach thickener settling tests
    • primary and secondary leaching tests
    • leach residue preliminary settling and filtration tests
  • establishment of laboratory and pilot testing facility (in the Philippines)
    • bench-scale laboratory equipment has been installed and testwork will commence at this facility before mid-February 2013
    • pilot plant equipment has been identified and specified
  • the process flowsheet has been identified and confirmed by laboratory tests
  • process flow diagrams are near completion
  • mass and energy balance have been developed in METSIM, using laboratory test data to calibrate the model
  • environmental and leached ore storage facilities designs are well advanced
  • preliminary infrastructure design is underway, including:
    • port/jetty design, including reagent storage facilities
    • water source identification
    • road design
    • process plant location and preliminary layout
An update to the NI 43-101 report prepared originally for Mindoro, together with a scoping study, are initially planned, to be followed by delivery of a full feasibility study. The feasibility study is underway and expected to be completed by the end of 2013. Pending a positive feasibility study and a decision to proceed, plant construction is expected to commence in 2014 with the commissioning/commercial production of nickel hydroxide product in Q2 of 2015, dependent on obtaining permits in a timely manner, among other things. Pan de Azucar Pyrite Project As described in Mindoro's news release of February 8, 2012, the Pan de Azucar pyrite project located on the Island of Panay is a drill-defined exploration target, which comprises a pyrite-rich mineralized horizon of between 10 and 40 metres in thickness and dipping at a shallow 10 to 15 degrees. The mineralized horizon is exposed at the surface. Mindoro reported it has drilled 30 holes into the mineralized horizon, showing a potential quantity of 8 million to 12.7 million dry metric tonnes with a grade range of 35% to 40% sulphur (70% to 90% pyrite). The potential quantity and grade has been determined by averaging the intercepts from the drill assays. The potential quantity and grade is conceptual in nature, because there has been insufficient exploration to define a mineral resource (including number of holes drilled) and it is uncertain if further exploration will result in the target being delineated as a mineral resource. TVI expects that commercializing the project may involve both the DSO export of pyrite material to China for the production of sulphuric acid and/or the self-production of sulphuric acid at the Agata Ni processing plant site. Currently there are no permits in place for the mining of the pyrite material. Activities planned or underway for the Pan de Azucar Pyrite Project include:
  • laboratory testing of the pyrite samples as a suitable feed for a sulphuric acid plant
  • additional diamond drilling to delineate resource to NI 43-101 standards
  • preliminary concepts and mining plans
  • confirming markets for products
  • metallurgical test works
  • community relations
On behalf of the Board of Directors,

Tony Climie
CEO




For investor relations inquiries please email ir@mindoro.com, or telephone one of the following:

Australia: Clayton Northey Tel: +61 3 9614 5055

Canada: Jeremy Hill, CHF Investor Relations, Tel: +1 416 868 1079 ext 238

Website: www.mindoro.com




About Mindoro

Mindoro is a Tier 1 Issuer trading on the TSX Venture Exchange (MIO), Australian Securities Exchange (MDO) and Frankfurt Stock Exchange (WKN 906167). Mindoro has a 75% interest, and an option to acquire the remaining 25%, in the Agata Nickel Project, Mindanao, and the Pan de Azucar Sulphur-Copper-Gold Project, Iloilo. TVI Pacific Inc. has the option to earn up to a 60% interest in these projects by meeting the earn-in requirements outlined in the September 27, 2012 release. Mindoro also holds a 53.3% stake in ASX listed Red Mountain Mining (ASX:RMX), which has a 100% direct and indirect interest in the Batangas gold and copper-gold projects.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Tony Climie is the CEO of Mindoro Resources Ltd and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a qualified person as defined by National Instrument 43-101. Tony Climie consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.

This release may contain forward-looking statements including management's assessments of future plans and operations, and expectations of future production. These statements are based on current expectations that involve a number of risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to, the risks associated with the mining and exploration industry (e.g. operational risks in development, exploration and production; delays or changes in plans with respect to exploration or development projects or capital expenditures; the uncertainty of reserve estimates; the uncertainty with respect to results of exploration, the uncertainty of estimates and projections relating to production and the uncertainty of the availability of capital). The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements. The Company does not undertake to update forward-looking statements except where required to do so by law.


SUBSCRIBE |
This email was sent to .com

Données et statistiques pour les pays mentionnés : Philippines | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Philippines | Tous

Mindoro Resources Ltd

EN DÉVELOPPEMENT
CODE : MIO.V
ISIN : CA6029131050
CUSIP : 602913105
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Mindoro Res. est une société d’exploration minière de nickel et de cuivre basée au Canada.

Mindoro Res. est en développement de projets de nickel, de cuivre, de cobalt et de fer aux Philippines, et détient divers projets d'exploration aux Philippines.

Son principal projet en développement est AGATA aux Philippines et ses principaux projets en exploration sont LOBO, ARCHANGEL, TAPIAN MAIN et TAPIAN SAN FRANCISCO aux Philippines.

Mindoro Res. est cotée au Canada, aux Etats-Unis D'Amerique, en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 1,5 millions CA$ (1,1 millions US$, 1,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 22 juin 2007 à 1,31 CA$, et son plus bas niveau récent le 05 juillet 2016 à 0,01 CA$.

Mindoro Res. possède 297 437 399 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Mindoro Resources Ltd
04/06/2012Releases Corporate Presentation for May 2012
Rapports annuels de Mindoro Resources Ltd
2008 Annual Report Available
Annual Report 2007
Financements de Mindoro Resources Ltd
17/12/2013Mindoro's JV Partner Enters into Definitive Agreements for T...
10/10/2012Results of Special Meeting and Provides Update on Private Pl...
01/10/2012TVI Pacific completes Tranche 1 of the Private Placement in ...
22/03/2012Mindoro Closes Private Placement for C$0.3M
12/03/2012Results of Special Meeting and Private Placement
02/02/2012Mindoro Closes Final Tranche of Private Placement
26/01/2012Receives Additional Private Placement Commitments of C$1.28M...
13/01/2012Mindoro Closes Second Tranche of Private Placement and Provi...
01/12/2011Mindoro completes first closing of Private Placement raising...
28/11/2011receives commitments for initial C$1.2 million under Private...
25/08/2009Closes Private Placement
19/08/2009Arranges Private Placement
19/02/2009Closes Private Placement; Planning Underway to Drill Americ...
14/01/2009Announces Private Placement
18/12/2008 Amends Price and Term of Purchase Warrants
Attributions d'options de Mindoro Resources Ltd
29/07/2010Issues Incentive Stock Options
06/08/2009 Issues Incentive Stock Options
03/11/2008Appoints Tosney an Advisor and Issues Incentive Stock Option...
03/11/2008Appoints Tosney An Advisor And Issues Incentive Stock Option...
Nominations de Mindoro Resources Ltd
02/07/2013Announces Director and Executive Appointments
06/06/2008Announces Executive Appointments
Projets de Mindoro Resources Ltd
13/03/2015(Agata)Agata Project Completes Two More High-Iron/Low Nickel DSO Sh...
28/04/2014(Agata)The Agata Mining Joint Venture Receives Declaration of Minin...
25/02/2014Mindoro Shareholder, Prime Resources, Increases Stake in Min...
21/10/2013Mindoro Provides an Update on the Agata High-Iron DSO Projec...
18/10/2013Mindoro's JV Partner Reports on Test Work Results for the Ag...
18/10/2013Mindoro Advises Variation To Agreement For The Sale Of Proje...
24/09/2013Mindoro Advises Further Economic Information for Agata DSO P...
23/09/2013(Agata)Renegotiates Option for Additional 25% in Agata Project
06/06/2013(Agata).: Agata Nickel Project Pilot Plant Commissioned, Operation ...
20/03/2013Mindoro Partner, TVI, Discusses Philippine Projects
19/02/2013Mindoro Provides an Update on the TVI Joint Venture Projects
27/09/2012Mindoro and TVI sign Joint Venture Agreements for Agata and ...
26/09/2012(Archangel)Releases Further Results from Archangel Gold Drilling Progra...
31/08/2012Mindoro Intersects 26.2m @ 4.07 g/t gold in First New Hole a...
06/07/2012Mindoro Announces TVI Pacific Strategic Investment and Propo...
04/01/2012(Archangel)Reports the Results of Drilling Gold Feeder-Structures at Ar...
09/12/2011(Archangel)on Archangel Gold Drilling Program, Results from First Hole
06/07/2011(Agata)Intersects Strong Nickel and Iron Grades at Agata South
08/06/2011China's Steel Production is Expected to Soar By Up to 25 Per...
05/05/2011(Pan De Azucar)Reports High Grade Copper Intersections and Thick Extensions...
01/04/2011(Pan De Azucar)Reports High-Grade Gold and Copper Intersections at Pan De A...
29/03/2011(Agata)RECEIVES FAVOURABLE ECONOMIC ASSESSMENT FOR AGATA NICKEL PRO...
28/02/2011(Pan De Azucar)Announces Strong Gold-Copper Drill Results at Pan De Azucar ...
24/01/2011(Bolobolo)Drills Further Strong Nickel Intersections from Bolobolo
15/01/2011(Bolobolo)Drills Further Strong Nickel Intersections and Acquires New ...
12/01/2011(Bolobolo)Drills Strong Nickel Intersections of Potential Economic Int...
24/08/2010(Agata)Announces Increased Nickel Resources
10/08/2010(Agata)Completes Agata Nickel Drilling; Higher-Grades Intersected
23/06/2010(Agata)Announces Further Nickel Laterite Intersections at Agata
14/09/2009(Kay Tanda)Looks to Maximize Value from Kay Tanda Gold Project as Avoce...
25/09/2009(El Paso)Gold Fields Commences Drilling on Mindoro's El Paso Copper-G...
01/09/2009(El Paso)Gold Fields Provides Further Update On Progress On The Batan...
06/08/2009(Agata)Drilling To Commence At American Tunnels
16/12/2008(Agata)Final Resource Estimate Released for Agata North Nickel Late...
17/11/2008(Agata)Extensive Copper Mineralization from Mindoro's American Tunn...
16/09/2008(Agata)Reports Further Drill Results From Agata Nickel Laterite Pro...
04/09/2008(Agata) Reports Further Drill Results from Agata Nickel Laterite Pr...
04/09/2008(Agata)Reports Further Drill Results From Agata Nickel Laterite Pro...
19/08/2008(Agata)Reports Further Excellent Drill Results From Agata Nickel La...
12/08/2008(Agata)d Resource Estimate Released For Agata North Nickel Laterite...
29/07/2008(Agata)Reports Further Drill Results From Nickel Laterite Project
16/07/2008(Agata)Drill Results From Agata North Nickel Laterite Project
12/05/2008(Agata)Artisanal Miners Expose High-Grade, Porphyry-Related Copper ...
30/04/2008(Agata) Starter Resource Estimates Released for Agata North Nickel ...
Communiqués de Presse de Mindoro Resources Ltd
02/05/2016Mindoro Files Annual Audited Financial Statements
01/09/2015Second Quarter Results and Board and Management Changes
01/09/2015Mindoro Resources Ltd.: Second Quarter Results and Board and...
08/07/2015Mindoro Announces that Prime Resources Holdings, Inc. has be...
10/04/2015Mindoro JV Completes Three Nickel Laterite DSO Shipments in ...
13/03/2015Mindoro's Agata Project Completes Two More High-Iron/Low Nic...
30/01/2015Mindoro Announces Extension To Bridge Loan Maturity Date
09/01/2015Mindoro Joint Venture Completes Two Additional Shipments of ...
17/12/2014Mindoro Announces $500,000 Financing Arrangement
10/12/2014Mindoro Joint Venture Completes Third DSO Shipment from Agat...
03/12/2014Mindoro Advises Results From Annual And Special Shareholders...
02/12/2014Mindoro Advises Results from Annual and Special Shareholders...
02/12/2014Mindoro's Agata Mining JV to Ship Higher Grade DSO and Provi...
02/12/2014Mindoro Announces Resource Definition Drill Program at Agata...
02/12/2014Mindoro Announces Negotiations For Bridge Loan And Convertib...
28/11/2014Mindoro Announces Negotiations for Bridge Loan and Convertib...
27/11/2014Mindoro Announces Resource Definition Drill Program at Agata...
26/11/2014Mindoro's Agata Mining JV to Ship Higher Grade DSO and Provi...
25/11/2014Mindoro Joint Venture Nears Completion of Definitive Feasibi...
20/11/2014Mindoro Joint Venture Acquires US$8 Million Loan for Agata P...
18/11/2014Mindoro Joint Venture Completes Second DSO Shipment
23/10/2014Mindoro Announces Changes to Board of Directors
23/10/2014Mindoro Announces Completion of First DSO Shipment at Agata
16/10/2014Mindoro Announces Start of DSO Shipping From Agata Project
30/09/2014Mindoro Announces Director and Corporate Secretary Appointme...
30/09/2014Mindoro Adopts Advance Notice Bylaw
29/08/2014Mindoro Announces Board and Management Changes
15/08/2014Mindoro Signs Agreements for Additional 25% in Agata and Tap...
17/06/2014Mindoro Sets Date for Annual and Special Meeting
28/05/2014Mindoro Applies to Delist From ASX
05/05/2014Mindoro Repays Loan
28/04/2014The Agata Mining Joint Venture Receives Declaration of Minin...
20/02/2014Mindoro's 100 Million Red Mountain Shares to be Released fro...
10/12/2013Mindoro Arranges Bridging Loan
24/10/2013Mindoro'S JV Partner Announces Third-Party Investment Opport...
18/10/2013Advises Variation to Agreement for the Sale of Projects to R...
01/10/2013Mindoro Advises Results From Annual And Special Shareholders...
01/10/2013Advises Results from Annual and Special Shareholders Meeting
10/09/2013(Agata)TVI Pacific Inc. and Mindoro Resources Ltd. Announce Robust ...
02/07/2013Mindoro Announces Director And Executive Appointments
24/06/2013Mindoro Secures up to $1.3m Loan and Amends Earn-In Terms
24/06/2013Secures Up to $1.3M Loan and Amends Earn-in Terms
11/04/2013(Agata).: New Resource Estimate for Agata North Provides a Strong F...
11/02/2013Red Mountain Mining Discloses New Mineral Resource Estimates...
31/10/2012Completes A$10 Million Sale of Philippines Gold and Copper-G...
07/09/2012Mindoro Provides Further Update on the Proposed TVI Transact...
07/09/2012Provides Further Update on the Proposed TVI Transaction
05/09/2012Red Mountain Mining Shareholders Approve Purchase of Mindoro...
27/07/2012Mindoro Draws Funding from Red Mountain Mining to Commence D...
23/07/2012Mindoro Signs Gold Assets Sale Agreement with Red Mountain M...
25/06/2012Mindoro Provides Update on Red Mountain Mining Transaction
29/05/2012Mindoro Proposes Major Restructure of Philippines Assets
01/05/2012Mindoro Files First Quarter 2012 Financial Results and Provi...
08/02/2012(Pan De Azucar)Releases Pan de Azucar Exploration Target and Positive Metal...
30/07/2011MAKES ORGANIZATIONAL CHANGES TO POSITION COMPANY FOR KEY GRO...
28/07/2011RECEIVES POSITIVE THERMAL UPGRADE TEST RESULTS
26/07/2011CEO Discusses Copper-Gold Results and Updates Nickel Program...
20/07/2011(Lobo)Intersects High-Grade Copper at Pan De Azucar and Plans to D...
07/06/2011ADVISES ON VOTING PROCEDURES AND EXTENDS INVITATION TO AGM
03/06/2011?S CEO PROVIDES AUDIO PRESENTATION ON BOARDROOM R
01/06/2011TO BE FEATURED BY CEO CLIPS ON THE DOCUMENTARY CHANNEL
25/05/2011(Bolobolo)ANNOUNCES FINAL STRONG NICKEL INTERSECTIONS FROM BOLOBOLO
17/05/2011(Pan De Azucar)REPORTS 76 METERS OF COPPER-GOLD IN STEP OUT HOLE AT PAN DE ...
21/04/2011(Agata)Commences Agata Nickel Pre-Feasibility Study and Makes Key A...
30/03/2011(Pan De Azucar)CEO Discusses Agata and Pan De Azucar on Boardroom Radio
22/03/2011(Bolobolo)Drills Further Strong Nickel Intersections from Bolobolo
02/03/2011Releases Fourth Quarter Activity and Financial Results for 2...
15/07/2010IFC To Invest CAD$2.1 Million In Mindoro
06/07/2010Awarded Commendation by Philippines Government for Coastal M...
22/06/2010Results of Mindoro Annual General Meeting
14/06/2010Reminder for Investor Luncheon for Mindoro Resources Ltd.
14/06/2010IFC Posts Summary of Proposed Investment
09/06/2010Announces Proposed IFC Investment
07/06/2010Invitation to Mindoro AGM
01/06/2010Gold Fields Commence Drilling Mindoro's Lobo Copper-Gold Tar...
02/08/2009Retains Senergy Communications For Investor Relations Servic...
08/07/2009Update on Progress on the Batangas Joint Ventures
02/06/2009Sumitomo's Palawan nickel plant starts full-scale operation
24/02/2009will be exhibiting at the Prospectors and Developers Associa...
11/02/2009Japanese Eye Philippines' Resources
05/02/2009Drilling Commences On Mindoro'S Kay Tanda Gold Resource
13/01/2009 Announces Director and Advisory Board Changes
13/01/2009Announces Director And Advisory Board Changes
09/01/2009Shareholder Letter
26/11/2008LOOMING FERTILIZER SHORTAGE
25/11/2008: Valderama Massive Pyritic Sulphide Prospect to be Evaluate...
10/11/2008Joint Ventures on Track for 2009
26/09/2008Announces Proposed IFC Investment
23/09/2008And Avocet Announce Joint Venture On Archangel Project
19/09/2008Retains Richmond Club
03/09/2008And Gold Fields Sign Letter Of Agreement On Three Batangas P...
14/08/2008Results of Mindoro Annual General Meeting
15/05/2008Creates Unique Partnership with Small-Scale Miners in the Ph...
02/04/2008Signs Benefits Sharing Agreement With Indigenous Community
01/04/2008at the 2008 Calgary Resource Investment Conference
31/03/2008at the 2008 Rohstoffmesse (Invest Stuttgart) Conference
27/03/2008Mindoro Subsidiary Launches New Website
26/03/2008 Management and Board Changes
25/03/2008Update on Mindoro's Nickel Laterite Projects
26/02/2008Expanded Nickel Laterite Resource Potential Enhances Foundat...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (MIO.V)FRANKFURT (OLM.F)
0,005+0.00%0,005+0.00%
TSX-V
CA$ 0,005
05/07 11:39 -
0%
Cours préc. Ouverture
0,010 0,010
Bas haut
0,005 0,010
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,005 -50,00%
Volume var. 1 mois
220 525 -50,00%
24hGold TrendPower© : -37
Produit
Développe Cobalt - Iron - Nickel
Recherche Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,64%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,63 CA$-2,23%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,27 CA$+4,33%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,72 US$+0,20%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :