Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Seabridge Gold Inc.

Publié le 08 octobre 2013

Moving Deep Kerr Towards High-Grade Resource

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Dollar | Potassium | Report |
Marketwired
 
 
Seabridge Gold Inc.
TSX: SEA
NYSE: SA
Other Recent News | Printer Friendly Version

October 8, 2013
Seabridge Gold Moving Deep Kerr Towards High-Grade Resource
New intercepts include 315 meters of 0.65% copper and 0.45 g/T gold
TORONTO, CANADA--(Marketwired - Oct. 8, 2013) - Seabridge Gold (TSX:SEA) (NYSE:SA) announced today it has received additional exceptional drill results from the high-grade Deep Kerr core zone, confirming the likelihood of being able to calculate a sizeable resource estimate for the new discovery after just one season of drilling. Of 29 holes drilled at Deep Kerr this summer, 26 have hit the high-grade zone. Assays have been received to date for 15 of these 26 holes; all 15 have intersected wide intervals grading at or above 0.5% copper and 13 have major intercepts averaging above 0.6% copper.

Five diamond core drill rigs were deployed on the Deep Kerr target during most of the field season, generating 24,000 meters of core. Initially, the program explored the dip projection of the 1,800 meter long Kerr deposit. Preliminary evaluation of the target indicates that the strike potential of the core zone is at least 1,600 meters long, between 200 and 300 meters wide and at least 700 meters vertically; however Deep Kerr remains open along strike and vertically. In August, drilling was focused on about 1,000 meters of the strike potential to generate data for an initial resource estimate.

The Deep Kerr core zone is defined by a distinctive set of minerals and textures that include:

--  Anhydrite, potassium feldspar and magnetite as alteration minerals. 
--  Abundant chalcopyrite and locally bornite with an observable decrease in
    pyrite. 
--  Intense fine shattering of quartz veins filled with copper minerals.
 
These features can be traced over the 1,000 meters of strike and 700 meters of vertical projection where drilling was concentrated during the season. Within the defined core zone, copper concentrations typically exceed 0.5% while the inner bornite-rich zone typically grades more than 1.0% copper. Gold concentrations, which are generally lower in the Kerr deposit, are significantly higher within the Deep Kerr core zone. Additional drilling will be required to determine if grades improve up-dip or down-dip from the 700 meter high vertical dimension drilled to date.

Chairman and CEO, Rudi Fronk commented that "the consistency of the Deep Kerr zone is surprising and very gratifying. Although much work needs to be done, deposits like this lend themselves to efficient and cost-effective mining. The grade continues to exceed our expectations and the overall size appears to be much larger than we originally anticipated."

Assay results from the next three core holes drilled at Deep Kerr this year are:

----------------------------------------------------------------------------
            Total                                              Copper Silver
 Hole ID    Depth     From      To      Thickness  Gold Grade  Grade   Grade
          (meters)  (meters) (meters)   (meters)      (g/T)     (%)    (g/T)
----------------------------------------------------------------------------
K-13-23C    1278      908.9   1224.4      315.5       0.45      0.65    1.2 
----------------------------------------------------------------------------
            1407      886.4   1043.4      157.0       0.56      0.50    2.5 
K-13-28A  including   907.9    974.5      66.6        0.71      0.65    3.1 
----------------------------------------------------------------------------
            1113                                                            
 K-13-31  including   421.9    670.4      248.5       0.39      0.77    2.0 
                    --------------------------------------------------------
                      519.2    624.4      105.2       0.66      1.11    2.2 
----------------------------------------------------------------------------
 
Drilling at Deep Kerr is employing state-of-the-art directional drilling tools operated by TECH Directional Services that enable additional holes to be started part way down a previously drilled hole. The Devico directional core barrel provided by TECH ensures that the new hole deviates from the first in a predictable manner to provide multiple intersections of the target, off-set from the original intercept. This technology significantly reduces the amount of drilling required to achieve a new intercept of the target zone as the top 400 to 800 meters of the hole is not re-drilled. The above-reported drill holes with a letter designation after the hole number represent wedged drill holes completed from holes that have been previously reported (i.e. K-13-23 and K-13-28). Drill hole K-13-23C was wedged from K-13-23 at 500 meters. Hole K-13-28A was wedged at 550 meters from K-13-28.

The above-reported drill holes were designed to intersect mineralized zones as close as technically feasible to a perpendicular angle to their strike. Therefore, the true widths of this mineralization are believed to be 75% or greater of the reported intercepts. (For a drill location map and cross sections of Deep Kerr, see http://www.seabridgegold.net/DKmap4.pdf.

During the 2013 program, one hole, K-13-27, was terminated before intersecting the core zone. This hole did not deviate as expected and would not have been suitable for subsequent directional drilling. It was re-started and completed as drill hole K-13-28. Drill hole K-13-33 could not get through a fault zone and was abandoned; it was redrilled as K-13-34 and assays are pending. The southern limit for this year's program was established by drill hole K-13-26. The characteristic mineralogy and textures of the Deep Kerr core zone were not encountered in this drill hole and copper grades were low. Time constraints did not permit further investigation of this part of the system. K-13-26 could terminate the mineral system to the south but additional work is required to reach this conclusion. The system does extend an unknown distance to the north.

The KSM Project contains one of the largest undeveloped gold and copper reserves in the world. Its composite intrusive complex hosts four distinct hydrothermal cells that each produced large gold-copper porphyry deposits. Several of these hydrothermal cells show a direct genetic link to epithermal vein deposits including the neighboring Brucejack/Valley of the Kings development owned by Pretium Resources. The KSM mining district was joined to the North American continent well after the mineralizing event creating enormous deformation of the rocks that host deposits. As a consequence of this deformation the porphyry systems have been significantly modified and partly concealed. Seabridge continues to unravel this complex history of the district in order to discover additional mineralizing systems.

Proven and probable reserves at KSM are as follows:

----------------------------------------------------------------------------
----------------------------------------------------------------------------
                     Reserve    Tonnes             Average Grades           
 Project     Zone    Category (millions)                                    
                                        ------------------------------------
                                           Gold    Copper   Silver    Moly  
                                          (gpt)     (%)     (gpt)    (ppm)  
----------------------------------------------------------------------------
----------------------------------------------------------------------------
KSM        Mitchell   Proven     476       0.67     0.17     3.05     60.9  
                    --------------------------------------------------------
                     Probable    935       0.57     0.16     3.11     50.7  
         -------------------------------------------------------------------
           Iron Cap  Probable    193       0.45     0.20     5.32     21.5  
         -------------------------------------------------------------------
          Sulphurets Probable    318       0.59     0.22     0.79     50.6  
         -------------------------------------------------------------------
             Kerr    Probable    242       0.24     0.45     1.2      0.0   
----------------------------------------------------------------------------
----------------------------------------------------------------------------
KSM Totals            Proven     476       0.67     0.17     3.05     60.9  
                    --------------------------------------------------------
                     Probable   1,688      0.51     0.22     2.65     40.1  
                    --------------------------------------------------------
                      Total     2,164      0.55     0.21     2.74     44.7  
----------------------------------------------------------------------------
----------------------------------------------------------------------------

----------------------------------------------------------------------------
----------------------------------------------------------------------------
                     Reserve    Tonnes             Contained Metal          
 Project     Zone    Category (millions)                                    
                                        ------------------------------------
                                           Gold    Copper   Silver    Moly  
                                         (million (million (million (million
                                         ounces)  pounds)  ounces)  pounds) 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
KSM        Mitchell   Proven     476         10.3    1,798       47       64
                    --------------------------------------------------------
                     Probable    935         17.2    3,296       93      104
         -------------------------------------------------------------------
           Iron Cap  Probable    193          2.8      834       33        9
         -------------------------------------------------------------------
          Sulphurets Probable    318          6.0    1,535        8       35
         -------------------------------------------------------------------
             Kerr    Probable    242          1.9    2,425        9        0
----------------------------------------------------------------------------
----------------------------------------------------------------------------
KSM Totals            Proven     476         10.3    1,798       47       64
                    --------------------------------------------------------
                     Probable   1,688        27.9    8,090      144      149
                    --------------------------------------------------------
                      Total     2,164        38.2    9,888      191      213
----------------------------------------------------------------------------
----------------------------------------------------------------------------
 
Exploration activities at KSM are being conducted by Seabridge personnel under the supervision of William E. Threlkeld, Senior Vice President of Seabridge and a Qualified Person as defined by National Instrument 43-101. Mr. Threlkeld has reviewed and approved this news release. An ongoing and rigorous quality control/quality assurance protocol is being employed during the 2013 program including blank and reference standards in every batch of assays. Cross-check analyses are being conducted at a second external laboratory on 10% of the samples. Samples are being assayed using fire assay atomic adsorption methods for gold, total digestion ICP methods for other elements, and atomic adsorption methods for Cu, Ag, Mo, Pb, Zn and As on samples with greater than 0.5% Cu, by ALS Minerals Canada Ltd. in North Vancouver, B.C.

Seabridge holds a 100% interest in several North American gold resource projects. The Company's principal assets are the KSM property located near Stewart, British Columbia, Canada and the Courageous Lake gold project located in Canada's Northwest Territories. For a breakdown of Seabridge's mineral reserves and resources by project and category please visit the Company's website at http://www.seabridgegold.net/resources.php.

All reserve and resource estimates reported by the Corporation were calculated in accordance with the Canadian National Instrument 43-101 and the Canadian Institute of Mining and Metallurgy Classification system. These standards differ significantly from the requirements of the U.S. Securities and Exchange Commission. Mineral resources which are not mineral reserves do not have demonstrated economic viability.

This document contains "forward-looking information" within the meaning of Canadian securities legislation and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995. This information and these statements, referred to herein as "forward-looking statements" are made as of the date of this document. Forward-looking statements relate to future events or future performance and reflect current estimates, predictions, expectations or beliefs regarding future events and include, but are not limited to, statements with respect to: (i) the core zone being minable efficiently and cost-effectively; (ii) the potential fo the core zone to extend along strike and vertically; (iii) the generation of a sizeable resource estimate for the deposit later this year; (iv) the proximity of the intercepts to true widths; (v) the estimated amount and grade of mineral reserves and mineral resources; (vi) estimates of capital costs of constructing mine facilities and bringing a mine into production, including financing payback periods; (vii) the amount of future production; and (vii) estimates of operating costs, net cash flow and economic returns from an operating mine. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "plans", "projects", "estimates", "envisages", "assumes", "intends", "strategy", "goals", "objectives" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements.

All forward-looking statements are based on Seabridge's or its consultants' current beliefs as well as various assumptions made by them and information currently available to them. These assumptions include: (i) the presence of and continuity of metals at the Project at modeled grades; (ii) the capacities of various machinery and equipment; (iii) the availability of personnel, machinery and equipment at estimated prices; (iv) exchange rates; (v) metals sales prices; (vi) appropriate discount rates; (vii) tax rates and royalty rates applicable to the proposed mining operation; (viii) financing structure and costs; (ix) anticipated mining losses and dilution; (x) metallurgical performance; (xi) reasonable contingency requirements; (xii) success in realizing proposed operations; (xiii) receipt of regulatory approvals on acceptable terms, including the necessary right of way for the proposed tunnels; and (xiv) the negotiation of satisfactory terms with impacted Treaty and First Nations groups. Although management considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect. Many forward-looking statements are made assuming the correctness of other forward looking statements, such as statements of net present value and internal rates of return, which are based on most of the other forward-looking statements and assumptions herein. The cost information is also prepared using current values, but the time for incurring the costs will be in the future and it is assumed costs will remain stable over the relevant period.

By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions do not reflect future experience. We caution readers not to place undue reliance on these forward-looking statements as a number of important factors could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates assumptions and intentions expressed in such forward-looking statements. These risk factors may be generally stated as the risk that the assumptions and estimates expressed above do not occur, but specifically include, without limitation: risks relating to variations in the mineral content within the material identified as mineral reserves or mineral resources from that predicted; variations in rates of recovery and extraction; developments in world metals markets; risks relating to fluctuations in the Canadian dollar relative to the US dollar; increases in the estimated capital and operating costs or unanticipated costs; difficulties attracting the necessary work force; increases in financing costs or adverse changes to the terms of available financing, if any; tax rates or royalties being greater than assumed; changes in development or mining plans due to changes in logistical, technical or other factors; changes in project parameters as plans continue to be refined; risks relating to receipt of regulatory approvals or settlement of an agreement with impacted First Nations groups; the effects of competition in the markets in which Seabridge operates; operational and infrastructure risks and the additional risks described in Seabridge's Annual Information Form filed with SEDAR in Canada (available at www.sedar.com) for the year ended December 31, 2012 and in the Corporation's Annual Report Form 40-F filed with the U.S. Securities and Exchange Commission on EDGAR (available at www.sec.gov/edgar.shtml). Seabridge cautions that the foregoing list of factors that may affect future results is not exhaustive.

When relying on our forward-looking statements to make decisions with respect to Seabridge, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. Seabridge does not undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by Seabridge or on our behalf, except as required by law.

ON BEHALF OF THE BOARD

Rudi Fronk, Chairman and CEO

(To unsubscribe from our private distribution list, please send an e-mail to gloria@seabridgegold.net)

CONTACT INFORMATION:
Seabridge Gold Inc.
Rudi P. Fronk
Chairman and CEO
(416) 367-9292
Fax: (416) 367-2711
info@seabridgegold.net
www.seabridgegold.net
INDUSTRY: Manufacturing and Production - Mining and Metals
.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Seabridge Gold Inc.

EN DÉVELOPPEMENT
CODE : SA
ISIN : CA8119161054
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Seabridge Gold est une société développant des projet miniers d'or basée au Canada.

Seabridge Gold est en développement de projets d'or, d'argent, de cuivre et de molybdène au Canada, et détient divers projets d'exploration au Canada.

Ses principaux projets en développement sont COURAGEOUS LAKE, SULPHURETS, KERR (KSM), RED MOUNTAIN, QUARTZ MOUNTAIN et MITCHELL ZONE au Canada et ses principaux projets en exploration sont KING'S RIVER, CASTLE-BLACK ROCK et HOG RANCH au Canada.

Seabridge Gold est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 882,1 millions US$ (772,7 millions €).

La valeur de son action a atteint son plus bas niveau récent le 29 décembre 2000 à 0,12 US$, et son plus haut niveau récent le 16 avril 2024 à 15,35 US$.

Seabridge Gold possède 57 467 118 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Seabridge Gold Inc.
31/07/2009Singular Research initiates coverage of Seabridge Gold
07/07/2009Seabridge Continues to Successfully Monetize its Non-Core As...
16/06/2009Two Long-Term Pit Scenarios Emerge for Seabridge’s KSM Proje...
12/03/2009Expands World-Class Mitchell Deposit at its KSM Project
03/02/2009Hunting the Big Game: Emerging Miners with Big Project Value...
29/04/2008Seabridge Gold to move KSM project towards feasibility
27/03/2008Seabridge Gold rating strong buy in update;
30/01/2008Seabridge Increases Resource Estimate at Noche Buena;
11/01/2008Seabridge Increases Resource Estimate at Kerr-Sulphurets
Dans les médias de Seabridge Gold Inc.
16/11/2016Seabridge Gold drilling supports expansion of deep Kerr Mine...
08/04/2010Seabridge: Taking It To The Shorts
13/11/2008Follow up N° 6
Rapports annuels de Seabridge Gold Inc.
Annual Report Available for Seabridge Gold
2009 Annual Report
2007 Annual Report
2006 Annual Report
2003 Annual Report
Financements de Seabridge Gold Inc.
30/06/2011Royal Gold and Seabridge Close Private Placement/Royalty Par...
22/06/2011Golden Predator and Seabridge Gold Agree to Contribute Selec...
17/06/2011Royal Gold and Seabridge Agree to PrivatePlacement/Royalty P...
Nominations de Seabridge Gold Inc.
05/01/2012Appoints Vice President, Corporate Affairs
05/04/2011Announces Transition in Chief Financial Officer Position
14/02/2011Seabridge Hires hired Jay S. Layman Executive Vice President...
Rapports Financiers de Seabridge Gold Inc.
14/11/2013Files Third Quarter Report to Shareholders and Its Financial...
14/05/2013Publishes 2012 Annual Reportand Files First Quarter 2013 Fin...
16/05/2012Publishes 2011 Annual Reportand Files First Quarter 2012 Fin...
16/08/2011Files Second Quarter 2011 Financial Statements and MD&A
01/04/2011Files Year End Audited Financial Statements and MD&A
09/08/2010Files Second Quarter 2010 Financial Statements and MD&A
12/11/2009Files Third Quarter 2009 Financial Statements and MD&A
13/08/2009Files Second Quarter 2009 Financial Statements and MD&A
06/04/2009Precious Metal Developers Outperform Gold-Silver in First Qu...
13/11/2008Files Third Quarter Financial Statements and MD&A
14/08/2008Files Second Quarter Financial Statements and MD&A
09/05/2008Files First Quarter Financial Statements and MD&A
Projets de Seabridge Gold Inc.
07/04/2015Seabridge Gold Reports Large New Resource at KSM's Iron Cap ...
07/04/2015Seabridge Gold Reports Large New Resource at KSM's Iron Cap ...
07/04/2015Seabridge Gold Reports Large New Resource at KSM's Iron Cap ...
07/04/2015Seabridge Gold Reports Large New Resource at KSM's Iron Cap ...
07/04/2015Seabridge Gold Reports Large New Resource at KSM's Iron Cap ...
07/04/2015Seabridge Gold Reports Large New Resource at KSM's Iron Cap ...
07/04/2015Seabridge Gold Reports Large New Resource at KSM's Iron Cap ...
18/02/2014Initial Resource Estimate for Seabridge
12/11/2013Reports Final Results from Highly Significant Deep Kerr Disc...
08/10/2013Moving Deep Kerr Towards High-Grade Resource
24/09/2013Finds Strong Continuity of Higher Grade Material at Deep Ker...
23/09/2013Gitxsan Nation Expresses Support for Seabridge Gold's KSM Pr...
10/09/2013Intercepts Rich Bornite Zone at KSM Project
20/08/2013Closes In On Second High-Grade Core Zone Discovery at KSM
13/05/2013New Walsh Lake Drilling Improving SeabridgeGold's Courageous...
12/12/2012Plans $15M Drill Campaign Targeting High-Grade at KSM
08/11/2012Discovers Large, High-Grade Copper Zone at KSM
16/10/2012Seabridge's Walsh Lake Discovery Delivers More High-Grade Go...
27/09/2012Narrows Search for KSM High-Grade Core
10/09/2012Seabridge Discovers High Grade Gold Occurrence at Courageous...
11/07/2012unveils KSM project website
14/05/2012New Preliminary Feasibility Study Improves Seabridge Gold's ...
15/03/2012Seabridge to Option Red Mountain Project to Banks Island Gol...
14/03/2012(Courageous Lake)Commences 2012 Exploration Program at Courageous Lake
08/02/2012(Kerr (ksm))2011 Drilling Upgrades and Grows Resources at Seabridge Gold...
10/01/2012Seabridge Adds More Than 1 Million Ouncesof M&I Gold Resourc...
04/01/2012(Kerr (ksm))Drilling at Seabridge Gold's Kerr DepositYields Significant ...
01/12/2011(Kerr (ksm))Revises KSM Permitting Schedule to Accommodate Improved Desi...
29/11/2011New Gold Zone to Expand Seabridge's Courageous Lake Project
24/10/2011(Quartz Mountain)Options Quartz Mountain Project to Orsa Ventures
22/09/2011(Mitchell Zone)New Drilling Supports Partial Underground Scenario at Seabri...
12/09/2011(Courageous Lake)Drilling Confirms Likely Resource Enhancements at Seabridge ...
09/08/2011(Courageous Lake)Drilling Upgrades and Expands Gold Resources at Seabridge's ...
27/07/2011(Sulphurets)Continued Drilling Success at Seabridge Gold's Sulphurets De...
20/06/2011Files Preliminary Feasibility Study for KSM Project
09/06/2011(Kerr (ksm))2011 Drill Program Underway at Seabridge Gold's KSM Project
02/06/2011(Courageous Lake)New Preliminary Assessment Completed for Seabridge Gold's Co...
09/05/2011(Kerr (ksm))and Pretium Sign Agreements on Cooperation
30/03/2011(Courageous Lake)Moving Courageous Lake Towards Preliminary Feasibility
23/03/2011(Grassy Mountain)Options Grassy Mountain Project to Calico Resources
16/02/2011(Kerr (ksm))Resources Continue to Grow at Seabridge Gold's KSM Project
08/02/2011(Kerr (ksm))Reports Major New Gold/Copper Resource at KSM's Iron Cap Zon...
25/01/2011(Courageous Lake)Seabridge Improves Size, Grade and Quality of Courageous Lak...
27/09/2010(Courageous Lake)Drills Upgrading Large Resource at Seabridge Gold's Courageo...
08/09/2010(Kerr (ksm))Drilling Expands and Upgrades KSM Project
09/06/2010(Kerr (ksm))Permitting Progresses at Seabridge Gold's KSM Project
27/05/2010(Kerr (ksm))Drilling Commences at Seabridge Gold's KSM Project
15/03/2010(Kerr (ksm))Independent Review Confirms Resource Estimates for Seabridge...
27/01/2010(Mitchell Zone)Files NI-43-101 Technical Report for KSM Project
21/12/2009Reports on Progress of KSM Preliminary Feasibility Study
23/11/2009(Kerr (ksm))Permitting Progresses at Seabridge Gold's KSM Project
03/11/2009(Kerr (ksm))Reports Positive Drill Results From Kerr Zone
10/09/2009(Kerr (ksm))2009 Drill Program Nearing Completion at Seabridge Gold's KS...
08/09/2009(Kerr (ksm))Completes Land Expansion at KSM Project
13/08/2009Expands Land Position at KSM Project
26/06/2009(Red Mountain)Agrees to Sell Red Mountain Project for C$12 Million
10/06/2009(Mitchell Zone)Reports Updated Open Pit Scenarios for KSM Project
11/03/2009(Mitchell Zone)Reports Major Expansion of Mitchell Resource
07/01/2009(Sulphurets)Reports Final 2008 Drill Results From Sulphurets Zone
22/12/2008(Kerr (ksm))Reports Final 2008 Drill Results From Mitchell Zone
04/06/2008(Kerr (ksm))15,000 Meter Drill Program Begins at Seabridge Gold's KSM Pr...
29/04/2008(Sulphurets)Project Description Report Filed for Seabridge Gold's KSM Pr...
25/03/2008(Kerr (ksm)) to Drill 15,000 Meters at KSM Project in 2008
10/03/2008(Courageous Lake)Economic Assessment Completed for Seabridge Gold's Courageou...
20/02/2008(Kerr (ksm))New NI 43-101 Resource Estimate Completed for Seabridge Gold...
10/01/2008(Sulphurets) Resource Estimates for Seabridge's Kerr and Sulphurets Gold...
19/12/2007(Kerr (ksm))Mitchell Gold-Copper Deposit Continues to Expand
Communiqués de Presse de Seabridge Gold Inc.
02/08/2016Seabridge Gold's Design of KSM Project's Tailing Management ...
30/06/2016Seabridge Gold Reports on Results of Annual Meeting of Share...
22/06/2016EDGAR
21/06/2016Seabridge Gold Completes Acquisition of SnipGold Corp.
16/06/2016ISS and Glass Lewis Recommend SnipGold Shareholders Vote FOR...
16/06/2016SnipGold Shareholders Overwhelmingly Approve Arrangement
09/06/2016Gold Pulls Back As Near Term Traders Book Profits
06/06/2016ISS and Glass Lewis Recommend SnipGold Shareholders Vote FOR...
18/12/2015Technical Data on Gold Stocks -- Harmony Gold Mining, Sandst...
24/11/2015Investors Of Bellatrix Exploration Ltd (BXE) Go Exploring Fo...
06/11/2015Seabridge's Rudi Fronk Interviewed by The Gold Report
03/11/2015EDGAR
03/11/2015Seabridge Gold Expects This Year's Deep Kerr Drill Results t...
08/10/2015Seabridge Gold Arranges a $14.6 Million Non-Brokered Private...
07/10/2015Seabridge Gold Drilling Continues to Grow Higher Grade Deep ...
01/10/2015An Interview With Seabridge Gold's Rudi Fronk
28/08/2015Seabridge Gold's Stock Could Hit $14, Another Deposit Site E...
26/08/2015Seabridge Gold Drilling Confirms Major Extension of KSM's De...
13/08/2015Seabridge Gold Files Second Quarter 2015 Report to Sharehold...
04/08/2015Seabridge Gold Pilot Plant Successfully Treats Selenium in K...
28/07/2015EDGAR
28/07/2015Seabridge Gold Finds Extension of KSM's Mitchell Deposit at ...
08/07/2015How To Profit From Low Oil Prices: An Energy Takeout Targets...
07/04/2015Seabridge Gold Closes $16.4 Million Bought Deal Flow-Through...
25/03/2015EDGAR
25/03/2015Seabridge Gold Reports Large New Resource at KSM's Iron Cap ...
23/03/2015Seabridge Gold Reports 52% Resource Expansion for KSM's Deep...
20/03/2015Ferrellgas, Prothena Lead Friday's After-Hours Movers
16/03/2015Seabridge Gold Files Form 40-F with the SEC
13/03/2015Seabridge Gold Files 2014 Year End Audited Financial Stateme...
13/03/2015Seabridge Gold Files 2014 Year End Audited Financial Stateme...
10/03/2015Seabridge Gold Arranges a $14.2 Million Bought Deal Flow-Thr...
10/03/2015Seabridge Gold Arranges a $14.2 Million Bought Deal Flow-Thr...
26/01/2015Independent Geotechnical Review Board Established for KSM Pr...
26/01/2015Independent Geotechnical Review Board Established for KSM Pr...
22/12/2014Seabridge Gold's KSM Project Receives Positive Federal EA De...
22/12/2014Seabridge Gold's KSM Project Receives Positive Federal EA De...
15/12/2014Mid-Morning Market Update: Markets Open Higher; BC Partners ...
28/11/2014Seabridge Gold Renews Shelf Prospectus and Refiles Certain D...
28/11/2014Seabridge Gold Renews Shelf Prospectus and Refiles Certain D...
28/11/20145 Top Analyst Stocks That Could Double In Price
14/11/2014Seabridge Gold Files Third Quarter Report to Shareholders an...
16/10/2014Seabridge Gold Drilling Builds Resource Potential at KSM's I...
04/02/2014Seabridge Gold Reports Sale of Grassy Mountain NPI Not Proce...
30/01/2014Seabridge Gold continues support of education in Northwester...
14/01/2014Seabridge Drilling Improving Size and Grade
19/12/2013Richard Kraus Appointed a Director of Seabridge Gold
10/12/2013Seabridge Closes $16.8 Million Flow-Through
05/11/2013Drills Spectacular Intercept Within Deep Kerr Deposit at KSM
29/10/2013Deep Kerr Continues to Grow
25/10/2013(Quartz Mountain)Alamos Gold Makes $2 Million Option Payment to Seabridge Gol...
13/08/2013Nisga'a Nation and Seabridge Gold ConfirmAgreement in Princi...
12/08/2013Seabridge Discovers Large, Higher-Grade Copper-Gold Core Zon...
27/06/2013Reports on Results of Annual Meeting of Shareholders
11/06/2013at Singular Research's conference June 13
05/06/2013Seabridge Hires Senior Vice President of Technical Services
04/06/2013KSM Environmental Assessment Application Accepted for Review
24/05/2013Acquires Shares of Wolfpack Gold Corp. Under RTO
22/05/2013Begins Drilling for High Grade at KSM
16/05/2013Seabridge Reports Excellent Gold Recoveries from Walsh Lake ...
09/04/2013The Gold Market
27/03/2013Files 2012 Year End Audited Financial Statements and MD&A
04/02/2013=?ISO-8859-1?Q?Seabridge=20Gold=20contributes=20=24100,000=2...
01/02/2013Filing KSM Environmental Assessment and Environmental Impact...
16/01/2013Seabridge Expands Camp Zone High Grade Gold Deposit at KSM
12/11/2012Nov 14th Presentation & Webcast
01/10/2012Presents at the John Tumazos Conference
17/09/2012American Creek Receives Notice of Application from Seabridge...
07/09/2012Time change: Seabridge Gold at Denver Gold Forum
07/09/2012Live at Denver Gold Forum
05/09/2012Seabridge Discovers High Grade Epithermal Gold Deposit at KS...
24/07/2012(Courageous Lake)Preliminary Feasibility Study Completed for Seabridge Gold's...
28/06/2012en Predator Corp=2E and Seabridge Gold Inc=2E Announce Closi...
28/06/2012Reports on Annual Meeting Results and Senior Management Chan...
18/06/2012Acquires Shares of Banks Island Gold Ltd=2E Under Option Agr...
07/06/2012en Predator Corp=2E and Seabridge Gold Inc=2E Sign Definitiv...
10/04/2012to Commence Trading on New York Stock Exchange
04/04/2012to List on the New York Stock Exchange Under Symbol "SA"
30/03/2012Files Year End Audited Financial Statements and MD&A
29/11/2011Seabridge's CEO Interview
30/09/2011Views on Gold from Seabridge
19/08/2010Projected Economics Continue to Improve at Seabridge Gold's ...
26/07/2010Drilling Confirms Iron Cap as Major New Gold-Copper Deposit
26/02/2010Announces Pricing of Offering
05/06/2009(Video) BNN chats with Rudi Fronk, President and CEO of Seab...
17/12/2008to be Added to S&P/TSX Global Gold and Global Mining Indices
15/12/2008Completes Sale of Noche Buena to Fresnillo/Newmont JV
01/12/2008Preliminary Economic Assessment Completed forSeabridge Gold'...
07/11/2008Interview on TMX Money
08/09/2008Positive Metal Recoveries Predicted for Seabridge Gold's KSM...
17/07/2008Independent Road Access Study Completed for Seabridge Gold's...
10/07/2008Announces Commencement of Trading on the TSX
18/06/2008Receives Conditional Approval for TSX Listing
31/03/2008Files Year End Audited Financial Statements and MD&A
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AMEX (SA)TORONTO (SEA.TO)
15,35+0.46%21,00-0.14%
AMEX
US$ 15,35
16/04 12:02 0,070
0,46%
Cours préc. Ouverture
15,28 15,06
Bas haut
14,69 15,35
Année b/h Var. YTD
9,43 -  16,65 29,32%
52 sem. b/h var. 52 sem.
9,43 -  16,65 12,70%
Volume var. 1 mois
214 840 14,38%
24hGold TrendPower© : -3
Produit
Développe Copper - Gold - Molybdenum - Silver
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 16/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202429,10%
2023-5,48%16,1910,43
2022-25,53%22,2210,03
2021-19,82%22,8614,92
202055,27%9,9010,25
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,73 AU$-1,90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$-1,95%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX-2,78%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,36 CA$-5,22%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,10 CA$-2,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,70 CA$-1,45%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,90 US$-1,49%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+3,03%Trend Power :