Phase 1 Drill Program At Tanoyan Gold Project Successfully Completed

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

News Release - Wednesday, January 18, 2012
Phase 1 Drill Program At Tanoyan Gold Project Successfully Completed

  • Phase 1 drilling completed with a total of 44 drill holes 5041.8 meters
  • 88% of drillholes intersected reportable gold
  • Updated 43-101 resource estimate to be undertaken
  • 10,000 meter Phase 2 drilling program to commence
January 18, 2012 - Reliance Resources Limited (TSX: RI) (the company) is pleased to announce a summary of its recently completed Phase 1 drilling program on the Tanoyan Gold Project, North Sulawesi, Indonesia
The Tanoyan Gold Project consists of five principal vein systems, Sondana, Ramai, Talong, Modupola and Lingkobungon, which are predominantly orientated northeast to southwest and dip steeply to the northwest or southeast. Drilling to date has primarily focused on the Sondana and Modupola veins.

The Phase 1 drilling program is now complete and includes a total of 5,041.8 meters over 44 drillholes Details of all drillholes are located in Table 1 ( http://www.goldenpeaks.com/i/misc/Drillhole-meters.jpg) and location of drillholes is shown on Figure 1 (http://www.goldenpeaks.com/i/misc/Tanoyan-Drill-Plan-location-Golden-Peaks-Phase.jpg)

This drill program was designed to increase the size and improve the classification of the existing 43-101 Inferred Mineral Resource of 2.22 Mt at 1.3 g/t for 91,100 ounces of contained gold. The company is confident that this successful completion of the Phase 1 drilling program has resulted in a material increase in the size of the mineral resource at the Tanoyan Gold Project.

Preparations are currently underway for the Phase 2 drill program which will include 10,000 metres of diamond drilling and is designed to further explore the potential of the Tanoyan epithermal gold vein system and to form the basis of ongoing studies to ascertain the commercial viability of a large gold mine at Tanoyan.

Phase 1 systematic drilling has confirmed that gold mineralisation along the Sondana Vein occurs over a strike length of approximately 2.0 kilometres, extending from surface to a minimum of 100 metres vertical depth over much of its length. The vein is still open to the north and open down-dip over much of its length. The Sondana vein includes drill intercepts of auriferous zones of up to 40 metres true width.

>From surface indications, the Sondana Vein system extends an additional 1.1 Km north from TND 079 (32.1m @ 2.1 g/t Au) giving an overall strike potential of at least 3.1 kilometres. This northern extension will be a priority target during the Phase 2 drill program. (Inset A) http://www.goldenpeaks.com/i/misc/Sondana-Vein-Phase-1-Drilling.jpg)

Experience from drilling the Sondana North zone during the Phase 1 program has shown that deeper drilling intersected mineralisation of higher grade and greater widths than encountered in historical drillholes; also updated detailed mapping and surface sampling of the vein system, from Phase 1, has advanced the company's understanding of structural controls of the mineralisation.


The other vein systems at Tanoyan include, the Modupola-Talong and Lingkobungon Vein systems,
(Inset B) http://www.goldenpeaks.com/i/misc/Modulopa-and-Talong-drill-map.jpg); They have also provided significant intersections (TND076: 17.65m @ 3.8 g/t Au and TND056: 16.45m @ 2.0 g/t Au). In addition to following up extensions along strike and down-dip to known mineralisation at Sondana and additional drilling at the Talong-Modupola and Lingkobungon vein systems, Phase 2 drilling will also target the Ramai Vein located 700 metres west of Sondana (Figure 1).

This 1.7Km long Ramai Vein has only been tested by 6 historical drillholes, several of which intersected significant gold mineralisation such as TND037: 7m @ 5.3 g/t Au and 2m @ 5.2 g/t Au and TND018: 16m @ 0.6 g/t Au. The continuous nature of the Ramai Vein as seen on surface suggests it has similarities with the Sondana Vein.

President Scott Emerson commented: "The Phase 1 drilling program has been a significant step in advancing the Tanoyan Gold Project and drilling has provided consistently strong results throughout the program. We are looking forward to having the same success during the next Phase 2, 10,000 meter drill program which is aimed at further gold discovery and the delineation of a mineral resource sufficient to form the basis of, eventually, a large mining and milling operation. "

The company has a portfolio of five mineral tenements covering 68,000 acres on the islands of Sulawesi and Halmahera in East Indonesia.

The company is active on three of its five Indonesian gold projects; currently preparing for Phase 2 drilling on the Tanoyan Gold Project and conducting surface exploration programs, in preparation for drilling, on the Kapa Kapa Gold Project and the Roko Gold Project. All of the projects have easy access via paved and/or gravel roads and the regional infrastructure is good

The projects offer both exploration potential and an existing resource base. All five projects are adjacent to or along strike from operating gold mines or identified gold resources with similar geology and structural feature. Importantly, all projects have been converted to IUP tenements as required under the new Indonesian Mining Act (2009).
All samples were assayed by Intertek Indonesia; a division of the global Intertek Group PLC.

Core is collected and initially logged at Tanoyan Base Camp at the project area. The core is then securely transported in closed core boxes to Golden Peaks' Exploration Office in Kotamobagu, North Sulawesi. Here the core is logged in detail, cut longitudinally into 2 equal halves and half-core is sampled at 1 meter intervals; except where the geology dictates a lesser sampling interval. Half core is permanently retained, as a reference, in the secure Kotamobagu core-storage facility. All QC samples are introduced before the bagged samples are trucked to PT Intertek Laboratory's sample preparation facility in Manado. Prepared samples are then couriered by PT Intertek to their analytical facility in Jakarta for analyses.

Gold is fire assayed using a 50.0 gram aliquot sample with an AA finish. Multi-element analysis is by Four Acid Digestion using an Induced Coupled Plasma (ICP) finish.

The Company's QA/QC program now includes the regular insertion of blanks, multiple certified assay standards into the sample shipments. Locally-sourced blank samples are inserted in every assay batch of 10 samples. Commercial standards are inserted in every assay batch of 25 samples. Sludge samples are also collected and assayed on a 1 metre interval from the drilling fluid circulation return. Regular monitoring of these QC samples is a critical part of Golden Peak's QA/QC protocols.

This press release has been reviewed and approved by Mr. John Levings, B.Sc., FAusIMM, director of Golden Peaks Resources Limited and a Qualified Person as defined by National Instrument 43-101, under whose direction the exploration programs are being carried out.

Media Information, contact:
Scott Emerson, President
se@relianceresources.com

Investor Information, contact:
Mike Kordysz
mk@relianceresources.com

The statements herein that are not historical facts are forward-looking statements. These statements address future events and conditions and so involve inherent risks and uncertainties, as disclosed under the heading "Risk Factors" in the company's periodic filings with Canadian securities regulators. Actual results could differ from those currently projected. The Company does not assume the obligation to update any forward-looking statement.

Table 2: Phase 1 Drill Results
DH No.
Vein
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
TND045
Sondana
0.00
16.10
16.10
0.8
incl
4.10
4.90
0.80
4.3
TND046
Sondana
77.00
78.00
1.00
0.7
TND047
Sondana
did not effectively test Sondana vein
TND048
Sondana
44.20
49.20
5.00
2.9
TND049
Sondana
10.93
30.70
19.77
1.6
Sondana
132.10
134.50
2.40
0.9
Sondana
144.50
145.40
0.90
0.9
TND050
Sondana
55.60
71.10
15.50
3.1
incl
63.00
63.90
0.90
12.4
and
69.10
70.10
1.00
23.2
TND051
Sondana
14.60
22.30
7.70
0.9
TND052
Modupola
44.10
45.10
1.00
1.7
TND053
Sondana
18.00
30.30
12.30
1.7
TND054-R
Sondana
49.30
50.50
1.20
1.5
TND055
Modupola
did not effectively test Sondana vein
TND056
Modupola
73.90
90.35
16.45
2.0
incl
73.90
83.30
9.40
3.1
incl
73.90
78.50
4.60
5.7
113.45
115.70
2.25
7.1
TND057
Sondana
126.10
131.55
5.45
2.3
TND058
Modupola
124.75
127.75
3.00
3.2
TND059
Sondana
137.80
144.15
6.35
1.0
TND060
Modupola
no significant intersections
TND061
Sondana
60.30
79.65
19.35
0.9
incl
60.30
65.70
5.40
1.4
incl
74.75
79.65
4.90
1.6
TND062
Modupola
40.90
44.90
4.00
0.8
TND063
Sondana
17.30
24.60
7.30
7.2
incl
22.30
23.60
1.30
38.2
27.60
28.60
1.00
0.9
TND064
Modupola
79.25
81.35
2.10
8.7
86.50
90.75
4.25
0.9
138.30
139.30
1.00
1.0
TND065
Sondana
did not effectively test Sondana vein
TND066
Modupola
29.70
43.55
13.85
1.0
incl
40.00
41.90
1.90
3.5
TND067
Sondana
10.55
11.55
1.00
0.4
TND068
Modupola
77.70
79.10
1.40
2.3
TND069
Sondana
11.20
13.50
2.30
0.5
TND070
Modupola
51.10
65.00
13.90
0.8
incl
51.10
55.95
4.85
1.0
incl
62.20
64.00
1.80
2.4
TND071
Sondana
14.65
15.90
1.25
0.4
TND072
Modupola
57.15
58.55
1.40
1.0
TND073
Sondana
149.00
159.70
10.70
1.6
171.20
172.20
1.00
0.6
178.00
183.30
5.30
0.5
TND074
Modupola
63.30
67.10
3.80
0.5
78.20
87.80
9.60
1.1

 

100.40
107.00
6.60
1.3
TND075
Sondana
4.50
8.50
4.00
1.8
79.30
81.30
2.00
1.5
96.20
115.05
18.85
4.4
incl
98.25
100.25
2.00
33.0
TND076
Modupola
69.85
87.50
17.65
3.8
incl
81.10
87.50
6.40
7.8
TND077
Sondana
63.50
64.50
1.00
1.9
72.00
144.00
72.00
1.0
incl
116.10
129.00
12.90
2.4
TND078
Talong
11.70
13.70
2.00
1.4
19.70
24.35
4.65
1.5
28.90
31.50
2.60
0.9
TND079
Sondana
80.50
112.60
32.10
2.1
incl
105.50
110.60
5.10
4.6
TND080
Talong
intersected artisanal mine opening
TND081
Sondana
46.60
48.10
1.50
0.3
TND082
Talong
no significant intersections
TND083
Sondana
21.30
24.10
2.80
2.1
TND084
Talong
no significant intersections
TND085
Sondana
31.40
35.40
4.00
1.4
TND086
Ling Atas
31.55
36.9
5.35
2.0
36.1
36.9
0.80
8.8
63.75
64.9
1.15
1.2
TND087
Sondana
37.45
52.40
14.95
0.8
55.40
58.40
3.00
0.5

Drill hole data for the holes reflect down hole core lengths. True widths cannot be reliably estimated at this time

Copyright � 2012 RELIANCE RESOURCES LTD. (TSX-V:RI) All rights reserved. For more information visit our website at http://www.relianceresources.com/ or send email to info@goldenpeaks.com ..

Golden Peaks Resources Ltd.

EXPLORATEUR
CODE : GL.TO
CUSIP : 28114L106
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Golden Peaks Res. est une société d’exploration minière d'or basée au Canada.

Golden Peaks Res. détient divers projets d'exploration en Argentine.

Ses principaux projets en exploration sont GOLDEN CATEO et LA FORTUNA en Argentine.

Golden Peaks Res. est cotée au Canada. Sa capitalisation boursière aujourd'hui est 29,9 millions CA$ (29,4 millions US$, 23,1 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 2,90 CA$, et son plus bas niveau récent le 05 décembre 2008 à 0,15 CA$.

Golden Peaks Res. possède 115 059 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Golden Peaks Resources Ltd.
2006 Annual report
Projets de Golden Peaks Resources Ltd.
24/02/2012Exploration Update Palopo Gold Project, Indonesia
16/02/2012Reliance Resources Announces New Director-Andrew Wilson- For...
18/01/2012Phase 1 Drill Program At Tanoyan Gold Project Successfully C...
13/12/2011Gold Mineralisation Drilled over 2.3 Kilometre Strike Length...
30/11/201132 Metres at 2.1 g/t Gold Further Confirms Sondana North Vei...
12/09/201118.85 metres at 4.4 g/t Au Intersected at Tanoyan
21/06/2011Tanoyan Gold Project Drilling Update, Indonesia
24/02/2011Drilling to Commence on Palopo Gold Project Indonesia
10/02/2011Drilling Underway on Tanoyan Gold Project, Indonesia,to Test...
21/06/2010(La Fortuna)Cuts 28 Meters of 0.60 Percent Copper
19/05/2010(La Fortuna)Cuts 45 Meters of 3.00 g/t Gold
20/04/2010(La Fortuna)Extends T-11 Zone
14/04/2010(La Fortuna)Cuts 28 Meters of 4.88 g/t Gold
22/03/2010(La Fortuna)Cuts 30 Meters of 3 g/t Gold
05/03/2010(La Fortuna)Expands Gold Zones
24/02/2010(La Fortuna)Accelerates Drilling
11/02/2010(La Fortuna)Second Drill Rig Added
25/01/2010(La Fortuna)La Fortuna: T-11 Gold Zone Drilling Update
11/01/2010(La Fortuna)Drilling to Start
03/12/2009(La Fortuna)Drilling To Focus On The T-11 & G Gold Zones
05/03/2009(La Fortuna)La Fortuna: Expanded - New Discoveries
12/02/2009(Cerro Delta)Cerro Delta Drill Permits Received
21/01/2009(Cerro Delta)Cerro Delta Project, Argentina
02/09/2008(La Fortuna)Resource Calculation Initiated
30/07/2008(La Fortuna)- La Fortuna Project Drill Results
23/07/2008(La Fortuna)La Fortuna Gold Project Update
21/05/2008(La Fortuna)G Zone Extends 450 Meters
05/05/2008(La Fortuna)T-11 Zone Extended
16/04/2008(La Fortuna)report receipt of surface sample results from the Hill zone,...
11/01/2008La Fortuna: T-11 Zone Extended
07/01/2008Drilling Resumes On La Fortuna Project
16/10/2007(Lonco)Drilling to Commence on the Lonco Project
02/10/2007(La Fortuna Durango)New Mineralized Shoot in the T-11 Zone - 3.90 g/t Gold over ...
25/09/2007(La Fortuna Durango)T-11 zone - drilling extends high grade gold
27/06/2007(La Fortuna Durango)La Fortuna - New Discovery Area at G Zone-18m of 4.19g/t Gol...
02/05/2007(La Fortuna Durango)3.05 g/t gold over 28.0 meters
30/04/2007(La Fortuna Durango)Amphitheatre Zone -- Additional High Grade
21/03/2007(La Fortuna Durango)Mina Bagual - Drill Results
Communiqués de Presse de Golden Peaks Resources Ltd.
14/03/2012Additional High-Grade Silver Assays from Kapa Kapa Gold-Silv...
09/03/2012New Indonesian Mining Regulation
24/02/2012Extension of Term of Warrants
24/01/2012of Initial 43-101 Resource Report Underway on Tanoyan Gold P...
07/10/2011Cease Trade Order
07/09/2011- Tanoyan Continues to Deliver Positive Drilling Results
31/08/2011Tanoyan Drilling Produces Strong Drilling Results
19/07/2011Drills 15.5 Metres at 3.1 (g/t) Gold, Sulawesi Indonesia
06/07/2011HALMAHERA GOLD PROJECTS UPDATE, INDONESIA
16/05/2011Files Amended & Restated Management's Discussion And Analysi...
09/05/2011s Indonesian gold projects
02/04/2011COMPLETES ACQUISITION OF RELIANCE RESOURCES LTD. AND FINANCI...
02/03/2011Closes $2 Million Private Placement
06/05/2010Drilling Deep Breccia Targets (with table)
18/12/2009Completes La Fortuna Title Transfer
10/12/2009INREMI Report on La Fortuna Gold Project; Argentina
29/10/2009Annual General Meeting Results & Update
09/07/2009Additional 10 km of New Gold Mineralized Structures Identifi...
25/06/2009New Drill Targets discovered 1400m Along strike from T11 Dep...
09/06/2009Baseline Report Received
04/06/2009Flanking Structures to the G Zone Gold Deposit
07/01/2009Announces $585,000 Financing
13/11/2008& Annual General Meeting Results
08/04/2008update progress on exploration activities in Argentina
10/12/2007Cerro Delta Progress
29/11/2007Strategic Property Acquisition
14/11/2007Check Assays
08/11/2007Lonco Drilling Completed-La Fortuna Drilling Resumed
01/11/2007T-11 Gold Zone Expanded
29/10/2007Annual and Special Meeting Results
21/06/2007La Fortuna Option Completed
21/02/2007La Fortuna Project - Two New Discoveries
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (GL.TO)
0,260+0.00%
TORONTO
CA$ 0,260
10/01 15:48 -
0%
Cours préc. Ouverture
0,260 0,250
Bas haut
0,250 0,260
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,260 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -2
Produit
Développe
Recherche Barite - Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 04/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :