Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
First Majestic Produces Another Quarterly Record 2.73 Million Silver Eqv. Ounces
Published : April 15, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   G Mexico | Report | Zinc |

VANCOUVER, BRITISH COLUMBIA--(Marketwired - April 15, 2013) - First Majestic Silver Corp. ("First Majestic" or the "Company") (News - Market indicators)(NYSE:AG)(FRANKFURT:FMV) is pleased to announce that total production at its five operating mines in Mexico for the first quarter ending March 31, 2013, reached 2,731,792 equivalent ounces of silver, representing a 36% increase compared to the same quarter in 2012.

Total silver production for the quarter consisted of 2,437,664 ounces of silver, representing an increase of 33% compared to the same quarter in 2012. In addition, 4,058,114 pounds of lead and 1,679,378 pounds of zinc were produced representing an increase of 28% and 27%, respectively, compared to the same quarter of the previous year. Also, 1,584 ounces of gold was produced, representing an increase of 159% compared to the first quarter of 2012.

Keith Neumeyer, President & CEO of First Majestic, states, "The first quarter of 2013 marked yet another milestone for First Majestic. We announced the inauguration of Del Toro after 21 months of construction. We're also now in the final stages of expanding mine and mill capacities at both our San Martin and La Guitarra operations. With four major projects underway simultaneously, our entire team needs to be congratulated for their hard work, persistence and dedication ensuring First Majestic's aggressive growth plans remain intact."

Production Details Table:

             
             
  Quarter Ended   Quarter Ended   %  
Consolidated March 31,   December 31,   Variance  
  2013   2012   Prior  
          Quarter  
Ore processed/tonnes milled 730,357   701,618   4 %
Total Silver Eqv. Production (ounces) 2,731,792   2,562,926   7 %
Total Commercial Silver Eqv. Production (ounces) 2,555,297   2,562,926   0 %
Pre-commercial silver ounces produced 148,084   -   100 %
Total silver ounces produced 2,437,664   2,311,146   5 %
Silver Grade (g/t) 181   176   3 %
Silver Recovery (%) 57 % 58 % (2 )%
Pounds of lead produced 4,058,114   3,751,074   8 %
Equivalent ounces from lead 140,859   114,293   23 %
Pounds of zinc produced 1,679,378   1,363,330   23 %
Equivalent ounces from zinc 51,413   36,927   39 %
Gold ounces produced 1,584   1,540   3 %
Equivalent ounces from gold 85,901   86,124   0 %
Tonnes of iron ore produced 4,354   4,432   (2 )%
Equivalent ounces from iron 15,955   14,436   11 %

Other Developments:

First Majestic proudly inaugurated its fifth operating silver mine in Mexico in January 2013. The Del Toro Silver Mine has been under construction since April 2011 and will ultimately become the Company's largest mine. As previously announced, this mine was not deemed to produce at commercial levels until April 1, 2013, therefore there was no commercial production attributed to the first quarter from Del Toro.

The total ore processed during the quarter at the Company's five operating silver mines, La Encantada, La Parrilla, San Martin, La Guitarra and Del Toro, amounted to 730,357 tonnes milled, representing an increase of 4% over the previous quarter. The average head grade in the quarter for the five mines increased by 3% over the previous quarter to 181 g/t of silver. The combined silver recoveries decreased minimally from 58% to 57% in the quarter.

The Company's underground development in the first quarter consisted of 15,575 metres, a 5% increase compared to 14,802 metres completed in the previous quarter. The Company's development program is primarily focused on preparing the underground accesses and stopes for increased production rates during the year.

There are currently 17 diamond drill rigs operating at the Company's five operations. The Company completed 16,962 metres of diamond drilling in the quarter compared to 25,940 metres in the prior quarter, representing a 35% decrease. The exploration program consists of definition drilling to define Reserves and Resources and assist in mining activities at the Company's five operating mines as well as some regional exploration in areas of interest previously defined. In addition, the current drill program will support updated NI 43-101 Technical Reports coming out during the year, as the Company's objective is to complete new Technical Reports for each of the Company's mines in 2013.

At the Del Toro Silver Mine:

  • Phase one of the plant construction, consisting of a 1,000 tpd flotation mill producing both silver-lead and zinc concentrates, was completed in the quarter. Mill throughput for the first quarter since inauguration amounted to 781 tpd with average head grades of 162 g/t for silver, 2.4% for lead and 2.8% for zinc.
  • Pre-commercial shipments in the quarter consisted of 30 shipments totalling 933 dry tonnes of concentrates containing 32% lead, 4,380 g/t silver and 1.2 g/t gold.
  • Since commercialization on April 1, 2013, averaged throughput has been 916 tpd with an average head grade of 190 gpt silver, 2.9% lead and 2.7% zinc.
  • Capital expenditures for Del Toro's mill and mine construction up to March 31, 2013 have totalled $61.9 million, slightly over budget by $1.6 million only due to extra underground development work undertaken in 2012 compared to the original estimate of $60.3 million. Capital costs for the remaining expansion phases are anticipated to remain on budget.
  • Development within the three underground mines (San Juan, Perseverancia/San Nicolas and Dolores) has produced 117,000 tonnes of stockpiled ore on surface which is currently being used as the feed for the mill. Further development in the first half of 2013 will be focused on preparing the mines for phase two of production (1,000 tpd flotation and 1,000 tpd cyanidation) scheduled to begin in the third quarter of 2013.
  • Phase two production, which will consist of silver doré bar production, is scheduled to begin early in the third quarter and will consist of an additional 1,000 tpd cyanidation circuit for a total milling capacity of 2,000 tpd.
  • To date, the foundation for the 12' by 14' ball mill has been completed and is awaiting the delivery of the mill in the coming days. Installation is expected to commence immediately upon arrival and operations of the mill are expected by the first week of June. The construction of the primary and intermediate thickeners has been completed. The new leaching tanks have been constructed and the installation of the pumps, motors and other mechanisms are currently underway.
  • The tailings filter area is progressing well with all four filters now on site. Filter No. 1 for the 1,000 tpd flotation circuit is in the testing stage and will be operating by the end of April. Filter No. 2 for the 1,000 tpd cyanidation circuit is in the process of being assembled and installed and is expected to be operating at the end of June. Filters No. 3 and No. 4 will be installed later in 2013 for Phase 3 implementation.
  • Total metres drilled in the first quarter amounted to 1,195 metres compared to 5,687 metres drilled in the previous quarter. In addition, 3,972 metres of development were completed in the first quarter of 2013 compared to 2,870 metres of development in the fourth quarter of 2012. There are four drill rigs active at Del Toro, three underground and one on surface.

At the La Guitarra Silver Mine:

  • The expansion of the milling and flotation areas which started in November 2012 from the current 350 tpd to 500 tpd at the La Guitarra mill is quickly coming to an end having completed the installation of the new ball mill and new larger flotation cells. The electrical and piping installations are near completion. In addition, the new tailings dam is approximately 90% complete. The newly expanded mill is expected to start running at 500 tpd by the end of April 2013.
  • Underground development has begun at the El Coloso area which is known to contain higher grades of silver and gold and is planned to be in production by the end of the third quarter.
  • Four drill rigs are currently active within the La Guitarra property, three underground and one on surface. Total metres drilled in the first quarter amounted to 3,357 metres compared to 8,088 metres drilled in the previous quarter. In addition, 1,042 metres of development were completed in the first quarter compared to 1,214 metres of development in the previous quarter.
  • The Company is working towards the completion of a NI 43-101 Technical Report scheduled for release before the end of 2013.

At the La Encantada Silver Mine:

  • Underground development continues to be focused on new areas within the mine defined by the latest exploration programs. Currently, the primary areas of focus are the surrounding ore bodies of the Milagros and San Javier brecca pipes. Additionally, development and production continues from the San Francisco vein and the recently discovered "990" and "990-2" chimneys and the newly discovered Regalo vein.
  • A total of 4,156 metres of exploration drilling was completed in the first quarter, compared to 3,186 metres of drilling in the previous quarter, representing an increase of 30%. In addition, a total of 4,130 metres of underground development were completed in the first quarter compared to 3,554 metres of development in the previous quarter, representing an increase of 16%.
  • Two diamond drill rigs are active underground at La Encantada, with the objective of defining additional Reserves and Resources in the newly discovered areas in addition to assisting in mining activities.
  • The Company is planning to have a new updated NI 43-101 Technical Report released prior to year end.

At the La Parrilla Silver Mine:

  • The new underground ore haulage system, including a new production shaft and hoist, are advancing well. This US$20 million project, which began construction in March 2012 and is expected to be completed in early 2014, will allow for the replacement of the current above ground trucking system of ore to the mill. Once completed, this investment is expected to improve logistics and the transportation of ore to the mill, ultimately reducing overall operating costs and thereby delivering operational efficiencies.
  • At the mill, several upgrades have been completed during the quarter, including the installation of new cleaning benches for the lead and zinc circuits and a regrinding mill in the flotation circuit which is expected to improve the quality of the final concentrates. In the cyanidation circuit, the construction of three new leaching tanks commenced in the quarter in order to increase leaching time with the objective of further increasing recoveries and quality of doré.
  • Underground development completed in the quarter totalled 3,714 metres compared with 5,198 metres developed in the previous quarter.
  • In exploration, four diamond drill rigs are currently operating, three on surface and one underground. The total metres drilled during the quarter amounted to 6,483 metres compared to 4,618 metres drilled in the previous quarter. The focus of the current exploration program has been the Rosarios, Quebradillas, Vacas, San Marcos, and La Blanca mines, as well as the Viboras, San Nicolas and the newly discovered La Estrella vein areas. The results from this exploration program are expected to be included in an updated NI 43-101 Technical Report scheduled to be released in the second half of 2013.

At the San Martin Silver Mine:

  • The mill expansion to 1,300 tpd is well underway. Capacity upgrades to the crushing circuit is in progress with the upgrade and installation of a third ball mill. In addition, the construction of four new leaching tanks, installation of new clarification filters and new tailings filters are scheduled to be completed by the end of the second quarter. The expansion of the processing plant to 1,300 tpd is expected to be fully completed by July 2013.
  • Underground development completed in the first quarter totalled 2,717 metres compared with 1,966 metres of development in the fourth quarter of 2012.
  • Three drill rigs are currently active within the San Martin property, two underground and one on surface. Total metres drilled in the first quarter amounted to 1,771 metres compared to 4,361 metres of drilling in the previous quarter.
  • Exploration and development in the Rosarios/Huichola areas continue to return positive results with the newly discovered La Lima Vein in the quarter. Mine preparation in this area is progressing with the construction of a new power line, a new compressor room and new underground mine office to support this operation. Production from these areas is being ramped up in the coming quarters.
  • The Company is planning to release a new NI 43-101 Technical Report before the end of the second quarter which will include new Resources and Reserves from the Rosarios/Huichola areas.

First Majestic is a silver producing company with operations focused in Mexico. The Company is aggressively pursuing its business plan to become a senior silver producer through the development of its existing assets and the pursuit through acquisition of additional assets that contribute to achieving its corporate growth objectives.

FIRST MAJESTIC SILVER CORP.

Keith Neumeyer, President & CEO

Cautionary Note Regarding Forward-Looking Statements

This press release contains "forward-looking statements", within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of First Majestic Silver Corp. Forward-looking statements include, but are not limited to, statements with respect to the future price of silver and other metals, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, hedging practices, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, timing and possible outcome of pending litigation, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved".

Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of First Majestic Silver Corp. to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the integration of acquisitions; risks related to international operations; risks related to joint venture operations; actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals; possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled "Description of the Business - Risk Factors" in First Majestic Silver Corp.'s Annual Information Form for the year ended December 31, 2012, available on www.sedar.com, and Form 40-F on file with the United States Securities and Exchange Commission in Washington, D.C. Although First Majestic Silver Corp. has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. First Majestic Silver Corp. does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.



First Majestic Silver Corp.
(604) 688-3033 or Toll Free: 1-866-529-2807
(604) 639-8873 (FAX)
info@firstmajestic.com
www.firstmajestic.com

First Majestic Silver Corp.

PRODUCTEUR
CODE : FR.TO
ISIN : CA32076R1029
CUSIP : 32076R1029
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

First Majestic est une société de production minière d'argent basée au Canada.

First Majestic est productrice d'argent, d'or, de plomb et de zinc au Mexique, et détient divers projets d'exploration au Canada et au Mexique.

Ses principaux projets en production sont LA PARRILLA SILVER MINE, LA ENCANTADA (FIRST MAJESTIC SILVER), SAN MARTIN et LA ENCANTADA SILVER MINE au Mexique et ses principaux projets en exploration sont REAL DE CATORCE, DEL TORO et CUITABOCA au Mexique et PITT ISLAND, PINCOURT, DOMPIERRE et DESJARDINS au Canada.

First Majestic est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 1,5 milliards CA$ (1,1 milliards US$, 1,1 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 02 novembre 2001 à 0,01 CA$, et son plus haut niveau récent le 22 décembre 2017 à 9,99 CA$.

First Majestic possède 164 340 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de First Majestic Silver Corp.
13/08/2018First Majestic shares hammered after reporting $40 million-l...
21/01/2009Follow up N° 1
Rapports annuels de First Majestic Silver Corp.
Files Form 40-F Annual Report
2008 Annual report
2007 Annual Report
Financements de First Majestic Silver Corp.
20/08/2009Tranche of Non-Brokered Private Placement Closes
12/08/2009Non-Brokered Private Placement and Debt Settlement
Nominations de First Majestic Silver Corp.
04/04/2014Appoints VP of Technical Services
24/12/2013Announces Retirement of Robert Young from Board of Directors
05/01/2012Appoints Chief Information Officer
30/12/2011Names Douglas Penrose as Chairman
Rapports Financiers de First Majestic Silver Corp.
25/02/2016First Majestic Announces Financial Results for Q4 and Year E...
03/02/2014Fourth Quarter and Year End Financial Results to be Released...
12/11/2013Reports Third Quarter Financial Results
31/10/2013Third Quarter Financial Results to be Released on November 1...
15/07/2013Second Quarter Financial Results to be Released on August 13...
15/05/2013Reports First Quarter Earnings of $26.5 million on Revenues ...
07/05/2013Quarter Financial Results to be Released on May 15th
14/11/2012Earns $24.9M in Third Quarter; Revenues of $63.6M, an Increa...
07/11/2012Third Quarter Financial Results to Be Released on November 1...
07/08/2012Second Quarter Financial Results to be Released on August 14...
10/05/2012Reports Strong Earnings of $26.4M in Q1 2012, Up 10% Compare...
04/05/2012First Quarter Financial Results to Be Released on May 10th
05/03/2012Announces New Record Earnings & Cash Flows for 2011
24/02/2012to Announce Fourth Quarter and Year End 2011 Financial Resul...
26/10/2011Third Quarter Financial Results to be Released on November 9...
03/08/2011Second Quarter Financial Results to be Released on August 11...
17/05/2011Earns a Record $23.9 million in First Quarter of 2011
11/05/2011Quarter Financial Results to Be Released on May 16, 2011-Con...
01/03/20112010 Audited Financial Results show Record Earnings & Cash F...
23/03/2010Year End & Fourth Quarter Financial Results
12/11/2009Record Third Quarter Financial Results
14/08/2009Second Quarter Financial Results
15/08/2008Second Quarter Financial Results
16/05/2008CORRECTION- MISSING TEXT - Record First Quarter Financial Re...
18/04/20082007 Year End Financial Results
Projets de First Majestic Silver Corp.
14/01/2014becomes a Senior Silver Producer; Produces 10.64M Ounces of ...
04/12/2013(Del Toro)Dor=E9 Production Commences at the Del Toro SilverMine
09/04/2013(Del Toro)Del Toro Silver Mine Flotation Circuit Deemed Commercial
09/01/2013Achieved Record Production of 2.6M Silver Eqv. Ounces (2.3M ...
27/09/2012Mine Videos - Just Released
24/01/2012(Del Toro)-La Parrilla Mill Expansion to 2,000 tpd Completed: Del Toro...
12/01/2012Achieved Record Production of 1.96M Silver Ounces (2.1M Silv...
13/10/2011(La Parrilla Silver Mine)Announces Q3 Production Results and Commences Commercial Pro...
22/09/2011(La Parrilla Silver Mine)First Stage of Expansion at the La Parrilla Processing Plant...
13/09/2011(La Parrilla Silver Mine)Mill Capacity at La Parrilla to Reach 2,000 tpd Following Po...
01/03/2011(San Martin)2010 Audited Financial Results show Record Earnings & Cash F...
08/04/2010(La Encantada (first Majestic Silver))La Encantada Achieves Commercial Production
26/11/2009(La Encantada (first Majestic Silver))La Encantada Opening Ceremony & Production of First Silver P...
13/10/2009(La Encantada (first Majestic Silver))La Encantada Expansion Nearing Completion
06/10/2009Third Quarter Production Results
17/02/2009(La Parrilla Silver Mine)La Parrilla Silver Mine Updates NI 43-101 Resource
20/01/2009(San Martin)San Martin Updated NI 43-101 Report Increasing Reserves/Reso...
17/07/2008(San Juan Silver Mine)Major Intersection At San Juan Silver Mine Drill Hole Inters...
29/04/20081st Quarter Production Results
23/04/2008(San Martin Silver Mine)Commissioning of Flotation Circuit at the San Martin Silver ...
01/04/2008(La Parrilla Silver Mine)Discovery of New High Grade Ore Shoot on the Vacas Vein at t...
08/01/2008(La Encantada Silver Mine)La Encantada Silver Mine Update and New NI 43-101 Resource
02/07/2007(La Parrilla Silver Mine)La Parilla Technical Report
Communiqués de Presse de First Majestic Silver Corp.
27/07/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
25/07/2016Second Quarter Financial Results to be Released on August 10
20/07/2016Here’s Why These Five Stocks Are on the Move on Wednesday
12/07/2016First Majestic Produces 4.7 Million Silver Eqv. Ounces in Se...
29/01/2016Silver Could Spike $10 In A Day In Global Collapse Scenario
28/11/2015How Top Traders Are Shifting Western Asst High Incm Opprtnty...
14/10/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
14/10/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
13/10/2015A Silver Lining in October 2015?
02/10/2015First Majestic Completes Acquisition of Silvercrest
01/10/2015First Majestic Completes Acquisition of SilverCrest
25/09/2015First Majestic and SilverCrest Announce Shareholder Approval...
15/09/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
27/08/2015First Majestic and SilverCrest Announce Receipt of Interim O...
27/08/2015First Majestic and SilverCrest Announce Receipt of Interim O...
11/08/2015First Majestic reports 2Q loss
11/08/2015First Majestic Reports Second Quarter Financial Results and ...
10/08/2015Why Earnings Season Could Be Great for First Majestic Silver...
30/07/2015Second Quarter Financial Results to be Released on August 11
30/07/2015First Majestic Silver: Second Quarter Financial Results to B...
27/07/2015First Majestic Announces Friendly Acquisition of Silvercrest...
27/07/2015announces friendly acquisition of Silvercrest Mines
09/07/2015First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2...
23/04/2015NYSE stocks posting largest percentage decreases
23/04/2015First Quarter Financial Results to be Released on May 7
23/04/2015First Majestic Silver Corp. First Quarter Financial Results ...
22/04/2015First Majestic Silver Corp. Announces Closing of C$30 Millio...
20/04/2015NYSE stocks posting largest percentage decreases
13/04/2015NYSE stocks posting largest percentage decreases
13/04/2015First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1...
09/04/2015NYSE stocks posting largest percentage decreases
06/04/2015First Majestic Silver Corp. Announces C$30 Million Bought De...
06/04/2015Announces C$30 Million Bought Deal Financing
06/04/2015First Majestic Announces Promotion of Martin Palacios to Chi...
06/04/2015First Majestic Announces Acquisition of Shares of First Mini...
01/04/2015NYSE stocks posting largest percentage increases
01/04/2015First Majestic Updates Mineral Reserve and Resource Estimate...
31/03/2015Announces New La Guitarra NI 43-101 Technical Report
31/03/2015First Majestic Announces New La Guitarra NI 43-101 Technical...
11/03/2015First Majestic Renews Share Repurchase Program
11/03/2015First Majestic Renews Share Repurchase Program
22/08/2014to List on the Mexican Stock Exchange
24/10/2013Appeal Against First Majestic Dismissed
30/09/2013Applies to Dismiss Appeal of Positive Judgment for US$93.84 ...
10/07/2013Produces a New Quarterly Record of 3.27 Million Silver Eqv. ...
02/07/2013Payment of CDN$14.85 million Received in Court Litigation
02/05/2013Announces Completion of La Guitarra's Expansion to 500 tpd
26/04/2013Receives Positive Judgment for US$89.6 in Court Litigation
17/04/2013Earns Socially Responsible Business Distinction Award for Fi...
15/04/2013Produces Another Quarterly Record 2.73 Million Silver Eqv. O...
11/03/2013Announces Share Repurchase Program
19/02/2013Elects Not to Exercise Right to Match Coeur's Offer for Orko
14/02/2013Considering Superior Offer from Coeur to Acquire Orko Silver
25/01/2013(Del Toro)Production Commences at the Del Toro Silver Mine
10/10/2012Produces a Record 2.44 Million Silver Equivalent Ounces in T...
26/09/2012New Look! New Features! First Majestic Bullion Store
06/09/2012Keith Neumeyer's Interview With Minesite.com
27/08/2012Announces Appointment of VP of Exploration
21/08/2012(Del Toro)Updated Del Toro NI 43-101 Technical Report & Final Permit R...
16/08/2012Recognized as a Leader in Corporate Social Responsibility
17/07/2012Produces 2.1 Million Silver Equivalent Ounces in Second Quar...
03/07/2012Completes Acquisition of Silvermex Resources
26/06/2012mex Securityholders Approve Plan of Arrangement With First M...
22/05/2012(Del Toro)Del Toro NI 43-101 Technical Report & Pre-Feasibility Study
16/04/2012First Quarter Production Results and Full Commencement of Co...
03/04/2012Announces Friendly Acquisition of Silvermex Resources
30/03/2012Files Form 40-F Annual Report
07/10/2011Third Quarter Production Results to Be Released on October 1...
11/08/2011Record Earnings of $30.6 million in Second Quarter
07/07/2011Another Record Quarter of Silver Production
08/04/2011Silver Production Up 25%; Reaches 97% Pure Silver and Mainta...
16/08/2010Record Earnings and Cash Flows. Purest Silver Producer with ...
22/04/20102nd Year Running for Mexican Distinction as a "Socially Resp...
12/04/2010Production Increases by 30% to 1,619,403 Equivalent Ounces S...
12/01/2010Production Increases by 18%, Reaches New Record
13/11/2009Completes Acquisition of Normabec Mining Resources; Normabec...
14/09/2009to Acquire Normabec Mining Resources
13/08/2009Joins OTCQX
26/06/2009offering for purchase 0.999 fine 1oz. silver rounds, and 5oz...
05/03/2009Closing of $21.2 Million Offering
19/11/2008Operations Update
11/09/2008Many Positive Developments Underway
15/07/20082nd Quarter Production Shows Continued Ramp-up
25/03/2008Closing of $45,475,000 Offering
17/01/2008Another Record Quarter of Silver Production
14/12/2007TSX Conditional Approval
05/12/2007Update on the Chalchihuites Group of Properties
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (FR.TO)OTHER OTC (FRMSF)
9,31+3.44%
TORONTO
CA$ 9,31
23/04 17:00 0,310
3,44%
Cours préc. Ouverture
9,00 8,89
Bas haut
8,75 9,41
Année b/h Var. YTD
5,74 -  10,95 16,67%
52 sem. b/h var. 52 sem.
5,74 -  10,95 -3,42%
Volume var. 1 mois
1 127 697 28,06%
24hGold TrendPower© : -17
Produit Lead - Silver - Zinc
Développe
Recherche Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 27/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202422,66%
2023-32,71%9,9510,07
2022-23,32%9,9610,00
2021-13,88%30,7512,74
20209,63%9,8610,08
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,71 AU$-0,39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :