Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Minera Andes Inc

Publié le 05 octobre 2009

Production Has Resumed At TheSan Jos=E9 Mine

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Precious Metals |
=======================================================================
      Minera Andes Announces That Production Has Resumed At The San
      Jos� Mine
=======================================================================

TORONTO, ONTARIO --OCTOBER 2, 2009 - Minera Andes Inc. (the
"Corporation" or "Minera Andes") (TSX: MAI and US OTC: MNEAF) is
pleased to announce today that it has been advised by Minera Santa Cruz
("MSC") that the San Jos� Mine in Argentina is back in production. The
San Jos� Mine is operated by MSC, a joint venture between Hochschild
Mining plc, and Minera Andes which has a 49% interest in the mine.

Daily production at the San Jose mine has been running at a rate of
approximately 32,600 silver equivalent ounces (of which the share
attributable to Minera Andes is approximately 16,000 silver equivalent
ounces).

Minera Andes is a gold, silver and copper exploration company focused
in Argentina. The Corporation holds three significant assets:

1. 49% interest in Minera Santa Cruz SA, the company that operates the
San Jose Mine, one of the world's largest primary silver mines;
2. 100% earned-in interest in the Los Azules copper project;
3. A portfolio of exploration properties near and around its existing
assets. Drilling on three of these properties will begin in November.

This news release is submitted by James K. Duff, Chief Operating
Officer of Minera Andes Inc.

For further information, please contact: Helen Bilhete or visit our Web
site: www.minandes.com.

Helen Bilhete
Director, Investor Relations
99 George St. 3rd Floor,
Toronto, Ontario, Canada. M5A 2N4
Toll-Free: 1-866-441-0690
Tel:647-258-0395
Fax: 647-258-0408
E-mail: info@minandes.com

Caution Concerning Forward-Looking Statements:
This press release contains certain forward-looking statements and
information, including those related to the resumption of work at the
San Jos� Mine. The forward-looking statements and information express,
as at the date of this press release, the Corporation's plans,
estimates, forecasts, projections, expectations or beliefs as to future
events and results. Forward-looking statements involve a number of
risks and uncertainties, and there can be no assurance that such
statements will prove to be accurate. Therefore, actual results and
future events could differ materially from those anticipated in such
statements. Risks and uncertainties that could cause results or future
events to differ materially from current expectations expressed or
implied by the forward-looking statements include, but are not limited
to, factors associated with fluctuations in the market price of
precious metals, mining industry risks, risks associated with foreign
operations, the state of the capital markets, environmental risks and
hazards, uncertainty as to calculation of mineral reserves and other
risks.

Readers should not place undue reliance on forward-looking statements
or information. We undertake no obligation to reissue or update
forward-looking statements or information as a result of new
information or events after the date hereof except as may be required
by law. See our annual information form for additional information on
risks, uncertainties and other factors relating to the forward-looking
statements and information. All forward-looking statements and
information made in this news release are qualified by this cautionary
statement.

=======================================================================
Copyright (c) 2009 MINERA ANDES INCORPORATED (MAI)  All rights
reserved.  For more information visit our website at
http://www.minandes.com/ or send mailto:info@minandes.com
=======================================================================
.
<
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Minera Andes Inc

CODE : MAI.TO
ISIN : CA6029101012
CUSIP : 602910101
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Minera Andes est une société de production minière d'argent basée au Canada.

Minera Andes est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 730,0 millions CA$ (728,7 millions US$, 555,9 millions €).

La valeur de son action a atteint son plus bas niveau récent le 06 février 2009 à 0,32 CA$, et son plus haut niveau récent le 15 avril 2011 à 3,39 CA$.

Minera Andes possède 282 959 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Minera Andes Inc
23/03/2006New Analysis
16/10/2006Learning from the Iconoclast
Rapports annuels de Minera Andes Inc
2008 Annual report
2006 Annual Report
Financements de Minera Andes Inc
26/02/2009COMPLETES SECOND TRANCHE OF PRIVATE PLACEMENT WITH ROB McEWE...
17/02/2009revised C$40.0 million private placement with Robert R. McEw...
Rapports Financiers de Minera Andes Inc
11/08/2011Announces Second Quarter 2011 Financial Results
06/06/2011Announces First Quarter 2011 Financial Results and Restated ...
30/03/2011Announces 2010 Full Year Financial Results and Record Earnin...
17/07/2009(San Jose Argentina)second quarter 2009 San José Production
16/05/2009REPORTS FIRST QUARTER 2009 FINANCIAL RESULTS
23/01/2009(San Jose Argentina)ANNOUNCES FOURTH QUARTER GOLD/SILVER PRODUCTION INCREASES AT...
14/11/2008REPORTS THIRD QUARTER 2008 RESULTS
11/11/2008(San Jose Argentina)ANNOUNCES THIRD QUARTER GOLD/SILVER SALES AT THE SAN JOSE MI...
15/08/2008REPORTS NET INCOME FOR SECOND QUARTER OF $0.05 PER SHARE
30/07/2008ANNOUNCES SECOND QUARTER GOLD/SILVER SALES AT THE SAN JOSE M...
09/05/2008(San Jose Argentina)ANNOUNCES FIRST QUARTER 2008 PRODUCTION FOR SAN JOSE MINE TO...
Projets de Minera Andes Inc
07/12/2011(San Jose Argentina)Provides Update On Exploration Drilling at the San Jose Mine
30/08/2011(San Jose Argentina)Provides Update on Exploration Drilling at the San Jose Mine
27/06/2011(Los Azules Argentina)Reports Drill Results and Development Update for the Los Azu...
17/05/2011(Los Azules Argentina)on Litigation With TNR Gold Corp.
04/05/2011(San Jose Argentina)Announces Work Resumption at San Jose Mine
13/03/2011(San Jose Argentina)Announces Outstanding 2010 Exploration Drill Results at the ...
05/10/2009(San Jose Argentina) Production Has Resumed At TheSan Jos=E9 Mine
02/10/2009(Los Azules Argentina)Provides Confirmation of its 100% Earn-In on the Los Azules ...
06/06/2009(San Jose Argentina) Announces completion of NI 43-101 Technical report on the J...
06/06/2009(Los Azules Argentina) Announces delivery of Earn-in notice under option agreement...
16/01/2009(San Jose Argentina)ANNOUNCES INCREASE IN FORECAST PRODUCTION AT THE SAN JOSE GO...
10/01/2009(San Jose Argentina)Announces Remaining Results From 2008 San Jose Drilling
25/09/2008(Los Azules Argentina)ANNOUNCES EXCELLENT METALLURGICAL TESTING RESULTS FOR LOS AZ...
08/09/2008(Los Azules Argentina)announces a mineral resource estimate of 922 million tonnes ...
13/08/2008(San Jose Argentina)REPORTS SAN JOSE PRODUCTION CASH COSTS AT $322/oz GOLD AND $...
27/06/2008(Los Azules Argentina)Exploration Program Increases The Size Of The Los Azules Por...
16/04/2008(Los Azules Argentina)DRILLING CUTS 132 METERS (433FT) OF 1.11 PERCENT COPPER AT L...
28/03/2008(San Jose Argentina) PROVIDES SAN JOSE MINE UPDATE
12/03/2008(Los Azules Argentina)ANNOUNCES 113 METERS OF +1 PERCENT COPPER IN DRILLING AT LOS...
07/03/2008(San Jose Argentina)ANNOUNCES 1.69 OZ/TON GOLD AND 37 OZ/TON SILVER FROM SAN JOS...
11/12/2007(Los Azules Argentina) ANNOUNCES DRILLING COMMENCES AT LOS AZULES COPPER PROJECT
26/10/2007(San Jose Argentina) ENGAGES MACQUARIE BANK LIMITED FOR DEBT FINANCING FOR SAN J...
15/08/2007(San Jose Argentina)ANNOUNCES PROGRESS AND PLANS AT SAN JOSE MINE
31/05/2007(Los Azules Argentina)drills significant copper at Los Azules Project, Argentina
Communiqués de Presse de Minera Andes Inc
22/03/2012Files Annual 2011 Financial Statements and MD&A and Project ...
18/01/2012Announces Fourth Quarter and Full Year 2011 San Jose Mine Pr...
13/01/2012(Los Azules Argentina).: Response to TNR Gold Corp. News Release Regarding Los Azu...
21/12/2011Rob McEwen Letter to Shareholders of US Gold and Minera Ande...
03/10/2011(San Jose Argentina)Announces Full Repayment of Loans From San Jose Mine
22/09/2011US Gold and Minera Andes Enter Into Arrangement Agreement to...
20/07/2011Announces Second Quarter 2011 San Jose Mine Production
20/04/2011Announces First Quarter 2011 San Jose Mine Production
07/02/2011' Treasury Increases by $19 Million
24/01/2011Reminds Warrant Holders of Accelerated Expiry on January 31,...
03/07/2009'AGM Presentation On Video
23/02/2009Rob McEwen becomes Executive Chairman of Minera Andes - Two ...
06/02/2009Announces Results Of Preliminary Assessment At Los Azules Co...
01/10/2008Recent Media Coverage on Minera Andes Inc.
02/09/2008ANNOUNCES 2.05 OZ/TON GOLD AND 37 OZ/TON SILVER FROM ONGOING...
06/08/2008ADDS ROB MCEWEN AND OTHER MINING INDUSTRY EXECUTIVES TO ITS ...
30/07/2008Welcomes Lundin Mining Executive To Board
22/12/2007ANNOUNCES 1st CLOSING ON FINANCING
19/12/2007 ANNOUNCES PROPOSED FINANCING
27/11/2007 ANNOUNCES THE SAN JOSE MINE INCREASES SILVER AND GOLD MINE...
15/11/2007SIGNS DEFINITIVE AGREEMENT AT LOS AZULES COPPER PROJECT WITH...
09/11/2007 ANNOUNCES SAN JOSE UPDATE
12/10/2007SAN JOSE PROJECT DRILLING HITS 3.22 OUNCES PER TON GOLD AND ...
18/09/2007ANNOUNCES THE SAN JOSE MINE INCREASES SILVER AND GOLD RESOUR...
06/09/2007SAN JOSE PROJECT DRILLING HITS 1.86 OUNCES PER TON GOLD AND ...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (MAI.TO)OTC BB (MNEAF.OB)
2,58-2.64%2,54-3.05%
Dernières informations avant suppression de la cote
Cours préc. Ouverture
2,65 2,71
Bas haut
2,48 2,73
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  2,58 -%
Volume var. 1 mois
2 733 962 -%
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/09/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :