Quarterly Production Report – Q1 2015

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | G Mexico | Guatemala | Report | Salvador |

Quarterly Production Report – Q1 2015

NEWS RELEASE, 29 APRIL, 2015

Q1 2015 PRODUCTION REPORT

NORMAL OPERATIONS RESUMED AFTER Q1 DISRUPTIONS

Antofagasta plc CEO, Diego Hernández, said: "As we have previously announced, the first quarter of this year has been affected by water issues of very different kinds at both Los Pelambres and at Centinela. At Los Pelambres protests by members of the local community concerned about the shortage of water in the region blocked access to the mine impacting production; while in the north of Chile our operations were disrupted by unprecedented heavy rains.
"After reaching agreement with the local community at Los Pelambres, normal operations resumed, as have operations at Centinela following the end of the rain storms.
"Although we expect to recover some of the lost production resulting from these disruptions, production for the year will be some 15,000 tonnes of copper lower than we originally forecast. However, we still expect our net cash costs for the year to be around $1.40/lb.
"Despite the disruption we have seen in this first quarter, we remain confident that our existing strategy of
reducing costs, engaging with stakeholders to find solutions to long-term issues and investing through the
cycle will continue to strengthen the Group."

PRODUCTION

HIGHLIGHTS

Copper production in Q1 2015 was 146,400 tonnes, a 13.6% decrease compared with Q1 2014 and a

21.9% reduction with the previous quarter, reflecting primarily the impact of disruptions at Los
Pelambres during the quarter that resulted in lower throughput

Gold production was 57,400 ounces in Q1 2015, a 30.3% decrease on Q4 2014 due to lower throughput at Los Pelambres and Centinela and is similar to Q1 2014.

Molybdenum production at Los Pelambres was 2,100 tonnes in Q1 2015, compared with 2,400 tonnes in Q4 2014 principally due to lower throughput, and 23.5% higher than in Q1 2014 as higher grade material was mined.

CASH COSTS

Cash costs before by-product credits in Q1 2015 were $1.83/lb, the same as in Q1 2014 and 4.6%

higher than in Q4 2014. This increase mainly related to lower production

Net cash costs were $1.43/lb in Q1 2015, a 2.9% increase compared with the previous quarter primarily due to lower production and lower realised gold and molybdenum prices

OTHER

During the quarter, the Group reached an agreement with the communities in the Choapa Valley to work with them to design a lasting solution to the water issues in the region. The Group has agreed to support the communities affected in the area by committing to use sea water for any future

1
expansions at Los Pelambres. The Group has also committed to funding evaluation studies for a desalination plant and a water dam project for the benefit of the communities and the region.

Los Pelambres has appealed a ruling by the Civil Court of Los Vilos that the plan submitted by Los

Pelambres to the Court was not sufficient to address requirements to allow the natural flow of the Pupío stream to the community of Caimanes. This process is ongoing and there are no further updates since the 2014 Preliminary Results announcement made on 17 March.

In March 2015, the Atacama Desert experienced unusually heavy rainfall which led to the temporary suspension of activities at Centinela, Michilla and Antucoya.

In April, the Group announced the sale of its water division for approximately $960 million, before

taxes and transaction costs, to Empresas Públicas de Medellín. The sale is subject to certain standard conditions and approvals and is expected to be completed by the end of May 2015.

GROUP PRODUCTION AND CASH COSTS

Q1

Q4

Year to Date

2015

2014

%

2015

2014

%

Copper production

kt

146.4

187.5

(21.9)

146.4

169.4

(13.6)

Gold production

koz

57.4

82.3

(30.3)

57.4

56.8

1.1

Molybdenum production

kt

2.1

2.4

(12.5)

2.1

1.7

23.5

Cash costs before by-product credits

$/lb

1.83

1.75

4.6

1.83

1.83

0.0

Net cash costs

$/lb

1.43

1.39

2.9

1.43

1.46

(2.1)

MINING OPERATIONS Los Pelambres

Los Pelambres produced 78,800 tonnes of copper in Q1 2015 compared with 95,700 tonnes in 1Q 2014 and
99,700 tonnes in the previous quarter. This decrease is mainly due to actions of protesters and lower grades. The protesters blocked the access road to the mine for ten consecutive days in early March, disrupting normal operations and reducing throughput during the quarter to 151,800 tonnes per day, some 6.6% less than in Q1 2014 and 13.7% lower than in the previous quarter. The protests were triggered by a small group of people seeking action by Los Pelambres and the local government to help alleviate the current drought conditions in the region.
Following a period of negotiation facilitated by the government, Los Pelambres agreed to contribute funding for the study of a desalination plant project, which would be developed under a private-public alliance or public concession scheme. Los Pelambres also agreed to contribute funds to complete studies for the construction of a water dam for local use, which if constructed would be developed under a private-public alliance. Finally, Los Pelambres agreed that it will use sea water for any further expansions of its mining operations.
Molybdenum production decreased to 2,100 tonnes in Q1 2015, from 2,400 tonnes in the previous quarter, primarily due to the lower throughput explained above, partly offset by higher grades. In comparison with Q1 2014, molybdenum production rose by 23.5% mainly due to higher grades.
Cash costs before by-product credits in Q1 2015 were $1.60/lb, compared with $1.52/lb in the previous quarter. This was principally due to the lower production in the first quarter of this year as a result of the road blockages mentioned above, partly offset by the weakening of the peso and lower input costs.
2
Compared with Q1 2014, cash costs before by-product credits were 2.4% lower in Q1 2015, primarily due to the 'one-off' signing bonuses paid to employees following the conclusion of labour negotiations in Q1 2014 and lower energy and input costs during the first quarter of 2015, partly offset by higher TC/RCs.
Net cash costs in Q1 2015 were $0.02/lb higher than in the previous quarter at $1.27/lb primarily reflecting lower molybdenum production and lower realised molybdenum prices. Net cash costs in Q1 2015 were 3.1%
lower than in the same period last year primarily reflecting the increase in molybdenum production.

LOS PELAMBRES

Q1

Q4

Year to Date

2015

2014

%

2015

2014

%

Daily ore throughput

Kt

151.8

175.8

(13.7)

151.8

162.6

(6.6)

Copper grade

%

0.69

0.72

(4.2)

0.69

0.73

(5.5)

Copper recovery

%

87.0

87.8

(0.9)

87.0

91.7

(5.1)

Copper production

Kt

78.8

99.7

(21.0)

78.8

95.7

(17.7)

Copper sales

Kt

79.9

106.1

(24.7)

79.9

95.8

(16.6)

Molybdenum grade

%

0.019

0.017

11.8

0.019

0.014

35.7

Molybdenum recovery

%

81.3

86.0

(5.5)

81.3

86.6

(6.1)

Molybdenum production

Kt

2.1

2.4

(12.5)

2.1

1.7

23.5

Molybdenum sales

kt

1.9

2.4

(20.8)

1.9

1.5

26.7

Gold production

Koz

11.3

15.9

(28.9)

11.3

15.5

(27.1)

Gold sales

Koz

12.4

17.0

(27.1)

12.4

15.5

(20.0)

Cash costs before by-product credits*

$/lb

1.60

1.52

5.3

1.60

1.64

(2.4)

Net cash costs

$/lb

1.27

1.25

1.6

1.27

1.31

(3.1)

* Includes tolling charges of $0.24/lb in Q1 2015, $0.21/lb in Q4 2014 and $0.20/lb in Q1 2014

Centinela

Total copper production at Centinela was 60,400 tonnes in Q1 2015, 14,400 tonnes lower than in the previous quarter and 4.0% lower than the same period last year mainly due a temporary shutdown at the operation during the unprecedented heavy rains in the Atacama Desert in March.
Production of copper in concentrates was 38,400 tonnes in Q1 2015, compared with 49,100 tonnes in the previous quarter, primarily due to lower throughput as result of scheduled maintenance and the shutdown following the heavy rains. Copper in concentrate production was 2.0% lower compared with the same period last year reflecting lower throughput in Q1 2015 as explained above, offset by higher grades.
Cathode production in Q1 2015 was 21,900 tonnes, a 14.8% decrease on the 25,700 tonnes produced in Q4
2014 largely as a result of anticipated lower grades and lower throughput. Compared with Q1 2014, cathode production was 7.6% lower primarily as a result of lower grades.
Gold production was 46,100 ounces in Q1 2015, 20,200 ounces lower than in the prior quarter primarily due to lower throughput as explained above and lower grades. Gold production was 11.6% higher compared with the same period last year due to higher grades and recoveries, partly offset by lower throughput.
Cash costs before by-product credits were $2.06/lb in Q1 2015 compared with $1.95/lb in the previous quarter. This increase in costs was due to the lower production explained above, partly offset by the 'one- off' signing bonuses paid to employees following the conclusion of labour negotiations in Q4 2014. Cash
3
costs before by-product credits were 3.0% higher compared with Q1 2014, again mainly as a result of lower production in Q1 2015.
Net cash costs were 10.5% higher than in the previous quarter at $1.58/lb in Q1 2015 due to the increase in cash costs before by-product credits explained above and lower gold production. Net cash costs were 3.3%
higher compared with the same period last year primarily reflecting lower realised gold prices.

CENTINELA

Q1

Q4

Year to Date

2015

2014

%

2015

2014

%

CONCENTRATES

Daily ore throughput

kt

74.7

88.0

(15.1)

74.7

82.1

(9.0)

Copper grade

%

0.71

0.71

0.0

0.71

0.64

10.9

Copper recovery

%

88.0

88.4

(0.5)

88.0

87.6

0.5

Copper production

kt

38.4

49.1

(21.8)

38.4

39.2

(2.0)

Copper sales

kt

37.8

54.6

(30.8)

37.8

39.0

(3.1)

Gold grade

g/t

0.30

0.32

(6.3)

0.30

0.26

15.4

Gold recovery

%

78.8

80.0

(1.5)

78.8

70.6

11.6

Gold production

koz

46.1

66.3

(30.5)

46.1

41.3

11.6

Gold sales

koz

46.9

68.5

(31.5)

46.9

41.6

12.7

CATHODES

Daily ore throughput

kt

25.4

26.6

(4.5)

25.4

25.8

(1.6)

Copper grade

%

1.17

1.41

(17.0)

1.17

1.28

(8.6)

Copper recovery

%

70.6

67.6

4.4

70.6

73.8

(4.3)

Copper production - heap leach

kt

19.2

23.1

(16.9)

19.4

21.2

(9.4)

Copper production - total (1)

kt

21.9

25.7

(14.8)

21.9

23.7

(7.6)

Copper sales

kt

21.8

25.5

(14.5)

21.8

23.1

(5.6)

Total copper production

kt

60.4

74.8

(19.3)

60.4

62.9

(4.0)

Cash costs before by-product credits(2)

$/lb

2.06

1.95

5.6

2.06

2.00

3.0

Net cash costs(2)

$/lb

1.58

1.43

10.5

1.58

1.53

3.3

1 Includes production from ROM material

2 Includes tolling charges for copper in concentrates of $0.28/lb in Q1 2015 and $0.24/lb in Q4 2014 and Q1 2014

Michilla

Copper production at Michilla was 7,300 tonnes in Q1 2015, 43.4% lower than in Q4 last year and 32.4% lower than in the same period last year which, as had been anticipated, is the result of mining activities winding down in advance of the planned mine closure in December 2015. Since January 2015 Michilla has begun the process of reducing the number of onsite staff and contractors.
Cash costs increased to $2.48/lb in Q1 2014 compared with $2.31/lb in the previous quarter primarily due to reduced mining activities partially offset by lower input costs. Cash costs were almost unchanged compared
to Q1 2014.
4

MICHILLA

Q1

Q4

Year to Date

2015

2014

%

2015

2014

%

Daily ore throughput

kt

6.8

12.9

(47.3)

6.8

12.0

(43.3)

Copper grade

%

1.00

1.19

(16.0)

1.00

1.08

(7.4)

Copper recovery

%

78.1

78.5

(0.5)

78.1

80.0

(2.4)

Copper production - heap leach

kt

1.8

10.9

(83.5)

1.8

9.4

(80.9)

Copper production - total

kt

7.3

12.9

(43.4)

7.3

10.8

(32.4)

Copper sales

kt

8.4

12.9

(34.9)

8.4

10.4

(19.2)

Cash costs

$/lb

2.48

2.31

7.4

2.48

2.49

(0.4)

Antucoya

Despite the heavy rains in the north of Chile, the construction of Antucoya is progressing according to plan with 99.8% total progress (including design, engineering, procurement and construction) and 99.7% construction progress as at 31 March 2015. Construction is expected to complete in Q2 2015 followed by ramp-up achieving full production by the beginning of 2016.

Transport and water

As previously announced on 23 April 2015, the Group has agreed the sale of its water division for approximately $960 million, before taxes and transaction costs, to Empresas Públicas de Medellín, an electricity, gas, water and sanitation provider owned by the city of Medellín that delivers these services to over 20 million people in Colombia, El Salvador, Guatemala, Mexico and Chile.
The sale is subject to certain standard conditions and the approval of Empresa Concesionaria de Servicios Sanitarios S.A (ECONSSA), the grantor of the water concession, and is expected to be completed by the end of May 2015.
Total volumes transported by the transport division were 1.7 million tonnes in Q1 2015, 8.4% lower than in the previous quarter, and a 0.9% decrease on the same period last year.
The water division sold 12.7 million cubic metres in Q1 2015, 3.1% less than in the previous quarter, and
1.6% lower than in the same period last year.

Q1 Q4

2015 2014 %

Year to Date

2015 2014 %

Total tonnage transported kt

Water volumes sold mil m³

1,714

12.7

1,871 (8.4)

13.1 (3.1)

1,714

12.7

1,729 (0.9)

12.9 (1.6)

5

Commodity prices and exchange rates

Q1 Q4

2015 2014 %

Year to Date

2015 2014 %

Copper

Market price $/lb

Realised price $/lb

2.64

2.45

3.00 (12.0)

2.85 (14.0)

2.64

2.45

3.19 (17.2)

2.87 (14.6)

Gold

Market price $/oz

Realised price $/oz

1,220

1,252

1,200 1.6

1,198 4.5

1,220

1,252

1,293 (5.6)

1,403 (10.8)

Molybdenum

Market price $/lb

Realised price $/lb

8.5

7.6

9.3 (8.6)

5.9 28.8

8.5

7.6

10.0 (15.0)

10.5 (28.6)

Exchange rates

Chilean peso per $

624

599 4.2

624

551 13.2

The spot commodity prices for copper, gold and molybdenum as at 31 March 2015 were $2.74/lb, $1,186/oz and $8.4/lb respectively compared with $2.88/lb, $1,206/oz and $9.0/lb as at 31 December 2014 and
$3.01/lb, $1,292/oz and $10.6/lb as at 31 March 2014.
The provisional pricing adjustments for the quarter for copper, gold and molybdenum were negative $66.3 million, positive $0.6 million and negative $4.8 million respectively.

Los Pelambres - Mauro tailings dam

Since the Mauro tailings dam began operating in 2008, there have been a series of legal claims by some members of the Caimanes community who live in the area. These claims have been through various courts and stages of appeal, but Los Pelambres has always complied with all applicable laws, regulations and controls.
Two of these claims are currently ongoing and Los Pelambres is continuing to take necessary steps to protect its position.
The most recent developments in relation to the first of these claims were announced on 9 March 2015 and in the 2014 Preliminary Results announcement on 17 March 2015. As explained in these announcements, Los Pelambres has appealed to the Appeal Court of La Serena the decision of the Civil Court of Los Vilos (the "Civil Court") that Los Pelambres must demolish part, or all, of the tailings dam wall. The dam will continue to operate normally while the appeal process proceeds, however there may be further appeals by the parties during this period. Los Pelambres continues to consider the exercise of all available legal measures that may be required to overturn this decision and address its potential consequences.
In a second claim, as previously reported in the 2014 Preliminary Results announced on 17 March 2015, the plaintiffs are seeking demolition of the dam on the basis of the risk that its collapse would pose to the community. The Civil Court issued a decision in May 2014 denying the demolition request, but ordering Los Pelambres to undertake some additional measures to ensure protection of the community in the event of a
major earthquake or similar natural event.
6
The decision of the Civil Court was appealed by both the plaintiffs and Los Pelambres and in April 2015 the Appeal Court of La Serena upheld Los Pelambres's appeal, overturning the decision of the Civil Court and rejecting completely the plaintiff's claim. The plaintiffs may appeal this ruling to the Supreme Court and
further updates will be provided in due course.

Investors - London Media (Brunswick)

Andrew Lindsay [email protected] Carole Cable [email protected]
Paresh Bhanderi [email protected] Robin Wrench [email protected]

Telephone +44 20 7808 0988 Telephone +44 20 7404 5959

Investors - Santiago

Alfredo Atucha [email protected]

Telephone +56 2 2798 7000

7

Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Guatemala | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Guatemala | Tous

Antofagasta plc

PRODUCTEUR
CODE : ANTO.L
ISIN : GB0000456144
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Antofagasta est une société de production minière de cuivre et d'or basée au Royaume-Uni.

Antofagasta est productrice de cuivre, d'or, d'argent et de molybdène au Chili, en développement de projets de cuivre et d'or au Chili et au Pakistan, et détient divers projets d'exploration au Chili, au Perou, en Australie et en Suede.

Ses principaux projets en production sont MICHILLA, EL TESORO MINE, LOS PELAMBRES, EL TESORO, ESPERENZA (OXIDES) et ESPERANZA (SULPHIDES) au Chili, ses principaux projets en développement sont REKO DIQ au Pakistan et LINCE/MICHILLA au Chili et ses principaux projets en exploration sont PUNT HILL et PYRAMID ( ALASKA) en Australie, KIRUNA SOUTH en Suede, CORDILLERA DE LAS MINAS au Perou et ANTUCOYA au Chili.

Antofagasta est cotée au Royaume-Uni, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 2 218,2 milliards GBX (2 579,3 milliards US$, 2 423,0 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 18 octobre 2002 à 100,00 GBX, et son plus haut niveau récent le 19 avril 2024 à 2 250,00 GBX.

Antofagasta possède 985 856 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Antofagasta plc
12/05/2019Without U.S.-China trade war, copper price would be higher -...
10/04/2019Antofagasta to stay put on dividend policy but will return c...
22/03/2019Antofagasta expects water agreement with BHP for Zaldivar mi...
19/03/2019Antofagasta expects copper deficit of up to 300,000 tonnes t...
23/01/2019Strong last quarter leads Antofagasta to record copper outpu...
15/11/2018Antofagasta goes ahead with $1.3B expansion of Los Pelambres...
03/11/2018Almost a quarter of Antofagasta's energy needs met by renewa...
19/08/2018Chile's Antofagasta expects more copper price volatility -me...
15/08/2018Miner Antofagasta's H1 earnings fall, trade tensions cloud d...
08/05/2018Antofagasta shares, half-year production hit by Los Pelambre...
25/04/2018Lower copper grades take toll on Antofagasta first quarter o...
13/12/2017Antofagasta has a new project in Canada
26/10/2017Antofagasta trims costs forecast as Q3 copper output rises
05/07/2017Antofagasta faces strike threats at two of its copper mines ...
23/05/2017Report blasts Antofagasta's Minera Los Pelambres
21/03/2017Tribunal rules in favour of Barrick, Antofagasta in Pakistan...
Projets de Antofagasta plc
31/07/2015Antofagasta to buy Chilean copper mine from Barrick for $1bn
20/08/2014Study shows Twin Metals mine economically feasible
Communiqués de Presse de Antofagasta plc
31/12/2015EWU Ended Low on Falling Oil Prices, Antofagasta at the Lead
28/10/2015Barrick earnings beat market expectations, cuts debt
28/10/2015Reuters Business News Schedule at 1330 GMT/0930 AM ET
24/09/2015EU mergers and takeovers (Sept 24)
25/08/2015Edited Transcript of ANTO.L earnings conference call or pres...
06/08/2015Tighter supplies fortify copper, lay foundation for price ra...
25/06/2015Aplc Committee Changes
23/04/2015Antofagasta sells Chile water business for $1bn
23/04/2015Sale of Water Division
14/04/20152014 Annual Report and Financial Statements
14/04/2015Antofagasta sounds warning on Chile copper industry
14/04/2015Antofagasta sees forecast global copper surplus disappearing...
01/04/2015Normal Operations resumed following heavy rains
27/03/2015Heavy Rains in the Atacama
17/03/20152014 Preliminary Results
12/03/2015Resolution of Los Pelambres Protest
10/03/2015Analyst Sees Bright Spot In Copper As Miners Dig Deeper In H...
10/03/20152014 FY Results webcast and dial in details
10/03/2015Court ruling against Los Pelambres
09/03/2015Protest at Los Pelambres
03/03/2015Charles de Vaulx Buys 4 New International Stocks in Fourth Q...
02/03/2015Charles de Vaulx Purchases 4 New Holdings in Q4
23/02/2015Antofagasta plc expects lower cash costs in 2015
06/02/2015Notification of Major Interest In Shares
28/01/2015Quarterly Production Report – Q4 2014
22/01/2015Notification of Directors Interests
21/01/2015Completion of Duluth transaction
14/01/2015World Bank warning hits markets; Copper slumps
14/01/2015World Bank warning weighs on markets; copper a big loser
13/01/2015Notification of Directors Interests
03/12/2014Appointment of Iván Arriagada as Chief Executive Officer of ...
04/11/2014Duluth Metals to be sold to Chilean mining company
03/11/2014Acquisition of Duluth Metals Limited
29/10/2014Quarterly Production Report – Q3 2014
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
LSE (ANTO.L)FRANKFURT (FG1.F)
2 250,00-0.62%25,87+2.25%
LSE
GBX 2 250,00
19/04 18:26 -14,00
-0,62%
Cours préc. Ouverture
2 264,00 2 247,00
Bas haut
2 222,00 2 259,00
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
 -  -
Volume var. 1 mois
1 139 208 -
24hGold TrendPower© : 28
Produit Copper - Gold - Molybdenum - Silver
Développe Copper - Gold
Recherche Copper - Gold - Molybdenum - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202454,64%
2023-5,86%1766,851036,00
202215,47%1799,501009,50
2021-7,08%1972,001147,50
202053,70%993,801006,50
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :