Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Sherwood Copper Corp.

Publié le 17 juillet 2008

Releases Further High Grade Copper-Gold from Area 2 & Area 118 at M...

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | K Street | Precious Metals | Zinc |

 

SUITE 860 - 625 HOWE STREET ? VANCOUVER, BC  ? V6C 2T6  CANADA ? TEL: (604) 687-7545  FAX: (604) 689-5041

PRESS RELEASE

FOR IMMEDIATE RELEASE

 

July 17, 2008                                                                                                                        #08-27

 

Sherwood Releases Further High Grade Copper-Gold from Area 2 & Area 118 at Minto Mine

Area 2 & 118 copper-gold deposits both expanded to south

High grade core at Area 118 confirmed, including 4.7 % Copper & 3.4g/t over 8.5m in 08SWC-310

 

VANCOUVER, BRITISH COLUMBIA - Sherwood Copper Corporation (SWC: TSX-V) today announced results for 19 drill holes completed as part of its 2008 exploration program at the high grade Minto copper-gold mine in the Yukon.  Highlights of these recent results include: (a) confirmation of a high grade zone within the Area 118 deposit, including the highest reported intercept from Area 118 to date (4.7% copper and 3.4g/t gold over 8.5 metres (m)), and (b) the discovery of further high grade mineralization in wide-spaced drilling on the south of the Area 2 and Area 118 deposits.  The Area 2 and Area 118 deposits are each located less than 500m from the Minto pit, currently being mined.  As a result of the successes to date, Sherwood has increased the 2008 exploration budget by $1..2 million to $5.6 million and will now include approximately 24,000m of drilling. Highlights from the most recent 19 holes are tabulated below, while complete results are attached.

 

Hole ID

Target

From

(m)

To

(m)

Interval (m)

Interval (ft)

Copper (%)

Gold (g/t)

Silver (g/t)

08SWC-287

Area 118

173.8

182.5

8.7

28.5

2.27

0.82

12.1

 including

 

173.8

178.6

4.8

15.7

2.60

0.80

9.5

08SWC-289

Area 118

153.2

164.9

11..7

38..4

1.42

0.44

5.2

 including

 

157.4

163.9

6.5

21..3

1.59

0.47

5.1

08SWC-296

Area 2 South

71..3

75..9

4.6

15.1

2.02

0.51

10.8

08SWC-298

Area 118

26..4

31..2

4.8

15..7

1.93

0.50

10..2

and

 

163.1

173.7

10..6

34..8

1.55

0.48

4.4

08SWC-299

Area 2 South

182.7

192.5

9.8

32..1

1.75

0.63

pending

08SWC-300

Area 118

163.7

186.7

23..0

75..5

1.21

0.36

pending

 including

 

180.2

186.7

6.5

21..3

1.99

0.65

pending

08SWC-301

Area 118

161.7

179.5

17..8

58..4

1.05

0.20

pending

08SWC-303

Area 118

216.9

225.7

8.8

28.9

2.26

0.92

7.4

and

 

252.5

261.9

9.4

30..8

1.86

0.70

5.6

including

 

256.9

261.9

5.0

16.4

2.63

0.98

8.0

08SWC-310

Area 118

189.9

198.4

8.5

27.9

4.71

3.43

pending

including

 

193.1

197.6

4.5

14.8

5.78

5.41

pending

 

?The recent infill drilling results confirm that the Area 118 discovery contains a significant, high grade resource, while the expansion of the Area 2 and Area 118 deposits demonstrates continued opportunities to increase resources at the Minto Mine,? said Stephen Quin, President & CEO of Sherwood Copper.  ?Based on the 140% increases in resources in 2006 and 2007, plus the tremendous results being generated in 2008, we have further expanded the 2008 exploration program to build off these successes,? he said.  ?Further, the results to date suggest that the deposits discovered thus far may all comprise one large mineralized system, so we intend to test the potential for linking up the deposits by testing the largely undrilled area between the Area 2, Area 118, Ridgetop and Copper Keel areas as part of this expanded program.

 

2008 Drill Program

The objective of the 2008 exploration program is to both (a) increase confidence in the existing resources to a level that would support conversion to reserves through infill drilling and (b) to increase the overall resource through drilling of previously untested areas.   Following a successful exploration program in the upper Minto Valley in early 2008, drilling focused on infill drilling on Area 118, discovered in 2007, and has subsequently moved on to systematically defining the Ridgetop deposit through a combination of infill and step-out drilling.  Recently, a program of wide spaced drill holes has commenced that will evaluate the potential for linking the Area 2, Area 118, and Ridgetop resources into one large mineralizing system.  

 

To date, 17,099 metres of drilling have been completed in 81 holes in the 2008 drill program.  Seventeen holes for 4,470 metres were completed in early 2008, the results of which were reported on May 14, 2008.  Following a break, a further 64 holes for 12,629 metres have been completed and drilling is continuing.  Copper and gold assay results have been received for only 19 of these 64 holes and are reported herein.  Results are pending on the remaining 48 holes drilled to date.

 

Please follow the link below to a map identifying the priority exploration areas for 2008.

www.sherwoodcopper.com/i/pdf/2008-07-17PriorityExplorationCorridor.pdf.

 

Comments on Results to Date

The 2008 drill program is proceeding well and a preliminary geological interpretation, based upon very wide spaced drill holes, appears to support the hypothesis proposed by Sherwood?s exploration group in 2006 that all the copper-gold mineralization at Minto is part of one continuous to contiguous system.  Post-mineralization deformation (in the form of broad open folding and late brittle faults) gives the impression that the many mineralized centers identified to date are separate deposits.  However, with the density of drilling that Sherwood has completed over three years, it now appears that faults and folds have just complicated the interpretation of what is perhaps one very large mineralized system.  Since 2006, Sherwood has worked toward linking these prospects and deposits on a geological basis, supported by drilling, and this process will continue in 2008 as drilling steps into crucial areas where there was little or no previous data, between previously defined zones of mineralization.

A summary table of drill statistics, attached to this release, details how the drilling in 2008 is distributed thus far, while a synopsis of results is set out below.

Area 118: Infill and some step-out drilling at Area 118 has returned excellent results, with 8 of 11 holes reported so far grading better than 1% copper over significant intervals; four of which grade better than 2% copper, including the highest grade intersection ever reported at Area 118: 4.71% copper and 3.4g/t gold over 8.5m (27.9ft) in 08SWC-310.

Area 2: Follow-up drilling in 2008 on the last hole of 2007, 07SWC-269 in the southeast of Area 2, returned significant grade intersections both at shallow and intermediate depths.  The Area 2 deposit remains open at shallow depths to the southeast and at intermediate to greater depths to the east.  Preliminary geological interpretations suggest possible continuity between Area 2 and Copper Keel to the east.  More drilling is required to test this hypothesis.

 

For current drill hole locations, please view the accompanying map: (www.sherwoodcopper.com/i/pdf/2008-07-172008DHLocationMap.pdf).

 

About Sherwood Copper

Sherwood Copper?s objective is the profitable production of base and precious metals from high grade, open pit mines in Canada.  Sherwood?s first operating mine, the high grade Minto copper-gold mine in Yukon, Canada, was built on budget and ahead of schedule.  The Minto Mine is one of the highest-grade open pit copper-gold mines in the world, and is forecast to be a low cost producer.  Aggressive exploration on the Minto property has yielded significant success, providing Sherwood the opportunity to ?grow from within? by expanding the resource and reserve base, potentially leading to further production increases.  To further accelerate its production growth, Sherwood intends to pursue merger & acquisition opportunities that fit its business model and, in May 2008, Sherwood acquired 100% ownership in Western Keltic Mines (now Kutcho Copper Corp.), owner of the high-grade Kutcho copper-zinc-gold-silver deposit in northwestern British Columbia.  Sherwood expects to lever off its successful development of the Minto Mine and advance the Kutcho project to a production decision.

 

Quality Assurance

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 and reviewed by Stephen P. Quin, P. Geo., President & CEO for Sherwood Copper Corporation.  The exploration activities at the Minto project site are carried out under the supervision of Brad Mercer, P. Geol., V.P. Exploration for Sherwood.

 

The analytical method for copper and silver performed by SGS Laboratories under a contract arrangement at the Minto Mine Site, Yukon includes digestion in aqua regia followed by absorption spectroscopy.  Gold is measured using fire assay with atomic absorption spectroscopy; analysis is performed by SGS Laboratories at Red Lake, Ontario.  When visible gold is noted in drill core samples or regular analytical values exceed 5 grams per tonne, the pulp and screen metallic assay method is used to determine total gold content and gold content of different size fractions. This is considered industry best practice when dealing with coarse gold mineralization where a nugget effect is suspected. The result of the pulp and screen metallic assay is accepted as the most representative value and used in the assay database for resource calculations. Blank and standard samples are added to all sample shipments prior to submittal to the lab for quality assurance and quality control.  If more than two check samples assay outside of expected ranges, the work order is re-assayed. After the completion of planned drill programs, random check assays will be carried out by ALS Chemex of North Vancouver, BC.

 

Assay intervals reported herein are drill core lengths unless otherwise stated.  Because the known deposits are essentially flat lying and most drill holes reported to date are vertical, true widths are generally expected to be the same as reported core lengths unless otherwise stated. 

 

Additional Information

Additional information on Sherwood and its Minto Project can be obtained on Sherwood?s website at http://www.sherwoodcopper.com.

 

On behalf of the board of directors

SHERWOOD COPPER CORPORATION

?Stephen P. Quin?

Stephen P. Quin

President & CEO

 

 

Investor Contacts:

Stephen P. Quin 604.687-7545 or Chris Curran 604-687-7545

 

 

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this press release.

 

Forward Looking Statements

This document may contain "forward-looking statements" within the meaning of Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. These forward-looking statements are made as of the date of this document and the Company does not intend, and does not assume any obligation, to update these forward-looking statements.

 

Forward-looking statements relate to future events or future performance and reflect management's expectations or beliefs regarding future events and include, but are not limited to, statements with respect to the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. In certain cases, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of resources; possible variations in ore reserves, grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; as well as those factors detailed from time to time in the Company's interim and annual financial statements and management's discussion and analysis of those statements, all of which are filed and available for review on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.


Accordingly, readers should not place undue reliance on forward-looking statements.

 


 

2008 Drill Statistics ? Minto Property

To accompany Sherwood Copper News Release Dated July 17, 2008

 

 

 

Holes Completed

Status

Drill Area and

Type of Hole

2008

Phase 1

2008

Phase 2

Assay Data Released (*)

Assay Data Pending

Exploration Holes

 

 

 

 

Airstrip SW

0

1

1

0

Airstrip C.

0

0

0

0

Area 2

0

14

6

8

Area 118

0

22

11

11

Area 118 SW

3

1

3

1

Copper Keel

0

2

1

1

Gap

1

0

1

0

Minto Valley

13

0

13

0

Ridgetop

0

21

0

21

Ridgetop W

0

3

0

3

 

17

64

36

45

Summary

 

 

 

 

# of Holes to Date

81

 

 

# of Metres to Date

17,099

 

 

 

 

 

 

 

 

 


Details of Drill Results

To accompany Sherwood Copper News Release Dated July 17, 2008

 

Hole ID

 

Target

From

(m)

To

(m)

Interval (m)

Interval (ft)

Copper (%)

Gold (g/t)

Silver (g/t)

08SWC-287

Area 118

173.8

182.5

8.7

28.5

2.27

0.82

12.1

 including

 

173.8

178.6

4.8

15.7

2.60

0.80

9.5

 

 

221.1

224.7

3.6

11..8

0.54

0.18

3.3

 

 

 

 

 

 

 

 

 

08SWC-288

Copper Keel South

Geochemically anomalous ? no significant intersections

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08SWC-289

Area 118

66..5

69..0

2.4

7.9

0.81

0.10

2.0

and

 

153.2

164.9

11.7

38.4

1.42

0.44

5.2

including

 

157.4

163.9

6.5

21.3

1.59

0.47

5.1

 

 

 

 

 

 

 

 

 

08SWC-290

Airstrip SW

262.6

265.6

3.0

9.8

1.11

0.14

5.1

 

 

 

 

 

 

 

 

 

08SWC-291

Area 118

42..4

44..8

2.4

7.9

1.32

0.26

2.5

 

 

148.2

158.3

10..1

33..1

0.76

0.34

3.3

 

 

 

 

 

 

 

 

 

08SWC-292

Area 118

134.4

143.8

9.4

30..8

0.32

0.04

0.9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08SWC-293

Area 2 South

44..6

56..3

11..7

38..4

0.45

0.10

1.1

 

 

126.8

133.1

6.3

20..7

0.40

0.06

0.6

 

 

 

 

 

 

 

 

 

08SWC-294

Area 118

22..1

27..7

5.6

18..4

0.43

0.02

0.6

 including

 

22..1

23..6

1.5

4.9

1.11

0.03

0.8

and

 

83..6

87..2

3.6

11..8

0.91

0.25

4.0

and

 

157.4

165.9

8.5

27.9

1.38

0.88

9.4

 

 

 

 

 

 

 

 

 

08SWC-295

Area 2 South

Geochemically anomalous ? no significant intersections

 

 

 

 

 

 

 

 

 

 

 

 

08SWC-296

Area 2 South

52..4

62..2

9.8

32..1

0.47

0.14

2.7

 

 

71.3

75.9

4.6

15.1

2.02

0.51

10.8

 

 

 

 

 

 

 

 

 

08SWC-297

Area 2 South

81.3

86.8

5.5

18.0

1.18

0.42

4.8

 including

 

81..3

83..1

1.8

5.9

2.59

0.92

9.3

 

 

 

 

 

 

 

 

 

08SWC-298

Area 118

2.1

6.1

4.0

13..1

0.41

0.01

1.4

 

 

26.4

31.2

4.8

15.7

1.93

0.50

10.2

including

 

27.4

29.6

2.2

7.2

3.46

0.77

20.0

and

 

115.4

119.4

4.0

13..1

0.46

0.03

0.7

and

 

163.1

173.7

10.6

34.8

1.55

0.48

4.4

 

 

 

 

 

 

 

 

 

08SWC-299

Area 2 South

25..7

37..3

11..6

38..1

0.71

0.13

pending

and

 

89..9

92..6

2.7

8.9

1.06

0.21

pending

and

 

108.5

113.1

4.6

15..1

0.41

0.05

pending

and

 

130.4

135.0

4.6

15..1

0.47

0.01

pending

and

 

182.7

192.5

9.8

32.1

1.75

0.63

pending

and

 

228.3

236.3

8.0

26..2

0.82

0.33

pending

and

 

241.8

247.2

5.4

17..7

0.38

0.07

pending

 

 

 

 

 

 

 

 

 

08SWC-300

Area 118

60..2

68..1

7.9

25..9

0.32

0.10

pending

and

 

126.6

130.7

4.1

13..4

0.93

0.02

pending

And

 

163.7

186.7

23.0

75.5

1.21

0.36

pending

including

 

180.2

186.7

6.5

21.3

1.99

0.65

pending

 

 

 

 

 

 

 

 

 

08SWC-301

Area 118

58..1

66..7

8.6

28..2

0.93

0.29

pending

and

 

161.7

179.5

17.8

58.4

1.05

0.20

pending

and

 

224.0

226.1

2.1

6.9

1.35

0.55

pending

 

 

 

 

 

 

 

 

 

08SWC-302

Area 2 South

238.8

247.8

9.0

29..5

0.99

0.58

4.1

 

 

 

 

 

 

 

 

 

08SWC-303

Area 118

216.9

225.7

8.8

28.9

2.26

0.92

7.4

and

 

232.0

238.7

6.7

22..0

0.40

0.06

1.1

and

 

252.5

261.9

9.4

30.8

1.86

0.70

5.6

including

 

256.9

261.9

5.0

16.4

2.63

0.98

8.0

 

 

 

 

 

 

 

 

 

08SWC-304

Area 118

57..1

74..2

17..1

56..1

0.52

0.10

3.7

including

 

57..1

71..0

13..9

45..6

0.60

0.12

4.3

and

 

57..1

65..3

8.2

26..9

0.81

0.14

6.1

 

 

 

 

 

 

 

 

 

08SWC-305

Area 2 East

Assay Results Pending

 

 

 

 

 

 

 

 

 

08SWC-306

Area 2 East

Assay Results Pending

 

 

 

 

 

 

 

 

 

08SWC-307

Area 118

Assay Results Pending

 

 

 

 

 

 

 

 

 

08SWC-308

Area 2 East

Assay Results Pending

 

 

 

 

 

 

 

 

 

08SWC-309

Area 2 East

Assay Results Pending

 

 

 

 

 

 

 

 

 

08SWC-310

Area 118

71..2

74..4

3.2

10..5

0.85

0.12

pending

and

 

111.4

116.9

5.5

18..0

0.50

0.06

pending

and

 

189.9

198.4

8.5

27.9

4.71

3.43

pending

including

 

193.1

197.6

4.5

14.8

5.78

5.41

pending

 

 

 

 

 

 

 

 

 

08SWC-311 to 08SWC-350 are all awaiting assay results

 

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Sherwood Copper Corp.

CODE : SWC.V
CUSIP : 82442N 103
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Sherwood Copper est une société développant des projet miniers de cuivre basée au Canada.

Sherwood Copper est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 56,5 millions CA$ (46,4 millions US$, 36,8 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 8,26 CA$, et son plus bas niveau récent le 21 novembre 2008 à 1,01 CA$.

Sherwood Copper possède 53 853 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Sherwood Copper Corp.
2007 Annual report
Financements de Sherwood Copper Corp.
29/02/2008 Signs Committed Term Sheet for Corporate Credit Facility wi...
15/02/2008 Announces $7.2 million Flow-through Financing
Nominations de Sherwood Copper Corp.
01/04/2008Makes Key Appointments to its Board & Management
16/01/2008 Appoints Kevin Weston as Chief Operating Officer
Rapports Financiers de Sherwood Copper Corp.
27/08/2008Reports Continued Strong Financial Results for the Three Mon...
22/07/2008Reports Increased Copper Production & Reduced Costs in Secon...
30/05/2008Reports Strong Results from Operations in First Quarter 2008
Projets de Sherwood Copper Corp.
26/01/2009(Minto Mine)Capstone Mining Corp. Commences US$ 3 Million Resource Expan...
10/12/2008(Minto Mine)Capstone Mining Corp. Reports Final Drill Intercepts of Nea...
13/11/2008(Kutcho Creek)Increases Continuity of High Grade Copper Trend at its Kutch...
07/11/2008(Minto Mine)Raises US$37.5 million from Minto Precious Metal ProductionT...
04/11/2008(Minto Mine)Reports New Copper-Gold Discovery at Minto Mine and possible...
22/09/2008(Kutcho Creek)Reports Further High Grade Intercepts from its Kutcho Copper...
18/09/2008(Minto Mine)Reports Thick Intervals of Near Surface Copper-Gold Minerali...
02/09/2008(Kutcho Creek)Reports Multiple High Grade Intercepts from its Kutcho Coppe...
28/08/2008(Minto Mine)Reports High Rainfall temporarily restricts access to its Mi...
21/08/2008(Minto Mine)Reports Further High Grade Copper-Gold Results From Areas 2 ...
17/07/2008(Minto Mine)Releases Further High Grade Copper-Gold from Area 2 & Area 1...
14/07/2008(Kutcho Creek)Reports High Grade Intercepts from the Kutcho Drill Program
17/06/2008(Minto Mine)Announces Significant Increase in Copper-Gold Resources at M...
17/04/2008(Minto Mine)Reports Minto Copper-Gold Mine Achieves & Exceeds Design Cap...
10/03/2008(Kutcho Creek) Completes Funding Arrangements for Kutcho Project & Begins ...
25/02/2008(Minto Mine)Reports 2007 Production Results & 2008 Production Estimate f...
13/02/2008(Minto Mine)Intersects High Grade Copper-Gold Mineralization in 4 Separa...
14/01/2008(Minto Mine)Intersects High Grade Copper-Gold Mineralization at Area 118...
18/12/2007(Minto Mine) Reports Phase 2 Mill Expansion at Minto Copper-Gold Mine Co...
12/12/2007(Minto Mine) Reports Results of Pre-feasibility Study for Expansion of M...
07/12/2007(Minto Mine)Reports Groundwork has Commenced on Carmacks to Stewart Tran...
03/12/2007(Minto Mine)Intersects High Grade Copper-Gold Mineralization at Ridgetop...
29/10/2007(Minto Mine) Intersects High Grade Copper-Gold Mineralization at Area 11...
25/10/2007(Minto Mine) Ships first Minto Mine Concentrates from Skagway
25/09/2007(Minto Mine)Receives Encouraging Results From 2007 Gradient IP Geophysic...
19/09/2007Discovers High Grade at Airstrip & Expands High Grade at Are...
05/09/2007(Minto Mine)Reports "On budget & Ahead of Schedule" Phase 1 Construction...
25/07/2007(Minto Mine)Delivers First Concentrates from Minto Mine to Port of Skagw...
15/06/2007(Minto Mine)Phase 2 Exploration Program Underway at Minto Copper-Gold Mi...
12/06/2007(Minto Mine)Reports Excellent Metallurgical Test Results from Area 2 at ...
24/05/2007(Minto Mine)Discovers High Grade Copper-Gold Mineralization in Minto 'Ga...
24/04/2007(Minto Mine)Awarded Funding from the Yukon Government to Advance Area 2 ...
12/04/2007(Minto Mine)Expands Scope of Pre-feasibility Study on Minto Copper-Gold ...
11/04/2007Accelerates Phase 2 Mill Expansion at Minto Copper-Gold Mine...
Communiqués de Presse de Sherwood Copper Corp.
23/01/2009Capstone Mining Corp. Reports Debt Repayments, Funding of De...
24/12/2008Capstone Mining Corp. Mails Offer to Purchase to its Debentu...
24/11/2008Reports Cash Flow from Mining Operations of $29.9 million in...
21/11/2008Announces Closing of Precious Metal Transaction
19/09/2008sets Shareholder Meeting Date for Capstone Combination
05/08/2008Reports Higher Copper Production Forecast for 2009 & Updated...
25/07/2008Reports Phase 3 Mill Throughput Increase to 3,200tpd Approve...
30/06/2008Finalizes Exploration Agreement with Northern Tiger Resource...
12/06/2008Reports Results of Preliminary Economic Assessment for Kutch...
05/06/2008Holds Successful Annual Meeting & Reports on Strategic Objec...
28/05/2008and Western Keltic Announce Closing of Business Combination
07/04/2008and Western Keltic Mines Inc. Announce Planned Business Comb...
06/03/2008 Increases Holdings to Approximately 93% of Western Keltic S...
03/03/2008Signs Exploration Memorandum of Understanding with Firestone...
22/02/2008Acquires 91.7% of Western Keltic Shares & Extends Offer for ...
12/02/2008Takes up 85.6% of Western Keltic Shares & Extends Offer for ...
30/01/2008Extends Offer for Western Keltic Mines to February 11, 2008
24/12/2007 Mails Offer for Western Keltic Mines
26/11/2007 Announces Agreement for Acquisition of Western Keltic Mines
29/10/2007 Appear on BNN TV
12/10/2007 Holds the Official Opening Ceremony for the Minto Mine, Yuk...
04/10/2007 Reports that Minto Mine Declares Commercial Production
17/07/2007Identifies Two Extensive Copper-Gold Systems at Minto Projec...
16/07/2007Reports Geotech Program Results in Improved Pit Slopes at Mi...
29/05/2007reports Yukon Utilities Board Approves Revised Power Purchas...
15/05/2007reports Yukon Government Support for Revamped Power Purchase...
10/05/2007Nominates Industry Leader for election to its Board of Direc...
02/05/2007Announces Yukon Utilities Board Turns Down Provisions of the...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SWC.V)
1,05-7.89%
Dernières informations avant suppression de la cote
Cours préc. Ouverture
1,14 1,04
Bas haut
1,02 1,12
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  1,05 -%
Volume var. 1 mois
0 -%
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/09/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :