Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

El Nino Ventures Ltd

Publié le 16 janvier 2013

Releases Phase 1 Metallurgical Results for the Murray Brook Base Metal Deposit, Bathurst Mining Camp

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Nickel | Report | Zinc |

El Nino Releases Phase 1 Metallurgical Results for the Murray Brook Base Metal Deposit, Bathurst Mining Camp, New Brunswick


January 16, 2013, Vancouver, BC; El Nino Ventures Inc. ("ELN" and the "Company") (TSX.V: ELN; OTCQX: ELNOF Frankfurt: E7Q) is pleased to announce the results from Phase 1 metallurgical testwork commissioned by its partner, Votorantim Metals Canada Inc. (Votorantim), on samples from the Murray Brook polymetallic deposit, located in the Bathurst Mining Camp, New Brunswick. The purpose of the testwork was to investigate flotation options for sequential recovery of copper, lead and zinc concentrates from Murray Brook feed.

The metallurgical testwork was completed at RPC Science & Engineering Laboratories (RPC) in Fredericton (New Brunswick), under the direction of metallurgists Ross Gilders and Leo Cheung. Further information on RPC may be found at the laboratories' website at http://www.rpc.ca

Results
Testwork was completed on bulk drill core samples from the Eastern Zone and from the Western Zone of the Murray Brook deposit (Figure 1; Table 1). The test program consisted of sample preparation and compositing, characterization, and batch flotation tests followed by locked cycle tests on a composite sample. The composite sample head grade for the testwork is similar to the grade of the current high confidence Measured resources for Murray Brook.

Locked cycle tests by RPC successfully produced individual copper, lead and zinc concentrates with the following recoveries and grades (Table 2):
  • Recoveries of 51.4% copper, 1.7% zinc, 4.5% lead, and 12.5 % silver in a copper concentrate grading 17.5% copper, 6.0% zinc, 6.2% lead, and 591 g/t silver;
  • Recoveries of 36.6% lead, 7.2% copper, 1.4% zinc, and 17.5% silver in a lead concentrate grading 50.3% lead, 2.4% copper, 5.3% zinc, and 833 g/t silver; and
  • Recoveries of 88.8% zinc, 15.8% copper, 8.3% lead and 25.3% silver in a zinc concentrate grading 53.8% zinc, 0.5% copper, 1.1% lead, 95 g/t silver.

A copy of the report is available for viewing on the Company's website. Additional metallurgical work has been commissioned by Votorantim and RPC, which involves completing expanded and extended locked cycle tests to optimize copper, lead and precious metal recoveries in support of a planned Preliminary Economic Assessment in 2013.

Harry Barr, Chairman & CEO states: "The results of the Phase 1 metallurgical testwork on Murray Brook are encouraging, particularly the 89% zinc recovery combined with good silver recovery. These initial metallurgical results plus the results of 18,500 metres of drilling completed since 2011 and the resource estimation of February 2012, confirm the robustness of Murray Brook as this well-located project is steadily advancing towards the planned completion of a Preliminary Economic Assessment in H1 2013."

Sampling

The sample materials were derived from three HQ size drill cores (Table 1). Hole MB-2012-121 was drilled in the Eastern Zone, the shallower and more copper-rich of the two massive sulfide zones at Murray Brook. Holes MB-2012-124 and MB-2012-132 were drilled in the deeper, more zinc-lead-precious metal rich Western Zone. (Description and assay results for each of the three holes are provided in ELN press releases dated July 30, August 14, August 28, 2012). The drill core was logged, split, sampled and shipped to RPC. Intervals of potential secondary mineralization and fracturing were sampled separately. In total 3226 kg of material was delivered to RPC for testwork.
 


Figure 1. Massive Sulfide Thickness, 10 metre contours: Colour contour map of Murray Brook showing the location of the Eastern Zone and the Western Zone plus the surface trace of the massive sulfides. Metallurgical hole MB-2012-121 was drilled in the Eastern Zone. Metallurgical holes MB-2012-124 and -132 were drilled in the Western Zone.
 

Table 1.Drill Core Sample Material for the metallurgical Testwork on Murray Brook

*Grade of current Measured and Measured + Indicated resources (see Technical Report on www.elnventures.com)


Table 2.Assay and Recovery Results of Locked Cycle Tests for Murray Brook

 

Grindability Tests

Composite samples for each of the three Murray Brook drill holes were submitted for grindability test work. Rod Mill Grindability Indices for the Murray Brook bulk sample materials averaged 14.6 kWh/t with a hardness percentile of 55%. Bond Ball Mill Grindability Indices averaged 10.7 kWh/t with a hardness percentile of 10%. These data suggest that Murray Brook mineralization is of moderate hardness for a rod mill and lower hardness for a ball mill.

Mineralogy

SEM-EDS mineralogical studies of the overall composite sample and each individual drill core by RPC indicate that sphalerite and galena occur as interstitial grains, inclusions, veinlets and attachments to pyrite. Chalcopyrite occurs as interstitial grains to pyrite. Chalcopyrite is less common hole MB-2012-132, consistent with the lower copper grades in the Western Zone. Covellite is present in MB-2012-124. Generally, the principal silver mineral is tetrahedrite. The sulfide grains are mainly <20 �m in size. However, sphalerite grains 50-100 �m in size are present interstitial to pyrite grains.

Flotation

Primary bulk sulfide rougher floats were carried out to estimate flotation performance. The reagent regime included 400 g/t CuSO4, pH 10.0-10.5, 33.3 g/t 3418A, 10g/t PAX, 15 g/t MIBC and 11 minutes total at 1250 rpm. Rougher target liberation grind size was established to be D80 of ~30 �m. Initial testwork found that flotation performance was adversely affected by the presence of secondary (oxidized) material. This latter material therefore was excluded from the overall composite sample used in locked cycle testing.

Next Steps

Additional metallurgical testwork is planned to be carried out by RPC in early 2013. The results will be reported in a planned Preliminary Economic Assessment to be completed in Q1 2013. The additional testwork will focus on optimizing copper, lead and precious metal recoveries, in part through processing of larger samples in bigger equipment. An expanded metallurgical test program, including pilot plant testing, may be warranted if PEA studies are positive.

Qualified Persons Statement

This news release has been reviewed and approved for technical content by Ali Hassanalizadeh M.Sc. P.Geo.,
a qualified Person under the provisions of National Instrument 43-101.

About El Ni�o Ventures Inc. Bathurst Projects

El Ni�o Ventures Inc. has two active projects in the Bathurst Mining Camp;

  1. Murray Brook Project

The Murray Brook project is a polymetallic, massive sulfide deposit and is the fifth largest deposit discovered to date in the Bathurst Mining Camp, New Brunswick. The Murray Brook property is located 60 km west of Bathurst. It is supported by excellent infrastructure, including paved roads, grid electricity and communities to provide goods, services and skilled labour.

A $3 million exploration budget was approved for the 2012 exploration program. It included $2.5 million for drilling to bring resources into the measured category at the Murray Brook deposit and $500,000 for exploration of the Murray Brook and Camel Back properties, both of which are covered by the option agreement with Murray Brook Minerals. To date, more than 28,000 metres of drilling has been completed with encouraging results. In February 2012, an NI43-101 compliant resource estimation was announced (see news release). The technical report is filed on SEDAR.com and also available on ELN's website. An updated NI43-101 mineral resource estimation and metallurgical test results are slated for completion in the first quarter of 2013. Results of these will be incorporated in a Preliminary Economic Assessment "PEA" that is slated for completion in the first quarter of 2013.

ELN and VMC currently own 70% of the project, of which 35% is held by each of the two parties. Under a purchase agreement signed by VMC on August 28, 2012 with MBM and Murray Brook Resources Inc. (collectively the owners), VMC acquired the right to purchase the additional 30% of the Murray Brook Project from the owners. ELN has been provided the option to purchase an additional 15% in the project for a combined total of 50% (35% +15%).

Although the terms of the Participation Agreement provided for a three-year period to earn the initial 50% and two years to earn the additional 20%, ELN and VMC completed their earn-in in less than 18 months.

  1. Bathurst Option Joint Venture Project (BOJV)

Consists of an initial 4,712 claims in the Tri-Party Agreement with Xstrata & VM Canada whereby VM Canada may incur exploration expenditures of $10 million over a period of 5 years to earn a 50% interest. VM Canada may further increase its interest to 70% by spending an additional $10 million over 2 years.

Votorantim Metals Canada Inc. Statement

Technical details in this news release were provided by Votorantim whose professional geologists conduct operations consistent with mineral industry best practices. Votorantim accepts no responsibility for this news release.

About Votorantim Metals Canada

Votorantim Metals Canada Inc. is a subsidiary of Votorantim Metais, a company that is part of the Votorantim Group that was founded in Brazil in 1918. The Votorantim Group operates in twenty countries and has over 40,000 employees. Votorantim Metais is the largest electrolytic nickel producer in Latin America and one of the world's leaders in the production of zinc, aluminum and nickel. Votorantim Canada Metals Inc. in conjunction with Xstrata Zinc and El Nino Ventures is operator of the Bathurst Option and Joint Venture which is actively exploring for base metal deposits within the Bathurst Mining Camp.

About El Nino Ventures Inc.

El Ni�o Ventures Inc. is an international exploration company, focused on exploring for lead, zinc, copper, gold and silver in New Brunswick, Canada and copper in the Democratic Republic of Congo ("DRC").

On Behalf of the Board of Directors


"Harry Barr"

Harry Barr
Chairman & CEO
El Nino Ventures Inc.


Further Information: Tel: +1 604 685 1870 Fax: +1 604 685 8045
Email: info@elninoventures.com or visit www.elninoventures.com
650-555 West 12th Avenue, City Square, West Tower, Vancouver, B.C., Canada, V5Z 3X7


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements. Note: This release contains forward-looking statements that involve risks and uncertainties. These statements may differ materially from actual future events or results and are based on current expectations or beliefs. For this purpose, statements of historical fact may be deemed to be forward-looking statements. In addition, forward-looking statements include statements in which the Company uses words such as "continue", "efforts", "expect", "believe", "anticipate", "confident", "intend", "strategy", "plan", "will", "estimate", "project", "goal", "target", "prospects", "optimistic" or similar expressions. These statements by their nature involve risks and uncertainties, and actual results may differ materially depending on a variety of important factors, including, among others, the Company's ability and continuation of efforts to timely and completely make available adequate current public information, additional or different regulatory and legal requirements and restrictions that may be imposed, and other factors as may be discussed in the documents filed by the Company on SEDAR (www.sedar.com), including the most recent reports that identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements. The Company does not undertake any obligation to review or confirm analysts' expectations or estimates or to release publicly any revisions to any forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events. Investors should not place undue reliance on forward-looking statements.

 

This email should not be construed as an offer to buy or sell securities of El Ni�o Ventures Inc.
Click HERE to unsubscribe to our email list

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

El Nino Ventures Ltd

EXPLORATEUR
CODE : ELN.V
ISIN : CA28335E3041
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

El Nino Ventures est une société d’exploration minière d'argent et d'or basée au Canada.

El Nino Ventures détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont KASALA en Republique Democratique Du Congo et BATHURST et BANCROFT au Canada.

El Nino Ventures est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 3,1 millions CA$ (2,5 millions US$, 2,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 15 août 1997 à 9,90 CA$, et son plus bas niveau récent le 24 mars 2016 à 0,01 CA$.

El Nino Ventures possède 61 610 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de El Nino Ventures Ltd
04/10/2013Niño Ventures Inc. Announces Closing of Private Placement an...
11/09/2013and Private Placement - El Nino Ventures
08/04/2011Closes Non Brokered Private Placement
02/12/2009Closes $1.5 Million Non-Brokered Private Placement; Update o...
26/08/2009First Tranche Closing Non-brokered Private Placement
27/07/2009Ammends Terms of Non-Brokered Private Placement
Nominations de El Nino Ventures Ltd
25/09/2009Appoints Mr. Harry Barr as Chairman and Acting CEO
27/03/2008appoints senior geologist to head its exploration program in...
12/10/2007Announces Appointment of New Directors and Chief Executive O...
Projets de El Nino Ventures Ltd
25/02/2014(Bathurst)Exploration Update on the Bathurst Option Joint Venture Zinc...
10/09/2013(Bathurst)$2 Million Exploration Program Approved for Bathurst Option ...
02/05/2013(Bathurst)Development Update on the Murray Brook Zn-Cu-Pb-Ag Deposit, ...
16/01/2013(Bathurst)Releases Phase 1 Metallurgical Results for the Murray Brook ...
23/10/2012(Bathurst)Exploration Update on the Bathurst Option JV Base Metals Pro...
18/09/2012EXPANDS ITS PROJECT INTEREST WITH BRAZIL'S SECOND LARGEST MI...
07/09/2012Announces completion of its 35% Earn-In, Receives Notice of ...
28/08/2012announces a 122 metre thick mineralized interval of massive ...
17/07/2012(Bathurst)Drills 9.23 % Zinc, 108.7 gpt Silver, 0.18 % Copper, 0.336 g...
24/04/2012(Bathurst)Exploration Update on the Bathurst Mining Camp (BMC) Base Me...
27/03/20122012 Exploration Program on the Murray Brook Polymetallic Ba...
04/03/2012Northern Miner article: El Nino Ventures posts new resource ...
23/02/2011(Bathurst)2011 Exploration Program on the Bathurst Mining Camp, New Br...
11/03/2010(Kasala)Reports Soil Geochemistry Sampling Results on the Kasala Cop...
24/07/2009(Bathurst)Options Bathurst Project to VotorantimMetals Canada Inc.
25/02/2009(Kasala)Identifies Additional Targets On The Company's Kasala Projec...
01/02/2008intersects 10 meters of 3.50% Cu and 5 meters of 1.90% Cu, i...
17/10/2007Acquires Significant Land Position in Ireland
Communiqués de Presse de El Nino Ventures Ltd
20/06/2016EL NINO CLOSES PRIVATE PLACEMENT AND ISSUES EARLY WARNING RE...
20/06/2016Early Warning Report
16/06/2016El Nino announces extension of private placement and issues ...
22/04/2016El Nino Announces Private Placement of up to $500,000; Negot...
10/07/2015Democratic Republic of the Congo (DRC) Corporate Update
09/04/2015MMG Limited Terminates Option Agreement with El Nino
27/10/2014El Nino Receives DRC Supreme Court Approval for All Arbitrat...
27/10/2014El Nino Receives DRC Supreme Court Approval for All Arbitrat...
23/09/2014El Nino Seeks Joint Venture Partner for Zinc-Lead Exploratio...
20/05/2014El Nino Options the Kasala Project to MMG Limited
02/04/2014El Nino Ventures Wins Final Award on all Costs of the Intern...
20/03/2014El Nino Ventures Inc. Grants Options
06/01/2014Wins International Commercial Arbitration Against George Kav...
23/07/2013(Bathurst)Positive Preliminary Economic Assessment for Murray Brook Zn...
05/06/2013(Bathurst)Positive Preliminary Economic Assessment for Murray Brook Zn...
13/11/2012Update from the Chairman
31/10/2012(Bathurst)Developing Bathurst's Largest NI 43-101 Polymetallic Deposit
02/10/2012Ni=F1o Ventures Inc. announces a 45.4 metre drill intersecti...
26/09/2012Niño Ventures retains Renmark Financial Communications
14/08/2012announces a 4.3% Zinc, 1.4% Lead and 54 g/t Silver over 81 M...
30/07/2012announces a 10.34 % Zinc, 126.0 gpt Silver, 0.29 % Copper, 1...
27/06/2012(Bathurst)continues to intersect High Grade Zinc, Gold and Silver Over...
05/06/2012(Bathurst)Announces High Grade Zinc, Gold and Silver intersections ove...
17/05/2012(Bathurst)Announces High Grade Zinc, Lead and Silver on Phase II 18,00...
11/05/2012(Bathurst)Ni=F1o Announces Initial 50% Earn-In for Murray Brook Projec...
17/04/2012Ni=F1o Ventures Inc. Announces SEDAR Filing of NI 43-101 Min...
28/02/2012(Bathurst)Announces an Initial NI 43-101 Mineral Resource Estimate for...
23/01/2012(Bathurst)Announces Additional High Grade Zinc, Lead and Silver Over B...
16/01/2012(Bathurst)Continues to Intersect High Grade Zinc, Lead and Silver Over...
28/11/2011(Bathurst)Reports High Grade Zinc, Lead and Silver over Broad intercep...
16/09/2011Joins OTCQX -- "ELNOF"
30/08/2011(Bathurst)Significant drill results continue to be intersected in the ...
12/07/2011Ni=F1o Ventures Announces $1=2C000=2C000=2C 6650 MeterDrill ...
24/05/2011amends press release of April 26, 2011
11/05/2011Up to 27 Metres (88.6 ft) of 9.56% Zinc; 122.1 g/t (3.56 opt...
25/04/2011An Interview of Harry Barr, Chairman and Acting CEO of El Ni...
11/04/2011DEMOCRATIC REPUBLIC OF CONGO (DRC) COURT RULES IN FAVOUR OF ...
07/03/2011Increases Private Placement to $2,000,000
04/03/2011Ni=F1o Ventures Appoints Colin Bird to Advisory Board
05/01/2011Hearing Update Regarding Claims Against George Kavvadias and...
24/06/2010Litigation in the DRC Dismissed; El Nino Files $850,000 Coun...
04/05/2010Votorantim Metals Canada Inc. finalizes Option/Joint Venture...
10/12/2009joins Agoracom and launches Online IR and Marketing Program
18/02/2009Joins the "Agoracom 100" and Launches Online IR and Marketin...
16/12/2008Completes Acquisition in the DRC
03/09/2008 at the Las Vegas Hard Assets Investment Conference
21/07/2008makes new Acquisition in the DRC
26/06/2008DRC Exploration Program Review and Update
13/05/2008DRC Exploration Program Update
05/05/2008Commences Irish Drill Program
14/04/200825,000 meter drill program underway in the Democratic Republ...
21/02/2008Update on Democratic Republic of Congo Projects
11/02/2008to Drill Irish Licences
04/02/2008acquires new Copper Project in the Democratic Republic of Co...
21/01/2008Update on Exploration Program in the Democratic Republic of ...
10/12/2007Update on Exploration program Project in the Democratic Repu...
28/11/2007 Completes 7,000 Meter Drill Program on Copper Project in th...
13/11/2007update on their drill program in the Democratic Republic of ...
06/11/2007New Office
25/10/2007expands drill program to 7,000 meters using a second drill r...
09/10/2007 5,000 meter drilling program in the Democratic Republic of ...
20/09/2007Identifies New Copper Mineralized Zone on Properties in the ...
20/08/2007to start 5,000 Meter Drill Program on their Democratic Repub...
02/08/2007to Commence Airborne Geophysics, Followed by Initial Drill P...
25/06/2007& Xstrata Zinc to Commence 25,000 m Drill Program on Bathurs...
22/06/2007Mining expertise helps El Nino Ventures find success
14/06/2007Begins Work on Copper Mountain Project in Democratic Republi...
11/06/2007Starts Operations in the (DRC) Congo and the Government of N...
20/04/2007Outlook for 2007 -2008 Work Program and Report on the Bathur...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (ELN.V)FRANKFURT (E7Q.F)
0,050+150.00%0,028+0.00%
TSX-V
CA$ 0,050
30/12 09:30 0,030
150%
Cours préc. Ouverture
0,020 0,050
Bas haut
0,050 0,050
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,050 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -25
Produit
Développe
Recherche Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/04/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2022100,00%0,050,02
2021-44,44%0,060,03
202080,00%0,070,02
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :