Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Kimber Reports Additional High Grade Gold and Silver Results From Underground Sampling at Monterde
Published : May 01, 2013

70 m at Average of 5.25g/t AuEq over 1.7m Width on Carmen Level 3

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   G Mexico | Report |

VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 1, 2013) - Kimber Resources Inc. (News - Market indicators)(NYSE MKT:KBX) is pleased to announce the latest set of results from its underground rehabilitation and sampling program within the historic Carmen level 3 underground workings of the Carmen deposit at the 100% owned Monterde gold-silver project in Chihuahua, Mexico.

Carmen Level 3 is the uppermost of the three adits driven into the Carmen vein during underground mining conducted between 1936 and 1944. Sampling results have been returned for the initial 80 metres of tunnel from the un-mined portal section of the 3 Level adjacent to one of the large stopes mined in the Carmen mine. Assay results from level 3 at Carmen again show a significant strike length of gold and silver mineralization along accessible unmined portions of the Carmen vein. The continuity of these high grade zones over significant strike lengths supports the potential for similar continuity of high grade zones intersected in other areas of the Carmen deposit.

Sampling within the initial section of the Carmen 3 level yielded a weighted average grade of 1.56 g/t gold and 194 g/t silver (5.25 g/t gold equivalent) over 1.73m average sample width (true width) representing 70 metres of notably mineralized strike length along the vein (S06 to S28). This average includes a higher grade section, from S11 to S28, totaling 50m of strike averaging 1.65m at 1.84 g/t gold and 230 g/t silver for 6.21 g/t gold equivalent (see figure 3).

Individual sample highlights from the sampling program are as follows:

Sample Number Sample Location True Width
(m)
Gold
g/t
Silver
g/t
Gold Eq*
g/t
S13 Carmen 3 1.4 5.64 255.9 10.50
S27 Carmen 3 1.5 2.06 336.0 8.45
S24 Carmen 3 1.55 1.56 351.5 8.25
S15 Carmen 3 1.1 3.37 275.0 8.60
S16 Carmen 3 1.9 2.22 311.2 8.14
* Gold equivalent based upon silver:gold ratio of $27/$1420, Gross metal values, no recovery factor applied.  
** Horizontal Samples are estimated to be between 80-100% of true width.    

"We continue to be pleased with the high grade gold and silver results from the underground sampling program at the Carmen deposit," said Gordon Cummings, President and CEO of Kimber Resources. "Kimber is currently reviewing the potential to take Monterde into production with reduced capital expenditure and a focus on high grade gold and silver production. These results showing continuity of high grade gold and silver at Carmen support that initiative."

The results of the underground sampling at Carmen have successfully provided valuable information including:

  1. Support of continuity of the high grade mineralization on the Carmen vein structure between the old mine workings.
  2. Distribution of gold and silver within the mineralized zones on the Carmen structure.
  3. Mineralization controls, including lithological and structural.
  4. Ground conditions for mine development planning and economics.

The underground work program initiated at the Carmen deposit was aimed at providing more than 650 metres of underground access to high-grade gold-silver mineralized structures, including the Carmen and Hilos structures (see figures 2 and 3 below). Thus far, access has been achieved within all four of the targeted adits and total access exceeds 965 metres within the historic underground mine workings. Levels rehabilitated currently include Hilos Mine levels 0 and 1 and Carmen Mine levels 1 and 3. Assay results have been received for sampling on the Hilos levels 0 & 1 and Carmen level 1, as well as partial sections of the Carmen 3 level reported herein (Hilos results reported December 20, 2012 and Carmen Level 1 reported February 26, 2013). Rehabilitation and sampling continues on the Carmen level 3 workings.

Figures 1 & 2 show the spatial relationship of the historic workings with relation to the proposed Open Pit as outlined in the 2011 Preliminary Economic Assessment (the "PEA"). While the levels being sampled are within the proposed Open Pit, the sampling and mapping provides important insight in respect of the potential continuity of high grade mineralization in the same vein structures below the proposed pit bottom. This information will be incorporated into the ongoing economic and engineering studies of the Carmen deposit development alternatives.

Figure 3 show the sample station locations within Carmen level 3. See the Company's website at www.kimberresources.com for full details of the sample data.

Historic production of gold and silver ores from the Monterde underground mine took place between 1937 and 1944. Total ore production has been estimated at 68,000 tonnes grading 19.29 g/t gold and 311.5 g/t silver. The mining cut-off grade is reported to have been approximately 15.0 g/t gold. All of the ore produced was oxide in nature. Historic mining depths were greater than 250 metres vertical. Production came from two underground mines located on two separate shears, Carmen and Los Hilos, separated by an east-west distance of approximately 150 metres.

Sampling Program Description and QA/QC

Sampling within the underground workings included diamond saw channel sampling, taken in compliance with the Company's core drilling QA/QC protocol, and have been analyzed for gold, silver and trace elements with ALS Chemex laboratory. The vein exposures in the back (roof) and face of the workings are sampled in stations perpendicular to the strike of the structure, with the widths of the individual samples determined by the mineralization and alteration. Sample stations include one to four continuous channel samples, with the hanging wall, vein and footwall mineralization separated into individual samples. Sample stations are spaced at approximately 2 metre intervals along the vein, except in areas where historic mining has removed the vein. Minimum sample widths were 0.4 metres and maximum was 2.0 metres. The cross cut drifts were sampled along waist high horizontal channel samples, with sample widths again determined by mineralization, but typically on 1.5 metre intervals. The underground channel sample data is being compared to the drill data in the area of the sampling for validation crosschecks and to analyze trends where stronger gold-silver mineralization occurs. Sample widths reported are true thicknesses, except for horizontal crosscut samples which are approximately 80-100% of true thickness. Duplicate channel samples were taken for each 20th sample with blank and standard samples inserted in the sample stream.

About Kimber

Kimber owns mineral concessions covering in excess of 39,000 hectares in the prospective Sierra Madre gold-silver belt, including the Monterde property, where three gold-silver mineral resources have already been defined. The most advanced of these, the Carmen deposit, has been extensively drilled and has undergone detailed geologic modeling. The completion of the Updated Preliminary Economic Assessment for Monterde in 2011 represented a significant step forward for Kimber and supported further evaluation and more advanced economic studies at the Monterde deposits, with the 2012 Updated Mineral Resource Estimate Technical Report for the Carmen deposit representing a component of those activities.

Forward looking statements

Statements in this release may be viewed as forward-looking statements, including statements regarding estimates of mineral resources at Monterde, the preliminary economic assessment of the Monterde project, the conversion of inferred mineral resources to measured and indicated mineral resources, the conversion of mineral resources to mineral reserves, life of mine estimates, the potential for gold and silver mineral resources in the Carmen and Veta Minitas deposits and other targets within the Monterde project, the implications of the results of channel samples reported herein, the results of future exploration, the economic potential of any such discoveries made, the further development, expected results and future economic assessments of the Monterde project. When used in this press release, the words "expect", "intend", "hopes", "should", "believe", "may", "will", "if", "anticipates", "potential for", "potentially", "suggests" and similar expressions are intended to identify forward-looking statements. Such statements involve risks and uncertainties that could cause actual results to differ materially from those projected. Such risks and uncertainties include, among others, uncertainty of mineral reserve and resource estimates, continuity of mineralization between drill holes, risks relating to fluctuations in the price of gold, the inherently hazardous nature of mining-related activities, potential effects on Kimber's operations of environmental regulations in the countries in which it operates, risks due to legal proceedings, risks relating to political and economic instability in certain countries in which it operates, risks related to the use of inferred mineral resources in the preliminary economic assessment, and uncertainty of being able to raise capital on favourable terms or at all, as well as those risk factors discussed under the headings "Cautionary Note Regarding Forward-Looking Statements" and "Risk Factors" in Kimber's latest Annual Report on Form 20-F as recently filed on SEDAR and EDGAR. There are no assurances the Company can fulfil such forward-looking statements and the Company undertakes no obligation to update such statements, except as required by law. Such forward-looking statements are only predictions; actual events or results may differ materially as a result of risks facing the Company, some of which are beyond the Company's control.

Quality Assurance/Quality Control

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 and reviewed and approved by Mr. David R. Hembree, P.Geo., Vice President Exploration of the Company. The exploration activities at the Monterde project site are now carried out under the supervision of Mr. David R. Hembree, who is the designated Qualified Person under National Instrument 43-101 for the Monterde project and is responsible for quality control at Monterde and has verified the data being disclosed herein. He has determined that the laboratory reports matched the underground sample logs and that the quality control assays fall within reasonable limits. QA/QC procedures incorporate blanks and duplicates inserted at the mine and standards inserted after sample preparation. Sample preparation was done by ALS Chemex at its Chihuahua laboratory. Pulps are analyzed by ALS Chemex at its laboratory in North Vancouver, British Columbia, using 50 gram sub-samples, using fire assay with an AA finish for gold and four-acid digestion and ICP finish for silver from a 0.4 gram subsample. Over limit gold or silver intervals are re-assayed by fire assay with gravimetric finish.

Cautionary Note to U.S. Investors - The United States Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Kimber Resources uses certain terms in this news release, such as "mineral resources," which the SEC guidelines strictly prohibit U.S. companies from including in their filings with the SEC. U.S. Investors are urged to consider closely the disclosure under the heading "Cautionary Note to U.S. Investors Regarding Mineral Reserve and Resource Estimates" in our latest annual report on Form 20-F which may be secured from us, or from the SEC's website at http://www.sec.gov/edgar.shtml.

To view figures 1-3 please click on the following link: http://media3.marketwire.com/docs/KBRFigs1-3.pdf



Kimber Resources Inc.
Renee Brickner, BSc (Hons) Geol.
Vice President, Investor Relations
(604) 669-2251 or North America Toll Free: 1-866-824-1100
or
Kimber Resources Inc.
Gordon Cummings, CA
President and CEO
(604) 669-2251 or North America Toll Free: 1-866-824-1100
(604) 669-8577 (FAX)
kimbernews@kimberresources.com
www.kimberresources.com

Kimber Resources Inc

EXPLORATEUR
CODE : KBR.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Kimber Res. est une société d’exploration minière d'or et d'argent basée au Canada.

Kimber Res. détient divers projets d'exploration au Mexique.

Ses principaux projets en exploration sont MONTERDE CARMEN, PERICONES, SETAGO, MONTERDE CAROTARE et MONTERDE VETAS MINITAS au Mexique.

Kimber Res. est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 15,7 millions CA$ (14,2 millions US$, 10,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 29 décembre 2006 à 3,95 CA$, et son plus bas niveau récent le 16 août 2013 à 0,07 CA$.

Kimber Res. possède 104 700 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Kimber Resources Inc
2007 Annual Report
Annual Report 2006
Nominations de Kimber Resources Inc
10/10/2013and Invecture Announce Take-Over Bid Circular and Directors'...
20/09/2011appoints TIm Haldane to the board of directors
Rapports Financiers de Kimber Resources Inc
01/10/2013Announces Year End Financial Results
15/02/2013Announces Second Quarter Financial Results
02/10/2012Announces 2012 Year End Results
02/10/2012Announces 2012 Year End Results
15/05/2012Announces Third Quarter Financial Results
14/02/2012Announces Second Quarter Financial Results
17/05/2011ANNOUNCES THIRD QUARTER FINANCIAL RESULTS
16/02/2011ANNOUNCES SECOND QUARTER FINANCIAL RESULTS
Projets de Kimber Resources Inc
16/04/2012Continues to Drill High-Grade Silver at Monterde Including 4...
26/01/2012Intercepts 7 Metres of 18.3 G/T Gold And 374.3 G/T Silver in...
20/01/2012Exhibits at Vancouver Resource Investment Conference
31/08/2011Intercepts 2.3 Metres of 22.7g/T Gold Below Carmen Gold-Silv...
27/07/2011Intercepts 10 Metres Of 11g/T Gold Below Carmen Gold-Silver ...
01/06/2011(Monterde Carmen)Intercepts 4.9 Metres Of 78.4 G/T Gold And 127.9 G/T Silver ...
27/05/2011(Monterde Carmen)Intercepts 5.2 Metres Of 51.9 G/T Gold And 1,076 G/T Silver ...
03/03/2011(Monterde Carmen)Intercepts 8 Metres Of 1.6 G/T Gold And 224 G/T Silver At Ca...
07/02/2011(Monterde Carmen)First Drill Results From Carmen Gold-Silver Deposit, Monterd...
27/07/2010Filing Of NI 43-101 Preliminary Assessment Technical Report ...
02/06/2010(Monterde Carmen)Positive Preliminary Assessment For Monterde
26/05/2010(Pericones)Updates exploration activities at Monterde gold-silver and P...
20/11/2009(Monterde Carmen)High Grade Gold-Silver Mineral Resource Estimate
Communiqués de Presse de Kimber Resources Inc
25/09/2013Invecture Group to Make C$0.15 Per Share Cash Offer for Kimb...
22/07/2013Files Form 25
25/06/2013Receives Notification of Non-Compliance from NYSE MKT and De...
18/06/2013Extends Repayment of Debt to Sprott Resource Lending to Dece...
07/05/2013Receives Notification Letter from the NYSE MKT Regarding Its...
01/05/2013Reports Additional High Grade Gold and Silver Results From U...
18/04/2013Makes Changes to the Board
31/01/2013Announces Drawdown of $2 Million From Bridge Loan Credit Fac...
22/01/2013Files Preliminary Short Form Base Shelf Prospectus and F-3 R...
24/10/2012Announces Updated Mineral Resource for the Carmen Deposit
27/09/2012Initiates Underground Sampling at its Monterde Gold-Silver P...
20/09/2012Attends Chicago Hard Assets
31/07/2012Appoints David Hembree as VP, Exploration and James Mckay as...
18/07/2012Announces $5 Million Bridge Loan Credit Facility
29/05/2012Intercepts 2.1 Metres Grading 4.3 g/t Gold and 167 g/t Silve...
16/04/2012Continues to Drill High-Grade Gold-Silver at Monterde Includ...
28/11/2011Intercepts 16.7 Metres of 9.9 g/t Gold Equivalent at the Car...
12/10/2011Positive 2011 Exploration Results Underpin Kimber Plans to U...
31/08/2011intercepts 2.3 metres of 22.7g/t gold below Carmen gold-silv...
27/07/2011intercepts 10 metres of 11g/t gold below Carmen gold-silver ...
08/06/2011Announces Updated Preliminary Assessment and Mineral Resourc...
02/06/2011Intercepts 2 Metres Of 12.8 G/T Gold Below Carmen Gold-Silve...
11/02/2010Closing of Public Offering of Common Shares in the U.S.
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (KBR.TO)AMEX (KBX)
0,150+0.00%0,140+0.00%
Dernières informations avant suppression de la cote
Cours préc. Ouverture
0,150 0,145
Bas haut
0,145 0,155
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,150 -%
Volume var. 1 mois
290 500 -%
Produit
Développe
Recherche Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/10/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,79 AU$-0,89%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,18 US$-0,97%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,72 GBX+1,41%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,05 CA$-9,09%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,58 CA$-1,53%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$-0,06%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-9,30%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,94 CA$+2,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
49,90 US$-0,44%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+2,78%Trend Power :