Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
Il est plus facile de désintégrer un atome qu'un préjugé
Albert Einstein  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1362,30-0,50
Silver 22,07-0,14
Platinum 1460,500,00
Palladium 738,60-3,65
MARCHES MONDIAUX
DOWJONES 15307-80
NASDAQ 3463-39
NIKKEI 15856228
ASX 5142-14
CAC 40 405115
DAX 853159
HUI 2573
XAU 97-3
MONNAIES (€)
AUS $ 1,3313
CAN $ 1,3327
US $ 1,2837
GBP (£) 0,8540
Sw Fr 1,2580
YEN 132,5960
RATIOS & INDEXES
Gold / Silver61,73
Gold / Oil14,18
Dowjones / Gold11,24
MATIERES PREMIERES
Copper 3,37-0,01
WTI Oil 96,05-0,11
Nat. Gas 4,200,01
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
Inter-Citic Reports New Metallurgical Work at Dachang Exceeds Previous Results
Published : March 02, 2011

( 0 vote, 0/5 ) Imprimer l'article
     
Tweet

TORONTO, ONTARIO--(Marketwire - March 2, 2011) - Inter-Citic Minerals Inc. (News - Market indicators) ("Inter-Citic" or "the Company") President and CEO James Moore, is pleased to provide an update of the metallurgical testwork carried out as part of its ongoing flowsheet development work, aimed at permitting and constructing a gold mine and associated concentrator and bacterial oxidation plant, at its Dachang Gold Project in Qinghai Province in China.

This extensive optimization testwork resulted in an estimated overall predictable recovery of gold from typical Dachang mineralization of 87.8% to doré, up from 85% previously reported by the Company and used in its Preliminary Economic Assessment announced July 6, 2009.

Over the past 6 months the Company has carried out multiple metallurgical testwork programs in both China and overseas in Australia and in South Africa. The aim of these programs has been to confirm the earlier testwork reported on by the Company on March 2nd and May 7th 2009, and to provide increased certainty as to metallurgical performance of the proposed treatment route for the production of gold in doré from the Dachang Project. This work was supervised by the Company's independent technical expert for metallurgy, Gary A. Patrick, B.Sc., MAusIMM, who is the principal of Metallurg Pty. Ltd. and a Qualified Person under NI 43-101. The testwork was completed at independent laboratories and testwork facilities both in China and overseas.

In November of 2010, a number of fresh samples of Dachang mineralization were collected to test for variability of flotation response within the Dachang ore body. Samples were collected throughout the Dachang Main Zone and Placer Valley Zone areas of the property and split into two sub-samples, to be sent for comparative testing at both the Beijing General Research Institute Of Mining & Metallurgy ("BGRIMM") in Beijing and at AMMTEC in Australia.

Results from the AMMTEC bulk flotation tests were 94.93% recovery, at a concentrate grade of 31.59 gpt gold. The variability flotation tests also showed no significant variation in metallurgical performance and all lithology types floated well. Optimum grind size for the AMMTEC testwork was determined to be 80% passing 106 microns. AMMTEC also completed settling tests on the concentrate and tailings products, and filtration tests on the concentrate product to aid in the detailed engineering design process.

BGRIMM's results for the same sample were marginally lower than AMMTEC, but the Company considers these differences to be within the acceptable limits and attributes the variability to different operator experience.

At the same time, approximately 30 kg of low-grade concentrate from the Extended Continuous Flotation Test ("ECT") averaging 26.9 gpt gold, 8.6% S2-, and 4.48% As, was shipped to SGS Laboratories, Johannesburg for bacterial oxidation and BIOX® testwork. The batch and bulk Batch Amenability Testwork ("BAT") tests were supervised by Gold Fields Group Services (PTY) Ltd ("Goldfields"). This program was completed in January 2011 and Goldfields confirmed that Dachang concentrate was ideally suited to the BIOX® process and that a BIOX® plant could be constructed to treat Dachang concentrate with a leach recovery of gold in solution of between 93.3 and 93.5% in the subsequent CIL plant.

In July of 2010 the Company also commissioned BGRIMM to carry out an ECT on a large sample of Dachang mineralization chosen to represent typical feed material for the Dachang mine operation. This sample totaled some 13 tonnes and graded approximately 3.05 gpt Gold, 5.32 gpt Silver and 0.48% Arsenic, and can be considered to be representative of mineralization at Dachang. BGRIMM established a pilot plant capable of treating 1 tonne of sample per day, using a conventional grinding and flotation circuit.

The ECT demonstrated that at a relatively coarse grind of 80% passing 106 microns, it was possible to produce two concentrate products from the Dachang bulk ore sample. These were a lower grade concentrate suitable for bacterial oxidation, grading 31.85 gpt gold with a recovery of 93.08%, and a higher grade concentrate suitable for sale to a smelter grading 60.27 gpt gold with a recovery of 92.3%. Concentrate from the lower grade bacterial oxidation run was subsequently shipped to SGS Laboratories in South Africa to conduct the commissioning of larger scale Batch Testwork to demonstrate the potential performance of a BIOX® plant for the oxidation and subsequent recovery of gold to doré. Goldfields supervised and evaluated the BAT and BIOX® testwork findings.

The Company now considers that the overall predictable recovery of gold from typical Dachang mineralization can be estimated to be 87.8% to doré, made up of flotation recoveries of 94.9%; BIOX®/CIL recoveries of 93.4% and estimated gold room recoveries of 99.0%. This exceeds the previously estimated overall gold recovery figures of 85.0% used in the Company's 2009 PEA. In addition, the comprehensive testwork program confirms that the effective grind size for the Dachang project can be coarsened from a P80 of 75 microns to a P80 of 106 microns, representing a significant saving in grinding costs, and potential increase in throughput for the project, for the same installed grinding power.

Gary A. Patrick, B.Sc., MAusIMM, has reviewed and approved the contents of this release. He acted as the Independent Expert retained by the Company to supervise the testwork program overall and is a Qualified Person under the definitions of National Instrument 43-101.

On Behalf of the Board:

James J. Moore, President & CEO

ABOUT INTER-CITIC:

Toronto-based Inter-Citic Minerals Inc. is an exploration and development company advancing its Dachang Gold Project in the People's Republic of China. Inter-Citic is listed on the TSX under the symbol ICI. Inter-Citic's website is www.inter-citic.com.

Investors are encouraged to review "Risk Factors" associated with the Dachang project as outlined in the Company's 2010 Financial Statements and Annual Information Form, along with updates, available on the SEDAR website at www.sedar.com. The statements herein that are not historical facts are forward-looking statements. These statements address future events and conditions and so involve inherent risks and uncertainties, as disclosed under the heading "Risk Factors" in the company's periodic filings with Canadian securities regulators. Actual results could differ from those currently projected. The Company does not assume the obligation to update any forward-looking statement.

The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of the content of this news release.

For more information, please contact

Inter-Citic Minerals Inc.
Stephen Lautens
Vice President, Corporate Communications
(905) 479-5072 x 227
stephen@inter-citic.com
Tweet

Inter-citic Minerals Inc

EN DÉVELOPPEMENT
CODE : ICI.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Inter-citic Minerals Inc
12/10/2011Extends Term of Warrants
23/03/2006closes $11 million private placement financing
Nominations de Inter-citic Minerals Inc
22/11/2010Appoints Vice-Chairman of Zijin Mining Group to Board of Dir...
Projets de Inter-citic Minerals Inc
22/03/2011(Dachang)Engages Company For Feasibility Study
02/03/2011(Dachang)Reports New Metallurgical Work at Dachang Exceeds Previous R...
18/01/2011(Dachang)Reports Drill Results From New Exploration Areas. All 41 New...
17/01/2011(Dachang)Exploration Licenses Renewed At Inter-Citic's Dachang Gold P...
23/11/2010(Dachang)Intersects Gold In Five New Exploration Areas. All 46 New Ho...
28/10/2010(Dachang)Releases Early Drill Hole Results From Dachang Gold Project
15/09/2010(Dachang)Issues Exploration Progress Update for Its Dachang Gold Proj...
27/07/2010(Dachang)CORRECTION FROM SOURCE: Inter-Citic Releases Drill Hole Resu...
19/07/2010(Dachang)Reports Updated NI 43-101 Compliant Mineral Resource Estimat...
08/07/2010(Dachang)25,000 Metre Drill Program Underway at Inter-Citic's Dachang...
22/04/2010(Dachang)Releases Drill Hole Results from Dachang Gold Project
05/11/2006(Dachang)Receives results from 10 new drill holes
Communiqués de Presse de Inter-citic Minerals Inc
19/11/2012Closes Plan of Arrangement
13/11/2012Announces PRC Approvals Related to Plan of Arrangement Have ...
29/10/2012Obtains Shareholder Approval for Arrangement
11/07/2011Announces Completion of Final Tranche of C$21 Million Non-Br...
28/06/2011Announces Completion of First Tranche of C$21 Million Non-Br...
26/05/2011Announces Significant Premium Pricing of Non-Brokered Equity...
29/03/2011Shares Commence Trading on the U.S. OTCQX
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ICI.TO)Other OTC (ICMTF.PK)
2,04+0.00%2,05+0.49%
TORONTO
CA$ 2,04
25/02 10:38 -
0%
Cours préc. Ouverture
2,04 2,04
Bas haut
2,04 2,04
Année b/h Var. YTD
2,04 -  2,04 -%
52 sem. b/h var. 52 sem.
0,800 -  2,04 161,54%
Volume var. 1 mois
31 250 -%
24hGold TrendPower© : 34
Produit
Développe Gold
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
20135,70%
201293,00%2,030,73
2011-52,83%2,370,71
2010118,56%2,190,77
2009162,16%1,040,34
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois