Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Lake Shore Gold Corporation

Publié le 17 février 2010

Reports Results of Underground Exploration at 650-Level Test Block

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | G Mexico |

Marketwire

 
 
Lake Shore Gold Corp.
TSX: LSG
Other Recent News

February 17, 2010
Lake Shore Gold Reports Results of Underground Exploration at Timmins Mine 650-Level Test Block

- Underground diamond drill holes in 50-metre test block above 650 Level confirm widths and grades of mineralization to be consistent with original resource estimate.

- 650-043 intersects 16.03 gpt over 25.00 metres, including 25.84 gpt over 11.50 metres, 650-044 intersects 12.01 gpt over 24.50 metres, and 650-045 intersects 43.28 gpt over 14.00 metres, including 180.20 gpt over 2.20 metres., and 650-006 intersects 16.59 gpt over 15.00 metres.

- Results in test block show increased tonnes and ounces and higher-grade core to mineralization averaging 10.53 gpt.

- 525-004 intersects 8.35 gpt over 19.20 metres, confirms upward extension of mineralization near 525 Level.

- Average grades from chip and muck samples in Ultramafic Zone confirm average gold grades in new resource block model at 650 Level.

TORONTO, ONTARIO--(Marketwire - Feb. 17, 2010) - Lake Shore Gold Corp. (TSX:LSG) ("Lake Shore Gold" or the "Company") today announced results for 50 holes (5,555 metres) drilled as part of the ongoing underground diamond drilling, development and sampling program in a 50-metre test block above the 650 Level at the 100% owned Timmins Mine. Among significant intersections from the new drilling are 16.03 gpt over 25.00 metres, including 25.84 gpt over 11.50 metres, in 650-043, 12.01 gpt over 24.50 metres in 650-044, 43.28 gpt over 14.00 metres, including 180.20 gpt over 2.20 metres, in 650-045 and 16.59 gpt over 15.00 metres in 650-006. These intersections are located in the central portion of the Ultramafic Zone and show a higher-grade core to the mineralization in the test block. 525-004 intersected 8.35 gpt over 19.20 metres and confirmed the upward extension of this higher-grade core towards the 525 Level. The overall widths and grades of mineralization being intersected in the new holes continue to be consistent with previous surface and recently released underground drilling. Typical core widths intersected range from 5 to 25 metres with the overall strike length of the main Ultramafic Zone on 650 Level totaling 125 metres.

The holes being reported today are the latest results from an 87 hole, 14,255 metre program being carried out from the 525 and 650 levels of which results from 25 holes and 5,323 metres have been previously reported (see press releases dated August 25, 2009 and October 29, 2009). Drilling from the most recent part of the program was targeting the Ultramafic and Upper Footwall zones, which make up the bulk of the total resource between the 650 and 525 metre levels. This part of the drill program was designed to provide coverage between 20 and 60 metres above the 650 Level at 12.5 metre centers.

Recent modeling and estimation of indicated resources near the 650 Level using results of all diamond drill holes assayed to date shows an updated indicated resource for the Ultramafic and Upper Footwall zones in the test block area of 335,005 tonnes grading 8.07 gpt (86,969 ounces) compared to the original resource of 263,136 tonnes grading 9.30 gpt (78,710 ounces) (see Table 2 for more information). The new estimation was conducted using inverse distance block modeling with application of a 95 gpt capping factor, which represents the 99th percentile of all gold assays in the zone. The increased tonnage and ounces for the new estimation is the result of using more rigorous estimation methods, reducing cutoff grades and assuming more of a bulk approach for mining of the Ultramafic Zone compared to the estimates in the latest National Instrument 43-101 report (October 2009).

Tony Makuch, President and CEO of Lake Shore Gold, commented: "We are very encouraged by the results to date from underground drilling, development and sampling at Timmins Mine. Through the more detailed underground drilling program, we have been able to verify that the original resource estimates based on surface drilling are holding up well. We are also encouraged that a higher-grade core exists within the test-block resource averaging 10.53 gpt and that an opportunity exists to increase mineable ounces. We are continuing to drill underground and to extend a development ramp above the 650 Level with plans to establish a series of sub-levels and commence stoping in the fourth quarter. We continue to be on schedule to complete our shaft to the 710 metre level and change over to a production format by early May. Underground development to Thunder Creek from Timmins Mine is also progressing well and we expect to reach mineralization from the 200 Level by July and from the 650 Level by the end of September."

Geological mapping on the 650 Level at Timmins Mine indicates that mineralization occurs as a series of east-west trending lenses surrounding a steep west plunging fold nose formed at the contact between ultramafic and volcanic rocks. The bulk of the mineralization identified to date is closely associated with swarms of quartz veins controlled by east trending shear zones as well as sulphide minerals located immediately adjacent to the veins. The Ultramafic Zone appears related to a shear structure following close to the axial plane of the plunging fold with the Upper Footwall Zone related to secondary structures immediately to the north and close to the contact between the ultramafic and mafic volcanic rocks.

To compliment mapping and diamond drilling on the 650 Level, chip and muck samples were collected from each round of development resulting in a total database of over 1,000 chips and 1,800 muck samples from the Ultramafic Zone. The average grade of the chip and muck samples collected for the Zone is 8.41 gpt (uncut) and 5.65 gpt (cut to 50 gpt), which is similar to the cut gold grade reported from the new block model at the same elevation using all drilling to date.

Today's results brings the total holes reported to 75 (10,878 metres) of the 87 hole (14,255 metre) program. Results from the remaining holes will be received prior to the end of the second quarter of 2010. In addition to the above, the Company is continuing with additional drilling near the 650 Level to infill certain key sections to a minimum 7.50 metre centres, as well as to test for expansions of the zones, mainly in the areas up and down plunge of existing resources. The Company is also continuing with further extension of a development ramp above the 650 Level with plans to establish a series of sub-levels.

Quality Control

The Company's Qualified Person ("QP") for the underground drill program at the Timmins Mine property is Stephen Conquer, P.Geo. and for resource estimate at Timmins Mine is Bob Kusins, P.Geo. As QPs, they have prepared or supervised the preparation of the scientific or technical information for the property and have verified the data disclosed in this press release. Both QPs are employees of Lake Shore Gold.

Additional information regarding exploration and resources at Timmins Mine is set out in the technical report entitled, "Updated NI 43-101 Technical Report on the Timmins Mine Property, Ontario, Canada," dated October 1, 2009, filed on SEDAR on October 6, 2009 (www.sedar.com). The new resource estimate is effective as of February 17, 2010.

Lake Shore Gold has implemented a quality-control program to ensure best practice in the sampling and analysis of the drill core. Samples are obtained from BQTK-sized diamond drill core, with roughly 75% of sampled core being sawn in half and the remaining 25% being whole core sampled. All remaining core materials, including the remaining half of sawn core is retained on site in a secure location. Drill core samples are stored for sample preparation and gold analysis performed by ALS Chemex. ALS Chemex is an ISO 9001-200 registered laboratory, preparing for ISO 17025 certification. Drill core samples are transported in security-sealed bags to ALS Chemex's Timmins Sample Preparation Facility. Sample preparation is completed in Timmins, and the prepared sample pulps are then transported to ALS Chemex's analytical laboratory in Vancouver, BC. Gold grades are obtained on all samples via Fire Assay with Atomic Absorption finish, using 50g aliquots. For samples that return a gold content greater than 3 gpt, the sample is reanalyzed via Fire Assay with Gravimetric finish, again using a 50g aliquot.

About Lake Shore Gold Corp.

Lake Shore Gold is a rapidly growing mining company with large land positions on the west and east sides of the Timmins Gold Camp. The Company is carrying out an underground advanced exploration program at its 100%-owned Timmins Mine project, where it has both a shaft and a ramp, and is currently commencing advanced exploration work at the adjacent Thunder Creek property. The Bell Creek Mill, located on the east side of Timmins, has been refurbished to a capacity of 1,500 tonnes per day. The Company is also making progress with an underground advanced exploration program at its Bell Creek Complex, including the Bell Creek Mine, Schumacher and Vogel properties, which is moving forward to become the Company's second mining operation in the Timmins Camp. The Company continues to invest aggressively in exploration primarily in Timmins and in select other areas of Northern Ontario and Quebec, and owns a large land position in Mexico. The Company's common shares trade on the TSX under the symbol LSG.

Forward-looking Statements

Certain statements in this press release relating to the Company's exploration activities, project expenditures and business plans are "forward-looking statements" within the meaning of securities legislation. The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in Lake Shore Gold's most recent Annual Information Form and other regulatory filings which are posted on sedar at www.sedar.com.

There is no guarantee that drill results reported in this news release will lead to the identification of a deposit that can be mined economically, and further work is required to identify a reserve or resource.

Table 1. Timmins Mine - Significant New Assay       
Results from Underground Drilling                   
----------------------------------------------------
Hole            From        To     Assay    Interval
----------------------------------------------------
Number           (m)       (m)    gpt Au         (m)
----------------------------------------------------
525-004        42.50     61.70      8.35       19.20
----------------------------------------------------
includes       42.50     45.90     14.96        3.40
----------------------------------------------------
and            56.40     61.70     16.69        5.30
----------------------------------------------------
               74.80     77.80      7.29        3.00
----------------------------------------------------
               95.50     96.20      4.45        0.70
----------------------------------------------------
              124.00    126.00      3.52        2.00
----------------------------------------------------
              133.00    135.70      6.59        2.70
----------------------------------------------------
              157.00    158.00      3.58        1.00
----------------------------------------------------
525-008       119.70    120.10    915.00        0.40
----------------------------------------------------
525-011        40.45     43.00      5.87        2.55
----------------------------------------------------
               68.90     69.70      3.73        0.80
----------------------------------------------------
525-012        41.10     41.90     27.60        0.80
----------------------------------------------------
              120.90    121.60      3.19        0.70
----------------------------------------------------
525-015        52.00     54.00      4.83        2.00
----------------------------------------------------
               63.60     64.60      5.69        1.00
----------------------------------------------------
525-016        65.40     74.30      6.04        8.90
----------------------------------------------------
               78.00     79.00      4.37        1.00
----------------------------------------------------
               82.00     83.00      3.57        1.00
----------------------------------------------------
525-017        50.00     51.00     12.60        1.00
----------------------------------------------------
               73.30     74.00     13.30        0.70
----------------------------------------------------
525-019        96.00     99.00      6.05        3.00
----------------------------------------------------
              104.50    107.10      3.15        2.60
----------------------------------------------------
              104.50    107.10      3.15        2.60
----------------------------------------------------
525-021        35.90     36.70      6.06        0.80
----------------------------------------------------
               72.80     73.30      7.40        0.50
----------------------------------------------------
650-006        47.00     62.00     16.59       15.00
----------------------------------------------------
includes       47.00     49.00     21.73        2.00
----------------------------------------------------
               85.00    104.00      7.04       19.00
----------------------------------------------------
includes       85.00     89.00     13.77        4.00
----------------------------------------------------
650-017        41.80     42.30     13.55        0.50
----------------------------------------------------
               47.50     56.90      9.45        9.40
----------------------------------------------------
650-020        43.00     61.00      6.18       18.00
----------------------------------------------------
includes       48.20     55.70     10.33        7.50
----------------------------------------------------
               91.00    102.50      7.73       11.50
----------------------------------------------------
includes       96.00     98.00     24.46        2.00
----------------------------------------------------
650-022        44.50     50.00      6.35        5.50
----------------------------------------------------
               95.00    101.20      9.54        6.20
----------------------------------------------------
650-024       121.00    124.00     11.93        3.00
----------------------------------------------------
650-029       116.00    120.00      6.91        4.00
----------------------------------------------------
              126.50    127.20     12.25        0.70
----------------------------------------------------
              173.70    174.70      3.57        1.00
----------------------------------------------------
              178.70    188.50      7.78        9.80
----------------------------------------------------
includes      182.30    188.50     10.67        6.20
----------------------------------------------------
650-031        97.00    121.00      4.99       24.00
----------------------------------------------------
includes       97.00    102.00     12.65        5.00
----------------------------------------------------
and           110.50    113.00     10.47        2.50
----------------------------------------------------
650-034        47.50     49.50     11.52        2.00
----------------------------------------------------
               60.80     75.80      4.51       15.00
----------------------------------------------------
includes       60.80     69.80      6.31        9.00
----------------------------------------------------
              102.00    104.80     20.21        2.80
----------------------------------------------------
650-035        51.30     52.80      5.68        1.50
----------------------------------------------------
               69.00     71.00     22.24        2.00
----------------------------------------------------
               83.70     84.70      9.19        1.00
----------------------------------------------------
              110.00    110.80      9.32        0.80
----------------------------------------------------
650-036        53.40     54.00      7.97        0.60
----------------------------------------------------
               55.40     56.30      3.60        0.90
----------------------------------------------------
               62.00     89.00      6.06       22.40
----------------------------------------------------
includes       63.60     72.70     11.16        9.10
----------------------------------------------------
               96.90     97.60      4.15        0.70
----------------------------------------------------
650-038        54.00     55.50     13.30        1.50
----------------------------------------------------
               60.00     61.80     13.48        1.80
----------------------------------------------------
               69.30     82.40      4.88       13.10
----------------------------------------------------
includes       75.00     77.00      9.73        2.00
----------------------------------------------------
includes       80.00     82.40     10.73        2.40
----------------------------------------------------
              109.40    111.00      5.88        1.60
----------------------------------------------------
650-039        68.00     72.80      4.58        4.80
----------------------------------------------------
650-042       107.50    120.00      7.87       12.50
----------------------------------------------------
includes      107.50    115.00     10.62        7.50
----------------------------------------------------
650-043        50.00     51.00      4.77        1.00
----------------------------------------------------
               57.00     82.00     16.03       25.00
----------------------------------------------------
includes       64.00     75.50     25.84       11.50
----------------------------------------------------
650-044        49.50     74.00     12.01       24.50
----------------------------------------------------
includes       49.50     51.00     45.10        1.50
----------------------------------------------------
and            65.00     69.00     26.08        4.00
----------------------------------------------------
               93.00     99.50      4.19        6.50
----------------------------------------------------
includes       93.00     94.50     11.08        1.50
----------------------------------------------------
650-045        52.00     66.00     43.28       14.00
----------------------------------------------------
includes       54.80     57.00    180.20        2.20
----------------------------------------------------
               84.00     86.00     10.21        2.00
----------------------------------------------------
              108.00    109.00      6.10        1.00
----------------------------------------------------
650-046        61.00     75.00      7.96       14.00
----------------------------------------------------
includes       61.00     63.80     24.13        2.80
----------------------------------------------------
               92.60     93.60      9.83        1.00
----------------------------------------------------
              104.20    104.70      9.65        0.50
----------------------------------------------------
650-047         61.9      65.4      4.55        3.50
----------------------------------------------------
                75.8        85      6.64        9.20
----------------------------------------------------
and             75.8        78     17.71        2.20
----------------------------------------------------
650-048        63.70     65.50      6.49        1.80
----------------------------------------------------
               71.90     74.40      4.28        2.50
----------------------------------------------------
 
Notes:

1) Holes 525-003, 525-007, 525-020, 525-023, 525-024, 525-025, 525-027, 650-011,
650-014A, 650-019, 650-021, 650-023, 650-025, 650-027, 650-027A, 650-030, 650-052,
650-052A, 650-053, 650-053A, 650-054, 650-055 returned weak or no significant values
2) 650-043 lost core 51.0-52.0 and 57.4-58.0.
3) Assays reported are uncut.
4) True widths are not reported at this time.

Table 2. Results of New Resource Model and Estimate for Ultramafic and   
----------------------------------------------------------------------
Upper Footwall Zones (600 to 650 Levels)                                 
----------------------------------------
                                                                         
Full Strike Length of Mineralization Identified to Date                  
                                                                         
-------------------------------------------------------------------------
                                               New Estimate              
                                                                         
-------------------------------------------------------------------------
Zone        Bottom  Top   Height Tonnes  Grade  Ounces   Grade    Ounces 
           --------------------------------------------------------------
                                          (cut)  (cut)  (uncut)   (uncut)
-------------------------------------------------------------------------
Ultramafic                                                               
 Zone       9367.5 9417.5   50   285,185  8.19  75,115    9.06    83,102 
-------------------------------------------------------------------------
Upper                                                                    
Footwall                                                                 
Zone        9367.5 9417.5   50   49,820   7.40  11,854    7.40    11,854 
-------------------------------------------------------------------------
Total       9367.5 9417.5   50   335,005  8.07  86,969    8.82    94,957 
-------------------------------------------------------------------------


-----------------------
   Original Resource   
                       
-----------------------
Tonnes    Grade Ounces 
-----------------------
          (cut)  (cut) 
-----------------------
241,029   9.53  73,873 
-----------------------
22,107    6.81  4,837  
-----------------------
263,136   9.30  78,710 
-----------------------



Centre section of Ultramafic zone (4668E to 4718E)
                                                                         
-------------------------------------------------------------------------
                                               New Estimate              
-------------------------------------------------------------------------
Zone        Bottom  Top   Height Tonnes  Grade  Ounces   Grade    Ounces 
           --------------------------------------------------------------
                                          (cut)  (cut)  (uncut)   (uncut)
-------------------------------------------------------------------------
                                                                         
-------------------------------------------------------------------------
Ultramafic                                                              
 Zone       9367.5 9417.5   50   132,546 10.53  44,881   11.89    50,653 
-------------------------------------------------------------------------



Detailed Resource Summary by Elevation (600 to 650 Levels)
                                                                         
-------------------------------------------------------------------------
                                             Ultramafic Zone
                                -----------------------------------------
                                               New Estimate              
-------------------------------------------------------------------------
Level       Bottom  Top   Height Tonnes  Grade  Ounces   Grade    Ounces 
-------------------------------------------------------------------------
                                          (cut)  (cut)  (uncut)   (uncut)
-------------------------------------------------------------------------
                                                                         
-------------------------------------------------------------------------
650 Drift                                                                
 Elevation  9367.5 9372.5   5    26,375   5.51  4,672     5.64     4,783 
-------------------------------------------------------------------------
15m slice                                                                
 above 650  9372.5 9387.5   15   89,078   6.48  18,555    6.72    19,260 
-------------------------------------------------------------------------
15 to 30m                                                                
 above 650  9387.5 9402.5   15   89,633   9.02  25,982   10.44    30,072 
-------------------------------------------------------------------------
30 to 45m                                                                
 above 650  9402.5 9417.5   15   80,099  10.06  25,905   11.26    28,988 
-------------------------------------------------------------------------
Total                       50   285,185  8.19  75,115    9.06    83,102 
-------------------------------------------------------------------------


-----------------------
    Ultramafic Zone
-----------------------
                       
   Original Resource   
-----------------------
Tonnes    Grade Ounces 
-----------------------
          (cut)  (cut) 
-----------------------
                       
-----------------------
11,634    6.56  2,454  
-----------------------
57,477    7.65  14,144 
-----------------------
91,407    9.11  26,771 
-----------------------
80,511    11.78 30,504 
-----------------------
241,029   9.53  73,873 
-----------------------



-------------------------------------------------------------------------
                                            Upper Footwall Zone
                                -----------------------------------------
                                               New Estimate              
-------------------------------------------------------------------------
Level       Bottom  Top   Height Tonnes  Grade  Ounces   Grade    Ounces 
-------------------------------------------------------------------------
                                          (cut)  (cut)  (uncut)   (uncut)
-------------------------------------------------------------------------
                                                                         
-------------------------------------------------------------------------
650 Drift                                                                
Elevation   9367.5 9372.5   5     2,573   7.08   586      7.08      586  
-------------------------------------------------------------------------
15m slice                                                                
above 650   9372.5 9387.5   15    8,028   5.62  1,452     5.62     1,452 
-------------------------------------------------------------------------
15 to 30m                                                                
above 650   9387.5 9402.5   15   11,494   5.82  2,151     5.82     2,151 
-------------------------------------------------------------------------
30 to 45m                                                                
above 650   9402.5 9417.5   15   27,725   8.60  7,666     8.60     7,666 
-------------------------------------------------------------------------
Total                       50   49,820   7.40  11,854    7.40    11,854 
-------------------------------------------------------------------------


-----------------------
  Upper Footwall Zone  
-----------------------
   Original Resource   
-----------------------
Tonnes    Grade Ounces 
-----------------------
          (cut)  (cut) 
-----------------------
                       
-----------------------
4,129     7.27   965   
-----------------------
1,644     6.84   362   
-----------------------
1,538     4.68   231   
-----------------------
14,796    6.89  3,279  
-----------------------
22,107    6.81  4,837  
-----------------------

Notes:
1) Estimation conducted with Inverse distance cubed estimation method and
   95 gpt capping factor. Lower cutoff grade used  for reporting of
   results was 0.5 gpt for the Ultramafic  zone and 3 gpt for the Upper
   Footwall Zone.
 
To view "Figure 1: 3D View", please visit the following link:

http://media3.marketwire.com/docs/lsg_fig1_217.pdf

To view "Figure 2: Plan View (New Drilling)", please visit the following link:

http://media3.marketwire.com/docs/lsg_fig2_217.pdf

To view "Figure 3: Plan View (Previously Reported Drilling)", please visit the following link:

http://media3.marketwire.com/docs/lsg_fig3_217.pdf

CONTACT INFORMATION:

Lake Shore Gold
Tony Makuch
President & CEO
(416) 703-6298
Email: info@lsgold.com

or

Lake Shore Gold
Mark Utting
Vice-President, Investor Relations
(416) 703-6298
Email: info@lsgold.com
Website: www.lsgold.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer


If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click .
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Lake Shore Gold Corporation

PRODUCTEUR
CODE : LSG.TO
ISIN : CA5107281084
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Lake Shore Gold est une société de production minière d'or basée au Canada.

Lake Shore Gold détient divers projets d'exploration au Canada.

Son principal projet en production est TIMMINS MINE au Canada et ses principaux projets en exploration sont BELL CREEK, BLAKELOOK, THORNE, THUNDER CREEK, WEST TIMMINS et BAND ORE au Canada et LA BUFA, UNIVERSO, MONTAÑA DE ORO et LLUVIA DE ORO au Mexique.

Lake Shore Gold est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 956,5 millions CA$ (734,7 millions US$, 646,6 millions €).

La valeur de son action a atteint son plus bas niveau récent le 01 février 2002 à 0,02 CA$, et son plus haut niveau récent le 11 mars 2011 à 4,42 CA$.

Lake Shore Gold possède 463 220 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Lake Shore Gold Corporation
28/02/2011Completes US$50 Million Corporate Revolving Credit Facility
28/07/2010Signs Term Sheet for Corporate Revolving Credit Facility of ...
16/02/2010Closing of Second Tranche of Flow-Through Financing
31/12/2009Announces Closing of First Tranche of Flow-Through Financing
04/12/2009Announces Closing of Private Placement Financing
19/02/2008 Announces Private Placement of $64.5 Million at 30% Premium...
Nominations de Lake Shore Gold Corporation
06/11/2013Lake Shore Gold Appoints Diane Francis to Board of Directors
19/03/2013Lake Shore Gold Announces Appointment of Philip C. Yee as Vi...
30/05/2008Announces Management Appointments
27/02/2007Appoints Hannu Virtanen as VP, Project Development
Rapports Financiers de Lake Shore Gold Corporation
03/12/2013Lake Shore Gold Produces 16,700 Ounces in November, Company ...
06/11/2013Lake Shore Gold Reports Lower Costs, Improved Grades and Hig...
24/06/2013Lake Shore Gold Reports Improving Operating Performance, Com...
15/05/2013Lake Shore Gold Reports First Quarter 2013 Results
09/08/2012Lake Shore Gold Reports Strong Second Quarter Results
12/01/2012Reports 2011 Operating Results, Pours 26,550 Ounces in Fourt...
10/08/2011Announces Second Quarter 201 =?ISO-8859-1?Q?1=20Financial=20...
26/05/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Results,=20In...
04/05/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Production=20...
11/08/2010Continued Progress During Second Quarter 2010
15/05/2008Announces First Quarter 2008 Results
Projets de Lake Shore Gold Corporation
10/12/2013Lake Shore Gold Increases 2014 Production Guidance
19/03/2013Lake Shore Gold Reports Solid Progress in 2012, Company Near...
30/01/2013Lake Shore Gold Reaches Agreement to Sell Mexican Properties...
21/01/2013(Thunder Creek)Lake Shore Gold Discovers New Mineralization 850 Metres Sout...
26/07/2012Lake Shore Gold and Revolution Resources Amend Option Agreem...
14/06/2012Lake Shore Gold Completes Credit Facility Agreement for Up t...
07/06/2012Lake Shore Gold Announces Significant Extension of High-Grad...
28/05/2012Lake Shore Gold Resumes Mining Operations at Timmins West Mi...
12/04/2012Lake Shore Gold Enters Agreement for Credit Facility of Up t...
04/04/2012Lake Shore Gold Provides Update on Incident at Timmins West ...
03/04/2012Lake Shore Gold Corp. Reports on Incident at Timmins West Mi...
31/03/2012Lake Shore Gold Files Technical Report for Timmins West Mine
22/02/2012Lake Shore Gold Announces Large Increase in Resources at Gol...
14/10/2011(Timmins Mine)Reports Higher Commercial Production from Timmins Mine in Th...
22/08/2011Completes Acquisition of Fen =?ISO-8859-1?Q?n-Gib=20Project=...
16/08/2011(Bell Creek)Reports 400 Metre Extension of Gold Mineralization at Bell C...
30/06/2011(Band Ore)en Share Mining Corporation Acquires Band Ore Gold Property ...
05/05/2011to Acquire Fenn-Gib Project from Barrick Gold in Exchange fo...
02/05/2011Announces New Resources at =?ISO-8859-1?Q?=20Marlhill=20and=...
29/03/2011(Band Ore)to Acquire 19% of Golden Share Through Sale of 100% Interest
28/02/2011(Timmins Mine)Lake Shore Gold Discovers Significant New Gold Zone at 144 P...
24/02/2011(Timmins Mine)Intersects Wide, High-Grade Mineralization at Timmins Mine, ...
25/01/2011(Timmins Mine)Lake Shore Gold to Nearly Triple Gold Production in 2011
25/01/2011(Thunder Creek)Confirms Broad Mineralized Envelope With High-Grade Sections...
06/01/2011(Timmins Mine)Declares Commercial Production =?ISO-8859-1?Q?=20at=20Timmin...
01/12/2010(Bell Creek)Announces Initial Resource a Bell Creek Mine, Large Deposit ...
29/06/2010(Thunder Creek)Ramp Reaches & Intersects High-Grade Gold Mineralization
23/06/2010Intersects High-Grade Mineralization at Thorne...
04/05/2010(West Timmins)Advances Third Major Gold Target
01/04/2010(Ti-pa-haa-kaa-ning (tpk))Agrees to Sell 50% Interest in Ti-pa-haa-kaa-ning Gold Prope...
18/02/2010(Timmins Mine)Major Extensions to Timmins Mine Mineralization, Thunder Cre...
17/02/2010(Timmins Mine)Reports Results of Underground Exploration at 650-Level Test...
17/02/2010(Casa Berardi)Extends Casa Berardi "G Zone"
26/01/2010(Thunder Creek)Extends Thunder Creek to Depth, Confirms High-Grade Core and...
18/01/2010(Bell Creek)Continues to Define and Extend Large New Gold System at Bell...
06/11/2009(Bell Creek)Confirms Presence of Large New Gold System
29/10/2009(Timmins Mine)Results of Underground Drilling and Development at Timmins M...
07/10/2009Releases Updated National Instrument 43-101 Report for Timmi...
01/10/2009(Bell Creek)Reports Extension to High grade mineralization at Bell Creek
25/08/2009(Thunder Creek)Continues to Establish Large Gold System at Thunder Creek
24/08/2009Reports High-Grade Intercepts From Underground Drilling at T...
21/07/2009(Bell Creek)Discovers Substantial New High-Grade Extension at Bell Creek
07/07/2009(Bell Creek)Confirms Deep Extensions of Gold Mineralization at Bell Cree...
16/12/2008Significantly Extends Rusk Zone and Announces New High-Grade...
10/12/2008(Bell Creek)Significantly Extends Bell Creek Mineralization
10/07/2008(Bell Creek)Intersects New Gold Zone and Extends Mineralization at Bell ...
31/03/2008(Thunder Creek)Intersects 8.57 Grams Gold Per Tonne Over 9.00 Metres at the...
Communiqués de Presse de Lake Shore Gold Corporation
28/07/2016Lake Shore Bancorp posts 2Q profit
27/04/2016Lake Shore Bancorp posts 1Q profit
01/04/2016Tahoe Resources Inc. and Lake Shore Gold Corp. Complete Busi...
31/03/2016Lake Shore Gold Announces Shareholder Approval of Plan of Ar...
31/03/2016Lake Shore Gold Announces Filing of Annual Information Form ...
24/02/2016Lake Shore Gold reports 4Q loss
19/01/2016Lake Shore Gold Reports Strong 2015 Operating Cost Performan...
08/01/2016Lake Shore Gold Reports Full Year and Fourth Quarter 2015 Pr...
07/01/2016Lake Shore Gold (LSG) Jumps: Stock surges 10.1%
14/12/2015Is Oriental Financial Group Inc. (OFG) A Good Stock To Buy?
27/11/2015Lake Shore Gold Corp Ordinary Shares (Canada) (LSG): Are Hed...
29/10/2015Lake Shore Gold posts 3Q loss
16/10/2015Lake Shore Gold Announces Details of Nine Month and Third Qu...
14/10/2015Lake Shore Gold Produces 136,200 Ounces in First Nine Months...
18/09/2015Lake Shore Gold Completes Acquisition of Temex Resources Cor...
16/09/2015Lake Shore Gold Reports High-Grade Intersections From Initia...
14/09/2015Temex Shareholders Overwhelmingly Approve Arrangement Agreem...
14/08/2015Lake Shore Gold Acquires Additional Equity Interest in IDM M...
04/08/2015Lake Shore Gold Acquires Significant Equity Interest in IDM ...
31/07/2015Lake Shore Gold Enters Into Arrangement Agreement With Temex...
30/07/2015Lake Shore Gold posts 2Q profit
30/07/2015Lake Shore Gold Reports First Half and Second Quarter 2015 F...
28/07/2015Lake Shore Bancorp posts 2Q profit
17/07/2015Lake Shore Gold Announces Details of First Half and Second Q...
16/07/2015Lake Shore Gold Proposes to Acquire Temex Resources Corporat...
14/07/2015Lake Shore Gold Announces First Half and Second Quarter 2015...
08/07/2015Lake Shore Gold Produces 95,600 Ounces in First Half of 2015...
25/06/2015IIROC Trade Resumption - LSG
27/04/2015Lake Shore Gold Continues to Intersect Significant Gold Mine...
08/04/2015Lake Shore Gold Announces Details of Annual General Meeting ...
26/03/2015Lake Shore Gold posts 4Q loss
16/03/2015Lake Shore Gold Announces Details of Year-End and Fourth Qua...
14/03/2015Lake Shore Gold Announces 29% Increase in Ore Reserves
13/03/2015Lake Shore Gold Announces Details of Year-End and Fourth Qua...
03/03/2015Lake Shore Gold Identifies Thick, High-Grade Core of Gold Mi...
24/01/2014Lake Shore Gold's Preliminary 2013 Operating Cost Per Ounce ...
07/01/2014Lake Shore Gold Achieves Record Production of 134,600 Ounces...
16/12/2013Lake Shore Gold Extends Maturity of Standby Line of Credit a...
24/10/2013Announces Details of Third Quarter 2013 Conference Call and ...
09/10/2013Lake Shore Gold Reports Solid Third Quarter 2013 Operating R...
13/08/2013Lake Shore Gold Reports Record Production and Lower Operatin...
29/07/2013Announces Details of Second Quarter 2013 Conference Call and...
05/07/2013Lake Shore Gold Reports Record Production in Second Quarter ...
16/05/2013Lake Shore Gold Announces Results of Shareholders' Meeting
10/05/2013Lake Shore Gold Announces Amendments to Shareholder Meeting ...
09/05/2013Lake Shore Gold Completes Sale of Mexican Portfolio to Revol...
07/05/2013Announces Details of First Quarter 2013 Conference Call and ...
22/04/2013Lake Shore Gold to Hold Annual Meeting in Toronto on May 15,...
08/04/2013Lake Shore Gold Reports First Quarter 2013 Production of 23,...
28/03/2013(Bell Creek)Lake Shore Gold Files Bell Creek Mine Reserve Technical Repo...
12/03/2013Announces Details of Full Year and Fourth Quarter 2012 Confe...
25/02/2013Lake Shore Gold to Reduce Carrying Value of Assets
06/02/2013Lake Shore Gold Announces Management Change
01/02/2013Lake Shore Gold to Draw $35 Million Standby Line of Credit
28/01/2013Lake Shore Gold Announces Launch of Investor Webinar Series
11/01/2013Lake Shore Gold Announces Adoption of Corporate Governance M...
10/01/2013Achieves 2012 Production Target, Company Poised for Sharply ...
11/12/2012on Track for Strong Finish to 2012, Processing Capacity Incr...
08/11/2012Lake Shore Gold Reports Third Quarter 2012 Results, Company ...
25/10/2012Announces Details of Third Quarter 2012 Conference Call and ...
10/10/2012Lake Shore Gold Reports Third Quarter 2012 Production of 20,...
18/09/2012Announces Exercise of Underwriters' Over-Allotment Option fo...
11/09/2012Lake Shore Gold Announces Management Change
07/09/2012Completes C$90 Million Convertible Senior Unsecured Debentur...
16/08/2012Announces C$75 Million Convertible Senior Unsecured Debentur...
10/08/2012GoldPennyStars.com Profiles Alerted Penny Gold and Metals St...
13/07/2012Announces Details of Second Quarter 2012 Conference Call and...
04/07/2012Reports Strong Second Quarter Production of 24,426 Ounces of...
13/06/2012Lake Shore Gold Forecasts 2012 Cost Savings While Remaining ...
25/05/2012Lake Shore Gold Reports Smoke from Forest Fire Results in Pr...
18/05/2012Files Timmins West Mine Reserve Technical Report
10/05/2012Exceeds Targets and Achieves Continued Operating Improvement...
01/05/2012Lake Shore Gold Reports Significant New Drill Intercepts at ...
01/05/2012Reports Significant New Drill Intercepts at Fenn-Gib Open-Pi...
05/04/2012Lake Shore Gold announces filing of Gold River Trend Technic...
05/04/2012Lake Shore Gold Announces First Quarter 2012 Operating Resul...
02/04/2012Lake Shore Gold Announces Reserve Estimate for Timmins West ...
30/03/2012(Bell Creek)Lake Shore Gold Announces Large Increase in Measured and Ind...
26/03/2012Lake Shore Gold Announces Fourth Quarter and Full-Year 2011 ...
23/03/2012Announces Details of Fourth Quarter and Full-Year 2011 Confe...
08/03/2012Lake Shore Gold and Franco-Nevada Complete $50 Million Royal...
28/02/2012Lake Shore Gold Announces Results of Preliminary Economic As...
28/02/2012Announces Results of Preliminary Economic Assessment for Tim...
15/02/2012Lake Shore Gold Confirms Large-Scale Resource for Timmins We...
08/02/2012and Franco-Nevada Enter Agreement for $50 Million Royalty an...
17/01/2012(Thorne)Lake Shore Gold Announces New Extension at Thorne Property, ...
04/01/2012Lake Shore Gold Announces Filing of Fenn-Gib Technical Repor...
29/12/2011(Thunder Creek)Announces Filing of Thunder Creek Technical Report
14/12/2011Signs Formal Agreement for Option on Company's Mexican Explo...
28/11/2011Completes Sale of Land to Golden Share Mining for Significan...
15/09/2011Enters Into Letter Agreement for Option on Company's Mexican...
30/08/2011Reports Extensions of Gold Mineralization Along Strike and t...
05/08/2011Announces Details of Second Quarter 2011 Conference Call and...
29/07/2011U=2ES=2E Listing on NYSE A =?ISO-8859-1?Q?mex=20Approved,=20...
26/07/2011Continues to Define and Ex =?ISO-8859-1?Q?tend=20Mineralizat...
19/07/2011Releases Production Resultsfor Second Quarter and First Six-...
16/06/2011Reports Wide, High-Grade Intercepts from Near-Surface Drilli...
08/06/2011Announces Management Appointme =?ISO-8859-1?Q?nts,=20Creates...
14/03/2011Lake Shore Gold Achieves Major Milestones in 2010, on Track ...
01/02/2011Increases Interest in Northern Superior Resources Inc.
22/07/2010Confirms & Expands Mineral
27/05/2010Completes Sale of 50% Interest in Ti-pa-haa-kaa-ning JV
12/05/2010Changes to Board of Directors
05/05/2010Announces Continued Progress
27/04/2010Expands Resource Potential at Timmins Mine
11/03/20102009 Year End Results
17/12/2009Completes Acquisition of "Bell Creek West" Properties
15/12/2009Announces Management Changes
15/12/2009Added to S&P/TSX Composite Index
24/11/2009Announces Changes to Board of Directors
06/11/2009and West Timmins Mining Complete Business Combination
27/08/2009and West Timmins Agree to Business Combination
06/08/2009Advances Projects on Schedule and Budget and Achieves Explor...
24/06/2009Reports 12.75 Grams Per Tonne Over 83.40 Metres at Thunder C...
16/05/2008Announces Approval of Special Resolutions at Annual and Spec...
05/05/2008Comments on May 15, 2008 Shareholder Vote
16/04/2008Announces Revised Agreement With Hochschild Mining; Second P...
16/04/2008 Announces Management Changes
28/03/2008Announces 2007 Year End Results and Provides 2008 Outlook
24/03/2008Announces Management Changes
18/03/2008Announces Annual Meeting and Revised Date for Special Meetin...
25/02/2008 Completes Financing and Enters Into Strategic Alliance With...
17/07/2007Commences Drilling at Blakelock and Expands its Property Pos...
23/04/2007Completes Due Diligence on Bell Creek Acquisition
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (LSG.TO)Other OTC (LSGGF)
2,07+4.29%2,29-0.87%
TORONTO
CA$ 2,07
07/04 15:32 0,090
4,29%
Cours préc. Ouverture
1,92 2,01
Bas haut
2,00 2,07
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  2,07 -0,481%
Volume var. 1 mois
10 132 648 -0,481%
24hGold TrendPower© : 41
Produit Gold
Développe
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 19/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,71%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :