Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Copper Fox Metals Inc.

Publié le 19 décembre 2013

Reports Successful Diamond Drill Results from 2013 Drilling Program at Schaft Creek Joint Venture

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Paramount |
Home   Corporate   Projects   News   Investors   Contact TSX.V:CUU
A Canadian Based Resource Development Company
News Release


Thursday, December 19, 2013
Copper Fox Reports Successful Diamond Drill Results from 2013 Drilling Program at Schaft Creek Joint Venture


Vancouver, British Columbia -- December 19, 2013 -- Copper Fox Metals Inc. (TSX-Venture: CUU) is pleased to announce the results from the 2013 diamond drill exploration and geotechnical drilling program on the Schaft Creek copper-gold-molybdenum-silver project located in northwestern British Columbia. Copper Fox owns a 25% working interest in the Schaft Creek Joint Venture. Teck Resources Limited owns 75% of the Schaft Creek Joint Venture and is the operator. Highlights of the drilling program are as follows:

  • DDH SCK 13-432 (azimuth 270) located 200m south of DDH CF415-2011, intersected 0.399% copper, 0.444g/t gold, 4.39g/t silver and 0.028% molybdenum over an interval of 76.5m starting at a core length of 81.0m. This higher grade interval is included in a 356.3m long zone from 64.2m to 420.5m that averaged 0.215% copper, 0.196g/t gold, 1.71g/t silver and 0.015% molybdenum,

  • DDH SCK-13-433 (azimuth 090) was collared on the same location as DDH CF411-2011, intersected two zones of mineralization including a 108.0m interval that assayed 0.187% copper, 0.029g/t gold, 0.025% molybdenum and 1.16g/t silver starting at a core length of 387.0m and a 41.0m interval that assayed 0.149% copper, 0.033g/t gold, 0.53g/t silver and 0.026% molybdenum starting at a core length of 521.0m,

  • DDH SCK-13-435 (azimuth 270) located 120m east of DDH CF-418B-2011 intersected a 357.8m interval that assayed 0.363% copper, 0.108g/t gold, 1.26g/t silver and 0.023% molybdenum starting at a core length of 239.0m. This interval contains two higher grade intervals; the first, a 43.6m interval that assayed 0.648% copper, 0.241g/t gold, 1.52g/t silver and 0.043% molybdenum, and the second, a lower 42.9m interval that assayed 0.591% copper, 0.072g/t gold, 2.16g/t silver and 0.057% molybdenum,

  • DDH SCK-13-439 (azimuth 270) located on the west side of the Paramount zone intersected a 29.0m interval that assayed 0.144% copper, 0.027g/t gold, 0.98g/t silver and 0.003% molybdenum starting at a core length of 38.0m.
Mr. Stewart, President of Copper Fox stated, "We are very pleased that the 2013 drilling program extended the mineralization between 100m and 300m east of the current resource block model and has also tested several blocks of inferred resources in the Paramount zone. The drilling results support the interpretation that the mineralization in the Paramount zone could extend to the east past the limits of the current block model. The extension of the mineralization into that area of the Paramount zone that was previously categorized as waste in the feasibility study prepared by Copper Fox and the testing of the inferred resource block within the pit shell could have a positive effect on the economics of the Schaft Creek project."

Drilling Program:
The 2013 drilling program commenced late in the season, after the execution of the Schaft Creek Joint Venture Agreement. Mineralized intervals for the exploration and geotechnical drill holes completed were estimated using a 0.15% recoverable copper equivalent cutoff grade. The determination of the recoverable copper equivalent grade used the same parameters used in the feasibility study with an effective date of January 23rd, 2013 completed on the Schaft Creek deposit by Copper Fox. Information on the drill holes completed including the average grades of the mineralized intervals are set out in the tables below.

Exploration Drill Holes:


Geotechnical Drill Holes:

Note: The core intervals listed in the above tables do not represent true widths.

To view the location of 2013 drill holes completed to date, please visit the Copper Fox website at www.copperfoxmetals.com.

Discussion of Diamond Drill Results:
DDH SCK-13-431 drilled to the east to a depth of 628.0m tested the Mike zone. This hole intersected three intervals with anomalous copper and gold values. The two longest intervals of anomalous copper-gold concentrations occur in the top portion of the drill hole.

DDH SCK-13-432 intersected an upper interval of copper-silver mineralization and a lower, much longer interval of copper-gold-molybdenum-silver mineralization. This hole located 200m south of DDH CF415-2011 tested a block of inferred resource and extended the mineralization an additional 120m to the west beyond the western edge of the inferred resource block. This drill hole also intersected a higher grade (76.5m core interval) zone of copper-gold-molybdenum-silver mineralization within the indicated resource block starting at a core interval of 81.0m.

DDH SCK-13-433 intersected two intervals of mineralization. The upper interval is 108.0m in length and is located approximately 300m to the east of the current block model.

DDH SCK-13-435 tested a block of inferred resource contained within the current resource block model and intersected the mineralization on average 100m east of the indicated and measured resource block. This drill hole also intersected a previously unknown zone of higher grade (43.6m core interval) copper-gold-molybdenum-silver mineralization immediately adjacent to but outside the inferred resource block on this section. A second zone (42.9m) was intersected within a portion of the current block model classified as an inferred resource.
DDH SCK-13-439 was a geotechnical drill hole that intersected a 29.0m interval of lower grade copper-silver mineralization commencing at a core interval of 38.0m. This zone of mineralization is located outside the western edge of the current resource block model on this section.

DDH SCK-13-433 and DDH SCK-13-435 extended the mineralization to the east on the Paramount zone intersected higher molybdenum (0.025% versus 0.019%) grades compared to the average for the Schaft Creek deposit.

Diamond Drilling and Sampling Procedures:
The diamond drilling was completed using HQ, NQ and PQ core size. Overall core recovery was estimated to be greater than 98%. After cutting with a diamond saw, one half of the core is collected for sample preparation and analysis and the other half is retained for future reference. Sample intervals were selected based on lithology changes/alteration intensity/estimated mineral content and ranged from 0.73 to 6.0m. The majority of the sample intervals were 2.0m. Sample preparation was completed by ACME Analytical Laboratories Ltd ("ACME") located in Smithers, British Columbia and analyses were completed by ACME in Vancouver, British Columbia.

Base metals were assayed using the ACME's 7TD and 1DX1 packages which include 4-acid digestion and ICP-ES finish. Lower detection limits are as follows: Cu >0.001%, Mo >0.001%, silver values are determined by the 1EX with a lower detection limit of 0.1g/t. gold is assayed by the G6 fire assay package - fusion of a 30-gram followed by ICP-ES finish; with a lower detection limit of 0.005 g/t. ACME has an 9001:2008 International Standard Organization rating.

Recoverable copper equivalent calculations are based on 86.3% of the copper content plus 73% of the gold content, 58.8% of the molybdenum content and 48.3% of the silver content. Metal prices used are copper $US3.25/pound, gold $US1,445/ounce, molybdenum $US14.64/pound and silver $US27.74/ounce.

Quality Control
The Joint Venture follows a rigorous Quality Assurance/Quality Control program consisting of inserting standards, blanks and duplicates into the sample stream submitted to the laboratory for analysis.

Elmer B. Stewart, MSc. P. Geol., President of Copper Fox, is the Corporation's nominated Qualified Person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, has reviewed the technical information disclosed in this news release.

About Copper Fox
Copper Fox is a Canadian resource development company listed on the TSX-Venture Exchange (TSX-V: CUU) with offices in Calgary, Alberta and Vancouver, British Columbia. In addition to Copper Fox's 25% interest in the Schaft Creek Joint Venture, Copper Fox holds, through Desert Fox and its wholly-owned subsidiaries, the Sombrero Butte copper project in the Bunker Hill Mining District, Arizona and the Van Dyke copper project in the Globe-Miami Mining District, Arizona. Desert Fox has opened an operations office in Miami, Arizona to advance the work required on the Van Dyke copper project to a Preliminary Economic Assessment. For further information on these projects, please refer to the Company's website at www.copperfoxmetals.com.

For additional information contact: Investor line 1-866-913-1910 or Lynn Ball, at 1-403-264-2820.

On behalf of the Board of Directors

Elmer B. Stewart
President and Chief Executive Officer

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the Canadian securities laws. Forward-looking information is generally identifiable by use of the words "believes," "may," "plans," "will," "anticipates," "intends," "budgets", "could", "estimates", "expects", "forecasts", "projects" and similar expressions, and the negative of such expressions. Forward-looking information in this news release includes statements about the results for the 2013 drilling program at the Schaft Creek project.

In connection with the forward-looking information contained in this news release, Copper Fox has made numerous assumptions, regarding, among other things: the results of the 2013 drilling results for the Schaft Creek project. While Copper Fox considers these assumptions to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies. Additionally, there are known and unknown risk factors which could cause Copper Fox's actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information contained herein. Known risk factors include, among others; the actual mineralization in the Van Dyke Deposit may not be as favorable as suggested by the historical estimates; the historical estimates may not be reliable or indicative of any commercial benefit to Copper Fox; Copper Fox may not be able to comply with its ongoing obligations regarding the Van Dyke Deposit; a Preliminary Economic Assessment may not be prepared for the Van Dyke Deposit as currently contemplated, or at all; some or all of the drilling results for the 2013 season at Schaft Creek may not be released as contemplated; additional drilling at Schaft Creek may not intersect additional mineralization; fluctuations in copper prices and demand; currency exchange rates; conditions in the financial markets and the overall economy may continue to deteriorate; uncertainties relating to interpretation of the previous drill results and the geology, continuity and grade of Van Dyke Deposit; the previous metallurgical testwork and metal recovery rates; the need to obtain additional financing and uncertainty of meeting anticipated program milestones; uncertainty as to timely availability of permits and other governmental approvals.

A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's continuous disclosure filings with Canadian securities regulatory authorities at www.sedar.com. All forward-looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, events or developments, except as required by law.


View this News Release in PDF Format:
Associated File: http://www.copperfoxmetals.com/i/pdf/2013-12-19_NR.pdf
243 KB in size, approx. 46 seconds to download at 56.6Kbps

You can also view this News Release on our website at:
http://www.copperfoxmetals.com/s/NewsReleases.asp?ReportID=616382

Home   Corporate   Projects   News   Investors   Contact � 2013 Copper Fox Metals Inc. All Rights Reserved

Copper Fox Metals Inc.

EN DÉVELOPPEMENT
CODE : CUU.V
ISIN : CA21749Q1046
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Copper Fox est une société développant des projet miniers de cuivre basée au Canada.

Copper Fox est en développement de projets de cuivre, d'argent, de molybdène et d'or au Canada.

Son principal projet en développement est SCHAFT CREEK au Canada.

Copper Fox est cotée au Canada. Sa capitalisation boursière aujourd'hui est 92,0 millions CA$ (67,3 millions US$, 62,5 millions €).

La valeur de son action a atteint son plus haut niveau récent le 21 avril 2011 à 2,63 CA$, et son plus bas niveau récent le 13 mars 2020 à 0,01 CA$.

Copper Fox possède 427 809 984 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Copper Fox Metals Inc.
2007 Annual report
2006 Annual report
Financements de Copper Fox Metals Inc.
01/07/2016Announces Closing of the Second placement
08/04/2013Announces Closing of a $2,653,000 Financing
22/02/2013announces a $2,500,000 Private Placement Unit Offering, insi...
22/01/2013ANNOUNCES the Closing of a $1,500,000 Financing by an Inside...
16/01/2013Announces a $1,500,000 Private Placement Unit Offering, Insi...
16/01/2013Announces a $1,500,000 Private Placement Unit Offering, Insi...
24/10/2012ANNOUNCES the Closing of a $2,500,000 Financing by an Inside...
14/09/2012Announces the Closing of a $4,025,000 Financing by an Inside...
23/07/2012ANNOUNCES a $4,025,000 Private Placement Unit Offering, Insi...
18/06/2012Announces A $4,480,000 Private Placement Unit Offering Insid...
30/01/2012Announces The Closing Of $2,200,000 Financing By An Insider
19/01/2012Announces a $2,200,000 Private Placement Unit Offering Insid...
14/12/2011Announces the Closing of $4,000,000 Financing by an Insider
07/12/2011Announces Increase of $2,000,000 to previously announced Pri...
05/10/2011Announces the Closing of $5,000,000 Financing by an Insider
13/09/2011Announces an Additional $2,000,000 Private Placement Unit Of...
08/09/2011announces a $3,000,000 Private Placement Unit Offering. Ins...
31/03/2011ANNOUNCES THE ACCELERATION TERM TO BE APPLIED TO THE EXPIRY ...
17/03/2011CLOSING OF A $3,750,000 NON BROKERED PRIVATE PLACEMENT FLOW-...
17/02/2011Announces a $3,750,000 Non Brokered Private Placement Flow-T...
22/10/2009closing of a $2,000,000 Private Placement Unit Offering
28/09/2009$2,000,000 Private Placement
23/06/2009Provides Update on its $6,000,000 Private Placement
19/06/2009 Updates on its $6,000,000 private placement
02/06/2009announces a $6,000,000 non-brokered Private Placement of whi...
16/12/2008Announces the Withdrawal of a Private Placement Financing
07/11/2008ANNOUNCES PRIVATE PLACEMENT FINANCING
07/11/2008Announces Private Placement Financing
15/05/2008closes Non Brokered Private Placement Financing of $12,398,2...
17/07/2007to raise $10,000,000 in flow-through and non-flow-through fu...
17/07/2007Intends to offer a brokered private placement
Attributions d'options de Copper Fox Metals Inc.
30/04/2012Announces Incentive Stock Option Grants
14/03/2011Grant of 1,700,000 shares at $ 1,69 par share
26/06/2008grant of incentive stock options to Employees, Officers, Con...
Nominations de Copper Fox Metals Inc.
03/05/2011ANNOUNCES RESIGNATION OF CFO, APPOINTMENT OF AN INTERIM CFO
16/07/2009Announces Executive Changes and the Appointment of a Directo...
17/09/2007Announces the appointment of Shane Uren as Vice President
Rapports Financiers de Copper Fox Metals Inc.
22/09/2016Announces 2016 Third Quarter Financial Results
31/03/2016Announces 2016 First Quarter Financial Results
29/09/2015Announces Third Quarter Results
28/09/2013Announces Third Quarter Results
24/06/2013Announces Second Quarter Results
27/09/2012Announces Third Quarter Results
18/06/2012Announces Second Quarter Results
25/04/2012Announces First Quarter Results
29/02/2012Reports 2011 Annual Financial Results and a Corporate Update
29/09/2011Reports 2011 Third Quarter Financial Results and a Corporate...
30/06/2011Advances Feasibility Study and Reports 2011 Second Quarter F...
31/03/2011Announces First Quarter 2011 Highlights and Financial Result...
16/02/2011Announces Fourth Quarter Highlights and 2010 Year-End Financ...
25/02/2010Announces 2009 Year-End Financial Results
06/03/20092008 Year-end Financial Results
04/06/2008Second Quarter Results Three and Six Months Ended April 30, ...
03/06/2008Second Quarter Results
31/03/2008First Quarter Financials
27/03/2008First Quarter Results Three Months Ended January 31, 2008
11/02/20082007 Year-End Financial Results
24/09/2007Announces third quarter results
28/03/2007announces its first quarter results for the three months en...
Projets de Copper Fox Metals Inc.
09/01/2014Outlines 2014 Diamond Drilling Plans for Van Dyke Copper Pro...
19/11/2013Sampling Locates Two Large Areas Of Porphyry Style Copper-M...
12/04/2013Acquires Van Dyke Copper Deposit in Arizona
25/03/2013(Schaft Creek)Enters Into Facilities Study Agreement with BC Hydro for Sch...
04/02/2013(Schaft Creek)Files Positive Feasibility Study on Schaft Creek Project
10/09/2012Completes Acquisition Of Sombrero Butte Copper Project And V...
09/07/2012To Acquire From Bell Copper The Van Dyke Copper Deposit And ...
31/05/2012(Schaft Creek)Schaft Creek Resource Estimate Update
24/05/2012(Schaft Creek)Provides Update on Schaft Creek Project
10/05/2012(Schaft Creek)Announces 2012 Exploration Program And Acquires Additional M...
27/03/2012(Schaft Creek)Completes Land Acquisitions Covering Positive Magnetic Linea...
19/03/2012(Schaft Creek)s Activities on the Schaft Creek-Copper-Gold-Molybdenum-Silv...
03/02/2012(Schaft Creek)Announces Drilling Intersect of 0.96% CuEq Over 110m and Rep...
12/12/2011Drilling Expands Paramount Zone with Intersection of 1.10% C...
13/10/2011(Schaft Creek)Secures Shipping Facilities for Concentrate at Port of Stewa...
23/09/2011(Schaft Creek)Extends Mineralized Zone to the East And Completes Strategic...
06/09/2011Welcomes the Awarding of the Construction Contract for the N...
26/07/2011(Schaft Creek)Drilling Intersects 1.18% Copper Equivalent Over 161M at Sch...
31/05/2011(Schaft Creek)Commences 2011 Drilling Program, Updates Other Activities ...
10/05/2011(Schaft Creek)Welcomes the Federal Government of Canada's Approval of the ...
06/05/2011(Schaft Creek)Provides Update on 2011 Plans for Schaft Creek, Diamond Dril...
05/05/2011(Schaft Creek)FOX PROVIDES UPDATE ON 2011 PLANS FOR SCHAFT CREEK, DIAMOND ...
24/03/2011(Schaft Creek)Announces Strategic Acquisitions to Enlarge Schaft Creek Pro...
28/02/2011(Schaft Creek)Copper Fox Metals Applauds the Announcement of the Province ...
23/02/2011(Schaft Creek)DDH CF405 Tests Chargeability Anomaly And Expands Zone Of De...
14/02/2011(Schaft Creek)News Release
03/02/2011(Schaft Creek)Latest Assay Results Expands Zone of Deep, Higher Grade Mine...
18/06/2010files an amended Preliminary Feasibility Study on SEDAR
01/04/2010s Status of Feasibility Study and Reports 2010 First Quarter...
21/01/2010(Schaft Creek)Awards Feasibility Study On Schaft Creek Project
18/11/2009(Schaft Creek)Geophysical Survey Outlines "8" IP Anomalies at Schaft Creek...
15/09/2008Positive Results of Preliminary Feasibility Study on Schaft ...
15/09/2008Announces Positive Results of Preliminary Feasibility Study ...
14/07/2008(Schaft Creek)Strategic Drilling Program and Greenfield Camp Expansion Hig...
26/06/2008(Schaft Creek)2007 Drilling And Geophysical Results All Show Increased Pot...
20/03/2008(Schaft Creek)Announces Schaft Creek progress
14/01/2008(Schaft Creek)Releases Positive Preliminary Economic Assessment on its Sch...
27/11/2007(Schaft Creek)continues development of its Schaft Creek British Columbia m...
22/10/2007(Schaft Creek)'Pit Optimization Study Demonstrates 65,000-tonne per-day Op...
10/07/2007(Schaft Creek)Updates 2007 Schaft Creek Work Program
04/07/2007(Schaft Creek)Significantly Increases Resources at Schaft Creek
Communiqués de Presse de Copper Fox Metals Inc.
29/06/2016Copper Fox Announces 2016 Second Quarter Financial Results
10/06/2016Copper Fox Announces a $1,000,000 Non-Brokered Private Place...
31/03/2016Copper Fox Announces 2016 First Quarter Financial Results
30/03/2016Copper Fox Annnounces 2016 Schaft Creek Program
25/01/2016Copper Fox Announces Mineral Mountain Copper Project in Ariz...
24/12/2015Copper Fox Files Van Dyke Technical Report on SEDAR
22/12/2015Copper Fox Announces $1,650,000 Non-Brokered Private Placeme...
06/11/2015Copper Fox Provides Update of Activities
29/09/2015Copper Fox Announces Third Quarter Results
25/09/2015Copper Fox Extends Size of Exploration Target on Sombrero Bu...
08/09/2015Copper Fox Reports Large Chargeablity Signature on Sombrero ...
28/07/2015Copper Fox Provides Update of Activities
13/07/2015Copper Fox Commences Titan-24 DCIP Survey at Sombrero Butte ...
15/04/2015Copper Fox Announces Preliminary Results of Metallurgical Te...
08/04/2015Copper Fox Announces Commencement of Preliminary Economic As...
31/03/2015Copper Fox Annnounces First Quarter Results
17/03/2015Copper Fox Annnounces 2015 Schaft Creek Program
13/03/2015Copper Fox Receives $3.63 Million Cash Refund
12/03/2015Copper Fox Extends Warrant Expiry Dates and Announces AGM Da...
27/02/2015Copper Fox Announces Annual Results
09/02/2015Copper Fox Updates Schaft Creek Project Activities
03/02/2015Copper Fox Files Van Dyke Technical Report on SEDAR
15/01/2015Copper Fox Completes Top-Up Investmentin Carmax Mining Corp.
24/12/2014Copper Fox Provides Corporate Update on Project Activities
19/12/2014Copper Fox Completes Inferred Mineral Resource Estimate for ...
03/12/2014Copper Fox Announces Preliminary In-Situ Leach Test Results ...
28/10/2014Copper Fox Announces Commencement of Resource Estimate at Va...
23/10/2014Copper Fox Announces Update on Schaft Creek Project
25/09/2014Copper Fox Completes Top-Up Investment in Carmax Mining Corp...
23/09/2014Copper Fox Announces Third Quarter Results
10/09/2014Copper Fox Announces Van Dyke Drill Results and Provides Oth...
07/08/2014Copper Fox Announces Van Dyke Drill Results and Provides Cor...
21/07/2014Copper Fox Completes Van Dyke Drilling Program and Provides ...
18/06/2014Copper Fox Announces Second Quarter Results
29/05/2014Copper Fox Closes Carmax Investment
23/05/2014Copper Fox Announces Carmax Shareholders Approve Private Pla...
15/05/2014Copper Fox Adds Second Drill to Van Dyke Project and Provide...
03/12/2013s Activities on Van Dyke Copper Deposit in Arizona
19/11/2013Sampling locates two large areas of porphyry style copper-mo...
30/08/2013announces a corporate reorganization
12/08/2013provides update on corporate activities
16/07/2013(Schaft Creek)And Teck Resources Form Schaft Creek Joint Venture
05/06/2013(Schaft Creek)provides update on discussions regarding Schaft Creek
07/02/2013(Schaft Creek)Completes Land Acquisitions at Schaft Creek & Sombrero Butte...
17/01/2013Announces Extension Of Expiry Date Of Certain Stock Options
17/10/2012(Schaft Creek)Reports Diamond Drill Results From the 2012 Drilling Program...
25/09/2012(Schaft Creek)Reports the Status of the Schaft Creek Feasibility Study and...
25/09/2012(Schaft Creek)Reports the Status of the Schaft Creek Feasibility Study and...
04/09/2012Drilling Indicates Widespread Mineralization in the Discover...
02/08/2012(Schaft Creek)Drilling Extends Mineralization In Discovery Zone And Acquir...
16/02/2012(Schaft Creek)Locates a New Zone of Copper Mineralization 1,200M North of ...
23/01/2012Announces The Issuance Of 1,272,727 Shares For Outstanding ...
13/01/2012Announces Shares For Debt Agreement
06/09/2011(Schaft Creek)Drilling Intersects 0.81% Copper Equivalent Over 154m at Sch...
11/07/2011(Schaft Creek)Measured and Indicated Resource Estimate Exceeds 1 Billion T...
21/06/2011(Schaft Creek)High Resolution Magnetic Survey at Schaft Creek Confirms Sim...
13/04/2011Announces Completion of 3D Model and Award of High-Resolutio...
13/04/2011ANNOUNCES COMPLETION OF 3D MODEL AND AWARD OF HIGH-RESOLUTIO...
17/06/2010June 17 2010 news release
01/06/2010June 1 2010 News release
02/02/2010Feb 2 2010 news release
21/01/2010Jan 21, 2010
23/10/2009New release attached
22/10/2009announces the closing of a $2,000,000 Private Placement Unit...
17/09/2009Applauds Federal Government’s Support for British Columbia N...
17/09/2009Applauds Federal Government's Support for British Columbia N...
13/07/2009Special Shareholders Meeting Approves a New control Person -...
13/07/2009July 13, 2009 News release
30/06/2009Three and Six Months Ended April 30, 2009
26/06/2009June 25, 2009 news release
03/03/2009Annual Financial
27/02/2009Feb 26, 2009 News release
27/02/2009Lions Gate Metals Inc. and Copper Fox Metals Inc. Announce B...
12/02/2009Correct News release
12/02/2009Feb 11 09 News release
12/02/2009provides an update of Corporate Activities
03/02/2009Highway 37 Power Line Coalition Applauds Premier for Express...
22/01/2009Cambridge House Invitation - Vancouver
18/12/2008December 17 2008 News release
18/12/2008Announces Resignation Of A Director
30/09/2008Sept 30/08
29/09/2008Applauds Advancement of Northwest Power Line
29/09/2008Applauds Advancement of Northwest Power Line
26/09/2008Northwest Power Line Could Create Thousands of Jobs, Attract...
17/09/2008Schaft not Galore says Copper Fox president
02/09/2008LV Hard Assets Conference Personalized Html
17/07/2008from the Ministry of Energy, Mines and Petroleum Resources r...
26/06/2008June 26 2008 Options
26/06/2008June 26, 2008
26/05/2008Register Today for a Discounted Rate to the New Orleans 2008...
04/04/2008Applauds Advancement of Northwest Power Line Study
31/03/2008$16mm offering
15/11/2007announces the renewal of the engagement of Jason Shepherd fo...
12/10/2007Announces is has earned a 70% Direct Interest in the World C...
02/10/2007$400 million to empower B.C.'s far northwest
08/08/2007Drilling to Commence at Copper Flats
12/07/2007Press Release: Augusta Files Plan of Operations for Rosemont...
03/07/2007 2nd Quarter Financials
11/06/2007announces its request for a trading halt
04/05/2007and the Tahltan Nation Development Corporation complete a "M...
22/04/2007Adopts a Shareholder Rights Plan.
27/02/2007Welcomes New Executive to the Team
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (CUU.V)
0,215-6.52%
TSX-V
CA$ 0,215
03/05 16:49 -0,020
-6,52%
Cours préc. Ouverture
0,230 0,220
Bas haut
0,215 0,220
Année b/h Var. YTD
0,160 -  0,250 -6,52%
52 sem. b/h var. 52 sem.
0,150 -  0,300 -10,42%
Volume var. 1 mois
36 450 7,50%
24hGold TrendPower© : 40
Produit
Développe Copper - Gold - Molybdenum - Silver
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 08/07/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20242,38%0,260,16
202331,25%0,310,08
2022-36,00%0,320,13
2021-25,37%0,660,20
2020346,67%0,470,01
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,49 AU$+0,13%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,76 US$+1,29%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-0,92%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,59 CA$-0,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,15 CA$+0,80%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-7,84%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-2,72%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
50,54 US$+0,40%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :