Avnel Reports That Diluted Pit-Constrained Indicated Resources Increase to 2.17 Million Ounces Grading 3.06 g/t Au at Kalana Main Deposit at $1,100/oz Gold
Published : March 26, 2015
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Mali | Nature | Report |

ST. PETER PORT, GUERNSEY--(Marketwired - March 26, 2015) - Avnel Gold Mining Limited ("Avnel" or the "Company") (News - Market indicators) is announcing an updated Mineral Resource Statement for the Company's 80%-owned Kalana Project in south-western Mali. The Company is also announcing that a 141-hole, 23,500-metre ("m") drill program at the Kalana Main deposit is about to commence that is expected to provide for a steady flow of assay result related news in the coming months.

Highlights:
Diluted Indicated Mineral Resource of 2.17 million ounces at the Kalana Main deposit
(22.1 million diluted tonnes at a diluted grade of 3.06 g/t Au at a 0.9 g/t Au cut-off)
Total Indicated Mineral Resources increased 67% to 2.15 million ounces since the PEA
(15.2 million tonnes grading 4.40 g/t Au at a 0.9 g/t Au cut-off)
Total Inferred Mineral Resource increased 24% to 0.38 million ounces since the PEA
(2.18 million tonnes grading 5.33 g/t Au at a 0.9 g/t Au cut-off)
An Exploration Target of 0.7 to 1.0 million ounces at the Kalana Main deposit
(5.3 to 6.6 million tonnes grading between 3.9 and 4.7 g/t Au)
Initial Inferred Mineral Resource of 70,000 ounces at the Kalanako satellite deposit
(380,000 tonnes grading 5.55 g/t Au at a 0.9 g/t Au cut-off)
141-hole drill program to expand and infill zones of known mineralisation
DFS completion date extended to Q1 2016 to design a larger open-pit mining operation

"I am pleased to report that since last year's PEA that pit-constrained diluted Indicated Resources at the Kalana Main deposit have increased to 2.17 million ounces at an average diluted grade of 3.06 grams per tonne at a gold price of $1,100 per ounce. On a related note, pit-constrained undiluted Inferred Resources have increased 52% to 380,000 ounces since the PEA, which is inclusive of the an initial Mineral Resource for the nearby Kalanako satellite deposit. We are also reporting an updated Exploration Target that suggests the potential to define up to a million ounces within a Conceptual Pit outside the Mineral Resource for the Kalana Main deposit," stated Howard Miller, Avnel's Chairman and CEO.

"I am also pleased to announce that our 141-hole, 23,500-m drill program at Kalana Main is about to commence. The drill program is designed to expand zones of known mineralisation, better define mineralisation in key areas, and convert Inferred Mineral Resources to Indicated Mineral Resources. This drilling is expected to lead to the optimisation of the overall potential economics of the project and improve key performance indicators."

"As a result of the larger Mineral Resource at Kalana Main, combined with our expectations from our current drill program, it has become clear that the DFS for Kalana Main should assess a larger operation than the 3,000 tonnes per day envisioned in the PEA. Accordingly, we are extending our timeline to complete the DFS into the first quarter of 2016, from late 2015, to account for the additional engineering required. We feel strongly that this is a positive development that is likely to increase expected average annual production and optimise NPV, IRR, stripping ratio, and other key performance indicators."

Mineral Resource Statement

A comparison between the Mineral Resource estimates reported today (the "March 2015 MRE") and the March 2014 MRE reported as part of the 31 March 2014 Preliminary Economic Assessment for the Kalana Main Project (the "PEA") is presented in the following table:

Total Mineral Resources for the Kalana Project
March 2015 MRE vs. March 2014 MRE1,2
(100% Project Basis Reported at a 0.9 g/t Au cut-off)
March 2015 MRE3 March 2014 MRE3 Change
($1,100/oz Au) ($1,110/oz Au) (%)
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(millions) (g/t Au) (millions) (millions) (g/t Au) (millions) (%) (%) (%)
INDICATED MINERAL RESOURCES
Kalana Main 14.5 4.52 2.11 8.5 4.53 1.25 70% (0%) 70%
Tailings4 0.66 1.8 0.04 0.66 1.8 0.04 0% 0% 0%
TOTAL 15.2 4.40 2.15 9.2 4.33 1.29 66% 2% 67%
INFERRED MINERAL RESOURCES
Kalana Main 1.8 5.28 0.31 2.1 3.7 0.25 -14% 43% 24%
Kalanako 0.38 5.55 0.07 - - - - - -
TOTAL 2.18 5.33 0.38 2.1 3.7 0.25 4% 44% 52%
1 – Avnel Gold has an 80% equity interest in SOMIKA, the Malian company that owns the Kalana Exploitation Permit
2 – Some figures in this table may not compute due to rounding and truncation
3 – Detailed summaries of the March 2015 MRE and the March 2014 MRE are provided in tables 1 and 2 near the end of this press release
4 – The Kalana tailings are reported at no cut-off as they are expected to be completely mined and reprocessed as per the PEA Technical Report

Kalana Main

The March 2015 MRE for the Kalana Main deposit is based upon a total of 133,679 m of drilling from 800 drill holes, of which 771 were drilled between 2009 and 2012 by the IAMGOLD Corporation ("IAMGOLD"). Data added to the database since the PEA includes 10,868 LeachWELL re-assays plus the addition of three Ashanti Gold RC drill holes, four SOMIKA RC drill holes, and 20 Russian diamond drill holes for a grand total of 1,287 m.

As a result of the inclusion of this additional data and enhanced interpretation, pit-constrained Indicated Mineral Resources have increased 71% to 2.11 million ounces at the Kalana Main deposit since the PEA. Similarly, Inferred Mineral Resources at the Kalana Main deposit have increased 24% to 0.31 million pit-constrained ounces since the PEA. The Mineral Resource estimate for the historic tailings from the Kalana Gold Mine is unchanged at 0.04 million ounces resulting in a 67% increase in total Indicated Mineral Resources at the Kalana Main Project to 2.15 million ounces.

Indicated and Inferred Mineral Resources for the Kalana Main deposit are pit-constrained using Whittle4X shells and are reported at a cut-off of 0.9 grams of gold per tonne ("g/t Au") utilising a gold price of $1,100 per ounce (down slightly from $1,110 per ounce in the PEA). Detailed summaries of the March 2015 MRE and the March 2014 MRE for the Kalana Project are presented in Table 1 and Table 2 near the end of this press release, respectively. A comparison of the March 2015 MRE to the interim Mineral Resource estimate for the Kalana Main Project that was reported on 15 October 2014 (the "September 2014 MRE") is presented in Table 3 near the end of this press release.

As discussed in the Company's news release dated 15 October 2014, an important contribution to the Mineral Resource estimation process since the PEA is an improvement to the estimation of dilution. The addition of estimated local dilution compared to the global dilution assumption of 50% utilised in the PEA has resulted in the exclusion of some of lower grade and narrow mineralisation with the diluted grades falling below the 0.9 g/t Au cut-off grade. As detailed in the table below, the resultant pit-constrained and diluted Indicated Mineral Resource above the diluted cut-off grade of 0.9 g/t Au is estimated at 22.1 million tonnes grading 3.06 g/t Au (diluted) containing 2.17 million ounces with an estimated global dilution of 52%:

Kalana Main Deposit Mineral Resource Diluted Estimate - March 2015 1,2
(100% Project Basis Above a Diluted Grade of 0.9 g/t Au)
Resource Resource Internal External Grade Grade Diluted Diluted Ounces
Tonnes Grade Dilution Dilution Internal External Tonnes Grade Gold
Dilution Dilution
(millions) (g/t Au) (%) (%) (g/t Au) (g/t Au) (millions) (g/t Au) (millions)
Indicated Resource 14.5 4.52 17% 30% 0.39 0.24 22.1 3.06 2.17
1 – Avnel Gold has an 80% equity interest in SOMIKA, the Malian company that owns the Kalana Exploitation Permit
2 – The above assessment of dilution is reported following depletion from historical production

The diluted Kalana Main deposit Indicated Mineral Resource of 2.17 million ounces, combined with the 0.04 million ounces of Indicated Mineral Resource from historic tailings, results in a total Indicated Mineral Resource at the Kalana Main Project of 2.2 million ounces (22.8 million diluted tonnes at a diluted grade of 3.02 g/t Au).

Kalanako Deposit

Kalanako is an open-ended satellite deposit located approximately 3 kilometres ("km") to the northeast of the Kalana Main deposit, as shown in Figure 1 near the end of this press release. Mineralisation at the Kalanako deposit occurs over a strike length that is in excess of 5 km in a northwest – southeast direction, of which only approximately 1.4 km of strike length has been drilled. The attitude of the vein packages varies from northwest – southeast to north-northwest – south-southeast and dips steeply in a northeasterly direction.

The initial pit-constrained Mineral Resource estimate for the Kalanako deposit is 0.07 million ounces and is based upon a total of 29,554 m of drilling from 235 holes that were drilled by IAMGOLD between 2010 and 2012, plus 5,060 m of drilling from 43 holes that were drilled by Ashanti and Russians. Gold grades are based upon a mixture of Fire and LeachWELL assays; similar to re-assay programs at the Kalana Main deposit, LeachWELL re-assay programs on IAMGOLD field duplicates and DD pulp rejects have resulted in an approximate upgrade of 40% relative to the original Fire Assay results. A detailed summary of the Mineral Resource estimate for the Kalanako deposit is presented in Table 1 near the end of this press release.

Kalana Main Deposit Exploration Target

An iteration of the Whittle 4X evaluation process for the March 2015 MRE was a pit shell that included mineralisation down to the bottom of the model to approximately 400 m below surface (the "Conceptual Pit"). Accordingly, the Exploration Target is defined as the portion of the model between the March 2015 MRE pit shell and the Conceptual Pit, which is shown in Figure 2 and Figure 3 near the end of this press release.

The Exploration Target, which is outside the March 2015 MRE, is estimated to be between 5.3 and 6.6 million tonnes grading between 3.9 and 4.7 g/t Au for an estimated 0.7 to 1.0 million ounces of contained gold.

The aforementioned assessment of potential quantity and grade is conceptual in nature and there has not been sufficient exploration to define a Mineral Resource and the preliminary economics are not sufficient to support a reasonable expectation for economic extraction. It is uncertain if further exploration will result in any portion of the Exploration Target being delineated as a Mineral Resource.

The Exploration Target is largely based upon LeachWELL re-assay results and a wide spacing of drill holes. As a result, confidence in this part of the model is not sufficient to define a Mineral Resource and therefore is defined as an Exploration Target rather than as part of the Mineral Resource for the Kalana Main deposit.

The 141-hole drill program that is about to commence is not designed to test the limits of the Conceptual Pit. As a result, the Exploration Target represents additional potential upside to the Kalana Main deposit to be further defined in future exploration and evaluation programs.

Kalana Main Definitive Feasibility Study Update

The Kalana Main deposit is open for expansion both laterally and at depth. As part of the planned work program for a Definitive Feasibility Study ("DFS") for the Kalana Main Project, the Company is about to commence a 141-hole, 23,500-m drill program at a budgeted cost of $3.8 million. This drill program is to be completed near the end of the second quarter of 2015 and is intended to:

1) Better define the up-dip shape and continuity of known mineralisation near the west, north and eastern margins of the pit shells;
2) Infill small gaps within the model to better define grade and continuity; and
3) Step-out near the limits of the pit shell to test for near surface gold mineralisation in highly prospective areas.

Drilling completed as part of this program is to be included in the next revision of the Mineral Resource estimate for the Kalana Main deposit, which is scheduled for completion late in the third quarter of 2015 and is expected to form the basis for a DFS. The inclusion of this drilling represents a major opportunity to optimise key performance indicators for the Kalana Main Project including annual production, net present value ("NPV"), internal rate of return ("IRR"), payback period, waste-to-ore ratio, and capital intensity per ounce of expected production.

As a result of the larger Mineral Resource at Kalana Main reported in this press release, combined with the expected results from the current drill program, it has become clear that the DFS should assess a larger operation than the 3,000 tonnes per day envisioned in the PEA. Accordingly, to account for the time required to complete the appropriate process plant engineering and mine planning, the Company is extending the timeline slightly to complete the DFS from late 2015 to the first quarter of 2016.

Qualified Persons

The Mineral Resource estimates reported in this news release were prepared by Mr. Ivor Jones, (BSc. Hons), MSc, FAusIMM, CP Geo., of Denny Jones Pty Ltd., who is an independent Qualified Person as defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). All Mineral Resources reported have been prepared in accordance with the CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines. Mr. Jones has reviewed and approved the contents of this press release.

Mr. Allan Earl, Associateship in Mining Engineering, FAusIMM of Snowden Mining Industry Consultants is an independent Qualified Person as defined by NI 43-101. Mr. Earl has reviewed and approved the contents of this press release.

Mr. Roy Meade, BSc (Honours) Mining Engineering and Professional Engineer (UK), Executive Director, Operations for Avnel Gold Mining Limited is a Qualified Person as defined by NI 43-101. Mr. Meade has reviewed and approved the contents of this press release.

Dr. Olivier Femenias, MSc, PhD, EurGeol 1115, Vice-President, Geology for Avnel Gold Mining Limited is a Qualified Person as defined by NI 43-101. Dr. Femenias has reviewed and approved the contents of this press release.

ABOUT AVNEL GOLD

Avnel Gold is a TSX-listed gold mining, exploration and development company with operations in south-western Mali in West Africa. The Company's focus is to develop its 80%-owned Kalana Main Project from a small underground mine into a low-cost, open-pit mining operation. The Company is also advancing several nearby satellite deposits on the 387 km2 30-year Kalana Exploitation Permit.

On March 31, 2014, the Company reported a Mineral Resource estimate and the results of a Preliminary Economic Assessment ("PEA") prepared by Snowden Mining Industry Consultants. The PEA outlines a 14-year open-pit mine life at the Kalana Main Project recovering 1.46 million ounces of gold at an average "all-in sustaining cost" of $577 per ounce with an initial capital cost of $149 million. Utilizing a gold price of $1,110 per ounce and a 10% discount rate, the PEA reported a net present value ("NPV") of $194 million after-tax and imputed interest, and an internal rate of return ("IRR") of 53% on a 100% project basis. Similarly, utilizing a 5% discount rate and a $1,300 per ounce gold price, the NPV was reported as $424 million and an IRR of 74%. The Company is now advancing the project to Definitive Feasibility, which is scheduled to be completed in the first quarter of 2016.

No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.

CAUTIONARY STATEMENTS

Preliminary Economic Assessment

The Kalana Main Preliminary Economic Assessment ("PEA") is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves; thus, there is no certainty that the economic benefits indicated in the PEA will be realized. The PEA is subject to a number of assumptions, including, among others that an Environmental and Social Impact Assessment ("ESIA") will be completed within the required timeline, all required permits will be obtained in a timely manner, the company will continue to have the support of local community, a constant regulatory environment and no material increase occurs to the estimated costs. The Kalana Main PEA is based upon an 8.54 million tonne Indicated Mineral Resource grading 4.53 g/t Au containing 1.25 million ounces and a 2.09 million tonne Inferred Mineral Resource grading 3.76 g/t Au containing 0.25 million ounces utilizing a cut-off grade of 0.9 g/t Au. The PEA also includes 0.66 million tonnes of tailings grading 1.80 g/t Au that are classified as an Indicated Mineral Resource. Investors are cautioned not to assume that all or any portion of the Mineral Resource will ever be converted into a Proven and Probable Mineral Reserve. The NI 43-101-compliant technical report for the PEA and the Mineral Resource Estimate was prepared by Allan Earl, Executive Consultant, and Ivor Jones, Executive Consultant, of Snowden Mining Industry Consultants, each of whom are independent Qualified Persons, as defined in NI 43-101. The PEA was filed on SEDAR (www.sedar.com) on March 31, 2014.

Forward-Looking Statements

This news release includes certain "forward-looking statements". All statements, other than statements of historical fact, included in this release, including the future plans and objectives of Avnel Gold, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Avnel Gold's expectations include, among others, risks related to international operations, the actual results of current exploration activities, conclusions of economic evaluations and changes in project parameters as plans continue to be refined as well as future prices of gold and silver, as well as those factors discussed in the section entitled "Risk Factors" in Avnel Gold's Annual Information Form, which is available on SEDAR (www.sedar.com). Although Avnel Gold has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Non-IFRS Measures

"All-in Sustaining Cost Per Ounce" is a non-GAAP and non-IFRS measure that does not have a standardized meaning prescribed by GAAP or IFRS and there may be some variation in the method of computation to other similarly titled measures of other gold mining companies. In the PEA, Snowden calculates "All-in Sustaining Cost" is defined as mine site cash operating costs, which includes costs such as mining, processing, administration, but excludes non-site costs (transport and refining of metals and royalties), plus sustaining capital costs, which includes community and environmental costs, plus closure costs. These costs are then divided by the number of ounces produced to arrive at "All-in Sustaining Cost Per Ounce".

Table 1: Kalana Project Mineral Resources (19 March 2015)
Indicated Resources Inferred Resources
Tonnes Grade Ounces Tonnes Grade Ounces
(millions) (g/t Au) (millions) (millions) (g/t Au) (millions)
Kalana Main 14.5 4.52 2.11 1.8 5.28 0.31
Kalanako 0.38 5.55 0.07
Kalana Tailings 0.66 1.8 0.04
TOTAL 15.2 4.40 2.15 2.18 5.33 0.38
Notes on Mineral Resources:
1. The Kalana Main pit and Kalanako pit Mineral Resource estimates are as at 19 March 2015. The Kalana Tailings Mineral Resource estimate is as at 31 March 2014. Mineral Resources are disclosed on a total project basis at 100%. Avnel Gold owns an 80% equity interest in SOMIKA, the Malian company that holds the Kalana Exploitation Permit.
2. The determination of pit-constrained Mineral Resources at Kalana Main are based upon a gold price of $1,100 per ounce and a 1.2 million tonne per annum mining operation; pit slope angles ranging from 37 to 50 degrees; estimated base mining cost at surface ranging from $2.23 to $3.25 per tonne mined, estimated processing, grade control, and G&A costs ranging from $20.02 to $26.91 per tonne of ore; and a range of gold recoveries averaging 94%
3. Unless stated otherwise, tonnages are metric tonnes and are rounded to the closest "0.0" million tonnes, grades are rounded to the closest "0.00", and contained gold is reported as troy ounces. All reported grades and tonnes are prior to dilution.
4. Mineral Resources for the Kalana Main and Kalanako deposits are reported above a cut-off of 0.9 g/t Au and were estimated by Ivor W.O. Jones, who is recognized as a Qualified Person for the purposes of NI 43-101. Grades were estimated using Multiple Indicator Kriging (MIK).
5. No cut-off has been applied to the tailings as all tailings are proposed to be treated according to the PEA.
6. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, marketing, or other relevant factors. These Mineral Resources are reported using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council.
7. The quantity and grade of reported Inferred Resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Mineral Resources as an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category.
Table 2: Kalana Project Mineral Resources (31 March 2014)
Indicated Resources Inferred Resources
Tonnes Grade Ounces Tonnes Grade Ounces
(millions) (g/t Au) (millions) (millions) (g/t Au) (millions)
Kalana Main 8.5 4.53 1.25 2.1 3.76 0.25
Tailings 0.66 1.8 0.04
TOTAL 9.2 4.33 1.29 2.1 3.76 0.25
Notes on Mineral Resources:
1. The Kalana Main Pit and Kalana Tailings resource estimates are as at 31 March 2014. Mineral Resources are disclosed on a total project basis at 100% and at an implied net interest of 80% to Avnel Gold, which owns an 80% equity interest in SOMIKA, the Malian company that holds the Kalana Exploitation Permit.
2. Indicated and Inferred Mineral Resources for the Kalana Main deposit are based upon a $1,110 per ounce gold price, pit slope angles ranging from 37 to 45 degrees, and estimated costs and gold recoveries based upon the PEA specifications.
3. The quantity and grade of reported Inferred Resources in this estimation are uncertain in nature and there has been insufficient exploration to define these inferred resources as an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category.
4. Unless stated otherwise, tonnages are metric tonnes and are rounded to the closet "0.0" million tonnes. Grades are rounded to the closest "0.00" and contained gold is reported as troy ounces. All reported grades and tonnes are prior to dilution.
5. No cut-off has been applied to the tailings as all tailings are proposed to be treated according to the PEA Technical Report.
6. Mineral Resources for Kalana are reported above a cut-off of 0.9 g/t Au and were estimated by Ivor W.O. Jones, who is recognized as a Qualified Person for the purposes of NI 43-101. Grades were estimated using Multiple Indicator Kriging (MIK).
7. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, marketing, or other relevant factors. These Mineral Resources are reported using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council.
8. For additional technical information, please refer to the NI 43-101 compliant technical report dated 31 March 2014 that is available on SEDAR.
Table 3: Comparison of March 2015 and September 2014 Mineral Resources for Kalana Project
Mineral Resources Comparison for the Kalana Project
March 2015 MRE vs. September 2014 MRE1,2
(100% Project Basis Reported at a 0.9 g/t Au cut-off)
March 2015 MRE3 September 2014 MRE4 Change
($1,100/oz Au) ($1,110/oz Au) (%)
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(millions) (g/t Au) (millions) (millions) (g/t Au) (millions) (%) (%) (%)
INDICATED MINERAL RESOURCES
Kalana Main 14.5 4.52 2.11 12.9 4.57 1.90 12% -1% 11%
Tailings5 0.66 1.8 0.04 0.66 1.8 0.04 0% 0% 0%
TOTAL 15.2 4.40 2.15 13.6 4.36 1.94 12% 1% 11%
INFERRED MINERAL RESOURCES
Kalana Main 1.8 5.28 0.31 0.7 4.24 0.1 157% 25% 210%
Kalanako 0.38 5.33 0.07 - - - - - -
Total 2.2 5.33 0.38 0.7 4.24 0.1 211% 26% 279%
1 – Avnel Gold has an 80% equity interest in SOMIKA, the Malian company that owns the Kalana Exploitation Permit
2 – Some figures in this table may not compute due to rounding and truncation
3 – A detailed summary of the March 2015 MRE is presented in Table 1
4 – For additional information on the September 2014 MRE, please refer to Avnel Gold's press release dated 15 October 2014 and the PEA Technical Report dated 31 March 2014
5 – The Kalana tailings are reported at no cut-off as they are expected to be completely mined and reprocessed as per the PEA Technical Report

To view "Figure 1: Kalana Exploitation Permit," please visit the following link: http://www.avnelgold.com/wp-content/uploads/News/2015/20150326-AVK-FIGURE01.jpg

To view "Figure 2: Kalana Main West-East Section and Assays (Kalana I South - Section A - A')," please visit the following link: http://www.avnelgold.com/wp-content/uploads/News/2015/20150326-AVK-FIGURE02.jpg

To view "Figure 3: North-South Section and Assays (Kalana I North)," please visit the following link: http://www.avnelgold.com/wp-content/uploads/News/2015/20150326-AVK-FIGURE03.jpg

Données et statistiques pour les pays mentionnés : Mali | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Mali | Tous

Avnel Gold Mining Ltd.

EXPLORATEUR
CODE : AVK.TO
ISIN : GB00B09Y5410
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Avnel Gold Mining est une société de production minière d'or basée au Royaume-Uni.

Ses principaux projets en exploration sont KALANA GOLD MINE et FOUGADIAN PERMIT au Mali.

Avnel Gold Mining est cotée au Canada. Sa capitalisation boursière aujourd'hui est 162,1 millions CA$ (133,0 millions US$, 111,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 13 décembre 2006 à 1,25 CA$, et son plus bas niveau récent le 19 décembre 2008 à 0,02 CA$.

Avnel Gold Mining possède 376 989 984 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Avnel Gold Mining Ltd.
Announces 2007 Annual Results - Period Ended December 31, 20...
Nominations de Avnel Gold Mining Ltd.
25/11/2013appoints Dr. Olivier Féménias as Vice President Geology
23/05/2013announces election of directors
05/08/2008Announces Appointment of Chief Financial Officer
27/03/2008Announces Appointment of Chief Operating Officer
16/10/2007Announces Appointment of VP Exploration
Rapports Financiers de Avnel Gold Mining Ltd.
14/08/2008Announces Second Quarter 2008 Results
15/05/2008Announces First Quarter 2008 Results - Period ended March 31...
14/11/2007Announces Third Quarter 2007 Results
13/08/2007Announces Second Quarter 2007 Results - Period ended June 30...
14/05/2007Announces First Quarter 2007 Results
Projets de Avnel Gold Mining Ltd.
24/03/2014Avnel Announces new mineral resource estimate preliminary ec...
21/01/2011(Kalana Gold Mine)- KALANA UPDATE
26/03/2008(Fougadian Permit) has commenced drilling program on the major gold anomaly di...
Communiqués de Presse de Avnel Gold Mining Ltd.
26/05/2016Avnel Reports Results of Annual General Meeting
11/05/2016Avnel Reports Files First Quarter 2016 Financial Statements ...
06/05/2016Avnel Gold Files NI 43-101 Technical Report for the Kalana M...
30/03/2016Avnel Announces Definitive Feasibility Study Results for Kal...
30/03/2016Avnel Announces Filing of AIF and Year-End Consolidated Fina...
05/10/2015Avnel Reports That Measured Plus Indicated Resource Increase...
15/09/2015Avnel Successfully Concludes its 30,143 m Over 181 Holes Dri...
12/08/2015Avnel Reports Second Quarter 2015 Financial Results
20/07/2015Avnel Drills 174.0 g/t over 3 m, 6.0 g/t over 15 m, and 7.8 ...
16/07/2015Avnel Drills 174.0 g/t over 3 m, 6.0 g/t over 15 m, and 7.8 ...
17/04/2015Avnel Gold Mining Limited Announces C$12 Million Bought Deal...
17/04/2015IIROC Trade Resumption - CWT.UN; AVK
16/04/2015IIROC Trading Halt - AVK
31/03/2015Avnel Confirms Commencement of Drilling at Kalana Main and A...
30/03/2015Avnel Appoints Mr. Andrew King and Mr. Keith McCandlish to t...
26/03/2015Avnel Reports that Diluted Pit-Constrained Indicated Resourc...
26/03/2015Reports That Diluted Pit-Constrained Indicated Resources Inc...
05/02/2015Avnel Gold Announces Commencement of Definitive Feasibility ...
13/11/2014Avnel Gold Provides Kalana Main PFS Update and Reports Third...
13/11/2014Avnel Gold Provides Kalana Main PFS Update and Reports Third...
30/10/2014TSX Delisting Review - Avnel Gold Mining Limited (Symbol: AV...
15/10/2014Avnel Gold Reports that Indicated Resources Increased 55% to...
17/07/2014Avnel Announces Closing of Approximately C$9.9 Million Priva...
07/07/2014TSX Delisting Review - Avnel Gold Mining Limited (Symbol: AV...
26/06/2014Avnel Announces Proposed Private Placement of up to C$13.5 M...
23/05/2014Avnel Gold Announces 2014 AGM Results
14/05/2014Avnel Gold Mining Limited (AVK: TSX) announces first quarter...
01/04/2014Avnel Gold Mining (TSX:AVK) Files NI 43-101 Technical Report...
31/03/2014Avnel Gold Mining Limited (AVK: TSX) Announces 2013 Annual R...
24/03/2014Announces New Mineral Resource Estimate and Preliminary Econ...
24/03/2014Avnel Announces New Mineral Resource Estimate and Preliminar...
16/10/20072007 Toronto Resource Investment Conference
15/10/2007 Receives Recommendations for Extensive Drill Program to Inv...
17/09/2007Announces Strategic Review
18/07/2007Announces Exceptional Soil Geochemistry Results at its Fouga...
02/04/2007Production at the Kalana Gold mine increases
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (AVK.TO)
0,430-2.27%
TORONTO
CA$ 0,430
15/09 14:58 -0,010
-2,27%
Cours préc. Ouverture
0,440 0,440
Bas haut
0,430 0,440
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,430 -%
Volume var. 1 mois
200 500 -%
24hGold TrendPower© : 24
Produit
Développe
Recherche Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 25/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :