Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Silver Standard Reports Third Quarter 2012 Financial Results and Further Exploration Results at Pirquitas
Published : November 08, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Argentine | Canada | Copper | G Mexico | Report | Zinc |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Nov. 7, 2012) - Silver Standard Resources Inc. (News - Market indicators)(NASDAQ:SSRI) ("Silver Standard" or the "Company") reports consolidated financial results for the third quarter ended September 30, 2012 and further exploration results.

"This quarter we continued to deliver at Pirquitas with strong production and even stronger sales. By year-end, we will have drilled over 50,000 metres at Pirquitas, showing our determination to add further value to the mine," said John Smith, President and CEO. "San Luis moves forward with the approval of our EIA, and the engineering team is well on track to deliver the Pitarrilla feasibility study later this year." 

Third Quarter 2012 Highlights:

(All figures are in U.S. dollars unless otherwise noted)

  • Generated record revenues of $73.5 million, a 73% increase compared with the second quarter of 2012, from record sales of 2.8 million ounces of silver - a 49% increase over last quarter's sales.
     
  • Shipped a record 5,900 dry metric tonnes of silver concentrate containing 3.4 million ounces of silver.
     
  • Produced 2.2 million ounces of silver, the second highest quarterly production in the history of the Pirquitas mine, up 7% from the second quarter of 2012, bringing year-to-date production to 6.4 million ounces, in line with guidance.
     
  • Milled ore containing an average silver grade of 214 g/t, in line with the 219 g/t reported last quarter. The average recovery rate for silver increased to 77.7% from 74.5% last quarter.
     
  • Reported significant silver and zinc mineralization in the Cortaderas target area at Pirquitas, including a 121 metre long intersection of the Cortaderas Breccia mineralization averaging 206 g/t silver and 5.0% zinc and a 26 metre intersection of the Cortaderas Valley target area averaging 254 g/t silver and 8.8% zinc.
     
  • Received government approval for the Environmental Impact Assessment ('EIA') at the San Luis property in Peru, a significant milestone.

Pirquitas Mine, Argentina

Summary Mine Operating Statistics (1)

    Q3 2012 Q2 2012 Q1 2012 Q4 2011 Q3 2011
Total Material Mined Kt 4,333 4,483 4,297 4,640 4,185
Ore Processed Kt 404 386 416 241 245
Silver Mill Feed Grade g/t 214 219 221 274 250
Recoveries % 77.7 74.5 77.3 82.4 82.9
Silver Produced '000 oz. 2,163 2,021 2,172 1,751 1,631
Direct Mining Cost US$/oz. $13.02 $13.07 $11.86 $14.97 $16.20
Total Cash Cost US$/oz. $24.01 $21.88 $20.30 $17.72 $20.60
  1. The Company reports non-GAAP cost, including direct mining cost and total cash cost, per ounce of silver produced to manage and evaluate operating performance at the Pirquitas mine. For a better understanding and a reconciliation of these measures to cost of inventory, as shown in the Company's consolidated interim statement of income please refer to 'Non-GAAP Financial Measures' in item 13 of the management discussion and analysis ("MD&A") for the three and nine months ended September 30, 2012.

Mine production

The Pirquitas mine produced 2.2 million ounces of silver during the third quarter of 2012, compared with 2.0 million ounces during the second quarter of 2012, bringing total silver production for the year to 6.4 million ounces. The improvement in silver production reflects higher average silver recoveries in the plant and consistent throughput at elevated levels. Silver production this quarter was higher than the 1.6 million ounces produced in the third quarter of 2011, principally due to significantly higher mill throughput. The mine also produced 2.8 million pounds of zinc in the third quarter, a 46% increase from the second quarter of 2012, bringing year to date production to 8.0 million pounds.

During the quarter, 404,000 tonnes of ore were processed at an average milling rate of 4,388 tonnes per day, compared to 386,000 tonnes at an average of 4,246 tonnes per day in the second quarter of 2012, and 245,000 tonnes at an average of 2,664 tonnes per day in the third quarter of 2011. The average milling rate of 4,388 tonnes per day this quarter is 10% higher than the plant's nominal design. The ongoing performance above design is the result of continuous improvement initiatives at the mine, including preventative maintenance, mill feed selection, and improved crusher capacity.

Ore milled during the third quarter of 2012 contained an average silver grade of 214 g/t, compared to 219 g/t in the second quarter of 2012, and 250 g/t in the third quarter of 2011. Silver recoveries were 77.7% in the third quarter of 2012 compared to 74.5% in the second quarter of 2012, and 82.9% in the third quarter of 2011. The higher recoveries in the third quarter of 2012 compared to the second quarter of 2012 resulted from further flotation optimization and an improved supply of preferred reagents.

Mine operating costs

Direct mining cost per ounce, total cash cost per ounce and total production cost per ounce are non-GAAP financial measures. Please see the discussion under 'Non-GAAP Financial Measures' in item 13 of the MD&A for the three and nine months ended September 30, 2012.

Direct mining costs in the third quarter of 2012 were $13.02 per ounce of silver compared to $13.07 per ounce in the second quarter of 2012 and $16.20 per ounce in the third quarter of 2011. Import restrictions continue to impact operational efficiencies, and high local inflation rates in Argentina (without a corresponding devaluation of the peso) continue to challenge the local cost structure. Cost control remains a key focus of management.

Total cash cost in the third quarter of 2012, which includes by-product credits, treatment and refining costs, royalties and production taxes, was $24.01 per ounce of silver compared to $21.88 per ounce of silver in the second quarter of 2012 and $20.60 per ounce in the third quarter of 2011. Treatment and refining costs, as well as royalties and production taxes, all vary as a function of sales prices and are recorded for the actual ounces of silver sold. Consequently, on a per ounce basis, the variability in total cash cost from period-to-period is partially due to sales prices and the difference between production and sales volumes. The incremental per ounce impact of these costs in the third quarter of 2012 as compared with the second quarter of 2012 and third quarter of 2011 was due to the higher volume of sales.

Total production cost, which includes depreciation, depletion and amortization, was $29.20 per ounce in the third quarter of 2012 compared to $27.06 in the second quarter of 2012 and $24.55 in the third quarter of 2011. The depreciation, depletion and amortization costs on a per ounce basis were the same as the second quarter of 2012; however, they are greater than in the third quarter of 2011 due to the reduction in mineral reserves at Pirquitas in the fourth quarter of 2011, which increased the depreciation, depletion and amortization charges on certain assets.

Exploration drilling program

At Pirquitas, the Company increased total planned drilling for the year to approximately 53,000 metres following positive drilling results and the definition of geophysical anomalies to the east of the San Miguel open-pit. As of October 31, 2012, the Company had diamond drilled 140 holes with a combined length of approximately 50,000 metres on the property. The drilling program is principally designed to expand and better define the Cortaderas Breccia and Cortaderas Valley mineral resources and upgrade significant portions of these resources from the Inferred Mineral Resource to the Indicated Mineral Resource category. As reported in a National Instrument 43-101 compliant technical report dated December 23, 2011, the two zones have a combined Inferred Mineral Resource containing an estimated 22.6 million ounces of silver and 361 million pounds of zinc.

Select assay results for the recently completed drill holes include:

Drill hole Area/Zone Interval (m) Ag (g/t) Zn (%)
DDH-248 Cortaderas Breccia 20.0 102.3 4.8
21.0 417.5 11.6
DDH-250 Cortaderas Breccia 120.8 205.8 5.0
DDH-254 Cortaderas Valley 25.0 164.0 7.8
7.7 134.8 8.2
26.4 254.1 8.8
DDH-260 Cortaderas Valley 14.1 750.8 16.3

Ron Burk, Vice President of Exploration, commented, "We continue to receive positive drill results at Pirquitas. We now believe the Cortaderas Breccia mineralized body has a strike length exceeding 250 metres and a minimum dip extent of 400 metres. In addition, the reported intersections of Cortaderas Valley mineralization are from holes positioned as far as 225 metres west of the center of the Cortaderas Breccia resource body. Based on our drill results, we believe multiple large sulphide veins emanate from the main breccia-hosted body of mineralization." 

During the third quarter, the Company also completed a second gravimetric survey on the property. The Company plans to test gravity anomalies identified by the survey with additional drilling in 2013. 

Details of the mineralized drill hole intervals reported in the news release are presented in Table 1, with the locations of the holes shown in Figure 1 and Figure 2. The majority of the reported drill holes in the Cortaderas Breccia target area are oriented at shallow angles to the inferred dip or plunge orientation of the mineralized breccia body. Drill holes DDH-267 and DDH-268 were drilled with an orientation so as to provide information about the actual width of the mineralized breccia zone. The reported intersections for these two holes indicate that the central portion of the Cortaderas Breccia resource body has a true width in the 20 to 30 metres range.

Third Quarter 2012 Financial Highlights

Mine Operations

  • Revenues were $73.5 million in the third quarter, versus $26.2 million in the three months ending September 30, 2011. Cost of sales was $57.1 million including $12.8 million in non-cash depletion, depreciation and amortization in the three months ending September 30, 2012. This compares to a cost of sales of $14.7 million and non-cash depletion, depreciation and amortization of $2.4 million in the third quarter of 2011.
     
  • Mine operating income increased to $16.5 million in the three months ended September 30, 2012 from $11.5 million in the third quarter of 2011.

Net Income/Loss

  • Net Loss for the three months ended September 30, 2012, was $2.5 million (-$0.03 per share) compared to net income of $21.8 million ($0.27 per share) in the third quarter of 2011. In the three months ended September 30, 2012, the Company recorded an income tax expense of $4.7 million compared to an income tax expense of $30.9 million in the third quarter of 2011. The income tax expense in the third quarter of 2012 is the result of profitable operations at Pirquitas and the continued devaluation of the Argentine Peso against the USD, which increased the deferred income tax liability balance and therefore increased deferred tax expense.

Cash Flow

  • Generated $17.5 million in cash from operating activities before a $16.3 million increase in non-cash working capital items. This compares to an $18.5 million use of cash in the third quarter of 2011 before a $2.6 million decrease in non-cash working capital items. 

Liquidity

  • As of September 30, 2012, the Company held cash and cash equivalents of $353.4 million compared to $329.1 million as of December 31, 2011. Working capital was $396.3 million as of September 30, 2012, compared to $399.1 million as of December 31, 2011.
Selected Financial Data
(US$000's, except per share amounts) This summary of selected financial data should be read in conjunction with the interim financial statements and the MD&A of the unaudited consolidated operating results and financial condition of the company for the three months ended September 30, 2012 and audited results for the year ended December 31, 2011.
 
  Three Months
Ended September 30, 2012
  Three Months
Ended September 30, 2011
 
Revenue 73,524   26,152  
Income from mine operations 16,469   11,492  
Operating income (loss) 7,144   3,066  
Net income (loss) for the period (2,491 ) 21,836  
Basic earnings per share (0.03 ) 0.27  
Cash generated by operating activities 1,247   (15,834 )
Cash generated by investing activities 402   (2,782 )
Cash generated by financing activities 11   5,760  
   
Financial Position September 30, 2012   December 31, 2011  
Cash and cash equivalents 353,439   329,055  
Current assets - total 604,341   476,676  
Current liabilities - total 208,090   77,587  
Working capital 396,251   399,089  
Total assets 1,343,382   1,276,102  

Review of Projects

Pitarrilla, Mexico

A total of $19.4 million was spent during the nine months ended September 30, 2012 at the wholly-owned Pitarrilla project located in the State of Durango, Mexico compared to $14.4 million in the first nine months of 2011. The Company is preparing a feasibility study which continues to be on schedule for completion by the end of 2012. 

Earlier in 2012, as the feasibility study progressed, the decision was made to extend the scope to carry out additional work that has the potential to add value or reduce the risk of the project.

Additional work included:

  • 34 in-fill drill holes for a total of 3,400 metres in the upper zones of the oxide deposit.
     
  • 33 close-spaced drill holes for a total of 8,500 metres for geostatistical studies to refine the mineral reserve model.
     
  • Milling optimization studies.
     
  • Confirmation of sulphide flotation recoveries in the upper zones of the project.

Due to deferrals and delays of other mine construction projects across the industry, the associated timelines for the delivery of key mining and processing equipment have contracted. As a result, the Company no longer plans to fast-track pre-construction expenditures and will instead incur only ancillary expenses until a construction decision is made. 

As previously disclosed, the feasibility study is based on a 16,000 tonnes per day open-pit project which would position Pitarrilla as one of the world's largest primary silver mines with a life in excess of 20 years. These facilities are expected to produce silver doré, and separate lead and zinc concentrates containing payable silver.

The design of the open pit anticipates starting in the upper and mid-level oxide and transitional ores, then extending into the higher grade sulphide ores in the basal conglomerate zone and finally bottoming out in the upper levels of sulphide mineralization in sedimentary structures below the conglomerate. This mining operation will leave the middle and lower zones of the sedimentary structures intact for subsequent potential underground mining.

The Company continues to negotiate for the remaining land access rights. The EIA for certain parts of the project infrastructure was approved during the third quarter of 2012, and work on the overall project EIA continues and will be filed once all land access has been obtained.

The Company updated the mineral resource estimate for Pitarrilla as of January 31, 2012, as announced in the Company's news release dated February 27, 2012. The Project currently comprises Measured and Indicated Mineral Resources of 245.0 million tonnes containing 655.7 million ounces of silver at an average grade of 83.3 g/t silver and Inferred Mineral Resources of 31.3 million tonnes containing 65.0 million ounces of silver at an average grade of 64.7 g/t silver, both at a 30 g/t silver cut-off grade. In addition to silver, the deposit also contains Measured and Indicated Mineral Resources of four pounds of zinc and two billion pounds of lead(1).

San Luis, Peru

A total of $5.7 million was spent during the nine months ended September 30, 2012 at the wholly-owned San Luis project in Peru compared to $4.9 million in the first nine months of 2011. 

The EIA for the mining operation of the Ayelen deposit was approved on September 10, 2012, a significant milestone for the Project. Long-term land access negotiations are continuing with one of the two local communities who controls the rights to surface lands on which the future mine would be located. An agreement with the other community was completed in late 2011. With the EIA approved, completion of the final land access agreement will enable permit applications to be submitted and a development decision to be made.

During the third quarter of 2012, the Company received approval for an exploration EIA, allowing for an exploration drilling campaign at the BP Zone, a high-potential porphyry copper target located about 4.5 kilometres southeast of the Ayelen deposit. The target is located in an area where land access has been previously granted by the local community. The Company requires a water permit before it can commence the planned 2,500 metre drill campaign, and expects to receive the permit before the end of 2012.

The San Luis project comprises Proven and Probable Mineral Reserves of 0.5 million tonnes containing 7.2 million ounces of silver at an average grade of 446 g/t silver and 0.29 million ounces of gold at an average grade of 18 g/t gold within the Ayelen vein, with other identified veins on the 35,000 hectare property requiring further exploration(2).

San Agustin, Mexico

A total of $0.6 million was spent during the nine months ended September 30, 2012 at the Company's wholly-owned San Agustin project located in Durango State, Mexico, consistent with the $0.5 million spent during the first nine months of 2011. Most of the expenditure was incurred on property holding costs and other administrative expenses.

Negotiations continued with the parties that control the surface rights covering the Company's mineral concessions and surrounding areas. Once land access agreements are in place, a 5,000 metre diamond drilling program will be initiated. The primary objective of the drilling campaign is to expand the near-surface oxidized gold mineral resource. In addition, drilling will be performed to initiate geotechnical, geomechanical and metallurgical studies(3).

The San Agustin project currently comprises an Indicated Mineral Resource of 121 million tonnes containing 47.8 million ounces of silver at an average grade of 12.3 g/t silver and 1.59 million ounces of gold at an average grade of 0.4 g/t gold, along with an Inferred Mineral Resource of 91.2 million tonnes containing 36.9 million ounces of silver at an average grade of 12.6 g/t silver and 1.06 million ounces of gold at an average grade of 0.36 g/t gold.

Diablillos, Argentina

A total of $1.1 million was spent during the nine months ended September 30, 2012 at the Company's wholly-owned Diablillos project (which is located 275 kilometres south of the Pirquitas mine in northwestern Argentina) compared to $1.9 million in the first nine months of 2011.

A diamond drilling program of 1,800 metres is planned for the fourth quarter. The drill holes will test zones of gold and silver mineralization that lie peripheral to the Oculto deposit where there is an Indicated Mineral Resource of 2.16 million tonnes containing 77.1 million ounces of silver at an average grade of 111 g/t silver and 640,000 ounces of gold at an average grade of 0.9 g/t gold, with additional Inferred Mineral Resources of 7.2 million tonnes containing 6.3 million ounces of silver at an average grade of 27 g/t silver and 0.19 million ounces of gold at an average grade of 0.8 g/t gold(4).

Other Exploration Projects

In addition to the above-mentioned drilling programs, the Company is planning to conduct diamond drilling campaigns on three other properties in the final quarter of 2012. Combined, this will amount to more than 7,800 metres of drilling in Mexico and the USA. 

In Mexico, 3,000 metres of drilling are planned to test silver and gold targets on the Valenciana property, while another 1,800 metres will be drilled on the San Patricio property in the Parral mining district. 

In the southwestern USA, a 3,000 metre diamond drilling program is scheduled for the Saddleback property that straddles the New Mexico-Arizona state border. This property covers extensive hydrothermal rock alteration that is anticipated to be related to a system of epithermal veins potentially hosting economic gold-silver mineralization.

(1) The mineral resources estimate for the Pitarrilla Project was prepared by Dr. Warwick Board, Ph.D. (Geology), P.Geo. and presented in a news release dated February 27, 2012, in accordance with the standard of the Canadian National Instrument 43-101 and the definitions of the CIM standards.

(2) The reserve estimate for the San Luis Project was prepared by Steve L. Milne, P.E of Tuscan, AZ and presented in a technical report dated June 4, 2010, in accordance with the standard of the Canadian National Instrument 43-101 and the definitions of the CIM standards.

(3) The resource estimate for the San Agustin Project was prepared by Wardrop, A Tetra Tech Company of Vancouver, British Columbia and presented in a technical report dated March 2009 and filed on SEDAR, in accordance with the standard of the Canadian National Instrument 43-101 and the definitions of the CIM standards.

(4) The resource estimate for the Diablillos Project was prepared by Wardrop Engineering Inc. of Vancouver, British Columbia and presented in a technical report dated July 27, 2009, in accordance with the standard of the Canadian National Instrument 43-101 and the definitions of the CIM standards.

Outlook

This section of the news release provides management's production and cost estimates for 2012. Major capital and exploration expenditures are also discussed. These are "forward-looking statements" and subject to the cautionary note regarding the risks associated with forward-looking statements.

Direct mining cost per ounce is a non-GAAP financial measure. Please see the discussion under 'Non-GAAP Financial Measures' in item 13 of the MD&A for the three and nine months ended September 30, 2012.

The Company maintains 2012 production guidance of between 8.2 and 8.5 million ounces of silver and between 10.5 and 11.5 million pounds of zinc.

Direct mining costs for the year ended December 31, 2012 are expected to be between $11.85 and $12.85 per ounce of silver, unchanged from the second quarter report. The regulatory environment in Argentina, as discussed in the Business Overview section of the MD&A for the three and nine months ended September 30, 2012, continues to provide a challenging cost environment, especially with inflation at elevated levels; however, the Company remains very focused on cost control.

The Company has now completed long-term silver concentrate sales contracts covering all of the production from Pirquitas through the remainder of 2012 and into 2013. During the third quarter, the Company started to sell down its concentrate inventory, which had accumulated while sales contracts were being negotiated and through the temporary suspension of shipping in the second quarter. The Company anticipates this trend to continue to continue to some extent in the fourth quarter. Going forward, concentrate production and sales are expected to be more aligned.

The Company forecasts that capital expenditures over the last quarter of 2012 at the Pirquitas mine will approximate $10 million, bringing the full year to $23 million, and exploration expenditures in the last quarter of 2012 will approximate $5 million, bringing the full year to approximately $20 million. The majority of exploration expenditures will be capitalized. Expenditures for the completion of the feasibility study at Pitarrilla in the last quarter of 2012, including infrastructure, camp operations and supporting administration, are expected to be approximately $2 million, bringing the total expenditures to $21 million for the full year. 

Fiscal stability agreement

The Pirquitas mine has a fiscal stability agreement with the government of Argentina dating from 1998. In 2002, the government of Argentina implemented an export duty on concentrates that did not apply to companies with pre-existing fiscal stability agreements. In December 2007 the National Customs Authority of Argentina levied an export duty of approximately 10% on concentrates for projects with fiscal stability agreements predating 2002. The Company has been advised that the Pirquitas mine is subject to this export duty despite rights under the fiscal stability agreement from 1998. The legality of the export duty applied to silver concentrates has been challenged and is currently under review by the court in Argentina. In July 2010, the Company filed a claim in the provincial court for repayment of export duties paid on silver concentrates and for an order to cease payment of the export duty until the matter is decided by the court. An order was granted in favor of Mina Pirquitas effective September 29, 2010 to cease paying the export duty on silver and tin concentrates pending the court's decision on the legality of the export duty. In April 2012, the federal government appealed this decision. In regards to Mina Pirquitas' challenge on the legality of the export duty, in August 2012, the federal court rejected the government's motion to dismiss the lawsuit on the grounds that Mina Pirquitas did not stipulate the refundable amount. The federal government has also appealed this decision.

Until the order to cease payment was granted in 2010, the Pirquitas mine had paid $6.6 million in export duties against which it has filed for recovery. In accordance with this order, the Company has not been paying export duties on silver concentrate but continues to accrue duties in full until the outcome of the claim is known with certainty. At September 30, 2012, the Company had accrued a liability totaling $25.8 million, with a corresponding impact on cost of sales in the relevant period. If this export duty is successfully overturned, the benefit will be recognized in the Consolidated Statement of Income (Loss) for the full amount of paid and unpaid duty in the period that recovery becomes virtually certain. The accrued export duty also has a significant impact on the Company's total cash cost per ounce calculation. If resolved in the Company's favour, the impact would be to reduce cash costs per ounce by approximately 10% of the net sales price on a per ounce basis.

In 2011, the government of Argentina announced a decree that requires all funds from mining export sales to be repatriated to Argentina and converted into Argentine pesos within the Sole Foreign Exchange Market in Argentina. Each transfer is subject to a 0.6% transfer tax. The mining industry had previously been exempted from this tax. Although the aforementioned fiscal stability agreement also includes stability over foreign exchange controls, the government removed such benefits with this decree.

Management Discussion & Analysis and Conference Call

This news release should be read in conjunction with Silver Standard's Consolidated Interim Financial Statements and MD&A of the Financial Position and Results of Operations for the three and nine months ended September 30, 2012 as filed with Canadian securities regulators available at www.sedar.com or the Company's web site at www.silverstandard.com.

Conference Call and Webcast: Thursday, November 8, 2012, at 11:00 a.m. EST.

Toll-free in North America: (888) 429-4600

All other callers: (970) 315-0481 

Webcast: http://ir.silverstandard.com/events.cfm

The call will be archived and available at www.silverstandard.com.

Audio replay will be available for one week by calling:

Toll-free in North America: (855) 859-2056, replay conference ID 35487344

All other callers: (404) 537-3406, replay conference ID 35487344

Table 1: Mineralized intervals from selected Pirquitas drill holes completed in Q3-2012.
Drill hole Area/Zone From
(m)
To
(m)
Interval
(m)
Ag
(g/t)
Zn
(%)
DDH-248 Cortaderas Breccia 37.0 57.0 20.0 102.3 4.8
290.0 311.00 21.0 417.5 11.6
DDH-250 Cortaderas Breccia 76.0 196.77 120.77 205.8 5.0
DDH-251B Cortaderas Valley 151.0 165.0 14.0 116.6 5.6
DDH-254 Cortaderas Valley 79.0 104.0 25.0 164.0 7.8
243.3 251.0 7.71 134.8 8.2
327.0 353.4 26.4 254.1 8.8
DDH-257 Cortaderas Valley 148.0 166.83 18.83 158.2 10.7
223.5 231.0 7.52 129.9 11.5
338.0 353.72 15.72 125.4 10.0
DDH-260 Cortaderas Valley 273.5 287.55 14.05 750.8 16.3
DDH-262 Cortaderas Breccia 137.64 141.96 4.32 276.7 11.0
176.0 202.0 26.0 159.4 6.9
210.0 230.0 20.0 144.7 4.5
261.0 290.0 29.0 129.1 7.3
337.0 403.0 66.0 80.7 4.2
DDH-264 Cortaderas Valley 255.0 271.0 16.0 66.0 4.9
DDH-266 Cortaderas Valley 237.5 243.5 6.0 175.0 14.6
DDH-267 Cortaderas Breccia 280.62 304.0 23.38 269.0 5.0
DDH-268 Cortaderas Breccia 347.0 379.0 32.0 135.0 4.7
DDH-269 Cortaderas Breccia 22.0 29.45 7.45 309.0 0.8
69.0 86.0 17.0 133.0 2.9
167.0 199.0 32.0 382.0 5.4
DDH-272 Cortaderas Breccia 63.0 108.0 45.0 62.0 4.7
120.0 173.0 53.0 74.0 5.4
DDH-276 Cortaderas Breccia 379.0 405.0 26.0 123.0 4.7
DDH-280 Cortaderas Breccia 217.6 228.0 10.4 229.0 13.2
382.0 392.9 10.9 588.0 9.5
 
Notes:
  1. The mineralized intercepts and core lengths do not represent true thicknesses of the mineralized bodies tested by the drill holes; these will be determined with follow-up drilling.
  2. The assay data presented in Table 1 have not been capped (top-cut).
  3. Prepared by Qualified Person (QP) Carl Edmunds P.Geo., Chief Geologist for Silver Standard, as detailed below in this news release.

To view Figures 1 and 2, please visit the following link: http://media3.marketwire.com/docs/sso1108i.pdf.

Carl Edmunds P.Geo., Chief Geologist for Silver Standard, is a Qualified Person (QP) as defined in National Instrument 43-101 and has approved the technical information in this news release. Industry standard drill hole core logging and sampling techniques were used. All drill hole core samples were submitted for preparation and analysis by ALS Chemex at its facilities in Mendoza, Argentina. All samples were analyzed using a 'near total' four-acid digestion followed by 34 element atomic emission ICP spectroscopy. Over limit Ag (>200 g/t) and Zn (>10%) grades were re-analyzed using a four-acid digestion with an AAS finish. Silver grades still over limit (>1,500 g/t) were analyzed by fire assay with a gravimetric finish. Silver Standard employs a rigorous QA/QC program, which includes real-time assay quality monitoring through the frequent insertion of blanks, duplicates, and certified reference standards, the submission of samples to an independent third party laboratory, as well as reviewing laboratory-provided QA/QC data.

SOURCE: Silver Standard Resources Inc.

Cautionary Statements on Forward Looking Information: This news release contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward looking information" within the meaning of Canadian securities laws (collectively "forward-looking statements") related to the Company and its operations, and in particular, the anticipated developments in the Company's operations in future periods, the Company's planned exploration activities, the adequacy of the Company's financial resources and other events or conditions that may occur in the future. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking statements to the extent that they involve estimates of the mineralization that will be encountered if and when the property is developed or further developed. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management and relate to, among other things: future production of silver and other metals; future cash costs per ounce of silver; the price of silver and other metals; the effects of domestic and foreign laws, regulations and government policies and actions affecting the Company's operations or potential future operations; future successful development of the Pitarrilla and San Luis projects and other exploration and development projects; the sufficiency of the Company's current working capital, anticipated operating cash flow or the Company's ability to raise necessary funds; estimated production rates for silver and other payable metal produced by the Company; timing of production and the cash and total costs of production at the Company's Pirquitas mine; the estimated cost of sustaining capital; ongoing or future development plans and capital replacement, improvement or remediation programs; the estimates of expected or anticipated economic returns from the Company's mining projects; future sales of the metals, concentrates or other products produced by the Company; and the Company's plans and expectations for its properties and operations.

Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "plans", "projects", "estimates", "assumes", "intends", "strategy", "goals", "objectives", "potential" or variations thereof, or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation: uncertainty of production and cost estimates for the Pirquitas mine; uncertainty of production at the Company's mineral exploration and development properties; risks and uncertainties associated with developing and exploring new mines including start-up delays; risks and hazards associated with the business of mineral exploration, development and mining (including operating in foreign jurisdictions, environmental hazards, industrial accidents, unusual or unexpected geological or structure formations, pressures, cave-ins and flooding); risks and uncertainties relating to the interpretation of drill results and the geology, grade and continuity of the Company's mineral deposits; risks related to the Company's ability to obtain adequate financing for the Company's planned development activities and to complete further exploration programs; fluctuations in spot and forward markets for silver, gold and base metals and certain other commodities; risks related to obtaining long-term sales contracts or completing spot sales for the Company's products; the Company's history of losses and the potential for future losses; risks related to general economic conditions, including recent market and world events and conditions; inadequate insurance, or inability to obtain insurance, to cover these risks and hazards; relationships with and claims by local communities and indigenous populations; diminishing quantities or grades of mineral reserves as properties are mined; challenges to, or difficulty maintaining, the Company's title to properties and continued ownership thereof;

risks related to the Company's covenants given with respect to the Company's 4.5% convertible senior notes due 2028; differences in U.S. and Canadian practices for reporting mineral resources and reserves; changes in national and local legislation, taxation, exchange controls or regulations and political or economic developments or changes in Canada, the United States, Argentina, Mexico, Peru or other countries where the Company holds assets or may carry on business, including without limitation recent import and export regulations in Argentina that may impact cash flow, concentrate sales and importation of goods and services required for the Pirquitas mine; risks related to the delay in obtaining or failure to obtain required permits, or non-compliance with permits the Company has obtained; increased costs and restrictions on operations due to compliance with environmental laws and regulations; regulations and pending legislation governing issues involving climate change, as well as the physical impacts of climate change; risks related to reclamation activities on the Company's properties; uncertainties related to title to the Company's mineral properties and the surface rights thereon, including the Company's ability to acquire, or economically acquire, the surface rights to certain of the Company's exploration and development projects; the Company's ability to successfully acquire additional commercially mineable mineral rights; risks related to currency fluctuations (such as the Argentine peso, Peruvian sol and Mexican peso); increased costs affecting the mining industry, including the current high rate of inflation in Argentina; increased competition in the mining industry for properties, qualified personnel and management; risks related to some of the Company's directors' and officers' involvement with other natural resource companies; the Company's ability to attract and retain qualified personnel and management to grow the Company's business; risks related to estimates of future income tax assets and liabilities; risks related to claims and legal proceedings; the Company's ability to maintain adequate internal control over financial reporting; the future value of Pretium's shares and the Company's ability to monetize the full value of the Company's interest in Pretium; and those factors identified under the heading "Risk Factors" in the Company's most recent Form 20-F Annual Information Form (which is filed for Canadian securities laws purposes) filed with the United States Securities and Exchange Commission (the "SEC") and Canadian provincial securities regulatory authorities.

This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially from these contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. Forward-looking statements are statements about the future and are inherently uncertain, and the Company's actual achievements or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the MD&A for the three and nine months ended September 30, 2012 under the heading "Other Risks and Uncertainties". The Company's forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made, and the Company does not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations or opinions should change, other than as required by applicable law. For the reasons set forth above, one should not place undue reliance on forward-looking statements.

Cautionary Note to U.S. investors: The terms "measured mineral resource", "indicated mineral resource", and "inferred mineral resource" used in this news release are Canadian geological and mining terms as defined in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101") under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves. The Company's advises U.S. investors that while such terms are recognized and required under Canadian regulations, the SEC does not recognize these terms. "Inferred mineral resources" in particular have a great amount of uncertainty as to their economic feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules estimates of inferred mineral resources may not generally form the basis of feasibility or other economic studies. U.S. investors are cautioned not to assume that any part or all of an inferred mineral resource exists, or is economically or legally mineable. Disclosure of contained metal expressed in ounces is in compliance with NI 43-101, but does not meet the requirements of Industry Guide 7 of the SEC, which will only accept the disclosure of tonnage and grade estimates for non-reserve mineralization.



Silver Standard Resources Inc.
N.A Toll-Free: (888) 338-0046
All Others: (604) 484-8216
invest@silverstandard.com
www.silverstandard.com
Données et statistiques pour les pays mentionnés : Argentine | Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Argentine | Canada | Tous

Silver Standard Resources Inc.

PRODUCTEUR
CODE : SSO.TO
ISIN : CA82823L1067
CUSIP : 82823L 106
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Silver Standard est une société de production minière d'argent basée au Canada.

Silver Standard est productrice d'argent, de étain et de zinc en Argentine, en développement de projets d'argent et d'or au Perou, et détient divers projets d'exploration au Perou.

Son principal projet en production est PIRQUITAS en Argentine, son principal projet en développement est SAN LUIS PROJECT au Perou et ses principaux projets en exploration sont CANDELARIA NEVADA et BERENGUELA au Perou, VETA COLORADA, PITARILLA, PENASCO QUEMADO et SAN AGUSTIN au Mexique, SUNRISE LAKE au Canada, CHALLACOLLO au Chili et DIABLILLOS et MAVERICK SPRINGS en Argentine.

Silver Standard est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 1,4 milliards CA$ (1,1 milliards US$, 961,5 millions €).

La valeur de son action a atteint son plus bas niveau récent le 04 septembre 1998 à 1,01 CA$, et son plus haut niveau récent le 02 août 2017 à 12,01 CA$.

Silver Standard possède 119 400 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Silver Standard Resources Inc.
25/11/2009Silver Standard, a different company
17/06/2008Follow up N° 10
Rapports annuels de Silver Standard Resources Inc.
2007 Annual Report
Financements de Silver Standard Resources Inc.
08/04/2011Announces Closing of Secondary Offering of Units of Pretivm ...
Attributions d'options de Silver Standard Resources Inc.
24/04/2014Announces Amendments to Stock Option Plan
29/04/2011Announces Amendments to Stock Option Plan
Nominations de Silver Standard Resources Inc.
10/05/2013Announces Election of Directors
09/01/2013announces the appointment of two new board members and manag...
05/01/2012Announces Appointment of Chief Financial Officer
15/08/2011Announces Senior Management Change
27/05/2010Announces the Appointment of John Smith as President and Chi...
15/05/2008Announces the Appointment of Peter Tomsett as Chairman of th...
18/07/2007Appoints New Vice President, Finance and CFO
05/06/2007Appoints Senior Vice President, Operations
Rapports Financiers de Silver Standard Resources Inc.
07/07/2016to announce second quarter 2016 consolidated financial resul...
12/05/2016reports first quarter 2016 results
20/04/2016to announce first quarter 2016 consolidated financial result...
08/04/2016Mails and Files Meeting Materials for Upcoming Annual and Sp...
26/02/2016reports fourth quarter and year-end 2015 results
26/01/2016to announce fourth quarter and year-end 2015 consolidated fi...
06/11/2015reports third quarter 2015 results
06/10/2015to announce third quarter 2015 consolidated financial result...
06/08/2015Reports Second Quarter 2015 Results
07/07/2015to Announce Second Quarter 2015 Consolidated Financial Resul...
05/11/2014Reports Third Quarter 2014 Results
02/10/2014to Announce Third Quarter Consolidated Financial Results Nov...
06/08/2014Reports Second Quarter 2014 Results
21/02/2014Reports Fourth Quarter and Year-End 2013 Results
06/11/2013Reports Third Quarter 2013 Results
03/10/2013to announce third quarter 2013 consolidated financial result...
08/08/2013Reports Second Quarter 2013 Results
09/07/2013to announce second quarter 2013 consolidated financial resul...
09/05/2013Reports First Quarter 2013 Results
08/04/2013to announce first quarter 2013 consolidated financial result...
11/10/2012to Announce Third Quarter 2012 Consolidated Financial Result...
25/07/2012to Announce Second Quarter 2012 Consolidated Financial Resul...
09/05/2012Reports First Quarter 2012 Financial Results
19/04/2012to Announce First Quarter 2012 Consolidated Financial Result...
22/02/2012to Announce Fourth Quarter and Year-Ended 2011 Consolidated ...
11/08/2011Reports Second Quarter 2011 Results
11/05/2011Reports First Quarter 2011 Results
02/03/2011Reports Fourth Quarter and Year-End 2010 Results
11/05/2010Reports First Quarter 2010 Results
05/03/2010Reports Fourth Quarter and Year-End 2009 Results
02/03/20102009 Financial Results and Conference Call
06/11/2009Reports Third Quarter 2009 Results
06/08/2009Reports Second Quarter 2009 Results
11/03/2009Reports Fourth Quarter and Year-End 2008 Results
08/08/2008Reports Second Quarter 2008 Results
07/11/2007Reports Third Quarter 2007 Results
Projets de Silver Standard Resources Inc.
08/11/2016Corporate Exploration Update
06/10/2016signs option agreement to explore Fisher Gold Project contig...
19/09/2016(Diablillos)Announces Transaction on Diablillos and M-18 Projects
14/09/2016to Sell Parral Exploration Properties
14/07/2016provides Q2 2016 production results
25/09/2015Silver Standard completes the acquisition of the Valmy Prope...
07/02/2014(Challacollo)Completes Sale of Challacollo Project
04/02/2014to Purchase Marigold Mine
15/01/2014Provides 2013 Production Results and Issues 2014 Guidance
30/12/2013(San Agustin)completes sale of San Agustin project
20/12/2013(Challacollo)to sell Challacollo Project
06/11/2013(San Agustin)to sell San Agustin Project
08/01/2013provides 2012 production results and issues 2013 production ...
11/09/2012(Pirquitas)Reports Silver and Zinc Mineralized Intercepts From Three Ta...
25/07/2012(Pirquitas)Reports Significant Silver and Zinc Mineralization in the Co...
17/04/2012(Pirquitas)Provides Q1 2012 Pirquitas Operations and Corporate Update
01/03/2012(Pitarilla)Pitarrilla Project and Resource Update
27/02/2012Camino Minerals Corporation Signs Purchase Of Rights Agreeme...
12/01/2012(Pirquitas)Provides Update on 2011 Pirquitas Operations and Announces 2...
24/12/2011(Pirquitas)Files NI 43-101 Technical Report for Pirquitas Mineral Resou...
25/10/2011(Pirquitas)Pirquitas Ball Mill and Sales Contract Update
26/09/2011(Bowdens)Completes Sale of Bowdens Project
01/08/2011(Bowdens)Sells Bowdens Project
14/06/2011(Pirquitas)Pirquitas Operations Update
01/03/2011(San Luis Project)Consolidates the San Luis Project
29/07/2010Brucejack Drilling Intersects More Bonanza-Grade Gold Minera...
08/06/2010(Pirquitas)Pirquitas Mine and Exploration Project Update
02/06/2010(Snowfield (sulphurets))Snowfield Preliminary Assessment Results
11/05/2010Reports San Luis Feasibility Study
19/02/2010(Silvertip)to Sell Silvertip Project
10/12/2009(Pirquitas)Pirquitas Silver Mine Production Guidance for 2010
04/12/2009(Pirquitas)Pirquitas Silver Mine Achieves Commercial Production
26/10/2009(Snowfield (sulphurets))Final Snowfield Zone Drilling Update
13/10/2009(Snowfield (sulphurets))Brucejack Drilling Update
01/10/2009(Snowfield (sulphurets))Snowfield Infill Drilling Update
15/09/2009(Snowfield (sulphurets))Brucejack Drilling Cuts Bonanza Grades
14/09/2009(Snowfield (sulphurets))Drilling Expands Snowfield Zone
20/08/2009(Snowfield (sulphurets))Snowfield Drilling Reveals New Zone
05/08/2009(Snowfield (sulphurets))Snowfield and Brucejack Drilling Update
25/06/2009(Pitarilla)Breccia Ridge Underground Pre-Feasibility Study and Pitarril...
18/02/2009(Pirquitas)s Pirquitas Project
03/02/2009(Snowfield (sulphurets))Snowfield Gold Resources Now 4.4 Million Ounces M&I and 14.3...
11/12/2008(Maverick Springs)More High-Grade Silver Intersected at Maverick Springs
03/12/2008(Snowfield (sulphurets))Reports Final Drill Results From Snowfield
02/12/2008(San Luis Project)San Luis Gold Resources Increase by 31%
17/07/2008(Shafter)Sale of Shafter Silver Project to Aurcana Closes
16/07/2008(Pitarilla)Measured & Indicated Silver Resources Increase 143% at Pitar...
14/05/2008(Pirquitas)Increases Pirquitas Silver Reserves by 43%
09/05/2008(San Luis Project)San Luis Project Update and New Resource Estimate to be Prep...
11/03/2008(Snowfield (sulphurets))Snowfield Measured & Indicated Gold Resources Grow to 3.1 Mi...
10/01/2008(Snowfield (sulphurets))Drilling Identifies New Gold Zone at Snowfield
26/11/2007(Pirquitas)Increases Pirquitas Reserves by 27% and Updates Capex
16/11/2007(San Luis Project)San Luis' Initial Resource Estimate; Nearby Porphyry-Style B...
07/11/2007(Pitarilla)Infill Drilling Increases Pitarrilla's Indicated Silver Reso...
18/09/2007and Esperanza Announce Further High-Grade Results at San Lui...
28/08/2007(Pitarilla)Updates Pitarrilla Drilling in Mexico
15/08/2007(San Luis Project)and Esperanza Update San Luis Exploration
14/05/2007(San Luis Project)and Esperanza Extend San Luis' High-Grade to Depth
16/04/2007and Esperanza Report Further San Luis High-Grade Drill Resul...
28/02/2007Esperanza and Silver Standard Announce New San Luis High-Gra...
Communiqués de Presse de Silver Standard Resources Inc.
02/05/2017Provides First Quarter 2017 Corporate Exploration Update
31/03/2017Receives Extension on the Chinchillas Project Option Agreeme...
13/07/2016Silver Standard provides Q2 2016 production results
31/05/2016Silver Standard Completes Acquisition of Claude Resources
26/01/2016Silver Standard to announce fourth quarter and year-end 2015...
19/01/2016Silver Standard Posts Q4, FY15 Production; Guides FY16
15/01/2016Silver Standard Reports Fourth Quarter and 2015 Production R...
08/01/2016Shares Of Silver Standard Lower Despite Record Annual Gold A...
07/01/2016Silver Standard Reports Production Records at Marigold and P...
25/11/2015Hedge Funds Are Crazy About Silver Standard Resources Inc. (...
06/11/2015General
06/11/2015Silver Standard reports third quarter 2015 results
20/10/2015Marigold Produces its Three Millionth Gold Ounce
16/10/2015Why Silver Standard Resources (SSRI) Could Be Positioned for...
08/10/2015Silver Standard Provides Q3 2015 Production Results
01/10/2015Silver Standard Signs Agreement with Golden Arrow for Chinch...
29/09/2015Silver Standard Concludes Valmy Property Acquisition
21/09/2015Silver Standard Intersects High Grade Silver Mineralization ...
18/09/2015Silver Standard Discovers Higher Grade Mineralized Area at t...
14/08/2015Silver Standard Closes New $75M Revolving Credit Facility
12/08/2015Silver Standard (SSRI) to Buy Valmy Property at Marigold
11/08/2015Silver Standard Acquires Valmy Property at Marigold
10/08/2015Edited Transcript of SSO.TO earnings conference call or pres...
06/08/2015Silver Standard Reports Second Quarter 2015 Results
05/08/2015Silver Standard Announces Closing of New $75 Million Revolvi...
05/08/2015General
30/07/2015Why Silver Standard Resources (SSRI) Could Shock the Market ...
28/07/2015Why Fortuna Silver Mines (FSM) Could Be Positioned for a Slu...
20/07/2015Mid-Morning Market Update: Markets Mostly Flat; Morgan Stanl...
15/07/2015Why Silver Standard Resources (SSRI) Could Shock the Market ...
14/07/2015Silver Standard Appoints Paul Benson as President & CEO - An...
14/07/2015Silver Standard Announces the Retirement of John Smith and A...
10/07/2015Silver Standard Posts Q2 Production Data, Tweaks FY15 View -...
08/07/2015Silver Standard Provides Q2 2015 Production Results and Incr...
07/07/2015Silver Standard to Announce Second Quarter 2015 Consolidated...
06/07/2015Silver Standard Reports Expanded Marigold Exploration Progra...
27/04/2015Final Glance: Silver companies
27/04/2015Midday Glance: Silver companies
27/04/2015Early Glance: Silver companies
22/04/2015Midday Glance: Silver companies
22/04/2015Early Glance: Silver companies
21/04/2015Final Glance: Silver companies
14/04/2015Early Glance: Silver companies
13/04/2015Silver Standard Provides Q1 2015 Production Results
13/04/2015Silver Standard to Announce First Quarter 2015 Consolidated ...
10/04/2015Final Glance: Silver companies
10/04/2015Midday Glance: Silver companies
10/04/2015Early Glance: Silver companies
02/04/2015Early Glance: Silver companies
27/03/2015Final Glance: Silver companies
27/03/2015Midday Glance: Silver companies
26/03/2015Early Glance: Silver companies
16/03/2015General
16/03/2015Silver Standard reports fourth quarter and year-end 2014 res...
04/04/2014Completes Marigold Mine Acquisition
10/10/2013provides Q3 2013 operational results
11/07/2013provides Q2 2013 operational results
12/04/2013provides Q1 2013 operational results
13/02/2013Announces Closing of Over-Allotment of Convertible Senior No...
05/02/2013Provides Option Purchase Notice and Notice of Convertibility...
16/01/2013completes US$250,000,000 convertible senior notes offering
16/01/2013completes US$250,000,000 convertible senior notes offering
16/01/2013completes US$250,000,000 convertible senior notes offering
08/11/2012(Pirquitas)Reports Third Quarter 2012 Financial Results and Further Exp...
18/10/2012Provides Q3 2012 Operational Results
11/07/2012Announces Two Additional Long-Term Silver Concentrate Sales ...
26/03/2012Announces Two Long-Term Silver Concentrate Sales Contracts W...
14/02/2012(Pirquitas)Pirquitas Silver Concentrate Sales Update
08/08/2011Revised Time for the Second Quarter Conference Call and Webc...
31/03/2011Announces Pricing of Secondary Offering of Units of Pretivm ...
24/03/2011Announces Secondary Offering of Common Shares of Pretivm Res...
01/02/2011Announces Automatic Conversion of Convertible Promissory Not...
28/01/2011Announces Senior Management Changes
06/01/2011Announces Exercise of Over-Allotment Option in Connection Wi...
12/07/2010Brucejack Drilling Cuts Bonanza-Grade Gold Mineralization
27/04/2010Provides Update on Exploration Program
12/02/2010Announces Pricing of Public Offering of Common Shares
11/02/2010announces public offering of common shares
05/02/2010Files Amended Base Shelf Prospectus
01/12/2009Snowfield and Brucejack Gold Resources: M&I-23.80 Million Ou...
25/11/2009Sale of Canadian ABCP Notes
17/08/2009Closing of Public Offering of Common Shares
13/08/2009Exercise of Over-Allotment Option
12/08/2009pricing of public offering of common shares
11/08/2009public offering of common shares
24/02/2009Announces Pricing of Public Offering of Common Shares
23/02/2009announces public offering of common shares
11/02/2009San Agustin Option Expires
11/02/2009Files Preliminary Base Shelf Prospectus
25/08/2008All Resources Increase at Pitarrilla's Breccia Ridge Zone
08/08/2008Changes to Silver Standard's Board of Directors
27/02/2008 Closes Sale of US$138 Million of Convertible Notes
22/02/2008Prices US$120 Million Convertible Notes Offering
20/02/2008Offers US$120 Million of Convertible Notes
22/08/2007Provides Short-Term Investment Status
10/04/2007Total Pitarrilla Silver Resources Increase by 28%
19/12/2005Follow up N° 9
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (SSO.TO)NASDAQ (SSRI)
12,01-1.23%11,50+2.95%
TORONTO
CA$ 12,01
02/08 16:00 -0,150
-1,23%
Cours préc. Ouverture
12,16 12,14
Bas haut
12,01 12,23
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  12,01 -%
Volume var. 1 mois
122 908 -%
24hGold TrendPower© : 11
Produit Silver - Tin - Zinc
Développe Gold - Silver
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/10/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,03 US$+1,47%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$+4,20%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,20 CA$-3,70%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,82 CA$-2,15%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,53 US$+0,76%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :