Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique
Teck Reports Unaudited First Quarter Results for 2012
Published : April 24, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Dollar | Europe | Face Value | Report | Zinc |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 24, 2012) -

All dollar amounts expressed in this news release are in Canadian dollars unless otherwise noted.

Teck Resources Limited (TSX:TCK.A and TCK.B, NYSE:TCK) reported first quarter adjusted profit of $504 million, or $0.86 per share, up 12% from $450 million in 2011.

"Our strong first quarter results demonstrate continued solid operating performance and the successful execution of our ongoing expansion programs, particularly in coal. Gross profit was similar to the first quarter of 2011, but cash flow from operations was up 14%. Our near-term copper growth projects are on track and, with the acquisition of SilverBirch, we increased our contingent bitumen resources by 67% to 3.5 billion barrels. With a strong balance sheet and strong cash flow, we are well positioned to successfully pursue our longer term growth plans," said Don Lindsay, President and CEO.

Highlights and Significant Items

  • We achieved record first quarter revenues and gross profits of $2.5 billion and $918 million, respectively, in the first quarter of 2012.
     
  • Gross profit before depreciation and amortization of $1.1 billion in the first quarter was similar to the first quarter of 2011.
     
  • Cash flow from operations, before working capital changes, was $1.0 billion in the first quarter of 2012, 14% higher than $874 million a year ago.
     
  • Profit attributable to shareholders was $218 million and EBITDA was $781 million in the first quarter.
     
  • Coal production increased to 6.3 million tonnes in the quarter, up 43% from the first quarter of 2011. This was the result of the successful execution of our ongoing expansion program. In addition, coal production in the first quarter of 2011 was negatively impacted by unusual weather-related events and a strike at our Elkview mine.
     
  • To date we have reached agreements with our coal customers to sell 6.3 million tonnes of coal in the second quarter of 2012 at an average price of US$202 per tonne. We expect to conclude additional sales over the course of the quarter as demand has improved and supplies, particularly from Australia, have been constrained.
     
  • In early April, we closed our acquisition of SilverBirch Energy Corporation ("SilverBirch") for a net cash outlay of $432 million, which gives us full ownership of the Frontier oil sands project, including the Equinox property. As a result, our total contingent resource for all of our oil sands projects has increased by 67% to 3.5 billion barrels of bitumen.
     
  • Our cash balance was $3.8 billion at March 31, 2012, after dividend payments, capital expenditures, share repurchases and investments totaling $728 million in the first quarter.
     
  • In February we refinanced $1 billion of our high-yield notes, replacing it with debt of longer maturities and lower effective interest rates averaging 4.2%. This refinancing resulted in a $329 million after-tax charge to profit in the quarter and will reduce our annual interest expense by $80 million.
     
  • Our Quebrada Blanca and Carmen de Andacollo copper operations in Chile ratified new collective labour agreements during the quarter.
     
  • On April 23, 2012 we announced that on July 3, 2012 we will pay an eligible dividend of $0.40 per share on our outstanding Class A common shares and Class B subordinate voting shares to shareholders of record at the close of business on June 15, 2012.

This management's discussion and analysis is dated as at April 23, 2012, and should be read in conjunction with the unaudited consolidated financial statements of Teck Resources Limited (Teck) and the notes thereto for the three months ended March 31, 2012, and with the audited consolidated financial statements of Teck and the notes thereto for the year ended December 31, 2011. In this news release, unless the context otherwise dictates, a reference to "the company" or "us," "we" or "our" refers to Teck and its subsidiaries. Additional information, including our annual information form and management's discussion and analysis for the year ended December 31, 2011, is available on SEDAR at www.sedar.com.

This document contains forward-looking statements. Please refer to the cautionary language under the heading "CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION" below.

Overview

Our continued focus on expanding coal and copper production is positively affecting our business and financial results. In coal, investments in new mining equipment, plant upgrades and people have resulted in substantial increases in material moved, increased clean coal production and sales. Our investments at Carmen de Andacollo and Antamina are expected to continue to generate increased copper production and we continue to advance Quebrada Blanca Phase 2 and Relincho. We also strengthened our energy business unit by consolidating ownership of our now wholly-owned Frontier project.

Prices for our key products in our metal units strengthened during the first quarter. Copper prices remain strong, but unit operating costs increased as a result of higher input costs, lower grades and higher stripping ratios at many of our mines. Contract coal prices and coal markets remain weaker than those we experienced in the previous nine months, but are higher than in the same quarter last year. Unit operating costs at our coal operations also decreased significantly. Coal production and sales significantly outpaced last year.

We refinanced $1.05 billion of high-yield notes with $1 billion of new notes at an average effective interest rate of 4.2%. This transaction will reduce our annual interest charge by $80 million and extended the average term of our debt to 15.1 years.

Our strong cash flow, debt capacity and cash position of $3.8 billion, together with access to capital markets, should provide the financial capacity necessary to fund our attractive portfolio of growth projects.

Profit and Adjusted Profit*

Adjusted profit, which excludes the effect of certain transactions described in the table below, was $504 million, or $0.86 per share, in the first quarter of 2012 compared with $450 million, or $0.76 per share in the same period a year ago. The higher adjusted profit was primarily due to a significantly higher contribution from our coal business unit and increased copper sales, partly offset by higher operating costs at our copper operations. Also contributing to the higher adjusted profit were positive after-tax pricing adjustments of $57 million compared to negative after-tax pricing adjustments of $18 million in the first quarter of 2011, which resulted from rising metal prices, particularly copper in the quarter.

Profit attributable to shareholders in the first quarter was also affected by a $329 million after-tax charge related to the refinancing of a portion of our debt. This was partly offset by a $55 million after-tax gain related to an increase in the fair value of our option to call certain of our high-yield notes prior to their maturity, which resulted from declining interest rates in the quarter. Profit attributable to shareholders was $218 million, or $0.37 per share, in the first quarter compared with $461 million or $0.78 per share in the same period last year.

    Three months
ended March 31,
 
($ in millions)   2012       2011  
Profit attributable to shareholders as reported  $  218     $ 461  
Add (deduct):              
  Derivative (gains) losses   (59  )     4  
  Financing items   329       -  
  Other (note 1)   16       (15 )
Adjusted profit  $ 504     $ 450  
Adjusted earnings per share  $ 0.86     $ 0.76  
               
1. Includes foreign exchange, asset sale gains and one-time collective agreement charges. 

* Our financial results are prepared in accordance with International Financial Reporting Standards ("IFRS"). This news release refers to adjusted profit, adjusted earnings per share, EBITDA and gross profit before depreciation and amortization, which are not measures recognized under IFRS in Canada and do not have a standardized meaning prescribed by IFRS or GAAP in the United States. For adjusted profit we adjust profit as reported to remove the effect of certain kinds of transactions in these measures. EBITDA is profit before net finance expense, income taxes, depreciation and amortization. Gross profit before depreciation and amortization is gross profit with depreciation and amortization added back. These measures may differ from those used by, and may not be comparable to such measures as reported by, other issuers. We disclose these measures, which have been derived from our financial statements and applied on a consistent basis, because we believe they are of assistance in understanding the results of our operations and financial position and are meant to provide further information about our financial results to investors.

Business Unit Results

Our business unit results are presented in the tables below.

Three months ended March 31
($ in millions) Revenues Gross profit before depreciation and amortization Gross profit
  2012 2011 2012 2011 2012 2011
Copper $ 753 $ 773 $ 366 $ 469 $ 285 $ 398
Coal   1,198   1,019   645   477   540   356
Zinc   595   574   119   167   93   143
Energy   1   -   1   -   -   -
Total $ 2,547 $ 2,366 $ 1,131 $ 1,113 $ 918 $ 897

Despite a 14% rise in copper sales volumes as a result of higher production levels and timing of shipments, gross profit before depreciation and amortization from our copper business unit decreased by $103 million in the first quarter compared with a year ago. This was primarily as a result of lower copper prices and other by-product prices. Costs also rose in the quarter, reflecting cost pressures for most input categories, additional milling throughput at Carmen de Andacollo, Antamina and Highland Valley, timing of maintenance projects and a one-time labour settlement charge of $16 million at our Chilean operations. Our average cash unit cost of product sold in the first quarter of 2012 was US$1.60 per pound, excluding one-time labour settlement costs, compared with US$1.40 per pound in the first quarter of 2011. Copper production in the first quarter rose by 8% to 81,000 tonnes compared with a year ago, reflecting our share of additional production from Antamina's mine expansion program and improvements at Carmen de Andacollo and Quebrada Blanca. Copper production at Highland Valley was lower than expected as we experienced delays in accessing higher grade ore. Severe weather conditions at Quebrada Blanca also constrained mining activities in the first quarter.

Gross profit before depreciation and amortization from our coal business unit increased by $168 million in the first quarter as a result of higher coal prices, increased sales volumes and lower unit costs. Coal production increased by 43% to 6.3 million tonnes in the quarter. This was partly a result of our expanded production capacity and partly because coal production was negatively impacted by unusual weather-related events and the strike at our Elkview mine in the first quarter of 2011. Sales volumes were 5.3 million tonnes and reflected weaker market conditions for steelmaking coal. The average coal price of US$223 per tonne in the first quarter was up 8% over the first quarter of last year despite the weaker market conditions. Unit cost of product sold in the first quarter, before transportation and depreciation charges, improved to $70 per tonne compared with $76 per tonne a year ago as the fixed costs were spread over a significantly larger production volume.

Gross profit before depreciation and amortization from our zinc business unit decreased by $48 million in the first quarter compared with a year ago primarily due to lower metal prices and higher concentrate purchase costs for silver at Trail, partially offset by higher sales volumes. As expected, zinc production at Red Dog declined by 10% in the first quarter compared with the same period a year ago because more ore was mined from the lower grade Aqqaluk pit. Refined zinc production from Trail rose slightly as a result of improved process plant reliability, while refined lead decreased by 7% due to a scheduled lead refinery shutdown in March. Zinc sales volumes in the first quarter from Red Dog increased by 19% as a result of the timing of shipments, partly due to advancement of deliveries by certain customers and higher consumption of offsite inventories. Zinc and lead prices decreased 16% and 19%, respectively, in the first quarter of 2012 compared with the same period a year ago.

Revenues

Revenues from operations were $2.5 billion in the first quarter compared with $2.4 billion a year ago. Revenues from our copper business unit remained similar to a year ago as higher sales volumes were offset by lower copper prices. Coal revenues increased by $179 million compared with the first quarter of 2011 as a result of higher realized coal prices and a 7% increase in sales volumes. Revenues from our zinc business unit rose slightly from a year ago as higher sales volumes from Red Dog and Trail were partially offset by lower metal prices.

Average Prices and Exchange Rates*

  Three months ended
March 31,
  2012 2011 % Change  
Copper (LME Cash - US$/pound) 3.77 4.38 -14 %
Coal (realized - US$/tonne) 223 207 +8 %
Zinc (LME Cash - US$/pound) 0.92 1.09 -16 %
Silver (LME PM fix - US$/ounce) 33 32 +3 %
Molybdenum (published price - US$/pound) 14 17 -18 %
Lead (LME Cash - US$/pound) 0.95 1.18 -19 %
Cdn/U.S. exchange rate (Bank of Canada) 1.00 0.99 +1 %

* Except for coal prices, the average commodity prices disclosed above are based on published benchmark prices and are provided for information only. Our actual revenues are determined using commodity prices and other terms and conditions specified in our various sales contracts with our customers. The molybdenum price is the price published in Platts Metals Week.

BUSINESS UNIT RESULTS

The table below shows our production and sales of our major commodities.

  Units (000's) Production Sales
    First Quarter First Quarter
    2012 2011 2012 2011
Principal products          
           
  Copper (note 1)          
    Contained in concentrate tonnes 63 57 65 56
    Cathode tonnes 18 18 18 17
    81 75 83 73
           
  Coal tonnes 6,265 4,379 5,305 4,950
             
  Zinc          
    Contained in concentrate tonnes 147 166 135 129
    Refined tonnes 74 72 76 73
           
Other products          
  Lead          
    Contained in concentrate tonnes 23 21 - -
    Refined tonnes 21 23 22 20
           
  Molybdenum          
    Contained in concentrate pounds 2,970 1,879 3,110 2,355
 
1. We include 100% of production and sales from our Highland Valley Copper, Quebrada Blanca and Carmen de Andacollo mines in our production and sales volumes, even though we own 97.5%, 76.5% and 90%, respectively, of these operations, because we fully consolidate their results in our financial statements. We include 22.5% of production and sales from Antamina, representing our proportionate equity interest in Antamina.

REVENUES AND GROSS PROFIT

QUARTER ENDED MARCH, 31

Our revenue, gross profit before depreciation and gross profit by business unit are summarized in the table below:

($ in millions)   Revenues Gross profit before depreciation and amortization Gross profit
       2012     2011     2012   2011   2012   2011
Copper                              
  Highland Valley Copper   $ 220   $ 210   $ 106 $ 116 $ 84 $ 99
  Antamina     206     218     148   160   142   154
  Quebrada Blanca     136     143     44   82   19   59
  Carmen de Andacollo     155     157     58   93   36   73
  Duck Pond     34     45     10   18   4   13
  Other     2     -     -   -   -   -
      753     773     366   469   285   398
                               
Coal (note 1)     1,198     1,019     645   477   540   356
                               
Zinc                              
  Trail     495     485     40   77   28   65
  Red Dog     153     143     77   86   64   74
  Other     2     6     2   4   1   4
  Inter-segment sales    (55 )   (60 )   -   -   -   -
      595     574     119   167   93   143
                               
Energy     1     -     1   -   -   -
                               
TOTAL   $ 2,547   $ 2,366   $ 1,131 $ 1,113 $ 918 $ 897
                               
1. Our coal business unit represents our interest in six operating mines. We wholly own the Fording River, Coal Mountain, Line Creek and Cardinal River mines, and have a 95% partnership interest in the Elkview mine and an 80% interest in the Greenhills mine.

COPPER

Highland Valley Copper (97.5%)

Operating results at the 100% level are summarized in the following table:

  Three months ended
March 31,
    2012     2011  
Tonnes milled (000's)   10,874     9,581  
             
Copper            
  Grade (%)   0.22     0.26  
  Recovery (%)   83.9     87.5  
  Production (000's tonnes)   20.1     21.4  
  Sales (000's tonnes)   23.1     20.2  
             
Molybdenum            
  Production (million pounds)   2.2     1.4  
  Sales (million pounds)   2.3     1.8  
             
Cost of sales ($ millions)            
  Operating costs $ 106   $ 86  
  Distribution costs $ 8   $ 8  
  Depreciation and amortization $ 22   $ 17  
             
Gross profit summary ($ millions)            
  Before depreciation and amortization $ 106   $ 116  
  Depreciation and amortization   (22 )   (17 )
  After depreciation and amortization $ 84   $ 99  
 
1. Results do not include a provision for the 2.5% non-controlling interest in Highland Valley Copper.

The decline in Highland Valley Copper's first quarter gross profit before depreciation and amortization was primarily due to lower copper prices, partially offset by a 14% increase in copper sales volumes as a result of timing of shipments.

Copper production of 20,100 tonnes was 6% lower than the same period last year primarily as a result of lower feed grades available during the quarter, partially offset by 13% higher throughput in the mill. Mine sequencing delayed the return to higher grade mining due to minor geotechnical issues with an access ramp. Higher grade production from the east wall of the Valley pit is expected to increase for the balance of 2012 as the development of larger mining fronts in this area is now progressing well. Meanwhile, throughput improvement projects enabled the mill to process additional low grade material from other areas during the quarter. Molybdenum production of 2.2 million pounds increased by 58% over the corresponding period last year primarily due to higher feed grades.

Operating costs charged to cost of sales increased by $20 million to $106 million primarily due to the effect of higher sales volumes and a greater proportion of costs capitalized in the first quarter of 2011 as part of the mine life extension program. Increases to milling costs as a result of higher throughput were largely offset by productivity improvement projects in the mine.

Execution of the $475 million mill modernization project is progressing well. Detailed engineering is advancing and the bulk of the excavation work is finished. The project is expected to increase throughput by 10% and improve metal recoveries over the life of the mine, with completion expected in the fourth quarter of 2013.

Highland Valley Copper production in 2012 is still expected to be in the range of 105,000 to 110,000 tonnes of copper, with higher production planned in the second half of the year.

Antamina (22.5%)

Operating results at the 100% level are summarized in the following table:

    Three months ended
March 31,
      2012     2011  
Tonnes milled (000's)              
  Copper-only ore     6,387     4,972  
  Copper-zinc ore     3,776     4,316  
      10,163     9,288  
Copper (note 1)              
  Grade (%)     1.05     0.99  
  Recovery (%)     86.6     83.5  
  Production (000's tonnes)     94.8     76.4  
  Sales (000's tonnes)     94.3     80.3  
               
Zinc (note 1)              
  Grade (%)     1.9     2.2  
  Recovery (%)     79.4     84.7  
  Production (000's tonnes)     59.3     84.8  
  Sales (000's tonnes)     47.5     90.0  
               
Molybdenum              
  Production (million pounds)     3.4     2.1  
  Sales (million pounds)     4.4     2.6  
               
Cost of sales (US$ millions)              
  Operating costs   $ 175   $ 140  
  Distribution costs   $ 24   $ 25  
  Royalties and other costs (note 2)   $ 56   $ 66  
  Depreciation and amortization   $ 29   $ 26  
               
Gross profit summary (our 22.5% share) ($ millions)              
  Before depreciation and amortization   $ 148   $ 160  
  Depreciation and amortization     (6 )   (6 )
  After depreciation and amortization   $ 142   $ 154  
 
(1) Copper ore grades and recoveries apply to all of the processed ores. Zinc ore grades and recoveries apply to copper-zinc ores only.
(2) In addition to royalties paid by Antamina, we also pay a royalty in connection with the acquisition of our interest in Antamina equivalent to 7.4% of our share of cash flow distributed by the mine.

The decrease in our 22.5% share of Antamina's gross profit before depreciation and amortization in the first quarter was primarily due to lower metal prices.

Tonnes milled in the first quarter were 9% higher than a year ago and averaged approximately 112,000 tonnes per day. In the month of March, the mill achieved a throughput rate of approximately 131,000 tonnes per day.

The mix of mill feed in the first quarter was 63% copper-only ore and 37% copper-zinc ore, compared with 54% and 46%, respectively, in the same period a year ago. Copper production, on a 100% basis, was 94,800 tonnes compared with 76,400 tonnes in the first quarter of 2011 as a result of the tonnes of copper ore processed, as well as higher head grades and improved recovery. As anticipated, zinc production decreased significantly to 59,300 tonnes from 84,800 tonnes in the same period a year ago due to a 13% decrease in copper-zinc ore processed in the quarter and lower zinc grades and recoveries arising from the nature of the orebody. Molybdenum production was significantly higher in the first quarter compared with a year ago as a result of higher throughput of copper-only ores with higher molybdenum grades.

The Antamina expansion project commissioned and operated SAG mill number 2 and ball mill number 4, as well as the expanded flotation circuits for both copper and zinc recovery. Other elements of the expansion, including additional mining equipment and mine infrastructure, process water supply and tailings dam works are ongoing as scheduled.

Quebrada Blanca (76.5%)

Operating results at the 100% level are summarized in the following table:

    Three months ended
March 31,
      2012     2011  
Tonnes placed (000's)              
  Heap leach ore     1,453     1,438  
  Dump leach ore     5,438     6,339  
      6,891     7,777  
Grade (TCu%) (note 1)              
  Heap leach ore     0.86     0.80  
  Dump leach ore     0.46     0.41  
               
Production (000's tonnes)              
  Heap leach ore     10.5     7.6  
  Dump leach ore     6.4     8.2  
      16.9     15.8  
               
Sales (000's tonnes)     16.4     14.9  
               
Cost of sales (US$ million)              
  Operating costs   $ 90   $ 59  
  Distribution costs   $ 2   $ 2  
  Depreciation and amortization   $ 25   $ 23  
               
Gross profit summary ($ millions) (note 2)              
  Before depreciation and amortization   $ 44   $ 82  
  Depreciation and amortization     (25 )   (23 )
  After depreciation and amortization   $ 19   $ 59  
 
(1) TCu% is the percent assayed total copper grade.
(2) Results do not include a provision for the 23.5% non-controlling interest in Quebrada Blanca.

Quebrada Blanca's gross profit before depreciation and amortization declined in the first quarter due to lower copper prices, higher operating costs and a one-time labour settlement charge of US$6 million for the new 46-month labour agreement ratified in the quarter.

For the second consecutive year, heavy rains and severe weather conditions affected mining operations during the first quarter. Although more rain was experienced this year, the operation was better prepared than last year, and this was reflected in the slightly higher copper production levels. The severe weather conditions restricted mine material movement and reduced ore placed on the leach pads, consequently lowering copper in the copper solution. These items were partly offset by an increase in SX-EW plant capacity.

Operating costs increased by $31 million in the first quarter compared with the same period a year ago as a result of higher fuel costs, the timing of maintenance projects, the effect of higher sales volumes which rose 10%, and the US$6 million labour settlement charge.

Carmen de Andacollo (90%)

Operating results at the 100% level are summarized in the following table:

  Three months ended
March 31,
     2012     2011  
Tonnes milled (000's)   3,898     3,723  
Copper            
  Grade (%)   0.51     0.50  
  Recovery (%)   88.1     86.8  
  Production (000's tonnes)   17.6     16.3  
  Sales (000's tonnes)   16.8     14.0  
             
Gold (note 1)            
  Production (000's ounces)   12.9     13.6  
  Sales (000's ounces)   13.1     11.8  
             
Copper cathode            
  Production (000's tonnes)   1.6     2.0  
  Sales (000's tonnes)   2.0     2.0  
             
Cost of sales (US$ million)            
  Operating costs $ 91   $ 60  
  Distribution costs $ 6   $ 6  
  Depreciation and amortization $ 22   $ 20  
             
Gross profit summary ($ millions) (note 2)            
  Before depreciation and amortization $ 58   $ 93  
  Depreciation and amortization   (22 )   (20 )
  After depreciation and amortization $ 36   $ 73  
 
(1) Carmen de Andacollo processes 100% of gold mined, but 75% of the gold produced is for the account of Royal Gold Inc.
(2) Results do not include a provision for the 10% non-controlling interest in Andacollo.

The decrease in Carmen de Andacollo's first quarter gross profit before depreciation and amortization was primarily due to lower copper prices, higher operating costs and a one-time labour settlement cost of US$10 million for the new 45-month labour agreement ratified in the quarter.

Copper production increased by 8% in the first quarter compared with a year ago, reflecting higher mill throughput and improved recoveries. We are pre-commissioning the new 20,000-tonnes-per-day pre-crushing plant to help us achieve the design mill throughput of 55,000 tonnes per day. We expect to start ramp-up of this plant in May. Mill modifications and new liners are planned to be in place for the second quarter which will increase SAG motor capacity by an additional 10%. An upgrade to the capacity of the main ore feed conveyor is in progress and is expected to be in place early in the third quarter.

Operating costs increased by $31 million in the first quarter compared with the same period a year ago due to the effect of higher sales volumes that rose 20%, higher fuel and power costs, increased consumable costs reflecting higher production levels and the US$10 million labour settlement charge.

The expansion study at Carmen de Andacollo has evaluated both additional grinding (SAG mill 2) and additional pre-crushing as ways to increase concentrator throughput. Project evaluations of these alternatives were essentially the same. As a result, further circuit configuration and economic evaluation for the expansion will be undertaken based on the performance of the new 20,000-tonnes-per-day pre-crushing plant during the second and third quarters of 2012. During this period we will continue infill drilling to evaluate the resource potential and our understanding of the ore body and continue our investigation in the sources available for additional water required for the expansion. We will also continue metallurgical test work to finalize the molybdenum recovery circuit. Both dust-control and water-use measures will be key to any expansion decision.

Our 2012 production guidance for the operation remains unchanged at between 70,000 to 75,000 tonnes of copper in concentrate and 5,000 tonnes of copper cathode.

Duck Pond (100%)

Duck Pond's gross profit before depreciation and amortization was $10 million in the first quarter compared with $18 million in the same period last year. The decline was primarily due to lower sales volumes as a result of timing of shipments and lower metal prices. Copper and zinc production in the first quarter improved to 3,700 tonnes and 5,200 tonnes, respectively, compared with 2,700 tonnes and 4,600 tonnes, respectively, last year. Copper and zinc sales in the first quarter were 3,600 tonnes and 4,100 tonnes, respectively, compared with 3,900 tonnes and 7,500 tonnes, respectively, last year.

Copper Development Projects

Quebrada Blanca Phase 2

Subsequent to the end of the quarter we completed a feasibility study on our Quebrada Blanca hypogene project. We own a 76.5% interest in Quebrada Blanca. The other shareholders are a Chilean private company which owns a 13.5% interest and Empresa Nacional de Minera ("ENAMI"), a state-owned Chilean mining company, which has a 10% non-funding interest. The study estimates a capital cost for the development of the project of US$5.6 billion (in January 2012 dollars, not including working capital or interest during construction), of which our funding share would be US$4.8 billion. The study contemplates the construction of a 135,000 tonne per day concentrator and related facilities connected to a new port facility by 165 kilometre concentrate and desalinated water pipelines.

The total mineral reserve and mineral resource estimates for the hypogene project, as at April 19, 2012, are set out in the tables below. Mineral resources are reported separately from and do not include that portion of mineral resources that are classified as mineral reserves.

Mill - Mineral Reserve* within design reserve pit
 
  Tonnes (000's) Copper Grade (%Cu) Molybdenum Grade (%Mo)
Probable 1,436,333 0.50 0.018
 
Mill - Mineral Resource* within design reserve pit
 
  Tonnes (000's) Copper Grade (%Cu) Molybdenum Grade (%Mo)
Inferred 325,375 0.43 0.018
 
Mill - Mineral Resource* outside design reserve pit
 
  Tonnes (000's) Copper Grade (%Cu) Molybdenum Grade (%Mo)
Indicated 744,176 0.42 0.014
Inferred 1,481,085 0.40 0.016
 
* The mineral reserve and mineral resource estimates assume US$2.50 per pound of copper, US$12.50 per pound of molybdenum and a net smelter return cut-off of US$9.08 per tonne.

Approximately 19,000 meters of additional drilling has been completed since the data cut-off date for the feasibility mine plan. We currently expect the results of that drilling, when incorporated, will support the reclassification of additional tonnage from the inferred mineral resource to the measured and indicated mineral resource categories.

The mine plan developed for the feasibility study is expected to supply mill feed that includes 1.436 billion tonnes of probable mineral reserves. In addition, there is approximately 325 million tonnes of material currently classified as inferred mineral resource scheduled within the design reserve pit. The inferred mineral resource has not been drilled to a level that would support mineral reserve classification due in part to access restrictions related to the existing supergene operation and minor geotechnical issues.

The mine plan contemplates a mine life, including mineral reserves, inferred mineral resources, previously reported leach (supergene) resources and associated low-grade material, within the design reserve pit, of 39 years. Marginal material outside the mineral reserve and mineral resource statement is stockpiled in the early years of the mine plan and fed to the mill in later years. The significant mineral resource outside the mine plan pit provides the potential for expansion in future years and the mine facilities have been designed with this in mind.

Estimated key project operating parameters, taking into account the inferred resources included in the design reserve pit (the development case) and excluding the inferred resources (the base case) are summarized in the following table:

Development Case (measured, indicated and inferred resource)
 
  Years 1-5     Years 1-10     Life of Mine  
Strip ratio (tonnes waste:tonnes ore) 0.10:1     0.22:1     0.48:1  
Tonnes milled (tonnes per day) 135,000     135,000     135,000  
Copper grade (%Cu) 0.62 %   0.58 %   0.48 %
Molybdenum grade (%Mo) 0.020 %   0.021 %   0.018 %
Contained copper production (tonnes per annum) 250,000     240,000     200,000  
Contained molybdenum production (tonnes per annum) 6,000     6,000     5,000  
C1 cash costs (US$)* 1.07     1.12     1.35  
 
* C1 cash costs are presented after by-product credit assuming US$12.50 per pound of molybdenum.
 
Base Case (measured and indicated resource)
 
  Years 1-5     Years 1-10     Life of Mine  
Strip ratio (tonnes waste:tonnes ore) 0.26:1     0.41:1     0.82:1  
Tonnes milled (tonnes per day) 135,000     135,000     135,000  
Copper grade (%Cu) 0.61 %   0.58 %   0.49 %
Molybdenum grade (%Mo) 0.020 %   0.020 %   0.018 %
Contained copper production (tonnes per annum) 240,000     240,000     200,000  
Contained molybdenum production (tonnes per annum) 6,000     6,000     5,000  
C1 cash costs (US$)* 1.08     1.15     1.38  
 
* C1 cash costs are presented after by-product credit assuming US$12.50 per pound of molybdenum.

The hypogene project includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Inferred mineral resources are subject to greater uncertainty than measured or indicated resources and, notwithstanding our current expectations, it cannot be assumed that they will be successfully upgraded to measured and indicated status through further drilling. Nonetheless, based on the nature of the mineralization, we believe that the feasibility mine plan, including inferred mineral resources, represents the most likely initial development scenario for the Quebrada Blanca hypogene deposit.

As part of the ongoing project work plan for 2012, the social environmental impact assessment for the project is expected to be submitted to the Chilean regulatory authorities during the second quarter of 2012. Discussions are ongoing with various potential suppliers for power to the project. We are also in discussions with the other shareholders of Quebrada Blanca concerning financing options for the hypogene project, which may include limited recourse project financing and, possibly, bringing in a new funding partner. A decision to proceed with development will depend on the outcome of these discussions.

The scientific and technical information regarding the hypogene project was approved by Paul C. Bankes, P. Geo, and Michael J. Allan, P. Eng, who are employees of Teck. Mr. Bankes is a qualified person, as defined under National Instrument 43-101, and approved the geology, mineral resource and global mineral reserve estimates. Mr. Allan is a qualified person, as defined under National Instrument 43-101, and approved the mine plans, metallurgy and the financial models on which the mineral reserves were based.

Relincho

The feasibility study is progressing on schedule and is expected to be complete by the end of the first quarter of 2013. Exploration and geotechnical drilling are ongoing and a new resource and reserve estimate is expected at the completion of the feasibility study. In accordance with the prefeasibility design, production would average 180,000 tonnes per year of copper and 6,000 tonnes per year of molybdenum over the 22 year mine life, with higher production in the first five years.

Galore Creek (50%)

The Galore Creek project team is currently executing a $25 million work program for 2012 which was previously approved by the partners. The 2012 work program is primarily focused on infill and geotechnical drilling to support the advanced engineering work that was completed in the fourth quarter of 2011. The program will include approximately 25,000 metres of drilling anticipated to start in the second quarter.

COAL

Teck Coal Partnership (100%)

Operating results at the 100% level are summarized in the following table:

  Three months ended
March 31,
    2012     2011  
Production (000's tonnes)   6,265     4,379  
             
Sales (000's tonnes)   5,305     4,950  
             
Average sale price            
  US$/tonne $ 223   $ 207  
  C$/tonne $ 226   $ 206  
             
Operating expenses (C$/tonne)            
  Cost of product sold $ 70   $ 76  
  Transportation $ 34   $ 34  
  Depreciation and amortization $ 20   $ 24  
             
Gross profit summary ($ millions)            
  Before depreciation and amortization $ 645   $ 477  
  Depreciation and amortization   (105 )   (121 )
  After depreciation and amortization $ 540   $ 356  

Gross profit before depreciation and amortization in the first quarter increased by $168 million over last year due primarily to higher selling prices, increased sales volumes, and lower unit cost of product sold.

Production for the first quarter increased by 43% compared with the same quarter of 2011. This significant increase is due partly to our expanded production capacity and partly to unusual weather-related events and the strike at our Elkview mine in the first quarter of 2011.

We continue to execute our growth strategy, with approximately $65 million of investments in expansion capital made during the quarter, including investments in the Quintette re-opening project, expansion of the maintenance shop at the Fording River mine to accommodate new larger capacity haul trucks, and the expansion of the processing plant at the Elkview mine, which has now been commissioned. The volume of material moved in the first quarter exceeded our previous best first quarter by more than 15%. Unless we are required to restrict production because of customer demand, we expect to produce 24.5 to 25.5 million tonnes in 2012.

The average coal price of US$223 per tonne in the first quarter was up 8% over last year. Quarterly contract prices for the first quarter of 2011 were finalized in late 2010 before the severe flooding in Australia caused significant supply disruptions in the seaborne steelmaking coal market, which resulted in a spike in prices in early 2011. Market conditions subsequently turned downward in the latter part of 2011 as supply gradually returned to normal and uncertainty over the global economic conditions grew. We have agreed on prices with the vast majority of our quarterly contract customers for the second quarter of 2012 based on pricing of approximately US$206 per tonne for our highest quality product. As of the date of this release, we have sold approximately 6.3 million tonnes of coal for delivery in the second quarter at an average price of US$202 per tonne, which is roughly balanced with our expected production for the quarter. Vessel nominations for quarterly contract tonnage are determined by our customers and final sales for the quarter will depend on vessels arriving at port as scheduled, as well as on the level of additional spot sales.

Unit cost of product sold in the first quarter before transportation and depreciation charges of $70 per tonne improved over 2011 as the fixed costs were spread over a significantly larger production volume. We continue to experience cost pressures arising from general inflation in most of our input cost categories and we expect our 2012 annual cost of product sold to fall within a range of $72 to $78 per tonne, for our current production plans.

Unit transportation costs were unchanged quarter-over-quarter and we continue to expect our 2012 annual unit transportation costs to fall within the range of $34 to $38 per tonne. 

Depreciation and amortization decreased by $4 per tonne due to the significant increase in coal reserves recorded in 2011 as a result of our drilling program. Certain of our capital assets are depreciated on a units-of-production basis over proven and probable reserves.

The feasibility study for the re-opening of our Quintette mine in northeast British Columbia is progressing. Additional work is ongoing to ensure water management plans are complete for inclusion in the permit application and to update the mine plan based on additional drilling. This information will be included in the study, which is due for completion in the second quarter. Long-lead equipment items, including trucks, shovels and drills, have been ordered, preliminary on-site work has commenced and stakeholder consultation processes are ongoing. Assuming permits are approved on a timely basis and development proceeds as currently planned, the mine could be in production in the second half of 2013 with production ramping up through 2014 to approximately three million tonnes per year.

Work is ongoing to develop and implement selenium management plans for each of our six operating coal mines and the Quintette project. It is possible that permitting for current and future projects may be delayed or withheld until appropriate selenium management plans are developed and implemented. We have begun to implement a number of measures, including a water treatment plant, entailing expenditures of approximately $80 million over the next 3 years, however, our plans are not yet complete and additional costs may be incurred, which may be significant.

ZINC

Trail (100%)

Operating results at the 100% level are summarized in the following table:

  Three months ended
March 31,
    2012     2011  
Metal production            
  Zinc (000's tonnes)   74.0     71.9  
  Lead (000's tonnes)   21.0     22.5  
  Silver (million ounces)   5.4     5.4  
             
Metal sales            
  Zinc (000's tonnes)   76.2     73.1  
  Lead (000's tonnes)   21.7     19.8  
  Silver (million ounces)   5.5     5.4  
             
Cost of sales ($ millions)            
  Concentrates $ 328   $ 296  
  Operating costs $ 100   $ 87  
  Distribution costs $ 27   $ 25  
  Depreciation and amortization $ 12   $ 12  
             
Gross profit summary ($ millions)            
  Before depreciation and amortization $ 40   $ 77  
  Depreciation and amortization   (12 )   (12 )
  After depreciation and amortization $ 28   $ 65  

Trail's first quarter gross profit before depreciation and amortization declined by $37 million from the same period a year ago primarily due to higher costs paid for silver purchased in concentrates. Lower prices for zinc and lead were partially offset by higher production and corresponding higher sales volumes.

Refined zinc production increased from a year ago as a result of improved process reliability and less downtime of the plant facilities. Lead production was 7% lower than a year ago despite achieving record feed rates into the KIVCET furnace, as there were lower lead inputs contained in the feed mix. A scheduled lead refinery shut down in March also impacted lead and silver production in the first quarter.

Concentrate purchases increased by $32 million in the quarter compared with a year ago, which reflects higher costs for silver. Operating costs rose by $13 million to $100 million primarily as a result of the higher production levels.

Construction of a new slag fuming furnace and settling furnace remains on time and budget, with early-works construction activity in progress and start-up scheduled for 2014. Construction of a new acid plant also remains on time and budget with engineering advancing, supply of major component equipment underway, with the start-up scheduled for late 2013.

Subsequent to quarter end, the Federal District Court for the Eastern District of Washington issued an order striking our affirmative defense of apportionment in the Lake Roosevelt CERCLA litigation. We are reviewing the order with counsel and are assessing our options.

Red Dog (100%)

Operating results at the 100% level are summarized in the following table:

  Three months ended
March 31,
    2012      2011  
Tonnes milled (000's)   859     921  
             
Zinc            
  Grade (%)   17.9     18.8  
  Recovery (%)   83.6     82.3  
  Production (000's tonnes)   128.3     142.8  
  Sales (000's tonnes)   120.5     101.0  
             
Lead            
  Grade (%)   4.7     4.8  
  Recovery (%)   57.4     47.7  
  Production (000's tonnes)   23.4     21.2  
  Sales (000's tonnes)   -     -  
             
Cost of sales (US$ millions)            
  Operating costs $ 35   $ 24  
  Distribution costs $ 23   $ 19  
  Royalties (NANA) $ 18   $ 15  
  Depreciation and amortization $ 13   $ 12  
             
Gross profit summary ($ millions)            
  Before depreciation and amortization $ 77   $ 86  
  Depreciation and amortization   (13 )   (12 )
  After depreciation and amortization $ 64   $ 74  

Red Dog's gross profit in the first quarter before depreciation and amortization decreased by $9 million compared with the same period a year ago, as lower zinc prices and higher operating costs were partially offset by higher zinc sales volumes. Zinc sales volumes in the first quarter increased by 19% compared with the same period a year ago as a result of timing of sales.

Zinc production in the first quarter of 2012 decreased by 10% compared with a year ago to 128,300 tonnes due to lower mill throughput and lower ore grades. Throughput decreased by 7% due to harder, higher silica ore from the Aqqaluk pit and lower mill availability. Zinc ore grades declined as the majority of ore feed was from the lower-grade Aqqaluk pit. Mining from the main pit was completed on February 29, 2012 and backfilling with Aqqaluk waste has started. Operating costs rose in the first quarter compared with a year ago as a result of higher sales volumes, increased fuel costs and higher input costs.

In accordance with the agreements governing our development of the mine, the net profits royalty that we pay to NANA Development Inc. will increase to 30% in the fourth quarter of 2012 from the current 25%.

Sales volumes of contained zinc metal are estimated at approximately 65,000 tonnes in the second quarter.

ENERGY

Fort Hills Project

Engineering studies are ongoing to update the design basis for the project and improve the accuracy of the cost estimates in anticipation of a project sanction decision by the partners in 2013. Assuming the partners sanction Fort Hills (Phase One), production is anticipated to start in mid to late 2016, ramping up to approximately 160,000 barrels per day of bitumen production.

Suncor, operator of Fort Hills, has provided a 2012 project spending estimate of approximately $800 million, which includes engineering, site preparation activities, procurement of some long lead items and early works. Our share of the 2012 spending is expected to be $220 million, including our ongoing earn-in commitments.

Frontier Project

The Frontier project has been designed for up to four production lines with a total capacity of approximately 277,000 barrels per day of bitumen. The first two production lines are planned to have a production capacity of 159,000 barrels per day. The Frontier project includes the development of Equinox as a satellite operation.

The Frontier project regulatory application was submitted to regulators on November 25, 2011. On January 19, 2012 the federal environment minister announced the referral of the Frontier regulatory application to an independent review panel. The Frontier project requires various provincial and federal regulatory reviews and conducting these reviews in parallel can streamline and improve the regulatory process.

On March 29, 2012 as part of its 2012 budget, the federal government announced specific regulatory review timeframes, which may apply to the Frontier project, providing greater certainty to the timing of the regulatory review process while maintaining a thorough and rigorous review.

In January 2012, we announced an agreement to acquire SilverBirch Energy Corporation through a plan of arrangement involving the spin out of the assets of SilverBirch, other than its 50% interest in the Frontier project and Equinox. The transaction closed on April 4, 2012 and resulted in a net cash outlay of $432 million. This creates a simplified ownership structure for Frontier, provides an opportunity to explore new partnerships and other alternatives to move the project towards development. With this acquisition our total contingent resources, estimated as at December 31, 2011, for all of our oil sands projects increased by 67% to a total of 3.5 billion barrels of bitumen.

No field exploration activities are planned in 2012 and the key focus will be on supporting the regulatory application review, consultations with stakeholders and ongoing engineering studies.

There is no certainty that it will be commercially viable to produce any portion of our contingent bitumen resources.

Lease 421 Area Project

During the first quarter, we acquired for $27 million a 50% working interest in Lease 899, which is immediately southwest and adjacent to the Lease 421 Area. This increases the contiguous land area of the Lease 421 Area project, of which we own 50%, by 34%. 

A total of 30 coreholes had been previously completed on Lease 899. Initial results indicate the potential for a mineable resource, however further core hole drilling is required to establish the quantity and quality of any potential resource.

No field exploration activities are planned in 2012.

Wintering Hills Wind Power Project

The Wintering Hills Wind Power Project became fully operational in November 2011. During the first quarter of 2012, our share of the power generation was 27 GWhs. Our share of expected power generation in 2012 is 80 GWhs, which will result in 50,000 tonnes of CO2 equivalent offsets.

OTHER COST AND EXPENSES

Financing expenses were $165 million in the first quarter compared with $131 million a year ago. The debt interest component of our financing expense increased from $93 million to $121 million in the quarter, as a result of our higher debt levels arising from the US$2 billion of notes issued in July 2011. The effect of the higher debt was partly offset by the ongoing effect of liability management transactions initiated in 2010 in which we replaced high-yield notes with lower cost notes with longer maturities. The effect of liability management transactions implemented to date, which includes the issuance of US$1 billion of new notes and the redemption of US$1.05 billion of our high-yield notes in this quarter, has increased the average term of our debt to 15.1 years and reduced the average coupon rate of our debt to 6.00%.

Other operating income, net of other expense, was $80 million in the first quarter compared with a $12 million expense in the first quarter of 2011. Included in other operating income was $94 million of positive price adjustments in the first quarter arising primarily from increasing copper prices. This compares with negative pricing adjustments of $28 million in the first quarter of 2011.

The table below outlines our outstanding receivable positions, which were provisionally valued at March 2012, and our receivable positions provisionally valued at, December 31, 2011.

  Outstanding at Outstanding at
  March 31, 2012 December 31, 2011
(pounds in millions) Pounds US$/lb Pounds US$/lb
Copper 129 3.83 164 3.43
Zinc 146 0.91 184 0.83

Non-operating income, net of expenses, includes items that arise from financial and other matters and includes such items as foreign exchange, debt refinancing, realized gains or losses on marketable securities and gains and losses on the revaluation of fixed price call options on certain of our high-yield notes. In the first quarter of 2012, other non-operating expense was $347 million. The principal components were a $414 million charge on the redemption of a portion of our high-yield notes and a mark-to-market gain of $67 million on the revaluation of our call option on this and other debt. This compares with $15 million of other income in the first quarter of 2011.

Income and resource taxes for the quarter were $216 million, or 47% of pre-tax earnings, which is higher than the Canadian statutory income tax rate of 25%. This was mainly due to the effect of the debt redemption costs, resource taxes and higher tax rates in foreign jurisdictions. The debt redemption costs incurred in the quarter were not wholly tax deductible, and therefore, had a significant effect on increasing our overall tax rate this quarter. Our tax rate on adjusted profit was 36% this quarter, compared to 35% for 2011 as a whole. The increase is primarily due to the impact of the new mining tax regime and additional taxes in Peru. We are currently shielded from cash income taxes, but not resource taxes in Canada. We remain subject to cash taxes in foreign jurisdictions.

OPERATING CASH FLOW, FINANCIAL POSITION AND LIQUIDITY

Cash flow from operations, before changes in non-cash working capital items, was $1.0 billion in the first quarter compared with $874 million a year ago.

Changes in non-cash working capital items resulted in a use of cash of $351 million in the first quarter compared with $120 million in the same period a year ago. This buildup of working capital primarily relates to increased coal inventories and the timing of royalty and bonus payments.

Expenditures on property, plant and equipment were $319 million in the first quarter and included $140 million on sustaining capital and $179 million on major development projects. The largest components of sustaining expenditures were at our coal operations which totalled $80 million. Major development expenditures included $13 million for preparatory stripping for Highland Valley Copper's mine life extension project, $29 million for Antamina's expansion, $14 million at the Quebrada Blanca hypogene project and $65 million at our coal operations. The expenditures at our coal operations are largely to enable us to incrementally expand production at existing operations. We also purchased a 50% interest in an oil sands lease for $27 million.

We also made investments totaling $168 million in the first quarter, primarily in a number of publicly traded companies.

We have committed bank credit facilities aggregating $1.2 billion, the majority of which mature in 2015. The current unused availability under these facilities, after drawn letters of credit, amounts to $1.1 billion.

OUTLOOK

We continue to experience volatile markets for our products. Commodity markets have historically been volatile, prices can change rapidly and customers can alter shipment plans. This can have a substantial impact on our business. The uncertainty over the ongoing economic conditions in Europe continues to have an effect on the global economy, and this may affect both prices and shipments to our customers.

Foreign Exchange, Debt Revaluation and Interest Expense

The sales of our products are denominated in U.S. dollars, while a significant portion of our expenses are incurred in local currencies, particularly the Canadian dollar. Foreign exchange fluctuations can have a significant effect on our operating margins, unless such fluctuations are offset by related changes to commodity prices.

Our U.S. dollar denominated debt is subject to revaluation based on changes in the Canadian/U.S. dollar exchange rate. As at March 31, 2012, all of our U.S. dollar denominated debt is designated as a hedge against our U.S. dollar denominated foreign operations and working capital items. As a result, any foreign exchange gains or losses arising on our designated U.S. dollar debt are recorded in other comprehensive income.

FINANCIAL INSTRUMENTS AND DERIVATIVES

We hold a number of financial instruments and derivatives, the most significant of which are marketable securities, foreign exchange forward sales contracts, fixed price forward metal sales contracts, prepayment rights on senior debt notes and settlements receivable and payable. The financial instruments and derivatives are all recorded at fair values on our balance sheet with gains and losses in each period included in other comprehensive income and profit for the period as appropriate. Some of our gains and losses on metal-related financial instruments are affected by smelter price participation and are taken into account in determining royalties and other expenses. All are subject to varying rates of taxation depending on their nature and jurisdiction.

QUARTERLY EARNINGS AND CASH FLOW

(in millions, except for share data) 2012 2011 2010
  Q1 Q4 Q3 Q2 Q1 Q4 Q3 Q2 Q1
Revenues $ 2,547 $ 2,972 $ 3,380 $ 2,796 $ 2,366 $ 2,716 $ 2,414 $ 2,198 $ 1,895
Gross profit   918   1,212   1,571   1,197   897   1,127   926   848   621
EBITDA   781   1,304   1,660   1,461   1,034   1,013   921   888   1,504
Profit
 (note 1)
  218   637   814   756   461   325   316   283   896
Earnings per share $ 0.37 $ 1.08 $ 1.38 $ 1.28 $ 0.78 $ 0.55 $ 0.54 $ 0.48 $ 1.52
Cash flow from operations $ 644 $ 1,199   1,383   621   754   1,156   771   834   513
 
1. Attributable to shareholders of the company.

OUTSTANDING SHARE DATA

As at April 23, 2012 there were 576,562,397 Class B subordinate voting shares and 9,353,470 Class A common shares outstanding. In addition, there were 7,143,646 director and employee stock options outstanding with exercise prices ranging between $4.15 and $58.80 per share. More information on these instruments and the terms of their conversion is set out in Note 21 of our 2011 year end financial statements.

INTERNAL CONTROL OVER FINANCIAL REPORTING

Our management is responsible for establishing and maintaining adequate internal control over financial reporting. Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation. There have been no changes in our internal control over financial reporting during the quarter ended March 31, 2012 that have materially affected, or are reasonably likely to materially affect, internal control over financial reporting.

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

This news release contains certain forward-looking information and forward-looking statements as defined in applicable securities laws. All statements other than statements of historical fact are forward-looking statements. These forward-looking statements, principally under the heading "Outlook," but also elsewhere in this document, include estimates, forecasts, and statements as to management's expectations with respect to, among other things, our future production at our business units and individual operations, profit and cash flow, sales volume and selling prices for our products (including settlement of coal contracts with customers), plans and expectations for our development projects, forecast operating costs, expected progress, costs and outcomes of our various projects and investments, including but not limited to those described in the discussions of our operations, the sensitivity of our earnings to changes in commodity prices and exchange rates, the impact of potential production disruptions, the impact of currency exchange rates, future trends for the company, progress in development of mineral properties, increased coal and copper production as a result of our expansion plans, timing of completion and results of our modernization program at Highland Valley, the statements under the heading "Copper Development Projects", including the anticipated production, results and costs relating to our Quebrada Blanca Phase 2 program, the timing and anticipated production from the reopening of the Quintette coal mine, capital expenditures and mine production costs, unit cost of product for coal, unit transportation costs, demand and market outlook for commodities, future commodity prices and treatment and refining charges, timing of completion of studies on our projects and the impact of measures to manage selenium discharges. These forward-looking statements involve numerous assumptions, risks and uncertainties and actual results may vary materially.

These statements are based on a number of assumptions, including, but not limited to, assumptions regarding general business and economic conditions, interest rates, the supply and demand for, deliveries of, and the level and volatility of prices of, zinc, copper and coal and other primary metals and minerals as well as oil, and related products, the timing of the receipt of regulatory and governmental approvals for our development projects and other operations, our costs of production and production and productivity levels, as well as those of our competitors, power prices, continuing availability of water and power resources for our operations, market competition, the accuracy of our reserve estimates (including with respect to size, grade and recoverability) and the geological, operational and price assumptions on which these are based, conditions in financial markets, the future financial performance of the company, our ability to attract and retain skilled staff, our ability to procure equipment and operating supplies, positive results from the studies on our expansion projects, our coal and other product inventories, our ability to secure adequate transportation for our products, our ability to obtain permits for our operations and expansions, our ongoing relations with our employees and business partners and joint venturers. The foregoing list of assumptions is not exhaustive. Events or circumstances could cause actual results to vary materially.

Factors that may cause actual results to vary materially include, but are not limited to, changes in commodity and power prices, changes in interest and currency exchange rates, acts of foreign governments and the outcome of legal proceedings, inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and resources), unanticipated operational difficulties (including failure of plant, equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, adverse weather conditions and unanticipated events related to health, safety and environmental matters), union labour disputes, political risk, social unrest, failure of customers or counterparties to perform their contractual obligations, changes in our credit ratings, unanticipated increases in costs to construct our development projects, and changes or further deterioration in general economic conditions.

Statements concerning future production costs or volumes, and the sensitivity of the company's earnings to changes in commodity prices and exchange rates are based on numerous assumptions of management regarding operating matters and on assumptions that demand for products develops as anticipated, that customers and other counterparties perform their contractual obligations, that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts and supplies, labour disturbances, interruption in transportation or utilities, adverse weather conditions, and that there are no material unanticipated variations in the cost of energy or supplies.

We assume no obligation to update forward-looking statements except as required under securities laws. Further information concerning risks and uncertainties associated with these forward-looking statements and our business can be found in our Annual Information Form for the year ended December 31, 2011, filed on SEDAR and on EDGAR under cover of Form 40-F.

WEBCAST

Teck will host an Investor Conference Call to discuss its Q1/2012 financial results at 11:00 AM Eastern time, 8:00 AM Pacific time, on Tuesday, April 24, 2012. A live audio webcast of the conference call, together with supporting presentation slides, will be available at our website at www.teck.com. The webcast is also available at www.earnings.com. The webcast will be archived at www.teck.com.

Teck Resources Limited
Consolidated Statements of Income
(Unaudited)
  Three months ended
March 31,
(Cdn$ in millions, except for share data)   2012       2011  
Revenues $ 2,547     $ 2,366  
Cost of sales   (1,629 )     (1,469 )
Gross profit   918       897  
Other operating expenses              
  General and administration   (28 )     (30 )
  Exploration   (24 )     (16 )
  Research and development   (5 )     (7 )
  Other operating income (expense) (Note 2)   80       (12 )
Profit from operations   941       832  
Finance income   31       25  
Finance expense (Note 3)   (165 )     (131 )
Non-operating income (expense) (Note 4)   (347 )     15  
Share of losses of associates   (3 )     (3 )
Profit before tax   457       738  
Provision for income and resource taxes   (216 )     (251 )
Profit for the period $ 241     $ 487  
               
Profit attributable to:              
  Shareholders of the company $ 218     $ 461  
  Non-controlling interests   23       26  
Profit for the period $ 241     $ 487  
               
Earnings per share              
  Basic $ 0.37     $ 0.78  
  Diluted $ 0.37     $ 0.78  
Weighted average shares outstanding (millions)   586.0       590.7  
Shares outstanding at end of period (millions)   585.9       590.8  
               
               
Teck Resources Limited
Consolidated Statements of Comprehensive Income
(Unaudited)
  Three months ended
March 31,
(Cdn$ in millions)   2012       2011  
Profit for the period $ 241     $ 487  
               
Other comprehensive income (loss) in the period              
  Currency translation differences (net of taxes of $(16) and $(16))   (46 )     (41 )
  Available-for-sale financial instruments (net of taxes of $(19) and $1)   142       (6 )
  Cash flow hedges (net of taxes of $nil and $1)   (1 )     (2 )
  Actuarial gain (loss) on retirement benefit obligations (net of taxes of $7 and $(10))   (13 )     24  
Total other comprehensive income (loss) for the period   82       (25 )
Total comprehensive income for the period $ 323     $ 462  
               
Other comprehensive income (loss) attributable to:              
  Shareholders of the company   85       (24 )
  Non-controlling interests   (3 )     (1 )
    82       (25 )
               
Comprehensive income attributable to:              
  Shareholders of the company   303       437  
  Non-controlling interests   20       25  
  $ 323     $ 462  
               
               
Teck Resources Limited
Consolidated Statements of Cash Flows
(Unaudited)
  Three months ended
March 31,
(Cdn$ in millions)   2012     2011  
Operating activities            
  Profit for the period $ 241   $ 487  
  Adjustments for:            
    Depreciation and amortization   213     216  
    Provision for deferred income and resource taxes   70     81  
    Share of losses of associates   3     3  
    Gain on sale of investments and assets   (3 )   (10 )
    Unrealized losses (gains) on derivatives   (66 )   6  
    Foreign exchange losses (gains)   7     (10 )
    Loss on debt repurchase   414     -  
    Finance expense   165     131  
    Finance income   (31 )   (25 )
    Other   (18 )   (5 )
    995     874  
  Net change in non-cash working capital items   (351 )   (120 )
    644     754  
Investing activities            
  Purchase of property, plant and equipment   (319 )   (226 )
  Purchase of financial investments and other assets   (168 )   (18 )
  Proceeds from the sale of investments and other assets   5     21  
    (482 )   (223 )
Financing activities            
  Issuance of debt   983     -  
  Repayment of debt   (1,288 )   (67 )
  Debt interest paid   (138 )   (34 )
  Issuance of Class B subordinate voting shares   -     3  
  Purchase and cancellation of Class B subordinate voting shares   (6 )   -  
  Dividends paid   (235 )   (177 )
  Distributions to non-controlling interests   (6 )   (21 )
    (690 )   (296 )
Effect of exchange rate changes on cash and cash equivalents   (77 )   (21 )
Increase (decrease) in cash and cash equivalents   (605 )   214  
Cash and cash equivalents at beginning of period   4,405     832  
Cash and cash equivalents at end of period $ 3,800   $ 1,046  
             
             
Teck Resources Limited
Consolidated Balance Sheets
(Unaudited)
 
(Cdn$ in millions)
March 31,
2012
  December 31,
2011
ASSETS          
           
Current assets          
  Cash and cash equivalents $ 3,800   $ 4,405
  Current income and resource taxes receivable   143     101
  Trade accounts receivable   1,267     1,242
  Inventories   1,800     1,641
    7,010     7,389
           
Financial and other assets   1,393     1,138
Investments in associates   722     715
Property, plant and equipment   23,089     23,150
Deferred income and resource tax assets   185     180
Goodwill   1,639     1,647
  $ 34,038   $ 34,219
LIABILITIES AND EQUITY          
           
Current liabilities          
  Trade accounts payable and other liabilities $ 1,223   $ 1,435
  Dividends payable   -     235
  Current income and resource taxes payable   122     93
  Debt   345     359
    1,690     2,122
           
Debt   6,543     6,676
Deferred income and resource tax liabilities   5,421     5,342
Retirement benefit obligations   683     691
Other liabilities and provisions   1,495     1,495
           
Equity          
  Attributable to shareholders of the company   18,022     17,721
  Attributable to non-controlling interests   184     172
    18,206     17,893
  $ 34,038   $ 34,219
           
           
Teck Resources Limited
Consolidated Statements of Changes in Equity
(Unaudited)
  Three months ended
March 31,
(Cdn$ in millions)   2012       2011  
Class A common shares $ 7     $ 7  
Class B subordinate voting shares              
Beginning of period   6,743       6,795  
  Share repurchase   (2 )     -  
  Issued on exercise of options   1       3  
End of period   6,742       6,798  
Retained earnings              
Beginning of period   10,858       8,840  
  Profit for the period attributable to shareholders of the company   218       461  
  Share repurchase   (4 )     -  
  Actuarial gain (loss) on retirement benefit obligations   (13 )     24  
End of period   11,059       9,325  
Contributed surplus              
Beginning of period   97       84  
  Share-based payment expense   3       3  
End of period   100       87  
Accumulated other comprehensive income (loss) attributable to shareholders of the company (Note 5(b))              
Beginning of period   16       47  
  Other comprehensive income (loss) before actuarial loss on retirement benefit obligations   98       (48 )
End of period   114       (1 )
Non-controlling interests              
Beginning of period   172       122  
  Profit for the period attributed to non-controlling interests   23       26  
  Other comprehensive loss   (3 )     (1 )
  Other   (2 )     (2 )
  Dividends or distributions   (6 )     (21 )
End of period   184       124  
Total equity $ 18,206     $ 16,340  
               
               

The accompanying notes are an integral part of these financial statements.

Teck Resources Limited
Notes to Consolidated Financial Statements
(unaudited)

1. BASIS OF PREPARATION

We prepare our financial statements in accordance with International Financial Reporting Standards ("IFRS") as issued by International Accounting Standards Board ("IASB"). These condensed interim consolidated financial statements have been prepared in accordance with IAS 34, Interim Financial Reporting ("IAS 34"). These condensed interim consolidated financial statements follow the same accounting policies and methods of application as our most recent annual financial statements. Accordingly, they should be read in conjunction with our most recent annual financial statements. The policies applied in these condensed consolidated financial statements are based on IFRS issued and outstanding as of April 23, 2012, the date the Board of Directors approved the financial statements.

2. OTHER OPERATING INCOME (EXPENSE)
 
  Three months
ended March 31,
(Cdn$ in millions)   2012       2011  
Gain on sale of operating assets $ 1     $ 5  
Commodity derivatives   (2 )     (7 )
Pricing adjustments (a)   94       (28 )
Share-based compensation (Note 5(a))   (6 )     15  
Other   (7 )     3  
  $ 80     $ (12 )

a) Pricing Adjustments

Sales and purchases of metals in concentrates and cathodes are recognized on a provisional pricing basis when title transfers and the rights and obligations of ownership pass to the customer, which usually occurs on shipment. However, the final pricing for the product sold and purchased is not determined at that time as it is contractually linked to market prices at a subsequent date. These arrangements have the characteristics of a derivative instrument as the value of our receivables and payables will vary as prices for the underlying commodities vary in the metal markets. These pricing adjustments result in gains (losses from purchases) in a rising price environment and losses (gains for purchases) in a declining price environment and are recorded as other operating income (expense). The profit impact of gains and losses on these financial instruments is mitigated by smelter price participation, royalty interests, taxes and non-controlling interests. It should be noted that while these effects arise on the sale of concentrates, we also purchase concentrates at our Trail refinery where the opposite effects occur.

3.FINANCE EXPENSE
 
  Three months
ended March 31,
(Cdn$ in millions)   2012       2011  
Debt interest $ 121     $ 93  
Discount and financing fee amortization   5       5  
Pension liability accretion   25       23  
Decommissioning and restoration provision accretion   17       13  
Other   2       2  
Less interest capitalized   (5 )     (5 )
  $ 165     $ 131  
               
4. NON-OPERATING INCOME (EXPENSE)
 
  Three months
ended March 31,
(Cdn$ in millions)   2012     2011
Foreign exchange gains (losses) $ (7 )   $ 9
Other derivative gains   72       1
Debt repurchase and financing costs   (414 )     -
Gain on sale of investments   2       5
  $ (347 )   $ 15

5. EQUITY

a) Share-Based Compensation

During the first quarter of 2012, we granted 1,474,208 Class B subordinate voting share options to employees. These options have a weighted average exercise price of $39.30, a term of 10 years and vest in equal amounts over three years. The weighted average fair value of Class B subordinate voting share options issued was estimated at $12.15 per share option at the grant date using the Black-Scholes option-pricing model. The option valuations were based on an average expected option life of 4 years, a risk-free interest rate of 1.38%, a dividend yield of 2.04% and an expected volatility of 43%.

During the first quarter of 2012, we issued 622,994 deferred and restricted share units to employees and directors. Deferred and restricted share units issued vest immediately for directors and vest in three years for employees. The total number of deferred and restricted share units outstanding at March 31, 2012 was 2,588,982.

A share-based compensation expense of $6 million (2011 - $15 million recovery) was recorded for the three months ended March 31, 2012 in respect of all outstanding share options and units.

b) Accumulated Other Comprehensive Income (Loss)

The components of accumulated other comprehensive income (loss) are:

 
(Cdn$ in millions)
 
 
  March 31,
2012
   
 
  March 31,
2011
 
Currency translation adjustment   $ (36 )   $ (108 )
Unrealized gains on investments (net of tax of $(21), and $(13))     145       103  
Unrealized gains on cash flow hedges (net of tax of nil and $(1))     -       1  
                 
    $ 109     $ (4 )
                 
Accumulated other comprehensive income (loss) attributable to:                
  Shareholders of the company   $ 114     $ (1 )
  Non-controlling interests     (5 )     (3 )
    $ 109     $ (4 )

6. SEGMENT INFORMATION

Based on the primary products we produce and our development projects, we have five reportable segments - copper, coal, zinc, energy and corporate - which is the way we report information to our Chief Executive Officer. The corporate segment includes all of our initiatives in other commodities, our corporate growth activities and groups that provide administrative, technical, financial and other support to all of our business units. Other operating expenses include general and administration costs, exploration, research and development, and other operating income (expense). Sales between segments are carried out at arm's length.

  Three months ended March 31, 2012
(Cdn$ in millions) Copper   Coal   Zinc   Energy     Corporate   Total  
Segment revenues 753   1,198   650   1     -   2,602  
Less: Inter-segment revenues -   -   (55 ) -     -   (55 )
Revenues 753   1,198   595   1     -   2,547  
Gross profit 285   540   93   -     -   918  
Other operating income (expenses) 58   (5 ) 9   -     (39 ) 23  
Profit from operations 343   535   102   -     (39 ) 941  
Net finance expense (1 ) (6 ) (6 ) -     (121 ) (134 )
Non-operating income (expenses) -   -   -   -     (347 ) (347 )
Share of losses of associates -   -   -   (2 )   (1 ) (3 )
Profit before tax 342   529   96   (2 )   (508 ) 457  
Capital expenditures 114   145   23   32     5   319  
Goodwill 436   1,203   -   -     -   1,639  
Total assets 7,743   17,218   4,851   1,190     3,036   34,038  
  Three months ended March 31, 2011
(Cdn$ in millions) Copper   Coal   Zinc   Energy   Corporate   Total  
Segment revenues 773   1,019   634   -   -   2,426  
Less: Inter-segment revenues -   -   (60 ) -   -   (60 )
Revenues 773   1,019   574   -   -   2,366  
Gross profit 398   356   143   -   -   897  
Other operating income (expenses) (28 ) -   (25 ) -   (12 ) (65 )
Profit from operations 370   356   118   -   (12 ) 832  
Net finance expense (1 ) (7 ) (4 ) -   (94 ) (106 )
Non-operating income (expenses) -   -   -   -   15   15  
Share of losses of associates -   -   -   (2 ) (1 ) (3 )
Profit before tax 369   349   114   (2 ) (92 ) 738  
Capital expenditures 109   94   9   13   1   226  
Goodwill 423   1,203   -   -   -   1,626  
Total assets 6,992   16,454   2,766   1,071   1,843   29,126  

7. DEBT

a) Notes Issued

In February 2012, we issued US$500 million of senior unsecured notes due March 2019, and US$500 million of senior unsecured notes due March 2042. The 2019 notes bear interest at rate of 3.0% per annum and were issued at 99.705% of face value. The 2042 notes bear interest at rate of 5.20% per annum and were issued at 99.533% of face value. The 2019 and 2042 notes are callable at any time by repaying the greater of the principal amount plus accrued interest and the present value of the principal and interest amounts discounted at a comparable treasury yield plus a stipulated spread. The 2042 notes are callable at 100% at any time on or after September 1, 2041. Our obligation under these notes is guaranteed by our wholly owned subsidiary, Teck Metals Limited.

Net proceeds from these two issues were US$987 million after underwriting discounts and issue costs. The net proceeds, plus cash on hand, were used to finance the redemption described below.

b) Notes Redeemed

During the first quarter, we redeemed US$1.051 billion aggregate principal amount of outstanding notes. The notes redeemed were comprised of US$530 million of the 9.75% notes due 2014 and US$521 million of the 10.75% notes due 2019. The total payment, including the premium of the repurchase, was US$1.29 billion. We recorded an accounting charge of $414 million in the first quarter in connection with the redemption.

8. CONTINGENCIES

We consider provisions for all our outstanding and pending legal claims to be adequate. The final outcome with respect to actions outstanding or pending as at March 31, 2012, or with respect to future claims, cannot be predicted with certainty. Significant contingencies not disclosed elsewhere in the notes to our financial statements are as follows:

Upper Columbia River Basin (Lake Roosevelt)

Teck American continued studies under the 2006 settlement agreement with the U.S. Environmental Protection Agency ("EPA") to conduct a remedial investigation on the Upper Columbia River in Washington State.

Discovery and motion proceedings continue in the Lake Roosevelt litigation involving Teck Metals Ltd. in the Federal District Court for the Eastern District of Washington. The first phase of the case, dealing with liability under CERCLA for cost recovery and natural resource damages, is scheduled to be tried in September, 2012. Subsequent to quarter end, an order for summary judgment was issued striking Teck Metals Ltd.'s defense of apportionment. We are reviewing the decision with counsel and are assessing our options.

There is no assurance that we will ultimately be successful in our defense of the litigation or that we or our affiliates will not be faced with further liability in relation to this matter. Until the studies contemplated by the EPA settlement agreement and additional damage assessments are completed, it is not possible to estimate the extent and cost, if any, of remediation or restoration that may be required or to assess our potential liability for damages. The studies may conclude, on the basis of risk, cost, technical feasibility or other grounds, that no remediation should be undertaken. If remediation is required and damage to resources found, the cost of remediation may be material.

9. SEASONALITY OF SALES

Due to ice conditions, the port serving our Red Dog mine is normally only able to ship concentrates from July to October each year. As a result, zinc and lead concentrate sales volumes are generally higher in the third and fourth quarter of each year than in the first and second quarter.

10. SUBSEQUENT EVENT

a) SilverBirch

On April 4, 2012, we completed the acquisition of SilverBirch Energy Corporation by way of a plan of arrangement under the Canadian Business Corporation Act for a net cash outlay of $432 million. Under the arrangement, substantially all of SilverBirch's assets, other than its 50% interest in the Frontier and Equinox oil sand projects, were transferred into SilverWillow Energy Corporation ("SilverWillow"), which is now a TSX-V listed company. As part of the arrangement, we also transferred our 50% interest in certain other oil sands leases that were jointly owned with SilverBirch. We now own 100% of the Frontier and Equinox oil sands projects, as well as 4.68 million common shares (8.7%) of SilverWillow issued in connection with the arrangement. The arrangement will be accounted for as an asset purchase.



Teck Resources Limited
Greg Waller
VP Investor Relations & Strategic Analysis
604.699.4014
or
Teck Resources Limited
Marcia Smith
SVP Sustainability and External Affairs
604.699.4616
www.teck.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Teck Resources Limited

PRODUCTEUR
CODE : TCK
ISIN : CA8787422044
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Teck est une société de production minière basée au Canada.

Teck est productrice d'argent, de charbon, de cuivre, de molybdène, d'or, de plomb et de zinc au Canada, au Chili, au Perou et au Salvador, en développement de projets d'argent, de cuivre, de molybdène, d'or, de plomb et de zinc au Canada, au Mexique, au Panama, en Australie et en Turquie, et détient divers projets d'exploration au Burkina Faso, au Canada, au Chili, au Honduras, au Mexique, au Perou, en Australie, en Argentine, en Chine, en Guyana et en Turquie.

Ses principaux projets en production sont HEMLO, RED DOG, DUCK POND, BOUNDARY - CARAMELIA, WILLIAMS, ELKVIEW COAL MINE (BALMER MINE), HIGHLAND VALLEY, WILLIAMS UNDERGROUND, DAVID BELL et WILLIAMS OPEN PIT au Canada, COLQUIJIRCA MINE, PEND OREILLE, ANTAMINA ZINC ORE et ANTAMINA au Perou, QUEBRADA BLANCA - HYPOGENE, HORN SILVER COMPLEX (SAN FRANCISCO), ANDACOLLO, QUEBRADA BLANCA MINE, CARMEN DE ANDACOLLO et ANDACOLLO HYPOGENE au Chili et SAN SEBASTIAN au Salvador, ses principaux projets en développement sont LENNARD SHELF et LENNARD SHELF en Australie, CERATTEPE en Turquie, EL LIMON et POGO au Mexique, GALORE CREEK au Canada et PETAQUILLA et PETAQUILLA COPPER au Panama et ses principaux projets en exploration sont PORACOTA, PICOTA et SILVER CLOUD au Perou, TAVSAN et ALTINTEPE en Turquie, AURBEL, BEACON NORTH, MAINSTREET, MERIDIAN, FUSE WEST, ADEL, MOUNT PLEASANT, PICKLE CROW, LOUVICOURT, HOMESTAKE RIDGE, GALORE CREEK - COPPER CANYON, KUDZ ZE KAYAH, FORDING RIVER, GREENHILLS, COAL MOUNTAIN, LINE CREEK, CARDINAL RIVER, SULLIVAN MINE, POLARIS MINE et AURBEL (DUMONT MINE) au Canada, LOS VERDES, MORELOS et LA VERDE PROJECT au Mexique, VREDELUS en Namibie, STONEPARK (LIMERICK) en Irlande, APOLLO HILL en Australie et TRUN en Bulgarie.

Teck est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 19,6 milliards US$ (17,2 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 26 juin 2020 à 10,00 US$, et son plus haut niveau récent le 14 janvier 2022 à 33,98 US$.

Teck possède 576 419 968 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Teck Resources Limited
05/07/2008Duluth Complex: A World-Class Value Play
31/01/2008 Comments on Red Dog and Highland Valley
Financements de Teck Resources Limited
15/07/2009Announces Closing of Private Placement
03/07/2009Announces C$1.74 Billion Private Placement
Attributions d'options de Teck Resources Limited
14/11/2012Announces 12.5% Dividend Increase
25/04/2012Announces Dividend
27/10/2011Announces 33% Dividend Increase
Nominations de Teck Resources Limited
26/07/2017Announces Appointment of Scott Maloney =?ISO-8859-1?Q?as=20V...
13/09/2013Announces Appointment of Andrew Golding =?ISO-8859-1?Q?=20as...
20/06/2013Announces Appointment of Dale Andres as =?ISO-8859-1?Q?=20Se...
20/06/2013Announces Appointment of Ian Kilgour as Executive Vice Presi...
03/04/2013Appoints New Vice President, Community and Government Relati...
09/10/2012Edward C. Dowling Appointed to Teck Board of Directors
01/06/2011Announces Retirement of General Manager, Trail Operations
01/06/2011New General Manager Appointed to Lead Teck's Trail Operation...
20/04/2011New Vice President Appointed to Lead Teck Asian Affairs
01/10/2008 Names Ray Reipas Vice President of Energy
29/06/2007Announces Appointment Of Tim Watson As Senior Vice President...
Rapports Financiers de Teck Resources Limited
27/07/2017(Port)Reports Unaudited Second Quarter Results for 2017
28/07/2016Reports Unaudited Second Quarter Results for 2016
29/06/2016Q2 2016 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
27/04/2016Announces Dividend
26/04/2016(Port)Reports Unaudited First Quarter Results for 2016
01/04/2016Q1 2016 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
11/02/2016(Port)Reports Unaudited Fourth Quarter Results for 2015
05/01/2016Q4 2015 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
22/10/2015(Port)Reports Unaudited Third Quarter Results for 2015
28/09/2015Q3 2015 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
23/07/2015(Port)Reports Unaudited Second Quarter Results for 2015
24/06/2015Q2 2015 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
21/04/2015(Port)Reports Unaudited First Quarter Results for 2015
13/02/2014(Port)Reports Unaudited Fourth Quarter Results for 2013
20/01/2014Q4 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
24/10/2013(Port)Reports Unaudited Third Quarter Results for 2013
30/09/2013Q3 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
25/07/2013(Port)Reports Unaudited Second Quarter Results for 2013
27/06/2013Q2 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
23/04/2013(Port)Reports Unaudited First Quarter Results for 2013
03/04/2013Q1 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
07/02/2013(Port)Reports Unaudited Fourth Quarter Results for 2012
16/01/2013Q4 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
24/10/2012(Port)Reports Unaudited Third Quarter Results for 2012
27/09/2012Q3 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
25/07/2012(Port)Reports Unaudited Second Quarter Results for 2012
28/06/2012Q2 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
25/04/2012(Port)Reports Unaudited First Quarter Results for 2012
28/03/2012Q1 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
18/01/2012Q4 2011 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
12/10/2011Q3 2011 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
29/07/2011(Port)Reports Unaudited Second Quarter Results for 2011
08/02/2011Reports Unaudited Results for 2010
28/07/2010Reports Second Quarter Results for 2010
20/04/2010First Quarter Results for 2010
09/02/2010Fourth Quarter Results for 2009
13/01/2010Q4 2009 Financial Results February =?ISO-8859-1?Q?8,=202010=...
05/10/2009Q3 2009 Financial Results October 28
28/10/2009Reports Third Quarter Results for 2009
23/07/2009Reports Second Quarter Results for 2009
17/02/2009CORRECTION FROM SOURCE: Teck Reports Fourth Quarter Results ...
17/02/2009 Reports Fourth Quarter Results for 2008
23/01/2009Q4 2008 Financial Results February
24/07/2008Reports Second Quarter Results for 2008
05/07/2008Q2 2008 Financial Results July =?ISO-8859-1?Q?=2023,=202008=...
23/04/2008 Reports First Quarter Results for 2008
12/02/2008Reports Fourth Quarter Results for 2007
09/10/2007Q3 2007 Financial Results Octob =?ISO-8859-1?Q?er=2029,=2020...
31/07/2007 Reports Second Quarter Results for 2007
03/07/2007Q2 2007 Financial Results July =?ISO-8859-1?Q?=2030,=202007=...
Projets de Teck Resources Limited
19/10/2016to Acquire 100% of Teena/Reward Zinc Project
16/01/2016Alaska zinc mine sues municipality over new severance tax
07/10/20156:02 am Teck Resources enters long-term streaming agreement ...
27/08/2015Canada's Goldcorp, Teck team up to develop Chile mine projec...
22/06/2015Chile environmental regulator eyes sanctions for Teck copper...
27/04/20159:34 am Teck Resources announces acquisition of an additiona...
06/04/2015Teck Resources' Greenhills coal mine re-opens after fire
31/10/2013(Fort Hills)Announces Partners Proceeding with Fort Hills Oil Sands Proj...
09/06/2012(Port)Files Technical Report for Quebrada Blanca Phase 2 Project
07/06/2011(Carmen De Andacollo)Announces Temporary Production Interruption at Carmen de And...
15/04/2011(Carmen De Andacollo)Inaugurates New Concentrator at Carmen de Andacollo
08/04/2011(Elkview Coal Mine (balmer Mine))Announces Elkview Operation Collective Agreement
03/04/2011(Elkview Coal Mine (balmer Mine))Announces Memorandum of Settlement Reached at its Elkview Op...
15/03/2011(Elkview Coal Mine (balmer Mine))Announces Tentative Collective Agreement at its Elkview Oper...
14/03/2011(Carrapateena)Announces Sale of Carrapateena Project
31/01/2011(Elkview Coal Mine (balmer Mine))Announces Labour Interruption at Its Elkview Operation
27/01/2011(Elkview Coal Mine (balmer Mine))Announces Elkview Strike Notice
02/07/2010(Greenhills)Provides Update on Incident
29/06/2010(Greenhills)Reports Serious Incident
24/02/2010(Line Creek)Line Creek Collective Agreement
21/01/2010(Highland Valley)! 7 Cent Jr. Hits Visible Copper Over 160 Meters Near Teck's...
15/01/2010(Red Dog)Comments on Red Dog Permit Appeal
05/01/2010(Antamina)Expansion at Antamina Mine
24/09/2009(Agi Dagi - Deli Zone) Proposed Sale of Turkish Gold Projects
13/08/2009(Andacollo)Possible Andacollo Permitting Delay
06/08/2009(Morelos)Proposed Sale of Morelos Gold Project
08/07/2009(Pogo)Closing of Pogo Sale
20/02/2009(Williams)Announces Sale of Hemlo Mines
15/12/2008(Pend Oreille) Announces Temporary Shutdown of Pend Oreille Zinc Mine
17/11/2008(Fort Hills)Fort Hills Energy Limited Partnership Defers Mine Decision U...
17/09/2008(Fort Hills Oil Sands)Fort Hills Energy Limited Partnership Releases Updated Cost ...
15/07/2008(Lennard Shelf)Lennard Shelf Operation Ceases Production
27/03/2008(Petaquilla)and Inmet Mining Announce Arrangements for Proceeding With P...
03/03/2008(Quebrada Blanca Mine) Reports New Billion Tonne Copper Resource at Quebrada Blanc...
31/12/2007(Elkview Coal Mine (balmer Mine))2007 Technical report
Communiqués de Presse de Teck Resources Limited
27/07/2017Announces Dividend
31/08/2016Teck Resources acquires 11.6% stake in Jet Gold
19/08/2016Top Analyst Upgrades and Downgrades: AK Steel, Allergan, Arc...
28/07/2016Teck Reports Unaudited Second Quarter Results for 2016
28/07/2016Teck Resources beats 2Q profit forecasts
27/07/2016Teck Announces Retirement of Vice President, Investor Relati...
06/05/2016Donates to Canadian Red Cross Fort McMurray Wildfire Relief ...
29/04/2016Reports Voting Results From Annual General Meeting
01/02/2016Freeport-McMoRan Burned Cash in 4Q15: Will 2016 Be Better?
25/01/2016Technical Coverage of Industrial Metals & Minerals Stocks --...
21/01/2016Teck Named to the Global 100 Most Sustainable Corporations L...
15/01/2016Teck Resources sues Alaska borough over tax hike
15/01/2016Teck Alaska Files Legal Complaint Over Severe Tax Hike
14/01/2016The Zacks Analyst Blog Highlights: Compañia de Minas Buenave...
05/01/2016Teck's Q4 2015 Financial Results and Investors' Conference C...
22/12/2015Teck Media and Investor Webcast Advisory - December 2, 2015
03/12/2015Teck Resources Geared Up to Face Bleak Coal Fundamentals
03/12/2015Could OPEC’s Meeting Negatively Impact Freeport-McMoRan?
02/12/2015Miner Teck says could monetize assets to raise cash if neede...
29/11/2015Teck Resources Ltd (USA) (TCK): Are Hedge Funds Right About ...
27/11/2015The 52-Week Low Club for Friday
26/11/2015Here is What Hedge Funds Think About Con-way Inc (CNW)
26/10/2015A Closer Look at Freeport-McMoRan’s 3Q15 Earnings
22/10/2015Teck Resources stock up as operating earnings outshine write...
22/10/2015Teck Resources reports 3Q loss
22/10/2015Teck Reports Unaudited Third Quarter Results for 2015
22/10/2015Teck Resources reports quarterly loss on C$2.2 bln charge
20/10/2015Teck Announces Appointment of Lawrence Watkins as Vice Presi...
12/10/2015Teck draws long-term upside play
08/10/2015After Freeport-McMoRan’s October Two-Month High, What Next?
07/10/2015Teck Announces Silver Streaming Agreement with Franco-Nevada
30/09/2015How is Rio Tinto Weathering the Copper and Coal Price Downtu...
28/09/2015Teck's Q3 2015 Financial Results and Investors' Conference C...
25/09/2015The 52-Week Low Club for Friday
20/09/2015Could Southern Copper Offer Stable Returns in Global Sell-Of...
14/09/2015Moody's cuts Teck Resources debt rating to junk
11/09/2015Capex Cut Could Help Improve Freeport-McMoRan’s Balance Shee...
10/09/2015Teck Named to Dow Jones Sustainability World Index
10/09/2015Anglo American seen likely to cut dividend as metal prices f...
01/09/2015Teck Media and Investor Webcast Advisory
28/08/2015Teck/Goldcorp to Merge Chilean Projects for Better Returns
27/08/2015Goldcorp Inc. (USA) (GG) And Teck Resources Ltd (USA) (TCK) ...
27/08/2015Goldcorp and Teck Combine El Morro and Relincho Projects in ...
19/08/2015How To Play Copper Long Term Amid A Low Prices Environment
18/08/2015The 'Elusive' Bottom Might Still Not Be In For Metals & Mini...
13/08/2015Freeport-McMoRan Continues to Trade Weakly: Investor Takeawa...
23/07/2015Miner Teck beats expectations, eyes further coal cutbacks
23/07/2015Teck Reports Unaudited Second Quarter Results for 2015
23/07/2015Teck Resources beats 2Q profit forecasts
14/07/2015Large trade bets on Teck rebound
09/07/2015Teck Announces Carmen de Andacollo Gold Stream
17/06/2015Copper Demand Takes a Hit as Car Sales Sputter in China
11/06/2015Dodge & Cox Buys 2 New Stocks
27/04/2015Chilean Refined Copper Production Falls to 2-Year Low
27/04/2015US Copper Demand Strong in Auto Sector, Appliances
27/04/2015Teck Announces Subscription to Erdene Placement
24/04/2015No Major Surprises in Freeport-McMoRan’s 1Q Earnings
24/04/2015Teck Reports Voting Results from Annual and Special Meeting
21/04/2015Teck Resources says China coal demand weakens; cuts dividend
21/04/2015CANADA STOCKS-TSX slides as resource shares drop, profit-tak...
21/04/20156:22 am Teck Resources misses by $0.06, misses on revs
21/04/2015Teck Announces Dividend
21/04/2015Teck Reports Unaudited First Quarter Results for 2015
21/04/2015Teck Resources cuts dividend by two-thirds on lower prices
17/04/2015What to Watch in the Week Ahead and on Monday, April 20
13/04/2015Gibson Energy to build 900,000 barrels of crude storage in A...
13/04/2015Teck Provides Update on Fort Hills Marketing and Logistics
05/04/2015Teck Reports Incident at Greenhills Operations
02/04/2015Why Freeport Investors Should Track China’s Automobile Indus...
02/04/2015Building Sales in China Fell Steeply in February 2015
01/04/2015Bull Market Excesses Hit the Chinese Copper Industry
01/04/2015Weakness Seen in Teck Resources (TCK): Stock Tumbles 10% - T...
01/04/2015CANADA STOCKS-TSX set to open higher
31/03/2015Movado and CBRE Group are big market movers
31/03/2015CANADA STOCKS-TSX steady as Teck decline offsets banks' rise
31/03/2015How China Became the Global Copper Giant
31/03/2015CANADA STOCKS-TSX set for lower open ahead of GDP data
31/03/2015PRESS DIGEST- Canada - March 31
25/03/2015Teck's Q1 2015 Financial Results and Investors' Conference C...
25/03/2015Teck Announces Appointment of Andrew Stonkus as Senior Vice ...
24/03/2015Ill Wind Blowing On Copper, Aluminum Producers
17/03/2015Teck Announces Appointment of Andrew Stonkus as Senior Vice ...
17/03/2015How is Freeport reacting to lower energy prices?
17/03/2015Lower energy prices a negative for Freeport-McMoRan
17/03/2015How lower copper prices impact Freeport-McMoRan
11/03/2015What part of Freeport’s financials should investors track?
10/03/2015How’s Freeport doing with its energy assets?
10/03/2015Why Freeport’s North American operations are so important
09/03/2015Freeport-McMoRan’s global mining portfolio
06/03/2015How Freeport is responding to regulatory changes in Indonesi...
06/03/2015Why asset sales won’t be easy for Freeport-McMoRan
06/03/2015An investor’s guide to Freeport-McMoRan
22/01/2014Named to the Global 100 Most Sustainable Corporations List
16/01/2014Media and Investor Audiocast Advisory
20/11/2013Announces Dividend
17/11/2013Uranium | Silver Market Review | Teck
13/11/2013Media and Investor Webcast Advisory
17/10/2013Acquires East Kootenay Lands
13/09/2013Named to Dow Jones Sustainability World Index
05/09/2013Announces Exercise of Strait Minerals Warrants
16/07/2013Copper Fox Metals and Teck Resources form Schaft Creek Joint...
26/06/2013Receives Regulatory Approval for Renewal of Share Buy-Back P...
11/06/2013Announces Subscription to Horizonte Minerals Share Placement
07/06/2013Announces Asset Exchange Agreement
07/06/2013Recognized for Corporate Citizenship and Social Responsibili...
09/05/2013Announces Subscription to True Gold Mining Share Placement
07/05/2013Media and Investor Webcast Advisory
27/04/2013(Port)Reports Voting Results from Annual General Meeting
24/04/2013Announces Dividend
16/04/2013Receives B=2EC=2E Ministry of Environment Area Based Managem...
03/04/2013UNICEF Canada and Teck Launch Partnership to =?ISO-8859-1?Q?...
20/02/2013Media and Investor Webcast Advisory
19/02/2013The Micronutrient Initiative, Government of Canada and Teck ...
23/01/2013Named to Global 100 Most Sustainable Corporations List
14/01/2013Media and Investor Webcast Advisory
09/11/2012Announces New Vice President Appointments
19/10/2012Announces Redemption of Notes
15/09/2012Named to Dow Jones Sustainability World Index
14/09/2012Announces Vice President Appointments
10/09/2012Announces Agreement as to Certain Facts in Upper Columbia Ri...
05/09/2012Media and Investor Webcast Advisory
16/08/2012Announces Subscription to Strait Minerals Share Placement
31/07/2012Announces Pricing of US$1.75 Billion Notes Offering
09/07/2012Announces Temporary Withdrawal of Quebrada Blanca Phase 2 SE...
06/07/2012(Cardinal River)Announces New Collective Agreement at Cardinal River Operati...
28/06/2012Marks Canada Day with Trans Canada Trail Investment
26/06/2012Receives Regulatory Approval for Renewal of Share Buy-Back P...
19/06/2012Announces Subscription to Horizonte Minerals Share Placement
09/06/2012Announces New Collective Agreement at Trail Operations and R...
01/06/2012Announces Tentative Collective Agreement at Trail Operations
15/05/2012=?ISO-8859-1?Q?The=20Micronutrient=20Initiative,=20Governmen...
10/05/2012Media and Investor Webcast Advisory
04/04/2012Announces Closing of SilverBirch Transaction
19/03/2012and China's Ministry of Agriculture Sign Agreement to Promot...
14/03/2012Media and Investor Advisory
23/02/2012Media and Investor Webcast Advisory
17/02/2012Announces Redemption of US$1.051 Billion Principal Amount of...
17/02/2012Announces Pricing of US$1.00 Billion Notes Offering
16/02/2012Announces Notes Offering
09/02/2012(Port)Reports Unaudited Results for 2011
08/02/2012Announces New Collective Agreement at its Quebrada Blanca Op...
27/01/2012and BASF Announce Partnership to Reduce Zinc Deficiency Thro...
18/01/2012Media and Investor Webcast Advisory
07/01/2012(Carmen De Andacollo)Announces New Collective Agreement at Carmen de Andacollo
20/12/2011Closes Strait Gold Placement
28/11/2011Media and Investor Webcast Advisory
22/09/2011(Highland Valley)Announces Major Upgrades at Trail and Highland Valley Operat...
06/09/2011Media and Investor Webcast Advisory
02/09/2011and Ridley Terminals Announce Coal Shipment Agreement
30/06/2011Announces Pricing of US$2.0 Billion Notes Offering
29/06/2011Announces Notes Offering
23/06/2011Receives Regulatory Approval for Share Buy-Back Program
20/06/2011s Coal Guidance
12/05/2011Reaches Agreement at Community Justice Forum
06/04/2011Announces Extension of its Odd Lot Selling Program
14/03/2011Announces Coal Production Guidance
04/03/2011Announces Coal Shipment Agreement with Westshore
24/02/2011Announces Odd Lot Selling Program
17/08/2010Notes Offering Closes
09/08/2010Increases Its Previously Announced Cash Tender Offer
04/08/2010Announces Pricing of US$750 Million of 7 and 30 Year Notes
16/07/2010Provides Additional Update on Greenhills Incident
21/06/2010Media & Investor Webcast Advisory
26/05/2010To Renew Debt Shelf Prospectus
20/05/2010Aqqaluk to Proceed
07/05/2010Media and Investor Webcast Advisory
22/04/2010Dividend
23/03/2010Annual Disclosure Documents
05/03/2010Waneta Dam Sale Closing
01/03/2010Confirms No Damage to Chilean Mines
17/02/2010Comments on Additional Permit Appeal at Red Dog
12/02/2010Agreement with Westshore on Coal Shipments
04/02/2010BCUC Approval of Waneta Dam Transaction
25/01/2010Closing of Andacollo Gold Royalty Transaction
08/12/2009Coal Production Guidance
23/09/2009Recognized for Outstanding Achievement in Mine Reclamation
31/07/2009Full Production at Trail and Update on Coal Sales
06/07/2009Secures Reduction in Rail Costs
25/06/2009Reports on Geotechnical Issues Identified at Highland Valley
23/06/2009Recognized for Excellence in Mine Safety and Mine Rescue & F...
22/06/2009Provides Coal Update
20/02/2009Sale of El Brocal
08/01/2009Announces Global Workforce Reduction of 13% and 2009 Coal Pr...
01/10/2008 Announces the Creation of Five Strategic Business Units and...
30/09/2008 Enters Into Definitive Credit Agreements
01/10/2008Announce Receipt of Final Order and Satisfaction of Closing ...
29/09/2008Provides Update on Financing for Fording Transaction
11/09/2008Named to Dow Jones Sustainability Index
02/08/2008Global Copper Corp=2E and Teck Cominco Limited Announce Clos...
29/07/2008Acquire Fording Canadian Coal Trust Assets
28/07/2008Global Copper Shareholders Approve Teck Cominco Transaction
11/06/2008Metals Ltd=2E and United Steelworkers Reach Contract Agreeme...
31/05/2008on Trail Incident From Teck Cominco Metals Limited
30/05/2008Statement From Teck Cominco Metals Limited
23/04/2008Announces Dividend
14/04/2008Acquire Global Copper Corp.
07/03/2008Receives Regulatory Approval For Share Buy-Back Program
08/01/2008U.S. Supreme Court Denies Teck Cominco's Petition for Review...
26/11/2007UPDATES PROGRESS AT THE ROCMEC 1 GOLD PROPERTY
21/11/2007Announces Dividend
31/10/2007 Files Shelf Prospectus
28/09/2007Completes Acquisition of Aur Resources
24/09/2007Increases Holding in Fording Canadian Coal Trust to 19.95%
20/09/2007Announces Acquisition of Additional 5% Interest in Fort Hill...
30/08/2007Commences Compulsory Acquisition of Remaining Aur Shares
22/08/2007Acquires Approximately 93% of Aur Resources Common Shares
13/08/2007European Commission Approval for Aur Resources Transaction
03/08/2007Announces Canadian Competition Approval for Aur Resources Tr...
14/07/2007Review Coroner's Inquest Jury Recommendations
03/07/2007CORRECTION FROM SOURCE: Teck Cominco Makes Friendly C$41 Per...
28/06/2007Announces Fort Hills Design Basis Approval
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
NYSE (TCK)TORONTO (TCK-B.TO)
33,98+1.01%33,57+1.60%
NYSE
US$ 33,98
14/01 16:10 0,340
1,01%
Cours préc. Ouverture
33,64 33,24
Bas haut
32,82 34,34
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  33,98 -%
Volume var. 1 mois
4 241 389 -%
24hGold TrendPower© : 22
Produit Coal - Copper - Gold - Lead - Molybdenum - Silver - Zinc
Développe Copper - Gold - Lead - Molybdenum - Silver - Zinc
Recherche Coal - Copper - Gold - Lead - Molybdenum - Silver - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202217,90%34,7828,66
202158,79%29,9217,31
20204,25%9,9410,00
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,57 GBX+3,64%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :