Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique
Teck Reports Unaudited Third Quarter Results for 2012
Published : October 24, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Dollar | Europe | Face Value | Report | Zinc |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Oct. 24, 2012) - All dollar amounts expressed in this news release are in Canadian dollars unless otherwise noted.

Teck Resources Limited (TSX: TCK.A and TCK.B, NYSE: TCK) reported third quarter adjusted profit of $349 million, or $0.60 per share, compared with $742 million or $1.26 per share in 2011.

"The uncertainty in global economic conditions resulted in lower commodity prices and sales volumes of steelmaking coal compared with the third quarter of 2011. This resulted in profits and cash flow from operations being less than the third quarter of last year. However, our quarterly operating results continued to be strong with another quarterly record for copper production at 99,000 tonnes, up 29% from the third quarter of last year. Our balance sheet remains strong, with a current cash balance of $4.2 billion and we are well positioned to continue with our growth plans. Notwithstanding our strong financial position, some of our planned capital spending has been deferred for a variety of reasons and we have also implemented a cost reduction program," said Don Lindsay, President and CEO.

Highlights and Significant Items

  • Gross profit before depreciation and amortization was $933 million in the third quarter compared with a record $1.8 billion in the third quarter of 2011.

  • Cash flow from operations, before working capital changes, was $741 million in the third quarter compared with a record $1.3 billion a year ago.

  • Our cash balance was $4.2 billion as at October 23, 2012.

  • Profit attributable to shareholders was $180 million and EBITDA was $721 million in the third quarter.

  • To date we have reached agreements with our coal customers to sell 6.2 million tonnes of coal in the fourth quarter of 2012 at an average price of US$163 per tonne. We expect to conclude additional sales over the course of the quarter.

  • Copper production increased 29% from the third quarter of 2011 to a record 99,000 tonnes in the third quarter, which reflects investments we have made at the Antamina, Carmen de Andacollo and Highland Valley Copper Operations. With the increase in copper production in the third quarter our total cash costs, before by-product credits declined by 6%, and cash costs net of by-product credits, declined by 5% from the second quarter of 2012 to US$1.69 per pound.

  • In August, we issued US$1.75 billion of long-term notes with an effective average interest rate of 4.0%. A portion of the notes refinanced US$660 million of our high-yield notes, which resulted in an after-tax charge of $196 million in the quarter.

  • On October 19, we issued a notice of redemption to redeem all US$521 million principal amount of our outstanding 10.75% senior notes due in 2019, with the redemption taking place on November 19, 2012. We expect to record an after-tax charge of approximately US$259 million in the fourth quarter in connection with the redemption.

  • Approximately $1.5 billion of expected capital spending is being deferred from our original 2012 and 2013 capital budgets, which includes:  

    • reduced capital spending for Quebrada Blanca Phase 2 and Quintette due to permitting delays for each project,
    • a delay in the Relincho project as a result of external factors related to power and port facilities,
    • a delay in the development of Fort Hills as our partner updates the design basis for the project, and
    • a deferral of the construction of the Number 4 slag fuming furnace at our Trail Operations.

  • We are currently implementing cost reduction programs across our operations designed to reduce a minimum of $200 million from our annual operating costs.

  • The Red Dog 2012 shipping season was successfully completed on October 19, 2012 with all available concentrates being shipped. Zinc concentrate shipments totalled 950,000 tonnes and lead concentrate totalled 175,000 tonnes.

  • During the quarter we reduced our coal production to align with declining market demand. However, we expect that our annual production will meet the lower end of our guidance of 24.5 million tonnes for 2012.

  • In September, we were named to the Dow Jones Sustainability World Index ("DJSI") for the third straight year. Our DJSI score placed our sustainability performance in the top two percent of companies in the mining industry worldwide, with our environmental performance being ranked the highest in the sector.

This management's discussion and analysis is dated as at October 24, 2012 and should be read in conjunction with the unaudited consolidated financial statements of Teck Resources Limited (Teck) and the notes thereto for the three months ended September 30, 2012 and with the audited consolidated financial statements of Teck and the notes thereto for the year ended December 31, 2011. In this news release, unless the context otherwise dictates, a reference to "the company" or "us," "we" or "our" refers to Teck and its subsidiaries. Additional information, including our annual information form and management's discussion and analysis for the year ended December 31, 2011, is available on SEDAR at www.sedar.com.

This document contains forward-looking statements. Please refer to the cautionary language under the heading "CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION" below.

Overview

We expect to meet our production guidance for the year and have achieved significant increases in both copper and coal production compared to last year. With the increase in copper production in the third quarter our total cash costs, before by-product credits declined by 6%, and cash costs, net of by-product credits, declined by 5% from the second quarter of 2012 to US$1.69 per pound. Our Carmen de Andacollo and Highland Valley Copper Operations led this improvement. Further cost control programs are being implemented across the company. These measures are expected to reduce our annual operating costs by a minimum of $200 million.

Average prices for our base metal products remained constant or declined slightly compared to the June 2012 quarter, however, more significant decreases affected our coal business with average realized prices falling from US$202 to US$193 per tonne compared to the preceding quarter.

A significant component of our planned capital spending program has been rescheduled for a variety of reasons. This includes a delay in Quebrada Blanca Phase 2, as the resubmission of our Social and Environmental Impact Assessment is not expected to occur before the second quarter of 2013. At Relincho changes in plans for local infrastructure projects necessitates a pause before the completion of the feasibility study. Spending on Fort Hills has decreased this year due to the focus on developing a cost-driven project schedule. We have also deferred the construction of the Number 4 slag furnace at Trail and we are considering delay of a number of other projects. This rescheduling will result in deferrals of capital expenditures of approximately $1.5 billion, of which $300 million relates to 2012, and $1.2 billion which relates to 2013. Our annual budgeting cycle occurs in the fourth quarter of each year and our capital and operating budgets for 2013 have not yet been finalized.

Profit and Adjusted Profit*

Adjusted profit, which excludes the effect of certain transactions as described in the table below, was $349 million, or $0.60 per share, in the third quarter of 2012 compared with $742 million, or $1.26 per share, in the same period a year ago. The decline in adjusted profit was primarily due to significantly lower prices for all our main products, especially for coal.

Profit attributable to shareholders was $180 million, or $0.31 per share, in the third quarter compared with $814 million or $1.38 per share in the same period last year.

      Three months
ended September 30,
  Nine months
ended September 30,
 
($ in millions) 2012   2011   2012   2011  
Profit attributable to shareholders as reported $ 180   $ 814   $ 666   $ 2,031  
Add (deduct):                        
  Asset sale gains   (22 )   (24 )   (43 )   (145 )
  Foreign exchange (gains) losses   2     15     21     10  
  Derivative (gains) losses   (48 )   (63 )   (95 )   (67 )
  Collective agreement charges   9     -     59     26  
  Financing items   196     -     525     -  
  Tax items   32     -     32     -  
Adjusted profit $ 349   $ 742   $ 1,165   $ 1,855  
Adjusted earnings per share $ 0.60   $ 1.26   $ 1.99   $ 3.14  

* Our financial results are prepared in accordance with International Financial Reporting Standards ("IFRS"). This news release refers to adjusted profit, adjusted earnings per share, EBITDA and gross profit before depreciation and amortization, which are not measures recognized under IFRS in Canada and do not have a standardized meaning prescribed by IFRS or Generally Accepted Accounting Principles ("GAAP") in the United States. For adjusted profit we adjust profit attributable to shareholders as reported to remove the effect of certain kinds of transactions in these measures. EBITDA is profit attributable to shareholders before net finance expense, income taxes, depreciation and amortization. Gross profit before depreciation and amortization is gross profit with depreciation and amortization added back. These measures may differ from those used by, and may not be comparable to such measures as reported by, other issuers. We disclose these measures, which have been derived from our financial statements and applied on a consistent basis, because we believe they are of assistance in understanding the results of our operations and financial position and are meant to provide further information about our financial results to investors.

Business Unit Results

Our business unit results are presented in the tables below.

Three Months ended September 30
($ in millions) Revenues Gross profit before depreciation and amortization Gross profit
  2012 2011 2012 2011 2012 2011
Copper $ 763 $ 808 $ 362 $ 439 $ 263 $ 362
Coal   1,077   1,717   445   1,094   333   954
Zinc   664   855   125   281   98   255
Energy   1   -   1   -   -   -
Total $ 2,505 $ 3,380 $ 933 $ 1,814 $ 694 $ 1,571

Gross profit before depreciation and amortization from our copper business unit in the third quarter declined by $77 million compared with a year ago as a result of lower copper prices and lower by-product revenues. This was partially offset by a 13% rise in sales volumes. Copper production in the third quarter increased by 29% to 99,000 tonnes compared with 77,000 tonnes a year ago, which reflects a new quarterly production record, and an increase of 10% from the second quarter of 2012. The higher production is a result of our share of additional production from Antamina's mine expansion, the mining of higher grade sections at Highland Valley Copper and mill throughput initiatives at Carmen de Andacollo. Copper prices softened by 14% in the third quarter to US$3.50 per pound compared with a year ago reflecting weaker commodity and metals markets, but ended the quarter at US$3.75 per pound, resulting in positive pre-tax pricing adjustments of $54 million which are recorded in other income. With the increase in copper production in the third quarter our total cash costs before by-product credits declined by 6%, and cash costs, net of by-product credits, declined by 5% from the second quarter of 2012 to US$1.69 per pound.

Gross profit before depreciation and amortization from our coal business unit decreased by $649 million in the third quarter compared with the same period a year ago as a result of significantly lower coal prices, reduced sales volumes and higher total unit costs. Production in the third quarter increased by 6% compared with the same quarter in 2011 despite our decision to reduce production starting in mid-August to align with the declining demand for coal. Production levels increased in July and the first part of August after completing the plant upgrade at our Elkview mine and the de-bottlenecking efforts across our operations. Coal sales were 5.5 million tonnes in the third quarter, 10% lower than the same period last year, and the average coal price declined by US$93 per tonne to US$193 per tonne in the third quarter compared with the same period last year reflecting weaker steelmaking coal market conditions. Total cash unit cost of product sold in the third quarter increased by 13% compared with a year ago to $114 per tonne primarily as a result of higher labour costs and increased transportation costs. On a year-to-date basis, total cash unit costs rose by 4% to $111 per tonne, with the increase entirely due to higher transportation costs.

Gross profit before depreciation and amortization from our zinc business unit decreased by $156 million to $125 million in the third quarter compared with a year ago. This was primarily due to significantly lower metal prices and a 24% decline in zinc sales volumes from our Red Dog Operations due to weather related shipping delays. Red Dog's zinc production declined by 15% in the third quarter compared with the same period a year ago due to lower ore grades and milling rates which were lowered to reduce silica in the zinc concentrate. A band of extremely fine grained/high silica content ore was encountered, requiring a reduction in mill throughput to achieve acceptable concentrate quality. Milling rates are expected to return to normal in the fourth quarter. Refined zinc and lead production from Trail Operations were similar to the same period a year ago. Sales volumes at Trail rose approximately 10% compared with a year ago due to stronger customer demand. Average zinc, lead and silver prices decreased 15%, 20% and 23%, respectively, in the third quarter of 2012 compared with the same period a year ago.

Revenues

Revenues from operations were $2.5 billion in the third quarter compared with record revenues of $3.4 billion a year ago. Revenues from our copper business unit declined by $45 million from a year ago as the higher sales volumes were offset by lower copper prices and lower by-product revenues. Coal revenues decreased by $640 million compared with the third quarter of 2011 as a result of significantly lower coal prices and a 10% decline in sales volumes. Revenues from our zinc business unit declined by $191 million from a year ago as a result of lower metal prices and a 24% reduction in sales volumes from Red Dog.

Average Prices and Exchange Rates*

  Three months Nine months
ended September 30, ended September 30,
  2012 2011 % Change 2012 2011 % Change
Copper (LME Cash - US$/pound) 3.50 4.07 -14% 3.61 4.20 -14%
Coal (realized - US$/tonne) 193 286 -33% 206 258 -20%
Zinc (LME Cash - US$/pound) 0.86 1.01 -15% 0.88 1.04 -15%
Silver (LME PM fix - US$/ounce) 30 39 -23% 31 36 -14%
Molybdenum (published price - US$/pound) 12 15 -20% 13 16 -19%
Lead (LME Cash - US$/pound) 0.90 1.12 -20% 0.91 1.15 -21%
Cdn/U.S. exchange rate (Bank of Canada) 1.00 0.98 +2% 1.00 0.98 +2%

* Except for coal prices, the average commodity prices disclosed above are based on published benchmark prices and are provided for information only. Our actual revenues are determined using commodity prices and other terms and conditions specified in our various sales contracts with our customers. The molybdenum price is the price published in Platts Metals Week.

Our year-to-date business unit results are presented in the table below:

Nine Months ended September 30
($ in millions) Revenues Gross profit before depreciation and amortization Gross profit
  2012 2011 2012 2011 2012 2011
Copper $ 2,247 $ 2,330 $ 1,070 $ 1,335 $ 803 $ 1,115
Coal   3,637   4,207   1,686   2,415   1,323   2,019
Zinc   1,726   2,005   298   604   221   531
Energy   3   -   2   -   -   -
Total $ 7,613 $ 8,542 $ 3,056 $ 4,354 $ 2,347 $ 3,665

BUSINESS UNIT RESULTS

The table below shows our production and sales of our major products.

  Units (000's) Production Sales
    Third Quarter Year-to-date Third Quarter Year-to-date
(note 1)   2012 2011 2012 2011 2012 2011 2012 2011
Principal products                  
  Copper                  
    Contained in concentrate tonnes 84 63 219 182 81 68 213 184
    Cathode tonnes 15 14 51 50 15 17 51 51
      99 77 270 232 96 85 264 235
  Coal tonnes 6,322 5,952 18,294 16,087 5,546 6,143 17,567 16,660
                     
  Zinc                  
    Contained in concentrate tonnes 145 164 441 496 157 194 371 422
    Refined tonnes 74 73 217 217 75 69 220 214
                   
Other products                  
  Lead                  
    Contained in concentrate tonnes 22 19 69 62 46 46 46 46
    Refined tonnes 21 20 64 64 22 21 65 63
  Molybdenum                  
    Contained in concentrate pounds 3,448 2,825 9,652 7,046 3,006 2,566 9,396 7,144
  1. We include 100% of production and sales from our Highland Valley Copper, Quebrada Blanca and Carmen de Andacollo Operations in our production and sales volumes, even though we own 97.5%, 76.5% and 90%, respectively, of these operations, because we fully consolidate their results in our financial statements. We include 22.5% of production and sales from Antamina, representing our proportionate equity interest in Antamina.

REVENUES AND GROSS PROFIT

QUARTER ENDED SEPTEMBER, 30

Our revenue, gross profit before depreciation and amortization, and gross profit by business unit are summarized in the table below:

($ in millions) Revenues   Gross profit before depreciation and amortization Gross profit (loss)
  2012   2011   2012   2011 2012   2011
Copper                                
  Highland Valley Copper $ 251   $ 262   $ 128   $ 142 $ 90   $ 119
  Antamina   227     195     164     145   153     140
  Quebrada Blanca   107     140     1     58   (22 )   35
  Carmen de Andacollo   142     172     60     78   40     58
  Duck Pond   31     39     6     16   (1 )   10
  Other   5     -     3     -   3     -
    763     808     362     439   263     362
                                 
Coal (note 1)   1,077     1,717     445     1,094   333     954
                                 
Zinc                                
  Trail   437     492     5     52   (7 )   40
  Red Dog   288     416     127     227   111     213
  Other   2     4     (7 )   2   (6 )   2
  Inter-segment sales   (63 )   (57 )   -     -   -     -
    664     855     125     281   98     255
Energy   1     -     1     -   -     -
TOTAL $ 2,505   $ 3,380   $ 933   $ 1,814 $ 694   $ 1,571
  1. Our coal business unit represents our interest in six operating mines. We wholly own the Fording River, Coal Mountain, Line Creek and Cardinal River Operations, and have a 95% partnership interest in the Elkview Mine and an 80% interest in the Greenhills Operations.

REVENUES AND GROSS PROFIT

NINE MONTHS ENDED SEPTEMBER 30

Our revenue, gross profit before depreciation and amortization, and gross profit by business unit are summarized in the table below:

($ in millions) Revenues   Gross profit before depreciation and amortization   Gross profit
  2012   2011   2012   2011 2012   2011
Copper                                
  Highland Valley Copper $ 698   $ 722   $ 341   $ 394 $ 249   $ 332
  Antamina   640     597     460     439   436     423
  Quebrada Blanca   380     423     87     209   15     143
  Carmen de Andacollo   423     482     155     246   94     187
  Duck Pond   99     106     27     47   9     30
  Other   7     -     -     -   -     -
    2,247     2,330     1,070     1,335   803     1,115
                                 
Coal (note 1)   3,637     4,207     1,686     2,415   1,323     2,019
                                 
Zinc                                
  Trail   1,366     1,498     38     208   1     171
  Red Dog   516     669     261     388   221     352
  Other   6     15     (1 )   8   (1 )   8
  Inter-segment sales   (162 )   (177 )   -     -   -     -
    1,726     2,005     298     604   221     531
                                 
Energy   3     -     2     -   -     -
                                 
TOTAL $ 7,613   $ 8,542   $ 3,056   $ 4,354 $ 2,347   $ 3,665
  1. Our coal business unit represents our interest in six operating mines. We wholly own the Fording River, Coal Mountain, Line Creek and Cardinal River Operations, have a 95% partnership interest in the Elkview Mine and an 80% joint venture interest in the Greenhills Operation.

COPPER

Highland Valley Copper (97.5%)

Operating results at the 100% level are summarized in the following table:

  Three months ended   Nine months ended  
September 30,   September 30,  
  2012   2011   2012   2011  
Tonnes milled (000's)   10,955     10,763     33,723     30,631  
                         
Copper                        
  Grade (%)   0.32     0.24     0.27     0.26  
  Recovery (%)   89.3     86.8     85.9     87.6  
  Production (000's tonnes)   31.5     22.8     78.9     70.0  
  Sales (000's tonnes)   31.5     26.8     80.2     73.5  
                         
Molybdenum                        
  Production (million pounds)   2.7     2.0     7.5     5.1  
  Sales (million pounds)   2.2     1.8     6.9     5.3  
                         
Cost of sales ($ millions)                        
  Operating costs $ 114   $ 111   $ 332   $ 303  
  Distribution costs $ 9   $ 9   $ 25   $ 25  
  Depreciation and amortization $ 38   $ 23   $ 92   $ 62  
                         
Gross profit summary ($ millions) (note 1)                        
  Before depreciation and amortization $ 128   $ 142   $ 341   $ 394  
  Depreciation and amortization   (38 )   (23 )   (92 )   (62 )
  After depreciation and amortization $ 90   $ 119   $ 249   $ 332  
  1. Results do not include a provision for the 2.5% non-controlling interest in Highland Valley Copper.

Highland Valley Copper's third quarter gross profit before depreciation and amortization decreased from a year ago primarily due to lower copper prices, despite an 18% increase in sales volumes and lower unit costs.

Copper production in the third quarter of 31,500 tonnes was 38% higher than a year ago primarily as a result of significantly higher grades and resulting higher recoveries. Production was focused on the higher grade ore in the Valley Pit during the third quarter of 2012, with higher than normal grades expected to continue in the fourth quarter. Molybdenum production was also strong in the quarter as a result of improved recoveries and higher feed grades.

The mill modernization project is progressing, with concrete work well advanced and steel erection and major equipment installation commencing in the third quarter. During the third quarter an updated cost estimate for the project was completed. The forecast completion cost for the project is now estimated at $550 million compared with the pre-feasibility study cost estimate of $475 million. The increase in cost of approximately 15% is primarily due to finalizing the project scope, bulk commodity quantities and the resulting construction hours for the project. The project is on schedule for completion and commissioning at the end of 2013.

Antamina (22.5%)

Operating results at the 100% level are summarized in the following table:

  Three months ended   Nine months ended  
September 30,   September 30,  
  2012 2011   2012   2011  
Tonnes milled (000's)                      
  Copper-only ore   9,359   7,623     23,541     18,405  
  Copper-zinc ore   2,915   1,774     11,190     9,533  
    12,274   9,397     34,731     27,938  
Copper (note 1)                      
  Grade (%)   1.15   1.11     1.07     1.00  
  Recovery (%)   89.4   87.3     87.6     85.3  
  Production (000's tonnes)   123.5   93.2     325.2     238.7  
  Sales (000's tonnes)   122.1   86.8     317.0     239.4  
                       
Zinc (note 1)                      
  Grade (%)   1.97   2.59     1.88     2.33  
  Recovery (%)   81.9   84.8     80.3     85.2  
  Production (000's tonnes)   51.1   31.4     174.6     187.8  
  Sales (000's tonnes)   54.7   33.6     166.3     188.4  
                       
Molybdenum                      
  Production (million pounds)   3.0   3.9     9.4     8.8  
  Sales (million pounds)   3.5   3.6     11.1     8.4  
                       
Cost of sales (US$ millions)                      
  Operating costs $ 204 $ 136   $ 570   $ 409  
  Distribution costs $ 29 $ 23   $ 80   $ 67  
  Royalties and other costs (note 2) $ 49 $ 55   $ 152   $ 170  
  Depreciation and amortization $ 39 $ 27   $ 103   $ 80  
                       
Gross profit summary (our 22.5% share) ($ millions)                      
  Before depreciation and amortization $ 164 $ 145   $ 460   $ 439  
  Depreciation and amortization   (11)   (5 )   (24 )   (16 )
  After depreciation and amortization $ 153 $ 140   $ 436   $ 423  
  1. Copper ore grades and recoveries apply to all of the processed ores. Zinc ore grades and recoveries apply to copper-zinc ores only.
  2. In addition to royalties paid by Antamina, we also pay a royalty in connection with the acquisition of our interest in Antamina equivalent to 7.4% of our share of cash flow distributed by the mine.

The increase in our 22.5% share of Antamina's gross profit before depreciation and amortization in the third quarter was primarily due to significantly higher sales volumes as the benefits from the expansion project and resulting higher production levels were realized. Higher sales volumes were partially offset by lower metal prices.

Tonnes milled in the third quarter were 31% higher than a year ago and averaged approximately 133,400 tonnes per day, which reflects Antamina's expanded mill capacity.

The mix of mill feed in the third quarter was 76% copper-only ore and 24% copper-zinc ore, compared with 81% and 19%, respectively, in the same period a year ago. Copper production increased by 33% to 123,500 tonnes compared with 93,200 tonnes in the third quarter of 2011. The higher production was primarily the result of the mill expansion, as well as slightly higher head grades and improved recoveries. Zinc production increased to 51,100 tonnes from 31,400 tonnes in the same period a year ago as a result of the additional mill throughput and a greater proportion of copper-zinc ore processed in the quarter. Molybdenum production decreased in the third quarter compared with a year ago as a result of lower molybdenum grades and recoveries.

The increased cost of sales in the third quarter compared with a year ago was due to substantially increased sales volumes in both copper and zinc. Cost per unit of production sold was similar to the same quarter last year.

Negotiations for Antamina's labour agreement, which expired on July 23, 2012, are continuing.

Quebrada Blanca (76.5%)

Operating results at the 100% level are summarized in the following table:

  Three months ended   Nine months ended  
September 30,   September 30,  
  2012   2011   2012   2011  
Tonnes placed (000's)                        
  Heap leach ore   1,904     1,546     5,130     4,825  
  Dump leach ore   7,449     5,002     19,693     17,258  
    9,353     6,548     24,823     22,083  
Grade (TCu%) (note 1)                        
  Heap leach ore   0.78     0.93     0.85     0.93  
  Dump leach ore   0.47     0.50     0.45     0.47  
                         
Production (000's tonnes)                        
  Heap leach ore   9.9     6.7     30.2     23.0  
  Dump leach ore   5.1     6.9     17.9     22.7  
    15.0     13.6     48.1     45.7  
                         
Sales (000's tonnes)   13.8     15.5     47.1     46.0  
                         
Cost of sales (US$ million)                        
  Operating costs $ 105   $ 82   $ 288   $ 213  
  Distribution costs $ 1   $ 2   $ 5   $ 5  
  Depreciation and amortization $ 23   $ 23   $ 71   $ 67  
                         
Gross profit (loss) summary ($ millions) (note 2)                        
  Before depreciation and amortization $ 1   $ 58   $ 87   $ 209  
  Depreciation and amortization   (23 )   (23 )   (72 )   (66 )
  After depreciation and amortization $ (22 ) $ 35   $ 15   $ 143  
  1. TCu% is the percent assayed total copper grade.
  2. Results do not include a provision for the 23.5% non-controlling interest in Quebrada Blanca.

Quebrada Blanca's gross profit before depreciation and amortization in the third quarter declined substantially due to significantly higher unit costs, lower copper prices and an 11% decrease in sales volumes due to timing of shipments.

Cathode copper production in the third quarter rose by 10% to 15,000 tonnes compared with the same period a year ago. Production increased as a result of processing higher amounts of heap and dump-leach ore placed in this and previous quarters, and now undergoing leaching, partly offset by lower ore grades.

Operating costs increased by US$23 million in the third quarter compared with the same period a year ago primarily due to significant increases in heap and dump-leach ore placed in the quarter and to high, non-recurring costs. This increased 43% compared with the same period a year ago. In addition, labour costs rose, reflecting the new terms of the collective agreement ratified earlier in 2012.

Quebrada Blanca's 2012 production is now expected to be approximately 60,000 tonnes of copper cathode compared with our previous guidance of 65,000 to 70,000 tonnes, with the reduction due a higher-than-anticipated proportion of low-grade dump material undergoing leaching and a corresponding lower-than-anticipated proportion of higher-grade heap ores undergoing leaching.

Carmen de Andacollo (90%)

Operating results at the 100% level are summarized in the following table:

  Three months ended   Nine months ended  
September 30,   September 30,  
  2012   2011   2012   2011  
Tonnes milled (000's)   4,529     3,703     12,490     10,988  
Copper                        
  Grade (%)   0.52     0.49     0.52     0.51  
  Recovery (%)   87.5     86.7     86.6     87.6  
  Production (000's tonnes)   20.8     15.8     56.1     48.8  
  Sales (000's tonnes)   18.5     17.9     50.5     46.8  
                         
Gold (note 1)                        
  Production (000's ounces)   16.2     11.8     40.9     38.5  
  Sales (000's ounces)   14.7     13.5     38.9     35.3  
                         
Copper cathode                        
  Production (000's tonnes)   0.8     1.1     3.2     4.5  
  Sales (000's tonnes)   0.6     1.1     3.3     4.7  
                         
Cost of sales (US$ million)                        
  Operating costs $ 75   $ 90   $ 248   $ 226  
  Distribution costs $ 7   $ 6   $ 19   $ 16  
  Depreciation and amortization $ 20   $ 21   $ 61   $ 61  
                         
Gross profit summary ($ millions) (note 2)                        
  Before depreciation and amortization $ 60   $ 78   $ 155   $ 246  
  Depreciation and amortization   (20 )   (20 )   (61 )   (59 )
  After depreciation and amortization $ 40   $ 58   $ 94   $ 187  
  1. Carmen de Andacollo processes 100% of gold mined, but 75% of the gold produced is for the account of Royal Gold Inc.
  2. Results do not include a provision for the 10% non-controlling interest in Andacollo.

The decrease in Carmen de Andacollo's third quarter gross profit before depreciation and amortization was primarily due to lower copper prices, partly offset by lower unit operating costs.

Production in the third quarter was a record and rose by 32% to 20,800 tonnes compared with the same period a year ago. The 20,000 tonnes per day pre-crushing plant commissioned during the third quarter was primarily responsible for the additional increase in throughput. Although not fully optimized, the plant began to reach design capacity near the end of the quarter. Plant throughput achieved just over 54,000 tonnes per day in the month of September versus the design capacity of 55,000 tonnes per day.

Operating costs in the third quarter decreased by 17% to $75 million compared with a year ago as result of lower unit costs achieved by the economies of scale from the higher production levels.

Duck Pond (100%)

Duck Pond's gross profit before depreciation and amortization declined to $6 million in the third quarter compared with $16 million in the same period a year ago as a result of lower metal prices. Copper and zinc production in the third quarter were 3,100 tonnes and 4,600 tonnes, respectively, compared with 3,500 tonnes and 5,900 tonnes, respectively, last year. Lower production in both copper and zinc was due to lower feed grades available during the quarter, as well as lower recoveries in the plant. Copper and zinc sales in the third quarter were 4,100 tonnes and 3,700 tonnes, respectively, compared with 3,900 tonnes and 4,300 tonnes, respectively, last year.

As planned in the original feasibility study, the operation will start early works for the Boundary pits in the fourth quarter as the mine transitions towards open pit mining in 2013 as a supplemental feed source for the remainder of the mine life, currently scheduled to close in early 2015.

Copper Development Projects

Quebrada Blanca Phase 2

During the second quarter we completed a feasibility study on our Quebrada Blanca hypogene project. The study estimates a capital cost for the development of the project of US$5.6 billion on a 100% basis (in January 2012 dollars, not including working capital or interest during construction), of which our funding share would be US$4.8 billion. The study contemplates the construction of a 135,000 tonne per day concentrator and related facilities connected to a new port facility by 165 kilometre concentrate and desalinated water pipelines.

As part of the ongoing project work plan for 2012, the Social Environmental Impact Assessment ("SEIA") for the project was submitted to the Chilean regulatory authorities during the second quarter. This was subsequently voluntarily withdrawn and we are preparing responses to the comments and questions from the Chilean authorities and collecting and analyzing some additional baseline environmental data. We currently do not expect to re-file the SEIA before the second quarter of 2013.

Discussions are ongoing with various potential suppliers for power to the project and with the other shareholders of Quebrada Blanca concerning financing options for the hypogene project, which may include limited recourse project financing and, possibly, bringing in a new funding partner.

Relincho

The feasibility study is progressing. Permitting delays have impacted the progress of third-party port and power supply facilities that we expected to use for Relincho and will delay the completion of the feasibility study. Exploration and geotechnical drilling are ongoing and a new resource and reserve estimate is expected at the completion of the feasibility study. Based on the prefeasibility design, production would average 180,000 tonnes per year of copper and 6,000 tonnes per year of molybdenum over a 22-year mine life, with higher production in the first five years.

Galore Creek (50%)

The 2012 work program, which included approximately 25,000 meters of infill and geotechnical drilling, was completed in the third quarter. The results of this field program are currently being assembled and reviewed.

COAL (100%)

Operating results at the 100% level are summarized in the following table:

  Three months ended   Nine months ended  
September 30,   September 30,  
  2012   2011   2012   2011  
Production (000's tonnes)   6,322     5,952     18,294     16,087  
                         
Sales (000's tonnes)   5,546     6,143     17,567     16,660  
                         
Average sale price                        
  US$/tonne $ 193   $ 286   $ 206   $ 258  
  C$/tonne $ 194   $ 279   $ 207   $ 252  
                         
Cost of sales (C$/tonne)                        
  Operating costs $ 77   $ 70   $ 75   $ 75  
  Transportation costs $ 37   $ 31   $ 36   $ 32  
  Depreciation and amortization $ 20   $ 23   $ 21   $ 24  
                         
Gross profit summary ($ millions)                        
  Before depreciation and amortization $ 445   $ 1,094   $ 1,686   $ 2,415  
  Depreciation and amortization   (112 )   (140 )   (363 )   (396 )
  After depreciation and amortization $ 333   $ 954   $ 1,323   $ 2,019  

Gross profit before depreciation and amortization in the third quarter declined substantially compared with last year due primarily to significantly lower coal prices, lower sales volumes and higher operating and transportation unit costs.

Production in the third quarter increased by 6% compared with the same quarter in 2011 despite our decision to reduce production starting in mid-August to align with the declining demand for coal. Production levels increased in July and the first part of August after completing the plant upgrade at our Elkview mine and the de-bottlenecking efforts across our operations.

Coal sales of 5.5 million tonnes in the third quarter were 12% below production levels and 10% lower than the same period last year. The average coal price of US$193 per tonne in the third quarter was 33% lower than the same quarter a year ago. The decline in sales volume and average coal price for this quarter reflects the weaker market conditions. Concerns surrounding the slowdown of global economic activity and softer steel prices have caused many steel producers to reduce their production.

Coal prices have been agreed with the majority of the quarterly contract customers for the fourth quarter of 2012 based on pricing of approximately US$170 per tonne for the highest quality product, which is consistent with prices reportedly achieved by our competitors. As of the date of this release, contracted sales are approximately 6.2 million tonnes of coal for delivery in the fourth quarter at an average price of US$163 per tonne. We remain in quarterly contract discussions with a small number of customers and are anticipating selling additional tonnage on the spot market as well. Vessel nominations for quarterly contract tonnage are determined by customers and final sales and average prices for the quarter will depend on vessels arriving at port as scheduled, and on the level of additional spot sales.

Unit cost of product sold of $77 per tonne, before transportation and depreciation charges, was $7 per tonne higher than in the same quarter of 2011. Cost reduction efforts at the mines, which accompanied the reduction in production levels beginning in mid-August, were successful and further reductions are being implemented. Costs in the third quarter, other than those for labour, were generally consistent with prior year levels. The increase in unit labour costs year-over-year was primarily due to the effect of new annual collective agreements at all mines, and a one-time charge from the recently settled Cardinal River collective agreement. The 2012 annual cost of product sold is expected to fall within the current guidance range of $72 to $78 per tonne, for current production plans.

Unit transportation costs in the third quarter were $37 per tonne, or 19% higher compared with the same quarter a year ago mainly due to higher port and ocean freight costs. Port costs rose due to an annual increase in contract rates and inflation adjustments. Ocean freight costs this quarter also increased due to a higher portion of coal that is being sold inclusive of ocean freight. The additional costs of utilizing different coal terminals as a means of supplementing capacity during outages that occur as part of expansion programs at the ports in greater Vancouver, also contributed to the higher transportation costs in the third quarter. Annual unit transportation costs are expected to remain within the current guidance range of $34 to $38 per tonne.

Westshore Terminals is completing planned capacity expansion work at its facility in the fourth quarter that will result in reduced rail dumping capacity during the construction period. We do not anticipate any impact on our sales with greater use of the Neptune, Ridley, and Pacific Coast terminals. Additionally, we will draw down stockpiles at Westshore to take advantage of vessel loading capacity that is available during the dumper work.

Ongoing CP Rail investment in its network, supported by the recent rail loop extension at Neptune Terminals, is adding rail capacity for coal through longer trains. More than half the trains in CP export service are now running at 152 cars in length allowing more coal to be transported with fewer trains. We expect to see average train lengths to increase further in 2013 as CP Rail's investment program progresses.

Depreciation and amortization declined by $3 per tonne due to the significant increase in coal reserves recorded in 2011 as a result of our drilling programs at our coal mines. Certain capital assets are depreciated on a units-of-production basis over proven and probable reserves.

The feasibility study for the re-opening of the Quintette mine was completed in the third quarter of this year. The feasibility study estimates the capital cost to re-open Quintette at $858 million, not including escalation or interest during construction. The study contemplates an average clean coal production rate of 3.5 million tonnes per year over the estimated 12 year life of Quintette. We are presently evaluating options that would extend the life of mine for Quintette beyond the present mineral reserve of 42.5 million tonnes of clean coal. The Mines Act Permit Amendment ("MAPA") application was submitted earlier this year and has been delayed as a result of newly issued provincial interim guidelines for caribou management. An updated Caribou Monitoring and Mitigation Plan incorporating the interim guidelines was developed and submitted as an amendment to the MAPA in October 2012. The delay in the permitting process has resulted in a reduction in capital spending of $224 million in 2012. We expect to receive the permit approval in the first half of 2013 and the first coal production is now expected in the first half of 2014. By the fourth quarter of 2014 Quintette is expected to be producing at an annualized rate of three million tonnes.

Work is ongoing to develop and implement selenium management plans for each of the six operating coal mines and the Quintette project. It is possible that permitting for current and future projects may be delayed or withheld until appropriate selenium management plans are developed and implemented. Water treatment is being planned at three mine sites in the Elk Valley entailing expenditures of approximately $175 million over the next three years. Construction has commenced at our Line Creek Operation on the first water treatment plant for selenium removal. However, plans are not yet complete and additional costs may be incurred, which may be significant. In addition, an extensive applied research and development program focused on the development of long-term, lower-cost methods of mining to reduce selenium generation has been initiated this year with planned costs of approximately $12 million annually for the next three years.

Neptune Bulk Terminals, of which we have a 46% ownership interest, is expanding its annual coal throughput capacity from 9 million tonnes to 12.5 million tonnes by the spring of 2013 with the addition of a second stacker reclaimer. Completion of the feasibility study for the next expansion phase, which may further increase capacity from 12.5 million tonnes to 18.5 million tonnes, is expected in the fourth quarter of 2012. The proposed upgrades will include a second railcar dumper and associated conveying system, a new rail track within the existing rail loop, the replacement of a ship loader and foundation reinforcement of the loading berth.

ZINC

Trail (100%)

Operating results at the 100% level are summarized in the following table:

  Three months ended   Nine months ended  
September 30,   September 30,  
  2012   2011   2012   2011  
Metal production                        
  Zinc (000's tonnes)   73.5     73.1     217.0     216.6  
  Lead (000's tonnes)   21.7     20.3     64.4     64.0  
  Silver (million ounces)   5.6     5.0     16.2     16.0  
                         
Metal sales                        
  Zinc (000's tonnes)   75.6     69.3     220.3     214.0  
  Lead (000's tonnes)   22.2     20.1     64.9     62.5  
  Silver (million ounces)   5.6     5.0     16.2     15.9  
                         
Cost of sales ($ millions)                        
  Concentrates $ 305   $ 326   $ 893   $ 946  
  Operating costs $ 99   $ 90   $ 354   $ 270  
  Distribution costs $ 28   $ 24   $ 81   $ 74  
  Depreciation and amortization $ 12   $ 12   $ 37   $ 37  
                         
Gross profit (loss) summary ($ millions)                        
  Before depreciation and amortization $ 5   $ 52   $ 38   $ 208  
  Depreciation and amortization   (12 )   (12 )   (37 )   (37 )
After depreciation and amortization $ (7 ) $ 40   $ 1   $ 171  

Gross profit at Trail before depreciation and amortization declined substantially from a year ago due to significantly lower metal prices, despite higher production and sales levels.

Third quarter production levels for lead and silver increased from a year ago due to a combination of the Kivcet furnace running at higher feed rates and a drawdown of in-process inventory that had accumulated in the second quarter. Stronger customer demand resulted in higher zinc sales volumes than the same period in 2011.

Concentrate purchase costs decreased in the third quarter compared with the same period a year ago as a result of lower metal prices. Operating costs rose slightly in the third quarter from a year ago due to higher labour costs and higher expenditures on operating supplies consistent with increased production levels.

Construction continued on the new acid plant project with start-up expected in late 2013. Spending on the Number 4 Furnace Project has been deferred as major excavation and construction have not commenced and detailed engineering has yet to be completed. Current production will not be impacted by the deferral and employees currently dedicated to the project will be deployed to other areas of Trail Operations.

Upper Columbia River Basin (Lake Roosevelt)

Teck American continues studies under the 2006 settlement agreement with the U.S. Environmental Protection Agency ("EPA") to conduct a remedial investigation on the Upper Columbia River in Washington State.

The Lake Roosevelt litigation involving Teck Metals Ltd. in the Federal District Court for the Eastern District of Washington continues. In April, an order for summary judgment was issued striking Teck Metals Ltd.'s defense of apportionment. In July, the United States Court of Appeals for the Ninth Circuit denied our application for leave to appeal that decision on an interlocutory basis.

In September, Teck Metals entered into an agreement with the plaintiffs, agreeing that certain facts were established for purposes of the litigation. The agreement stipulates that some portion of the slag discharged from our Trail Operations into the Columbia River between 1896 and 1995, and some portion of the effluent discharged from Trail Operations, have been transported to and are present in the Upper Columbia River in the United States, and that some hazardous substances from the slag and effluent have been released into the environment within the United States. These facts are expected to provide the minimum requirements to allow the court to find in favour of the plaintiffs on their claim for a declaratory judgment that TML is liable under CERCLA for response costs, the amount of which will be determined in a subsequent phase of the case. In October, the Federal District Court for the Eastern District of Washington heard argument with respect to personal jurisdiction and certain legal issues with respect to CERCLA. The subsequent hearing, with respect to claims for natural resource damages and costs, is expected to be deferred while the remedial investigation and feasibility study being undertaken by Teck American are completed, which is currently expected to occur in 2015.

There is no assurance that we will ultimately be successful in our defense of the litigation or that we or our affiliates will not be faced with further liability in relation to this matter. Until the studies contemplated by the EPA settlement agreement and additional damage assessments are completed, it is not possible to estimate the extent and cost, if any, of remediation or restoration that may be required or to assess our potential liability for damages. The studies may conclude, on the basis of risk, cost, technical feasibility or other grounds, that no remediation should be undertaken. If remediation is required and damage to resources found, the cost of remediation may be material.

Red Dog (100%)

Operating results at the 100% level are summarized in the following table:

  Three months ended   Nine months ended  
September 30,   September 30,  
  2012   2011   2012   2011  
Tonnes milled (000's)   880     959     2,575     2,817  
                         
Zinc                        
  Grade (%)   18.1     19.3     18.2     18.9  
  Recovery (%)   80.8     81.7     82.3     82.0  
  Production (000's tonnes)   128.9     151.1     386.8     436.9  
  Sales (000's tonnes)   141.2     186.8     321.1     364.1  
                         
Lead                        
  Grade (%)   4.3     4.8     4.7     4.8  
  Recovery (%)   59.4     42.2     57.7     45.7  
  Production (000's tonnes)   22.3     19.4     69.1     61.9  
  Sales (000's tonnes)   46.4     45.6     46.4     45.6  
                         
Cost of sales (US$ millions)                        
  Operating costs $ 80   $ 90   $ 127   $ 131  
  Distribution costs $ 32   $ 40   $ 66   $ 73  
  Royalties (NANA) $ 52   $ 61   $ 64   $ 82  
  Depreciation and amortization $ 16   $ 14   $ 40   $ 36  
                         
Gross profit summary ($ millions)                        
  Before depreciation and amortization $ 127   $ 227   $ 261   $ 388  
  Depreciation and amortization   (16 )   (14 )   (40 )   (36 )
  After depreciation and amortization $ 111   $ 213   $ 221   $ 352  

Red Dog's gross profit declined significantly in the third quarter as a result of lower metal prices and a 24% decrease in zinc sales volumes associated with weather related shipping delays.

Zinc production in the third quarter decreased by 15% from a year ago to 128,900 tonnes as milling rates were lowered to reduce silica in the zinc concentrate and due to lower ore grades. A band of extremely fine grained/high silica content ore was encountered, requiring a reduction in mill throughput to achieve acceptable concentrate quality. Milling rates are expected to return to normal in the fourth quarter. Lead production was 15% higher than the third quarter of 2011 due to improved recoveries as significantly less near-surface, weathered ore from the Aqqaluk Pit was processed in the quarter.

The 2012 shipping season was completed on October 19, 2012 following the shipment of 950,000 tonnes of zinc concentrate and 175,000 tonnes of lead concentrate compared with 1,010,000 tonnes and 143,000 tonnes respectively, for the 2011 season. This represents all of Red Dog's concentrates available to be shipped from the operation.

Appeals of Red Dog's 2010 water discharge permit have been favourably resolved (although deadlines for further appeal have not yet expired), and discussions are ongoing with regulators in connection with the reissuance of the permit.

In accordance with the agreements governing our development of the mine, the net proceeds of production royalty that we pay to NANA Development Inc. will increase to 30% in the fourth quarter of 2012 from the current 25%.

ENERGY

Fort Hills Project

Engineering studies are ongoing to update the design basis for the project and improve the accuracy of cost estimates to facilitate a project sanction decision by the partners in 2013. Suncor, operator of Fort Hills, has indicated that it is developing a cost-driven construction schedule and as a result, should the partners approve the sanction of Phase One of the Fort Hills project in 2013, production would not be expected to start before 2017.

Our share of 2012 Fort Hills spending, including our ongoing earn-in commitments, is now estimated at $138 million compared with our previous guidance of $220 million. Spending has decreased this year due to the focus on developing a cost-driven project schedule.

Frontier Project

The Frontier project has been designed for up to four production lines with a total capacity of approximately 277,000 barrels per day of bitumen. The first two production lines are planned to have a production capacity of 159,000 barrels per day.

Provincial and federal regulatory agencies completed their initial review of the Frontier project application and provided supplemental information requests ("SIR"s) in July 2012. We anticipate responding to these information requests in late 2012 or early 2013. The Canadian Environmental Assessment Agency ("CEAA") has provided estimates of the federal review schedule for the Frontier project application. The cumulative federal review period is estimated to be approximately two years. When time to respond to information requests is included, 2015 is the earliest an approval decision and receipt of required permits is expected.

A field exploration program is being planned for 2013 to acquire additional resource definition and geotechnical information to assist in future engineering studies.

There is no certainty that it will be commercially viable to produce any portion of our contingent bitumen resources.

Wintering Hills Wind Power Operation

During the first nine months of 2012, our share of the power generation from Wintering Hills was 68 GWhs. Expected power generation in 2012 is 80 GWhs, which will result in 50,000 tonnes of CO2 equivalent offsets.

OTHER COST AND EXPENSES

Other operating income, net of other expense, was $57 million in the third quarter compared with $141 million of other expenses in the third quarter of 2011. Included in other operating income was $55 million of positive price adjustments in the third quarter of 2012 primarily from rising copper prices in the period. This compares with negative pricing adjustments of $192 million in the third quarter of 2011 when copper prices declined sharply at the end of the quarter.

The table below outlines our outstanding receivable positions, which were provisionally valued at June 30, 2012, and our receivable positions provisionally valued at, September 30, 2012.

  Outstanding at Outstanding at
  June 30, 2012 September 30, 2012
(pounds in millions) Pounds US$/lb Pounds US$/lb
Copper 171 3.44 169 3.74
Zinc 93 0.84 184 0.95

Financing expenses were $143 million in the third quarter compared with $160 million a year ago. The debt interest component of our financing expense decreased to $106 million from $117 million in the third quarter of last year due to the lower interest rates on the new notes issued pursuant to our recent liability management transactions partly offset by higher debt levels.

Other non-operating income, net of expenses, includes items that arise from financial and other matters and includes such items as foreign exchange, debt refinancing costs, realized gains or losses on marketable securities and gains and losses on the revaluation of fixed price call options on certain of our high-yield notes. In the third quarter of 2012, other non-operating expense was $179 million, which was primarily comprised of the $238 million charge on the redemption of a portion of our high-yield notes and a mark-to-market gain of $59 million on the revaluation of our call option on our high-yield notes. This compares with $82 million of other income in the third quarter of 2011.

Income and resource taxes for the quarter were $186 million, or 49% of pre-tax profit, which is higher than the Canadian statutory income tax rate of 25%. This was mainly due to the effect of debt redemption costs, the new Chilean first category tax rate increase, resource taxes and higher tax rates in foreign jurisdictions. The debt redemption costs incurred in the quarter were not fully tax deductible, and therefore, had a significant effect on increasing our overall tax rate this quarter. The tax rate on our adjusted earnings was 38% in both the quarter and on a year-to-date basis. We are currently shielded from cash income taxes, but not resource taxes in Canada. We remain subject to cash taxes in foreign jurisdictions.

OPERATING CASH FLOW, FINANCIAL POSITION AND LIQUIDITY

Cash flow from operations, before changes in non-cash working capital items, was $741 million in the third quarter compared with a record $1.3 billion a year ago as a result of the effect of significantly lower commodity prices for all our main products.

Changes in non-cash working capital items resulted in a use of cash of $154 million in the third quarter compared with a source of cash of $81 million in the same period a year ago. The increase in working capital and resulting use of cash in the third quarter this year was due to higher accounts receivable and production inventories balances. Accounts receivable increased primarily as a result of higher closing copper and zinc prices at September 30 compared with June 30, 2012. Production inventories rose in the third quarter, which was mainly attributable to coal production exceeding sales volumes by 776,000 tonnes.

Expenditures on property, plant and equipment were $478 million in the third quarter and included $181 million on sustaining capital and $297 million on major development projects. The largest component of sustaining expenditures was $94 million at our coal operations. Major development expenditures included $32 million at Trail, $24 million at Relincho, $27 million for Antamina's expansion, $50 million at the Quebrada Blanca hypogene project, $30 million for Quintette and $77 million at our existing coal operations to incrementally expand production.

In August, we issued US$1.75 billion of long-term notes with an effective average interest rate of 4.0%. We used $738 million from the proceeds of the notes to retire US$660 million of our high-yield notes. This resulted in an after-tax charge of $196 million in the quarter, including a write-off relating to the value of the embedded call options, which enabled us to complete the transaction. We also repaid our 10-year 7% notes when they became due in September, 2012.

We have committed and unused bank credit facilities aggregating $1.1 billion, the majority of which mature in 2016.

On October 19, we issued a notice of redemption to redeem all US$521 million principal amount of our outstanding 10.75% senior notes due in 2019, with the redemption taking place on November 19, 2012. We expect to record an after-tax charge of approximately US$259 million in the fourth quarter in connection with the redemption. After this redemption the average coupon rate on our outstanding notes will be 4.8% with an average term to maturity of 16.5 years. On completion of this transaction, we will have retired all of our high-yield debt and we do not expect any further significant charges on debt retirement.

OUTLOOK

We continue to experience volatile markets for our products. Commodity markets have historically been volatile, prices can change rapidly and customers can alter shipment plans. This can have a substantial impact on our business. Ongoing economic uncertainties in Europe and the United States and less robust growth rates in China, India and other emerging markets have impacted both demand and prices for some of our products. We believe that the medium to longer term fundamentals for steelmaking coal are quite favorable, however, the recent weakness in the seaborne steelmaking coal market may well persist into the first half of 2013. Markets for copper remain steady while zinc markets have shown some weakness. In the meantime, the Company's financial position is strong and we continuously monitor all aspects of our key markets as conditions evolve in order to be in a position to take whatever actions may be appropriate.

Capital Expenditures

A significant component of our capital spending program has been rescheduled for a variety of reasons. This includes a delay at Quebrada Blanca Phase 2 as the resubmission of our Social and Environmental Impact Assessment is not expected to occur before the second quarter of 2013. At Quintette we have been delayed due to environmental permitting issues, but still expect to be in production in 2014. At Relincho changes in plans for local infrastructure projects necessitates a pause before the completion of the feasibility study. Spending on Fort Hills has decreased this year due to the focus on developing a cost-driven project schedule. We have also deferred the construction of the Number 4 slag furnace at Trail and we are considering delay of a number of other projects. This rescheduling will result in deferrals of capital expenditures of approximately $300 million in 2012 and $1.2 billion in 2013. Our annual budgeting cycle occurs in the fourth quarter of each year and our capital and operating budgets for 2013 have not yet been finalized.

The amount and timing of actual capital expenditures is also dependent upon being able to secure permits, equipment, supplies, materials and labour on a timely basis and at expected costs to enable the projects to be completed as currently anticipated. We may change capital spending plans for the balance of this year and next, depending on commodity markets, our financial position, results of feasibility studies and other factors. As a result, our forecast capital expenditures for 2012 are now expected to be approximately $1.8 billion, which is lower than our previous guidance of $2.1 billion and our original guidance of $2.3 billion. This is summarized in the following table:

       
($ in millions) Sustaining Development Total
Copper $ 195 $ 670 $ 865
Coal   350   300   650
Zinc   90   110   200
Energy   -   70   70
Corporate   25   -   25
  $ 660 $ 1,150 $ 1,810

We also expect to invest approximately $138 million in 2012 for our share of costs for the Fort Hills oil sands project, including our earn-in commitments, compared with our previous guidance of $220 million.

Foreign Exchange, Debt Revaluation and Interest Expense

The sales of our products are denominated in U.S. dollars, while a significant portion of our expenses are incurred in local currencies, particularly the Canadian dollar. Foreign exchange fluctuations can have a significant effect on our operating margins, unless such fluctuations are offset by related changes to commodity prices.

Our U.S. dollar denominated debt is subject to revaluation based on changes in the Canadian/U.S. dollar exchange rate. As at September 30, 2012, all of our U.S. dollar denominated debt is designated as a hedge against our U.S. dollar denominated foreign operations and working capital items. As a result, any foreign exchange gains or losses arising on our designated U.S. dollar debt are recorded in other comprehensive income.

FINANCIAL INSTRUMENTS AND DERIVATIVES

We hold a number of financial instruments and derivatives, which are recorded on our balance sheet at fair value with gains and losses in each period included in other comprehensive income and profit for the period as appropriate. The most significant of these instruments are marketable securities, foreign exchange forward sales contracts, energy price option contracts, metal-related forward contracts, prepayment rights on certain senior debt notes and settlements receivable and payable. Some of our gains and losses on metal-related financial instruments are affected by smelter price participation and are taken into account in determining royalties and other expenses. All are subject to varying rates of taxation depending on their nature and jurisdiction.

QUARTERLY EARNINGS AND CASH FLOW

(in millions, except for share data) 2012 2011 2010
  Q3 Q2 Q1 Q4 Q3 Q2 Q1 Q4 Q3
Revenues $ 2,505 $ 2,561 $ 2,547 $ 2,972 $ 3,380 $ 2,796 $ 2,366 $ 2,716 $ 2,414
Gross profit   694   735   918   1,212   1,571   1,197   897   1,127   926
EBITDA   721   790   781   1,304   1,660   1,461   1,034   1,013   921
Profit (note 1)   180   268   218   637   814   756   461   325   316
Earnings per share $ 0.31 $ 0.46 $ 0.37 $ 1.08 $ 1.38 $ 1.28 $ 0.78 $ 0.55 $ 0.54
Cash flow from operations $ 587 $ 768 $ 644 $ 1,199   1,383   621   754   1,156   771
  1. Attributable to shareholders of the company.

OUTSTANDING SHARE DATA

As at October 23, 2012 there were 576,661,370 Class B subordinate voting shares and 9,353,470 Class A common shares outstanding. In addition, there were 6,887,546 director and employee stock options outstanding with exercise prices ranging between $4.15 and $58.80 per share. More information on these instruments and the terms of their conversion is set out in Note 21 of our 2011 year end financial statements.

INTERNAL CONTROL OVER FINANCIAL REPORTING

Our management is responsible for establishing and maintaining adequate internal control over financial reporting. Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation. There have been no changes in our internal control over financial reporting during the quarter ended September 30, 2012 that have materially affected, or are reasonably likely to materially affect, internal control over financial reporting.

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

This news release contains certain forward-looking information and forward-looking statements as defined in applicable securities laws. All statements other than statements of historical fact are forward-looking statements. These forward-looking statements, principally under the heading "Outlook," but also elsewhere in this document, include estimates, forecasts, and statements as to management's expectations with respect to, among other things, anticipated production at our business units and individual operations and expectation that we will meet our production guidance, sales volume and selling prices for our products (including settlement of coal contracts with customers), plans and expectations for our development projects, forecast operating costs and costs of product sold, expected progress, costs and outcomes of our various projects and investments, including but not limited to those described in the discussions of our operations, the sensitivity of our profit to changes in commodity prices and exchange rates, the impact of potential production disruptions, the impact of currency exchange rates, future trends for the company, progress in development of mineral properties, increased coal and copper production as a result of our expansion plans, timing of completion, costs and results of our mill modernization program at Highland Valley Copper, 2012 production guidance for Quebrada Blanca, statements under the heading "Copper Development Projects," including the expected resubmittal of the environment impact assessment for Quebrada Blanca Phase 2, the timing of the feasibility study and drilling for Relincho, our expectation that coal sales will not be impacted by greater use of shipping terminals other than Westshore terminals, our expectation that average trail lengths will increase in 2013, the timing of permit approval, production and anticipated production levels from the Quintette coal mine, timing and results of the Neptune Bulk Terminals capacity expansions, the impact of measures to manage selenium discharges and costs and impacts related thereto, timing of construction at our new acid plant in Trail, the statements under the heading "Energy" regarding timing of sanction, production permitting decisions, timing of final SIRs on our Frontier project and our responses thereto, anticipated capital expenditures and demand and market outlook for commodities, These forward-looking statements involve numerous assumptions, risks and uncertainties and actual results may vary materially.

These statements are based on a number of assumptions, including, but not limited to, assumptions regarding general business and economic conditions, the supply and demand for, deliveries of, and the level and volatility of prices of, zinc, copper and coal and other primary metals and minerals as well as oil, and related products, the timing of the receipt of regulatory and governmental approvals for our development projects and other operations, our costs of production and production and productivity levels, as well as those of our competitors, power prices, continuing availability of water and power resources for our operations, market competition, the accuracy of our reserve estimates (including with respect to size, grade and recoverability) and the geological, operational and price assumptions on which these are based, conditions in financial markets, the future financial performance of the company, our ability to attract and retain skilled staff, our ability to procure equipment and operating supplies, positive results from the studies on our expansion projects, our coal and other product inventories, our ability to secure adequate transportation for our products, our ability to obtain permits for our operations and expansions, our ongoing relations with our employees and business partners and joint venturers. With respect to the Quebrada Blanca Phase 2, assumptions are based on receiving comments from all interested parties and our ability to address the comments in a satisfactory manner. The foregoing list of assumptions is not exhaustive. Events or circumstances could cause actual results to vary materially.

Factors that may cause actual results to vary materially include, but are not limited to, changes in commodity and power prices, changes in market demand for our products, changes in interest and currency exchange rates, acts of foreign governments and the outcome of legal proceedings, inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and resources), unanticipated operational difficulties (including failure of plant, equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, adverse weather conditions and unanticipated events related to health, safety and environmental matters), union labour disputes, political risk, social unrest, failure of customers or counterparties to perform their contractual obligations, changes in our credit ratings, unanticipated increases in costs to construct our development projects, difficulty in obtaining permits, inability to address concerns regarding permits of environmental impact assessments, and changes or further deterioration in general economic conditions. Our Fort Hills project is not controlled by us and construction, sanction and production schedules may be adjusted by our partner.

Statements concerning future production costs or volumes, and the sensitivity of the company's profit to changes in commodity prices and exchange rates are based on numerous assumptions of management regarding operating matters and on assumptions that demand for products develops as anticipated, that customers and other counterparties perform their contractual obligations, that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts and supplies, labour disturbances, interruption in transportation or utilities, adverse weather conditions, and that there are no material unanticipated variations in the cost of energy or supplies.

We assume no obligation to update forward-looking statements except as required under securities laws. Further information concerning risks and uncertainties associated with these forward-looking statements and our business can be found in our Annual Information Form for the year ended December 31, 2011, filed on SEDAR and on EDGAR under cover of Form 40-F.

WEBCAST

Teck will host an Investor Conference Call to discuss its Q3/2012 financial results at 11:00 AM Eastern time, 8:00 AM Pacific time, on Wednesday, October 24, 2012. A live audio webcast of the conference call, together with supporting presentation slides, will be available at our website at www.teck.com. The webcast is also available at www.earnings.com. The webcast will be archived at www.teck.com.

Teck Resources Limited
Consolidated Statements of Income
(Unaudited)
 
    Three months ended   Nine months ended  
September 30,   September 30,  
(Cdn$ in millions, except for share data) 2012   2011   2012   2011  
Revenues $ 2,505   $ 3,380   $ 7,613   $ 8,542  
                           
Cost of sales   (1,811 )   (1,809 )   (5,266 )   (4,877 )
Gross profit   694     1,571     2,347     3,665  
                           
Other operating expenses                        
  General and administration   (33 )   (28 )   (95 )   (90 )
  Exploration   (36 )   (33 )   (94 )   (72 )
  Research and development   (5 )   (6 )   (14 )   (14 )
  Other operating income (expense) (Note 3)   57     (141 )   30     (57 )
Profit from operations   677     1,363     2,174     3,432  
                         
Finance income   27     27     91     78  
Finance expense (Note 4)   (143 )   (160 )   (459 )   (426 )
Non-operating income (expense) (Note 5)   (179 )   82     (534 )   116  
Share of losses of associates   (5 )   (3 )   (9 )   (4 )
                           
Profit before tax   377     1,309     1,263     3,196  
                           
Provision for income and resource taxes   (186 )   (470 )   (549 )   (1,087 )
                           
Profit for the period $ 191   $ 839   $ 714   $ 2,109  
Profit attributable to:                        
  Shareholders of the company $ 180   $ 814   $ 666   $ 2,031  
  Non-controlling interests   11     25     48     78  
Profit for the period $ 191   $ 839   $ 714   $ 2,109  
Earnings per share                        
  Basic $ 0.31   $ 1.38   $ 1.14   $ 3.44  
  Diluted $ 0.31   $ 1.37   $ 1.14   $ 3.42  
                           
Weighted average shares outstanding (millions)   586.0     590.8     586.0     590.8  
                           
Shares outstanding at end of period (millions)   586.0     590.8     586.0     590.8  
 
 
Teck Resources Limited
Consolidated Statements of Comprehensive Income
(Unaudited)
 
    Three months ended   Nine months ended  
September 30,   September 30,  
(Cdn$ in millions) 2012   2011   2012   2011  
Profit $ 191   $ 839   $ 714   $ 2,109  
                           
Other comprehensive income (loss) in the period                        
  Currency translation differences (net of taxes of $(30), $43, $(31) and $24)   (97 )   230     (76 )   175  
  Available-for-sale financial instruments (net of taxes of $16, $9, $14 and $11)   (111 )   (56 )   (101 )   (86 )
  Cash flow hedges (net of taxes of $nil, $(1), $nil and $nil)   1     (1 )   -     (3 )
  Actuarial loss on retirement benefit obligations (net of taxes of $21, $71, $48 and $81)   (49 )   (163 )   (106 )   (185 )
Total other comprehensive income (loss) for the period   (256 )   10     (283 )   (99 )
Total comprehensive income (loss) for the period $ (65 ) $ 849   $ 431   $ 2,010  
Other comprehensive income (loss) attributable to:                        
  Shareholders of the company   (255 )   7     (281 )   (101 )
  Non-controlling interests   (1 )   3     (2 )   2  
    (256 )   10     (283 )   (99 )
Comprehensive income (loss) attributable to:                        
  Shareholders of the company   (75 )   821     385     1,930  
  Non-controlling interests   10     28     46     80  
    $ (65 ) $ 849   $ 431   $ 2,010  
 
 
Teck Resources Limited
Consolidated Statements of Cash Flows
(Unaudited)
 
      Three months ended
September 30,
  Nine months ended
September 30,
 
(Cdn$ in millions) 2012   2011   2012   2011  
Operating activities                        
  Profit $ 191   $ 839   $ 714   $ 2,109  
  Items not affecting cash                        
    Depreciation and amortization   239     243     709     689  
    Provision for deferred income and resource taxes   34     210     126     489  
    Share of loss (gain) of associates   5     3     9     4  
    Gain on sale of investments and assets   (25 )   (37 )   (51 )   (173 )
    Unrealized loss (gain) on derivatives   (60 )   (95 )   (113 )   (87 )
    Foreign exchange loss (gains)   2     19     25     9  
    Loss on debt repurchase   238     -     652     -  
    Finance income   (27 )   (27 )   (91 )   (78 )
    Finance expense   143     160     459     426  
    Other   1     (13 )   22     (5 )
        741     1,302     2,461     3,383  
  Net change in non-cash working capital items   (154 )   81     (462 )   (625 )
        587     1,383     1,999     2,758  
Investing activities                        
  Property, plant and equipment   (478 )   (364 )   (1,201 )   (862 )
  Financial investments and other assets   (50 )   (68 )   (259 )   (139 )
  Acquisition of SilverBirch Energy Corporation   -     -     (432 )   -  
  Proceeds from the sale of investments and other assets   31     63     37     218  
        (497 )   (369 )   (1,855 )   (783 )
Financing activities                        
  Issuance of debt   1,747     1,907     2,730     1,907  
  Repayment of debt   (1,032 )   (15 )   (2,334 )   (93 )
  Debt interest paid   (138 )   (82 )   (369 )   (257 )
  Issuance of Class B subordinate voting shares   -     1     1     4  
  Purchase and cancellation of Class B subordinate voting shares   -     -     (6 )   -  
  Dividends paid   (234 )   (177 )   (469 )   (354 )
  Distributions to non-controlling interests   (22 )   (13 )   (39 )   (41 )
        321     1,621     (486 )   1,166  
                             
Effect of exchange rate changes on cash and cash equivalents   (122 )   311     (133 )   287  
Increase (decrease) in cash and cash equivalents   289     2,946     (475 )   3,428  
Cash and cash equivalents at beginning of period   3,641     1,314     4,405     832  
Cash and cash equivalents at end of period $ 3,930   $ 4,260   $ 3,930   $ 4,260  
 
 
Teck Resources Limited
Consolidated Balance Sheets
(Unaudited)
 
    September 30, December 31,
(Cdn$ in millions) 2012 2011
ASSETS        
Current assets        
  Cash and cash equivalents $ 3,930 $ 4,405
  Current income and resource taxes receivable   103   101
  Trade accounts receivable   1,265   1,242
  Inventories   1,937   1,641
      7,235   7,389
           
Financial and other assets   1,040   1,138
Investments in associates   774   715
Property, plant and equipment   23,884   23,150
Deferred income and resource tax assets   194   180
Goodwill   1,632   1,647
  $ 34,759 $ 34,219
LIABILITIES AND EQUITY        
           
Current liabilities        
  Trade accounts payable and other liabilities $ 1,366 $ 1,435
  Dividends payable (Note 7 (c))   -   235
  Current income and resource taxes payable   37   93
  Debt (Note 6)   65   359
      1,468   2,122
         
Debt (Note 6)   7,541   6,676
Deferred income and resource tax liabilities   5,412   5,342
Retirement benefit obligations   820   691
Other liabilities and provisions   1,465   1,495
           
Equity        
  Attributable to shareholders of the company   17,880   17,721
  Attributable to non-controlling interests   173   172
    18,053   17,893
  $ 34,759 $ 34,219
 
 
Teck Resources Limited
Consolidated Statements of Changes in Equity
(Unaudited)
 
  Nine months ended
September 30,
 
(Cdn$ in millions) 2012   2011  
Class A common shares $ 7   $ 7  
               
Class B subordinate voting shares            
Beginning of period   6,743     6,795  
  Share repurchases   (2 )   -  
  Issued on exercise of options   2     5  
End of period   6,743     6,800  
               
Retained earnings            
Beginning of period   10,858     8,840  
  Profit for the period attributable to shareholders of the company   666     2,031  
  Dividends declared   (234 )   (177 )
  Share repurchases   (4 )   -  
  Actuarial loss on retirement benefit obligations   (106 )   (185 )
End of period   11,180     10,509  
               
Contributed surplus            
Beginning of period   97     84  
  Share-based payment expense   13     10  
  Transfer to Class B subordinate voting shares on exercise of options   (1 )   (1 )
End of period   109     93  
               
Accumulated other comprehensive income (loss) attributable to shareholders of the company (Note 7(b))            
Beginning of period   16     47  
  Other comprehensive income (loss) before actuarial loss on retirement benefit obligations   (175 )   84  
End of period   (159 )   131  
             
Non-controlling interests            
Beginning of period   172     122  
  Profit for the period attributed to non-controlling interests   48     78  
  Other comprehensive income (loss)   (2 )   2  
  Other   (6 )   6  
  Dividends or distributions   (39 )   (41 )
End of period   173     167  
Total equity $ 18,053   $ 17,707  
 
The accompanying notes are an integral part of these financial statements.

Teck Resources Limited

Notes to Consolidated Financial Statements

(Unaudited)

1. BASIS OF PREPARATION

We prepare our financial statements in accordance with International Financial Reporting Standards ("IFRS") as issued by International Accounting Standards Board ("IASB"). These condensed interim consolidated financial statements have been prepared in accordance with IAS 34, Interim Financial Reporting ("IAS 34"). These condensed interim consolidated financial statements follow the same accounting policies and methods of application as our most recent annual financial statements. Accordingly, they should be read in conjunction with our most recent annual financial statements. These condensed consolidated financial statements were approved for issue on October 23, 2012.

2. ACQUISITION

In April 2012, we completed our purchase of SilverBirch Energy Corporation ("SilverBirch") by way of a plan of arrangement for a net cash outlay of $432 million. Under the arrangement, substantially all of SilverBirch's assets, other than its 50% interest in the Frontier and Equinox oil sands projects, were transferred into SilverWillow Energy Corporation ("SilverWillow"). As part of the arrangement, we also transferred to SilverWillow our 50% interest in certain other oil sands leases that were jointly owned with SilverBirch. SilverBirch shareholders, with the exception of Teck, received $8.50 in cash and one share of a new company, SilverWillow Energy Corporation ("SilverWillow"), for each SilverBirch common share. Following completion of the purchase, we now own 100% of the Frontier and Equinox oil sands projects, as well as 4.7 million common shares (8.7%) of SilverWillow issued in connection with the arrangement.

We recorded the purchase at $493 million, which was the fair value of the consideration given up and was comprised of $415 million of cash paid to SilverBirch shareholders, $25 million in working capital contributed to SilverWillow, $12 million of oil sands leases contributed to SilverWillow, $40 million of SilverBirch shares that we owned prior to the transaction and $1 million in transactions fees.

We accounted for this transaction as an acquisition of assets and have allocated the cost to the assets based on their relative fair values at the date of purchase. No goodwill arose on this transaction. The oil sand leases acquired are recorded as exploration and evaluation costs within property, plant and equipment. The shares of SilverWillow are recorded as investments in marketable securities, which are designated as available for sale financial assets and measured at fair value.

3. OTHER OPERATING INCOME (EXPENSE)

  Three months
ended September 30,
  Nine months
ended September 30,
 
(Cdn$ in millions) 2012   2011   2012   2011  
Gain (loss) on sale of operating assets $ 22   $ (1 ) $ 26   $ 129  
Commodity derivatives   -     13     (4 )   -  
Pricing adjustments (a)   55     (192 )   65     (214 )
Share-based compensation (Note 7(a))   (4 )   43     (11 )   48  
Provision for closed properties   (7 )   9     (15 )   3  
Other   (9 )   (13 )   (31 )   (23 )
  $ 57   $ (141 ) $ 30   $ (57 )

a. Pricing Adjustments

Sales and purchases of metals in concentrates and cathodes are recognized on a provisional pricing basis when title transfers and the rights and obligations of ownership pass to the customer, which usually occurs on shipment. However, the final pricing for the product sold and purchased is not determined at that time as it is contractually linked to market prices at a subsequent date. These arrangements have the characteristics of a derivative instrument as the value of our receivables and payables will vary as prices for the underlying commodities vary in the metal markets. These pricing adjustments result in gains (losses from purchases) in a rising price environment and losses (gains for purchases) in a declining price environment and are recorded as other operating income (expense). The profit impact of gains and losses on these financial instruments is mitigated by smelter price participation, royalty interests, taxes and non-controlling interests. It should be noted that while these effects arise on the sale of concentrates, we also purchase concentrates at our Trail refinery where the opposite effects occur.

4. FINANCE EXPENSE

  Three months
ended September 30,
  Nine months
ended September 30,
 
(Cdn$ in millions) 2012   2011   2012   2011  
Debt interest $ 106   $ 117   $ 332   $ 301  
Discount and financing fee amortization   3     6     12     17  
Pension interest accretion   25     25     74     74  
Decommissioning and restoration provision accretion   14     12     51     39  
Other   3     5     7     10  
Less capitalized interest   (8 )   (5 )   (17 )   (15 )
  $ 143   $ 160   $ 459   $ 426  

5. NON-OPERATING INCOME (EXPENSE)

  Three months
ended September 30,
  Nine months
ended September 30,
 
(Cdn$ in millions) 2012   2011   2012   2011  
Foreign exchange gains (losses) $ (2 ) $ (17 ) $ (25 ) $ (9 )
Other derivative gains (losses)   59     62     119     80  
Debt repurchase and financing costs   (238 )   -     (652 )   -  
Gain on sale of investments   2     38     24     44  
Other   -     (1 )   -     1  
  $ (179 ) $ 82   $ (534 ) $ 116  

6. DEBT

(Cdn$ in millions) September 30, 2011   December 31, 2011  
  Carrying   Carrying  
  Value   Value  
7.0% notes due September 2012 (US$200 million) $ -   $ 203  
9.75% notes due May 2014 (US$530 million) (b)   -     514  
5.375% notes due October 2015 (US$300 million)   294     304  
10.25% notes due May 2016 (US$659 million) (b)   -     629  
3.15% notes due January 2017 (US$300 million)   293     303  
3.85% notes due August 2017 (US$300 million)   290     300  
2.50% notes due February 2018 (US$500 million) (a)   487     -  
3.00% notes due March 2019 (US$500 million) (a)   487     -  
10.75% notes due May 2019 (US$1,043 million) (b)   481     991  
4.5% notes due January 2021 (US$500 million)   487     504  
4.75% notes due January 2022 (US$700 million)   683     706  
3.75% notes due February 2023 (US$750 million) (a)   726     -  
6.125% notes due October 2035 (US$700 million)   673     696  
6.0% notes due August 2040 (US$650 million)   636     658  
6.25% notes due July 2041 (US$1,000 million)   971     1,005  
5.20% notes due March 2042 (US$500 million) (a)   484     -  
5.40% notes due February 2043 (US$500 million) (a)   486     -  
Antamina senior revolving credit facility due April 2015   22     117  
Quebrada Blanca bridge loan due November 2012   29     -  
Other   77     105  
    7,606     7,035  
             
Less current portion of long-term debt   (65 )   (359 )
  $ 7,541   $ 6,676  

a) Notes Issued

In February 2012, we issued US$500 million of senior unsecured notes due March 2019 and US$500 million of senior unsecured notes due March 2042. The 2019 notes bear interest at the rate of 3.00% per annum and were issued at 99.705% of face value. The 2042 notes bear interest at the rate of 5.20% per annum, were issued at 99.533% of face value. Net proceeds from these two issues were US$987 million after underwriting discounts and issue costs.

In August 2012, we issued US$500 million of senior unsecured notes due February 2018, US$750 million of senior unsecured notes due February 2023 and US$500 million of senior unsecured notes due February 2043. The 2018 notes bear interest at a rate of 2.50% per annum and were issued at 99.690% of face value. The 2023 notes bear interest at a rate of 3.75% per annum and were issued at 99.188% of face value. The 2043 notes bear interest at a rate of 5.40% per annum and were issued at 99.808% of face value. Net proceeds from these three issues were US$1,727 million after underwriting discounts and issue costs. 

The notes are callable at any time by repaying the greater of the principal amount plus accrued interest and the present value of the principal and interest amounts discounted at a comparable treasury yield plus a stipulated spread. The 2023, 2042 and 2043 notes are callable at 100% at any time on or after November 1, 2022, September 1, 2041 and August 1, 2042 respectively. Our obligations under these notes are guaranteed by our wholly owned subsidiary, Teck Metals Limited. 

The net proceeds of these issues, in addition to cash on hand, were used to finance the redemptions described below and for the amount due on maturity of our 7.00% notes due September 2012. Net proceeds not used to retire or redeem indebtedness may be used for other general corporate purposes, including capital expenditures, share repurchases or as general working capital.

b) Notes Redeemed

During the first quarter, we redeemed US$1.051 billion aggregate principal amount of outstanding notes. The notes redeemed were comprised of US$530 million of the 9.75% notes due 2014 and US$521 million of the 10.75% notes due 2019. The total payment, including the premium for the repurchase, was US$1.29 billion. We recorded an accounting charge of $414 million in the first quarter in connection with the redemption.

During the third quarter, we redeemed all of the approximately US$659.5 million principal amount of the outstanding 10.25% notes due 2016. The total payment, including the premium for the repurchase, was US$738 million. We recorded an accounting charge of C$238 million in the third quarter in connection with the redemption.

7. EQUITY

a) Share-Based Compensation

During the first three quarters of 2012, we granted 1,524,821 Class B subordinate voting share options to employees. These options have a weighted average exercise price of $39.24, a term of 10 years and vest in equal amounts over three years. The weighted average fair value of Class B subordinate voting share options issued was estimated at $12.15 per share option at the grant date using the Black-Scholes option-pricing model. The option valuations were based on an average expected option life of 4 years, a risk-free interest rate of 1.38%, a dividend yield of 2.04% and an expected volatility of 43%.

During the first three quarters of 2012, we issued 683,460 deferred and restricted share units to employees and directors. Deferred and restricted share units issued vest immediately for directors and vest in three years for employees. The total number of deferred and restricted share units outstanding at September 30, 2012 was 2,597,026.

A share-based compensation expense of $11 million (2011 - $48 million recovery) was recorded for the nine months ended September 30, 2012 in respect of all outstanding share options and units.

b) Accumulated Other Comprehensive Income (Loss)

The components of accumulated other comprehensive income (loss) are:

    September 30,   December 31,  
(Cdn$ in millions) 2012   2011  
Currency translation adjustment $ (66 ) $ 10  
Unrealized gains (losses) on investments (net of tax of $12 and $(2))   (98 )   3  
Unrealized gains on cash flow hedges (net of tax of $nil and $nil)   1     1  
    $ (163 ) $ 14  
Accumulated other comprehensive income (loss) attributable to:            
  Shareholders of the company $ (159 ) $ 16  
  Non-controlling interests   (4 )   (2 )
    $ (163 ) $ 14  

c) Dividends of $0.40 per share were declared on our Class A common shares and Class B subordinate voting shares with a record date of June 15, 2012, and were paid on July 3, 2012.

8. SEGMENT INFORMATION

Based on the primary products we produce and our development projects, we have five reportable segments - copper, coal, zinc, energy and corporate - which is the way we report information to our Chief Executive Officer. The corporate segment includes all of our initiatives in other commodities, our corporate growth activities and groups that provide administrative, technical, financial and other support to all of our business units. Other operating expenses include general and administration costs, exploration, research and development, and other operating income (expense). Sales between segments are carried out at arm's length.

  Three months ended September 30, 2012  
(Cdn$ in millions) Copper   Coal   Zinc   Energy   Corporate   Total  
Segment revenues 763   1,077   727   1   -   2,568  
Less: Inter-segment revenues -   -   (63 ) -   -   (63 )
Revenues 763   1,077   664   1   -   2,505  
Gross profit 263   333   98   -   -   694  
Other operating income (expenses) 34   3   (23 ) -   (31 ) (17 )
Profit from operations 297   336   75   -   (31 ) 677  
Net finance expense (1 ) (7 ) (6 ) -   (102 ) (116 )
Non-operating income (expenses) -   -   -   -   (179 ) (179 )
Share of losses of associates -   -   -   (4 ) (1 ) (5 )
Profit before tax 296   329   69   (4 ) (313 ) 377  
Capital expenditures 201   201   63   7   6   478  
                         
                         
  Three months ended September 30, 2011  
(Cdn$ in millions) Copper   Coal   Zinc   Energy   Corporate   Total  
Segment revenues 808   1,717   913   -   -   3,438  
Less: Inter-segment revenues -   -   (58 ) -   -   (58 )
Revenues 808   1,717   855   -   -   3,380  
Gross profit 362   954   255   -   -   1,571  
Other operating income (expenses) (195 ) -   (18 ) -   5   (208 )
Profit from operations 167   954   237   -   5   1,363  
Net finance expense -   (9 ) (6 ) -   (118 ) (133 )
Non-operating income (expenses) 27   34   -   -   21   82  
Share of profit (loss) from associates -   -   -   -   (3 ) (3 )
Profit before tax 194   979   231   -   (95 ) 1,309  
Capital expenditures 150   156   32   21   5   364  
                         
                         
  Nine months ended September 30, 2012  
(Cdn$ in millions) Copper   Coal   Zinc   Energy   Corporate   Total  
Segment revenues 2,247   3,637   1,888   3   -   7,775  
Less: Inter-segment revenues -   -   (162 ) -   -   (162 )
Revenues 2,247   3,637   1,726   3   -   7,613  
Gross profit 803   1,323   221   -   -   2,347  
Other operating income (expenses) 4   (2 ) (33 ) -   (142 ) (173 )
Profit from operations 807   1,321   188   -   (142 ) 2,174  
Net finance expense (4 ) (25 ) (17 ) -   (322 ) (368 )
Non-operating income (expenses) -   -   -   -   (534 ) (534 )
Share of profit (loss) from associates -   -   -   (6 ) (3 ) (9 )
Profit before tax 803   1,296   171   (6 ) (1,001 ) 1,263  
Capital expenditures 522   481   135   44   19   1,201  
Goodwill 429   1,203   -   -   -   1,632  
Total assets 7,708   17,289   5,149   1,744   2,869   34,759  
                         
                         
  Nine months ended September 30, 2011  
(Cdn$ in millions) Copper   Coal   Zinc   Energy   Corporate   Total  
Segment revenues 2,330   4,207   2,183   -   -   8,720  
Less: Inter-segment revenues -   -   (178 ) -   -   (178 )
Revenues 2,330   4,207   2,005   -   -   8,542  
Gross profit 1,115   2,019   531   -   -   3,665  
Other operating income (expenses) (117 ) -   (41 ) -   (75 ) (233 )
Profit from operations 998   2,019   490   -   (75 ) 3,432  
Net finance expense (3 ) (23 ) (16 ) -   (306 ) (348 )
Non-operating income (expenses) 27   34   -   -   55   116  
Share of profit (loss) from associates -   -   -   -   (4 ) (4 )
Profit before tax 1,022   2,030   474   -   (330 ) 3,196  
Capital expenditures 374   376   59   39   14   862  
Goodwill 458   1,203   -   -   -   1,661  
Total assets 7,532   16,916   3,006   1,140   5,046   33,640  

9. CONTINGENCIES

We consider provisions for all our outstanding and pending legal claims to be adequate. The final outcome with respect to actions outstanding or pending as at September 30, 2012, or with respect to future claims, cannot be predicted with certainty. Significant contingencies not disclosed elsewhere in the notes to our financial statements are as follows:

Upper Columbia River Basin (Lake Roosevelt)

Teck American continues studies under the 2006 settlement agreement with the U.S. EPA to conduct a remedial investigation on the Upper Columbia River in Washington State.

The Lake Roosevelt litigation involving Teck Metals Ltd. in the Federal District Court for the Eastern District of Washington continues. In April, an order for summary judgment was issued striking Teck Metals Ltd.'s defense of apportionment. In July, the United States Court of Appeals for the Ninth Circuit denied our application for leave to appeal that decision on an interlocutory basis.

In September, Teck Metals entered into an agreement with the plaintiffs, agreeing that certain facts were established for purposes of the litigation. The agreement stipulates that some portion of the slag discharged from our Trail Operations into the Columbia River between 1896 and 1995, and some portion of the effluent discharged from Trail Operations, have been transported to and are present in the Upper Columbia River in the United States, and that some hazardous substances from the slag and effluent have been released into the environment within the United States. These facts are expected to provide the minimum requirements to allow the court to find in favour of the plaintiffs on their claim for a declaratory judgment that TML is liable under CERCLA for response costs, the amount of which will be determined in a subsequent phase of the case. In October, the Federal District Court for the Eastern District of Washington heard argument with respect to personal jurisdiction and certain legal issues with respect to CERCLA.

The subsequent hearing, with respect to claims for natural resource damages and costs, is expected to be deferred while the remedial investigation and feasibility study being undertaken by Teck American are completed, which is currently expected to occur in 2015.

There is no assurance that we will ultimately be successful in our defense of the litigation or that we or our affiliates will not be faced with further liability in relation to this matter. Until the studies contemplated by the EPA settlement agreement and additional damage assessments are completed, it is not possible to estimate the extent and cost, if any, of remediation or restoration that may be required or to assess our potential liability for damages. The studies may conclude, on the basis of risk, cost, technical feasibility or other grounds, that no remediation should be undertaken. If remediation is required and damage to resources found, the cost of remediation may be material.

10. SEASONALITY OF SALES

Due to ice conditions, the port serving our Red Dog mine is normally only able to ship concentrates from July to October each year. As a result, zinc and lead concentrate sales volumes are generally higher in the third and fourth quarter of each year than in the first and second quarter.

11. SUBSEQUENT EVENT

On October 19, 2012, we announced the issuance of a notice to redeem, on November 19, 2012, all of the approximately US$521.3 million principal amount of the outstanding 10.75% senior notes due 2019. Based on current interest rates, we expect to record an after-tax expense of approximately US$259 million in the fourth quarter of 2012 in connection with the redemption of the 2019 Notes.



Teck Resources Limited
Greg Waller
Vice President, Investor Relations & Strategic Analysis
604.699.4014
or
Teck Resources Limited
Marcia Smith
Senior Vice President, Sustainability and External Affairs
604.699.4616
www.teck.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Teck Resources Limited

PRODUCTEUR
CODE : TCK
ISIN : CA8787422044
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Teck est une société de production minière basée au Canada.

Teck est productrice d'argent, de charbon, de cuivre, de molybdène, d'or, de plomb et de zinc au Canada, au Chili, au Perou et au Salvador, en développement de projets d'argent, de cuivre, de molybdène, d'or, de plomb et de zinc au Canada, au Mexique, au Panama, en Australie et en Turquie, et détient divers projets d'exploration au Burkina Faso, au Canada, au Chili, au Honduras, au Mexique, au Perou, en Australie, en Argentine, en Chine, en Guyana et en Turquie.

Ses principaux projets en production sont HEMLO, RED DOG, DUCK POND, BOUNDARY - CARAMELIA, WILLIAMS, ELKVIEW COAL MINE (BALMER MINE), HIGHLAND VALLEY, WILLIAMS UNDERGROUND, DAVID BELL et WILLIAMS OPEN PIT au Canada, COLQUIJIRCA MINE, PEND OREILLE, ANTAMINA ZINC ORE et ANTAMINA au Perou, QUEBRADA BLANCA - HYPOGENE, HORN SILVER COMPLEX (SAN FRANCISCO), ANDACOLLO, QUEBRADA BLANCA MINE, CARMEN DE ANDACOLLO et ANDACOLLO HYPOGENE au Chili et SAN SEBASTIAN au Salvador, ses principaux projets en développement sont LENNARD SHELF et LENNARD SHELF en Australie, CERATTEPE en Turquie, EL LIMON et POGO au Mexique, GALORE CREEK au Canada et PETAQUILLA et PETAQUILLA COPPER au Panama et ses principaux projets en exploration sont PORACOTA, PICOTA et SILVER CLOUD au Perou, TAVSAN et ALTINTEPE en Turquie, AURBEL, BEACON NORTH, MAINSTREET, MERIDIAN, FUSE WEST, ADEL, MOUNT PLEASANT, PICKLE CROW, LOUVICOURT, HOMESTAKE RIDGE, GALORE CREEK - COPPER CANYON, KUDZ ZE KAYAH, FORDING RIVER, GREENHILLS, COAL MOUNTAIN, LINE CREEK, CARDINAL RIVER, SULLIVAN MINE, POLARIS MINE et AURBEL (DUMONT MINE) au Canada, LOS VERDES, MORELOS et LA VERDE PROJECT au Mexique, VREDELUS en Namibie, STONEPARK (LIMERICK) en Irlande, APOLLO HILL en Australie et TRUN en Bulgarie.

Teck est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 19,6 milliards US$ (17,2 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 26 juin 2020 à 10,00 US$, et son plus haut niveau récent le 14 janvier 2022 à 33,98 US$.

Teck possède 576 419 968 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Teck Resources Limited
05/07/2008Duluth Complex: A World-Class Value Play
31/01/2008 Comments on Red Dog and Highland Valley
Financements de Teck Resources Limited
15/07/2009Announces Closing of Private Placement
03/07/2009Announces C$1.74 Billion Private Placement
Attributions d'options de Teck Resources Limited
14/11/2012Announces 12.5% Dividend Increase
25/04/2012Announces Dividend
27/10/2011Announces 33% Dividend Increase
Nominations de Teck Resources Limited
26/07/2017Announces Appointment of Scott Maloney =?ISO-8859-1?Q?as=20V...
13/09/2013Announces Appointment of Andrew Golding =?ISO-8859-1?Q?=20as...
20/06/2013Announces Appointment of Dale Andres as =?ISO-8859-1?Q?=20Se...
20/06/2013Announces Appointment of Ian Kilgour as Executive Vice Presi...
03/04/2013Appoints New Vice President, Community and Government Relati...
09/10/2012Edward C. Dowling Appointed to Teck Board of Directors
01/06/2011Announces Retirement of General Manager, Trail Operations
01/06/2011New General Manager Appointed to Lead Teck's Trail Operation...
20/04/2011New Vice President Appointed to Lead Teck Asian Affairs
01/10/2008 Names Ray Reipas Vice President of Energy
29/06/2007Announces Appointment Of Tim Watson As Senior Vice President...
Rapports Financiers de Teck Resources Limited
27/07/2017(Port)Reports Unaudited Second Quarter Results for 2017
28/07/2016Reports Unaudited Second Quarter Results for 2016
29/06/2016Q2 2016 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
27/04/2016Announces Dividend
26/04/2016(Port)Reports Unaudited First Quarter Results for 2016
01/04/2016Q1 2016 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
11/02/2016(Port)Reports Unaudited Fourth Quarter Results for 2015
05/01/2016Q4 2015 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
22/10/2015(Port)Reports Unaudited Third Quarter Results for 2015
28/09/2015Q3 2015 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
23/07/2015(Port)Reports Unaudited Second Quarter Results for 2015
24/06/2015Q2 2015 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
21/04/2015(Port)Reports Unaudited First Quarter Results for 2015
13/02/2014(Port)Reports Unaudited Fourth Quarter Results for 2013
20/01/2014Q4 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
24/10/2013(Port)Reports Unaudited Third Quarter Results for 2013
30/09/2013Q3 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
25/07/2013(Port)Reports Unaudited Second Quarter Results for 2013
27/06/2013Q2 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
23/04/2013(Port)Reports Unaudited First Quarter Results for 2013
03/04/2013Q1 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
07/02/2013(Port)Reports Unaudited Fourth Quarter Results for 2012
16/01/2013Q4 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
24/10/2012(Port)Reports Unaudited Third Quarter Results for 2012
27/09/2012Q3 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
25/07/2012(Port)Reports Unaudited Second Quarter Results for 2012
28/06/2012Q2 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
25/04/2012(Port)Reports Unaudited First Quarter Results for 2012
28/03/2012Q1 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
18/01/2012Q4 2011 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
12/10/2011Q3 2011 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
29/07/2011(Port)Reports Unaudited Second Quarter Results for 2011
08/02/2011Reports Unaudited Results for 2010
28/07/2010Reports Second Quarter Results for 2010
20/04/2010First Quarter Results for 2010
09/02/2010Fourth Quarter Results for 2009
13/01/2010Q4 2009 Financial Results February =?ISO-8859-1?Q?8,=202010=...
05/10/2009Q3 2009 Financial Results October 28
28/10/2009Reports Third Quarter Results for 2009
23/07/2009Reports Second Quarter Results for 2009
17/02/2009CORRECTION FROM SOURCE: Teck Reports Fourth Quarter Results ...
17/02/2009 Reports Fourth Quarter Results for 2008
23/01/2009Q4 2008 Financial Results February
24/07/2008Reports Second Quarter Results for 2008
05/07/2008Q2 2008 Financial Results July =?ISO-8859-1?Q?=2023,=202008=...
23/04/2008 Reports First Quarter Results for 2008
12/02/2008Reports Fourth Quarter Results for 2007
09/10/2007Q3 2007 Financial Results Octob =?ISO-8859-1?Q?er=2029,=2020...
31/07/2007 Reports Second Quarter Results for 2007
03/07/2007Q2 2007 Financial Results July =?ISO-8859-1?Q?=2030,=202007=...
Projets de Teck Resources Limited
19/10/2016to Acquire 100% of Teena/Reward Zinc Project
16/01/2016Alaska zinc mine sues municipality over new severance tax
07/10/20156:02 am Teck Resources enters long-term streaming agreement ...
27/08/2015Canada's Goldcorp, Teck team up to develop Chile mine projec...
22/06/2015Chile environmental regulator eyes sanctions for Teck copper...
27/04/20159:34 am Teck Resources announces acquisition of an additiona...
06/04/2015Teck Resources' Greenhills coal mine re-opens after fire
31/10/2013(Fort Hills)Announces Partners Proceeding with Fort Hills Oil Sands Proj...
09/06/2012(Port)Files Technical Report for Quebrada Blanca Phase 2 Project
07/06/2011(Carmen De Andacollo)Announces Temporary Production Interruption at Carmen de And...
15/04/2011(Carmen De Andacollo)Inaugurates New Concentrator at Carmen de Andacollo
08/04/2011(Elkview Coal Mine (balmer Mine))Announces Elkview Operation Collective Agreement
03/04/2011(Elkview Coal Mine (balmer Mine))Announces Memorandum of Settlement Reached at its Elkview Op...
15/03/2011(Elkview Coal Mine (balmer Mine))Announces Tentative Collective Agreement at its Elkview Oper...
14/03/2011(Carrapateena)Announces Sale of Carrapateena Project
31/01/2011(Elkview Coal Mine (balmer Mine))Announces Labour Interruption at Its Elkview Operation
27/01/2011(Elkview Coal Mine (balmer Mine))Announces Elkview Strike Notice
02/07/2010(Greenhills)Provides Update on Incident
29/06/2010(Greenhills)Reports Serious Incident
24/02/2010(Line Creek)Line Creek Collective Agreement
21/01/2010(Highland Valley)! 7 Cent Jr. Hits Visible Copper Over 160 Meters Near Teck's...
15/01/2010(Red Dog)Comments on Red Dog Permit Appeal
05/01/2010(Antamina)Expansion at Antamina Mine
24/09/2009(Agi Dagi - Deli Zone) Proposed Sale of Turkish Gold Projects
13/08/2009(Andacollo)Possible Andacollo Permitting Delay
06/08/2009(Morelos)Proposed Sale of Morelos Gold Project
08/07/2009(Pogo)Closing of Pogo Sale
20/02/2009(Williams)Announces Sale of Hemlo Mines
15/12/2008(Pend Oreille) Announces Temporary Shutdown of Pend Oreille Zinc Mine
17/11/2008(Fort Hills)Fort Hills Energy Limited Partnership Defers Mine Decision U...
17/09/2008(Fort Hills Oil Sands)Fort Hills Energy Limited Partnership Releases Updated Cost ...
15/07/2008(Lennard Shelf)Lennard Shelf Operation Ceases Production
27/03/2008(Petaquilla)and Inmet Mining Announce Arrangements for Proceeding With P...
03/03/2008(Quebrada Blanca Mine) Reports New Billion Tonne Copper Resource at Quebrada Blanc...
31/12/2007(Elkview Coal Mine (balmer Mine))2007 Technical report
Communiqués de Presse de Teck Resources Limited
27/07/2017Announces Dividend
31/08/2016Teck Resources acquires 11.6% stake in Jet Gold
19/08/2016Top Analyst Upgrades and Downgrades: AK Steel, Allergan, Arc...
28/07/2016Teck Reports Unaudited Second Quarter Results for 2016
28/07/2016Teck Resources beats 2Q profit forecasts
27/07/2016Teck Announces Retirement of Vice President, Investor Relati...
06/05/2016Donates to Canadian Red Cross Fort McMurray Wildfire Relief ...
29/04/2016Reports Voting Results From Annual General Meeting
01/02/2016Freeport-McMoRan Burned Cash in 4Q15: Will 2016 Be Better?
25/01/2016Technical Coverage of Industrial Metals & Minerals Stocks --...
21/01/2016Teck Named to the Global 100 Most Sustainable Corporations L...
15/01/2016Teck Resources sues Alaska borough over tax hike
15/01/2016Teck Alaska Files Legal Complaint Over Severe Tax Hike
14/01/2016The Zacks Analyst Blog Highlights: Compañia de Minas Buenave...
05/01/2016Teck's Q4 2015 Financial Results and Investors' Conference C...
22/12/2015Teck Media and Investor Webcast Advisory - December 2, 2015
03/12/2015Teck Resources Geared Up to Face Bleak Coal Fundamentals
03/12/2015Could OPEC’s Meeting Negatively Impact Freeport-McMoRan?
02/12/2015Miner Teck says could monetize assets to raise cash if neede...
29/11/2015Teck Resources Ltd (USA) (TCK): Are Hedge Funds Right About ...
27/11/2015The 52-Week Low Club for Friday
26/11/2015Here is What Hedge Funds Think About Con-way Inc (CNW)
26/10/2015A Closer Look at Freeport-McMoRan’s 3Q15 Earnings
22/10/2015Teck Resources stock up as operating earnings outshine write...
22/10/2015Teck Resources reports 3Q loss
22/10/2015Teck Reports Unaudited Third Quarter Results for 2015
22/10/2015Teck Resources reports quarterly loss on C$2.2 bln charge
20/10/2015Teck Announces Appointment of Lawrence Watkins as Vice Presi...
12/10/2015Teck draws long-term upside play
08/10/2015After Freeport-McMoRan’s October Two-Month High, What Next?
07/10/2015Teck Announces Silver Streaming Agreement with Franco-Nevada
30/09/2015How is Rio Tinto Weathering the Copper and Coal Price Downtu...
28/09/2015Teck's Q3 2015 Financial Results and Investors' Conference C...
25/09/2015The 52-Week Low Club for Friday
20/09/2015Could Southern Copper Offer Stable Returns in Global Sell-Of...
14/09/2015Moody's cuts Teck Resources debt rating to junk
11/09/2015Capex Cut Could Help Improve Freeport-McMoRan’s Balance Shee...
10/09/2015Teck Named to Dow Jones Sustainability World Index
10/09/2015Anglo American seen likely to cut dividend as metal prices f...
01/09/2015Teck Media and Investor Webcast Advisory
28/08/2015Teck/Goldcorp to Merge Chilean Projects for Better Returns
27/08/2015Goldcorp Inc. (USA) (GG) And Teck Resources Ltd (USA) (TCK) ...
27/08/2015Goldcorp and Teck Combine El Morro and Relincho Projects in ...
19/08/2015How To Play Copper Long Term Amid A Low Prices Environment
18/08/2015The 'Elusive' Bottom Might Still Not Be In For Metals & Mini...
13/08/2015Freeport-McMoRan Continues to Trade Weakly: Investor Takeawa...
23/07/2015Miner Teck beats expectations, eyes further coal cutbacks
23/07/2015Teck Reports Unaudited Second Quarter Results for 2015
23/07/2015Teck Resources beats 2Q profit forecasts
14/07/2015Large trade bets on Teck rebound
09/07/2015Teck Announces Carmen de Andacollo Gold Stream
17/06/2015Copper Demand Takes a Hit as Car Sales Sputter in China
11/06/2015Dodge & Cox Buys 2 New Stocks
27/04/2015Chilean Refined Copper Production Falls to 2-Year Low
27/04/2015US Copper Demand Strong in Auto Sector, Appliances
27/04/2015Teck Announces Subscription to Erdene Placement
24/04/2015No Major Surprises in Freeport-McMoRan’s 1Q Earnings
24/04/2015Teck Reports Voting Results from Annual and Special Meeting
21/04/2015Teck Resources says China coal demand weakens; cuts dividend
21/04/2015CANADA STOCKS-TSX slides as resource shares drop, profit-tak...
21/04/20156:22 am Teck Resources misses by $0.06, misses on revs
21/04/2015Teck Announces Dividend
21/04/2015Teck Reports Unaudited First Quarter Results for 2015
21/04/2015Teck Resources cuts dividend by two-thirds on lower prices
17/04/2015What to Watch in the Week Ahead and on Monday, April 20
13/04/2015Gibson Energy to build 900,000 barrels of crude storage in A...
13/04/2015Teck Provides Update on Fort Hills Marketing and Logistics
05/04/2015Teck Reports Incident at Greenhills Operations
02/04/2015Why Freeport Investors Should Track China’s Automobile Indus...
02/04/2015Building Sales in China Fell Steeply in February 2015
01/04/2015Bull Market Excesses Hit the Chinese Copper Industry
01/04/2015Weakness Seen in Teck Resources (TCK): Stock Tumbles 10% - T...
01/04/2015CANADA STOCKS-TSX set to open higher
31/03/2015Movado and CBRE Group are big market movers
31/03/2015CANADA STOCKS-TSX steady as Teck decline offsets banks' rise
31/03/2015How China Became the Global Copper Giant
31/03/2015CANADA STOCKS-TSX set for lower open ahead of GDP data
31/03/2015PRESS DIGEST- Canada - March 31
25/03/2015Teck's Q1 2015 Financial Results and Investors' Conference C...
25/03/2015Teck Announces Appointment of Andrew Stonkus as Senior Vice ...
24/03/2015Ill Wind Blowing On Copper, Aluminum Producers
17/03/2015Teck Announces Appointment of Andrew Stonkus as Senior Vice ...
17/03/2015How is Freeport reacting to lower energy prices?
17/03/2015Lower energy prices a negative for Freeport-McMoRan
17/03/2015How lower copper prices impact Freeport-McMoRan
11/03/2015What part of Freeport’s financials should investors track?
10/03/2015How’s Freeport doing with its energy assets?
10/03/2015Why Freeport’s North American operations are so important
09/03/2015Freeport-McMoRan’s global mining portfolio
06/03/2015How Freeport is responding to regulatory changes in Indonesi...
06/03/2015Why asset sales won’t be easy for Freeport-McMoRan
06/03/2015An investor’s guide to Freeport-McMoRan
22/01/2014Named to the Global 100 Most Sustainable Corporations List
16/01/2014Media and Investor Audiocast Advisory
20/11/2013Announces Dividend
17/11/2013Uranium | Silver Market Review | Teck
13/11/2013Media and Investor Webcast Advisory
17/10/2013Acquires East Kootenay Lands
13/09/2013Named to Dow Jones Sustainability World Index
05/09/2013Announces Exercise of Strait Minerals Warrants
16/07/2013Copper Fox Metals and Teck Resources form Schaft Creek Joint...
26/06/2013Receives Regulatory Approval for Renewal of Share Buy-Back P...
11/06/2013Announces Subscription to Horizonte Minerals Share Placement
07/06/2013Announces Asset Exchange Agreement
07/06/2013Recognized for Corporate Citizenship and Social Responsibili...
09/05/2013Announces Subscription to True Gold Mining Share Placement
07/05/2013Media and Investor Webcast Advisory
27/04/2013(Port)Reports Voting Results from Annual General Meeting
24/04/2013Announces Dividend
16/04/2013Receives B=2EC=2E Ministry of Environment Area Based Managem...
03/04/2013UNICEF Canada and Teck Launch Partnership to =?ISO-8859-1?Q?...
20/02/2013Media and Investor Webcast Advisory
19/02/2013The Micronutrient Initiative, Government of Canada and Teck ...
23/01/2013Named to Global 100 Most Sustainable Corporations List
14/01/2013Media and Investor Webcast Advisory
09/11/2012Announces New Vice President Appointments
19/10/2012Announces Redemption of Notes
15/09/2012Named to Dow Jones Sustainability World Index
14/09/2012Announces Vice President Appointments
10/09/2012Announces Agreement as to Certain Facts in Upper Columbia Ri...
05/09/2012Media and Investor Webcast Advisory
16/08/2012Announces Subscription to Strait Minerals Share Placement
31/07/2012Announces Pricing of US$1.75 Billion Notes Offering
09/07/2012Announces Temporary Withdrawal of Quebrada Blanca Phase 2 SE...
06/07/2012(Cardinal River)Announces New Collective Agreement at Cardinal River Operati...
28/06/2012Marks Canada Day with Trans Canada Trail Investment
26/06/2012Receives Regulatory Approval for Renewal of Share Buy-Back P...
19/06/2012Announces Subscription to Horizonte Minerals Share Placement
09/06/2012Announces New Collective Agreement at Trail Operations and R...
01/06/2012Announces Tentative Collective Agreement at Trail Operations
15/05/2012=?ISO-8859-1?Q?The=20Micronutrient=20Initiative,=20Governmen...
10/05/2012Media and Investor Webcast Advisory
04/04/2012Announces Closing of SilverBirch Transaction
19/03/2012and China's Ministry of Agriculture Sign Agreement to Promot...
14/03/2012Media and Investor Advisory
23/02/2012Media and Investor Webcast Advisory
17/02/2012Announces Redemption of US$1.051 Billion Principal Amount of...
17/02/2012Announces Pricing of US$1.00 Billion Notes Offering
16/02/2012Announces Notes Offering
09/02/2012(Port)Reports Unaudited Results for 2011
08/02/2012Announces New Collective Agreement at its Quebrada Blanca Op...
27/01/2012and BASF Announce Partnership to Reduce Zinc Deficiency Thro...
18/01/2012Media and Investor Webcast Advisory
07/01/2012(Carmen De Andacollo)Announces New Collective Agreement at Carmen de Andacollo
20/12/2011Closes Strait Gold Placement
28/11/2011Media and Investor Webcast Advisory
22/09/2011(Highland Valley)Announces Major Upgrades at Trail and Highland Valley Operat...
06/09/2011Media and Investor Webcast Advisory
02/09/2011and Ridley Terminals Announce Coal Shipment Agreement
30/06/2011Announces Pricing of US$2.0 Billion Notes Offering
29/06/2011Announces Notes Offering
23/06/2011Receives Regulatory Approval for Share Buy-Back Program
20/06/2011s Coal Guidance
12/05/2011Reaches Agreement at Community Justice Forum
06/04/2011Announces Extension of its Odd Lot Selling Program
14/03/2011Announces Coal Production Guidance
04/03/2011Announces Coal Shipment Agreement with Westshore
24/02/2011Announces Odd Lot Selling Program
17/08/2010Notes Offering Closes
09/08/2010Increases Its Previously Announced Cash Tender Offer
04/08/2010Announces Pricing of US$750 Million of 7 and 30 Year Notes
16/07/2010Provides Additional Update on Greenhills Incident
21/06/2010Media & Investor Webcast Advisory
26/05/2010To Renew Debt Shelf Prospectus
20/05/2010Aqqaluk to Proceed
07/05/2010Media and Investor Webcast Advisory
22/04/2010Dividend
23/03/2010Annual Disclosure Documents
05/03/2010Waneta Dam Sale Closing
01/03/2010Confirms No Damage to Chilean Mines
17/02/2010Comments on Additional Permit Appeal at Red Dog
12/02/2010Agreement with Westshore on Coal Shipments
04/02/2010BCUC Approval of Waneta Dam Transaction
25/01/2010Closing of Andacollo Gold Royalty Transaction
08/12/2009Coal Production Guidance
23/09/2009Recognized for Outstanding Achievement in Mine Reclamation
31/07/2009Full Production at Trail and Update on Coal Sales
06/07/2009Secures Reduction in Rail Costs
25/06/2009Reports on Geotechnical Issues Identified at Highland Valley
23/06/2009Recognized for Excellence in Mine Safety and Mine Rescue & F...
22/06/2009Provides Coal Update
20/02/2009Sale of El Brocal
08/01/2009Announces Global Workforce Reduction of 13% and 2009 Coal Pr...
01/10/2008 Announces the Creation of Five Strategic Business Units and...
30/09/2008 Enters Into Definitive Credit Agreements
01/10/2008Announce Receipt of Final Order and Satisfaction of Closing ...
29/09/2008Provides Update on Financing for Fording Transaction
11/09/2008Named to Dow Jones Sustainability Index
02/08/2008Global Copper Corp=2E and Teck Cominco Limited Announce Clos...
29/07/2008Acquire Fording Canadian Coal Trust Assets
28/07/2008Global Copper Shareholders Approve Teck Cominco Transaction
11/06/2008Metals Ltd=2E and United Steelworkers Reach Contract Agreeme...
31/05/2008on Trail Incident From Teck Cominco Metals Limited
30/05/2008Statement From Teck Cominco Metals Limited
23/04/2008Announces Dividend
14/04/2008Acquire Global Copper Corp.
07/03/2008Receives Regulatory Approval For Share Buy-Back Program
08/01/2008U.S. Supreme Court Denies Teck Cominco's Petition for Review...
26/11/2007UPDATES PROGRESS AT THE ROCMEC 1 GOLD PROPERTY
21/11/2007Announces Dividend
31/10/2007 Files Shelf Prospectus
28/09/2007Completes Acquisition of Aur Resources
24/09/2007Increases Holding in Fording Canadian Coal Trust to 19.95%
20/09/2007Announces Acquisition of Additional 5% Interest in Fort Hill...
30/08/2007Commences Compulsory Acquisition of Remaining Aur Shares
22/08/2007Acquires Approximately 93% of Aur Resources Common Shares
13/08/2007European Commission Approval for Aur Resources Transaction
03/08/2007Announces Canadian Competition Approval for Aur Resources Tr...
14/07/2007Review Coroner's Inquest Jury Recommendations
03/07/2007CORRECTION FROM SOURCE: Teck Cominco Makes Friendly C$41 Per...
28/06/2007Announces Fort Hills Design Basis Approval
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
NYSE (TCK)TORONTO (TCK-B.TO)
33,98+1.01%33,57+1.60%
NYSE
US$ 33,98
14/01 16:10 0,340
1,01%
Cours préc. Ouverture
33,64 33,24
Bas haut
32,82 34,34
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  33,98 -%
Volume var. 1 mois
4 241 389 -%
24hGold TrendPower© : 22
Produit Coal - Copper - Gold - Lead - Molybdenum - Silver - Zinc
Développe Copper - Gold - Lead - Molybdenum - Silver - Zinc
Recherche Coal - Copper - Gold - Lead - Molybdenum - Silver - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202217,90%34,7828,66
202158,79%29,9217,31
20204,25%9,9410,00
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,20 US$+1,45%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,46 CA$-2,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,82 CA$-1,43%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,82 CA$-4,21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,80 US$+0,73%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :