Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Highland Gold Mining Ltd

Publié le 14 août 2015

Trading Update for the First Half of 2015

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada |

Trading Update for the First Half of 2015

Released: 14 August 2015

Highland Gold Mining Limited ("Highland Gold" or the "Company") announces its operational update for the half-year ending June 30, 2015. The Company expects to release a full report of the interim results, including financial results for the period, on or about September 23, 2015.

HIGHLIGHTS

  • Total H1 2015 production of 121,242 oz of gold and gold equivalents at Mnogovershinnoye ("MNV"), Novoshirokinskoye ("Novo"), and Belaya Gora, a 1% increase from 120,121 oz in H1 2014.
  • Continued optimisation of operations at the Belaya Gora processing plant, with gold recovery rates reaching 76% on average (21% higher than in H1 2014) and 80.9% in June.
  • Steady operations at Novo, with ore processing volumes set to rise to an annual rate of 630,000 - 650,000 tonnes by year-end.
  • Work on Kekura progressing as planned, including state approval of Russian-compliant reserves, finalisation of processing studies; and initiation of work on technical design documentation.
  • Guidance for full-year 2015 output of gold and gold equivalents unchanged at 270,000 - 285,000 ounces.

OPERATIONS

Mnogovershinnoye (MNV) - Khabarovsk Region, Russia

Processing plant throughput for the first six months of 2015 was 705,493 tonnes of ore, yielding 42,451 oz of gold. Recovery rates averaged 89%, a slight decrease from the same period in 2014. The dip was due to changes in the mineral composition of the ore and a decline in gold grades.

Open-pit and underground ore production totalled 619,749 tonnes. Underground development recorded a 7% increase to 4,287 metres from the previous six months.

The average ore grade was 2.15 g/t, which is 37% less than the same period of 2014. The reduction is due to the commencement of mining at the Verkhneye, Tikhoye, and Valunistoye ore bodies, which have slightly lower gold grades.

MNV 100% Unit H1 2014 H2 2014 H1 2015
Waste stripping 1,194,036 1,310,227 1,780,663
Underground development M 5,151 4,015 4,287
Open pit ore mined T 300,569 249,270 289,420
Open pit ore grade g/t 3.71 3.2 2.08
Underground ore mined T 292,877 316,779 330,329
Underground ore grade g/t 3.11 2.7 2.21
Total ore mined T 593,446 566,049 619,749
Average grade mined g/t 3.42 2.94 2.15
Ore processed T 629,854 736,604 705,493
Average grade processed g/t 3.31 2.81 2.08
Recovery rate % 92.5 91.1 89.0
Gold produced Oz 61,761 60,559 42,451

Novoshirokinskoye (Novo) - Zabaikalsky Region, Russia

Novo continued to meet expectations in terms of ore production. Work was carried out over the reporting period to optimise mining and processing technology, the result of which will be an increase in ore processing to an annual rate of 650,000 tonnes by the end of the year. Furthermore, the Company is successfully implementing a project for the extension of underground operations, and stoping operations have commenced at the 700 metre horizon.

In order to handle increased throughput, a new flotation circuit will be installed in H2 with the goal of maintaining the 85.3% recovery rate achieved in the first half, which is 1.1% higher than in the same period last year.

Novo 100% Unit H1 2014 H2 2014 H1 2015
Underground development m 5,162 5,155 5,312
Ore mined t 280,987 302,485 327,629
Average grade mined* g/t 5.6 6.6 5.4
Ore processed t 281,137 301,685 331,551
Average grade processed* g/t 5.6 6.6 5.4
Recovery rate* % 84.3 85.3 85.3
Gold produced (100%)* oz 42,949 54,826 48,634

* Approximate Au equivalent
Mined ore metal content breakdown = Au 2.92 g/t, Ag 67.48 g/t, Pb 2.12%, Zn 0.84% **

** The Company has re-estimated the Novo deposit's ore reserves based on the results of mining and grade control drilling as of January 01, 2014. The recalculation has received approval from Russian regulatory authorities, however, updated JORC Ore Reserves have not yet been determined. Total Russian-classification reserves increased by 77% from 9.42 million tonnes of ore to 16.69 million tonnes. The figure includes lower reserves of Pb (down 4% from 348.7 kt to 334.8 kt) and Zn (down 4% from 169.9 kt to 159.1 kt), but increased reserves of Au (up 24% from 30.8 kt to 38.4 kt) and Ag (up 18% from 811.1 kt to 959.7 kt).

Belaya Gora - Khabarovsk Region, Russia

First-half ore production at Belaya Gora reached 885,314 tonnes, an increase of 91% from the same period of 2014 and in line with project forecasts. The average ore grade was 1.63 g/t, a 4% increase over the same period last year.

The Belaya Gora plant saw the full commissioning of its first processing stage in H1, with nameplate production parameters achieved at most of the plant's equipment. Ore processing reached 674,985 tonnes, which is 46% higher than in the same period last year. The average recovery rate was 76%, which is 21% higher than in H1 2014 and also in line with project parameters. The recovery rate reached 80.9% in June of this year.

The process of commissioning the plant's second stage continues, with all equipment in place and optimisation of the process flow underway. Design documentation and a tender process have been completed for the installation of automated process control systems. Additional Knelson separators were also delivered to site.

RC grade control drilling was introduced for the first time at Belaya Gora during the first half of the year. This will allow the Company to reduce dilution as well as to clarify ore contours, thus providing improved production forecasting accuracy going forward.

The government's Main Ecological Expert Review Panel issued a positive ruling on design documentation for the construction of a solid waste landfill in the vicinity of the nearby village of Chlya. Project materials are currently undergoing the Main State Expert Review, and a construction contractor is being selected.

Belaya Gora 100% Unit H1 2014 H2 2014 H1 2015
Waste stripping 767,690 1,137,601 1,557,257
Ore mined T 465,610 611,457 885,314
Average grade mined g/t 1.32 1.52 1.63
Ore processed T 462,333 764,972 674,985
Average grade processed g/t 1.81 1.45 1.87
Recovery rate % 62.79 61.6 75.89
Gold produced oz 15,411 23,431 30,157

DEVELOPMENT PROJECTS

Kekura - Chukotka Autonomous District, Russia

The Kekura project site took delivery of 6,300 tonnes of materials and equipment in the first half of 2015, ensuring supplies for ongoing activities and preparations for construction.

A scoping study was completed in H1, and work is now being finalised on a process study by Irgiridmet, including the selection of an optimal system for processing Kekura ores and subsequent delivery of a Processing Flow Sheet. Furthermore, VNIMI has completed calculations for the ideal parameters for dump location and open pit wall stability.

Work has also commenced on drafting technical design documentation for mining the Kekura deposit. The general engineering contractor is Zabaikalzolotoproyekt LLC. Design documentation is expected to be submitted to the Main State Expert Review by the end of 2015.

Preparation for large-scale construction work during the 2016 construction season is currently in progress.

Taseevskoye - Zabaikalsky Region, Russia

In H1 2015, Zabaikalzolotoproyekt worked on the Technical and Economic Calculation (TEC) of the viability of mining and processing ores from the Taseevskoye deposit, Sredny Golgotay deposit, and Baley ZIF-1 tailings. The TEC is being carried out as per recommendation from regulators Rosnedra in order to update the conditions of subsoil use licences for these deposits. TEC-related deliverables are currently being reviewed.

Preparation work for the development of a scoping study for joint development of the Baley area ore deposits is currently underway. A tender was completed and a contractor, Amec Foster Wheeler, selected. A service agreement is currently being finalised.

In the first half of 2015, the Company received regulatory permission and conducted a pilot test for batch processing of ores from Sredny Golgotay and Novo using the existing gravity-flotation process at Novo. Based on these test results, a flowsheet for processing the two types of ore at the Novo processing plant has been developed.

The Company also received mining schedule approval for Sredny Golgotay from Rosnedra, along with an extension in license terms.

Lyubov - Zabaikalsky Region, Russia

In order to maintain compliance with licence requirements, the Company submitted technical design for the Lyubov project for state review. In the first half of the year, Rosnedra approved the documentation and extended licence terms.

EXPLORATION

Mnogovershinnoye - Khabarovsk region, Russia

Throughout 2015, the Company is focused on near-mine exploration at MNV to clarify existing resources and target additional resources in order to enhance life of mine for both underground and open-pit operations.

At the Lower Horizon Mnogovershinnoye licence, the Company received regulatory approval for an underground exploration drilling programme of 9,300 metres at the lower horizons of Severnoye ore body to delineate additional resources in the vicinity of existing underground infrastructure. Drilling commenced in late Q2 2015 and will be completed in H2 2015.

At the Western Flank Mnogovershinnoye license, immediately adjacent to the mine operations (Chaynoye prospect), a follow-up exploration programme of 2,000 metres of trenching was designed in H1 2015, with plans to execute in H2 2015 in order to investigate a potential open pit resource at the site of a prominent gold anomaly identified in 2014.

Kekura - Chukotka region, Russia

In Q1 2015, the Company submitted a TEO study to the State Committee on Reserves (GKZ) for registration of reserves with the state. In Q2 2015, GKZ approved (C1+C2) category reserves of 62.1 tonnes (1.99 million oz) of gold, including open-pit mineable reserves of 45.6 tonnes (1.47 million oz) and 16.5 tonnes (0.53 million oz) destined for underground mining. The reserve approval marks significant progress in the mine's development, facilitating detailed project design according to Russian mining regulations

In H1 2015, the Company also initiated an updated independent JORC-compliant resource/ reserve evaluation by an international consultancy, with final results expected in Q3 2015.

Final results from an exploratory prospecting programme completed in 2014 were received in H1 2015 and indicate areas with significant gold mineralization in the immediate vicinity of the Kekura deposit, highlighting near-mine upside potential which the Company plans to pursue with follow-up exploration in the future.

In addition, the Company also initiated a small exploration programme for alluvial gold at selected prospects on the license area which is planned to be completed in autumn 2015.

Other Projects

No field work was conducted in H1 2015 at the Belaya Gora Flanks, Blagodatnoye, Verkhne-Krichalskaya and Unkurtash projects as the Company prioritised other projects.

Qualified Persons Statement: Mr. Werner Klemens, Head of Exploration at Highland Gold, has reviewed and verified the information contained in this release with respect to reserve and resource matters. Mr. Klemens holds a Ph.D. in Geology from the University of Toronto. He has more than 17 years' experience in mineral exploration and is a fellow of the Geological Association of Canada. A rigorous quality assurance programme complying with international standards is in effect at all exploration projects and includes duplicate sampling, insertion of standards, and check assaying at external laboratories.

HEALTH, SAFETY, AND ENVIRONMENT

The Company remains dedicated to ensuring the safety of its employees and to managing production risks as well as training staff and encouraging employee responsibility for work safety.

The Lost Time Incident ("LTI") rate (defined as the number of lost time incidents for every 200,000 man hours worked) fell by 16% to 0.25 in H1 2015 compared to 0.30 in H1 2014. A total of four lost time incidents were recorded across the Company during the period versus five incidents in H1 2014.

Some 932 employees attended a one-day safety induction course, 190 employees received workplace safety training regarding hazardous production risks (3-5 day courses), and 166 employees were trained and tested on industrial safety (7-30 day programmes).

Incoming inspection of overalls, footwear, and personal protective equipment was carried out at Mnogovershinnoye JSC (MNV) and Novoshirokinsky Rudnik OJSC (Novo) with the involvement of a specialized organization to check their compliance with the Company's PPE Standard. A company-wide standard, entitled "Key Rules of Behavioural Safety", was enacted.

The Company's environmental practices remain fully compliant with regulatory and legislative requirements. The ISO 14001 accredited environmental management system has been successfully implemented at the management company offices and the Mnogovershinnoye, Belaya Gora and Novoshirokinskoye mines. Certificates have been obtained to confirm the Company's compliance with environmental requirements. Environmental safety training was given to 160 employees at MNV, Belaya Gora and Novo, and 122 employees received training relating to safe methods for handling production waste.

FOR FURTHER INFORMATION PLEASE CONTACT:

Highland Gold

John Mann, Head of Communications
+ 7 495 424 95 21
Duncan Baxter, Non-Executive Director
+ 44 (0) 1534 814 202
Numis Securities Limited
(Nominated Adviser and broker)
John Prior, James Black
Paul Gillam
+44 (0) 207 260 1000
Peat & Co
(Joint Broker)
Charlie Peat
+44 (0) 207 104 2334
Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Highland Gold Mining Ltd

PRODUCTEUR
CODE : HGM.L
ISIN : GB0032360173
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Highland Gold est une société de production minière d'or basée au Royaume-Uni.

Highland Gold est en développement de projets d'or, d'argent, de palladium et de platine in Russia.

Ses principaux projets en production sont DARASUN et MNV-MNOGOVERSHINNOYE in Russia, ses principaux projets en développement sont NOVOSHIROKINSKOYE, TASEEVSKOYE, MAYSKOYE et FEDOROVA in Russia et ses principaux projets en exploration sont BELAYA GORA, LYUBOV, UNKURTASH et KASSAN in Russia.

Highland Gold est cotée au Royaume-Uni, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 97,5 milliards GBX (108,3 milliards US$, 91,4 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 01 juillet 2016 à 100,00 GBX, et son plus haut niveau récent le 18 novembre 2020 à 299,80 GBX.

Highland Gold possède 325 222 098 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Communiqués de Presse de Highland Gold Mining Ltd
27/05/2016Results of the AGM 2016
23/05/2016Q1 2016 Operational Results
19/05/2016Kekura Resource and Reserve Estimate and Pre-Feasibility Stu...
20/04/2016HIGHLAND GOLD MINING LIMITED
15/04/2016Full Year Results Announcement Date
27/01/2016Trading Update for the Second Half of 2015
15/01/2016New CEO appointment
22/04/2015Highland Gold Mining Limited announces Final results for the...
09/04/2015Directorate Change
10/12/2014Production Update
28/10/2014Mnogovershinnoye Lower Horizon Acquisition
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
LSE (HGM.L)Other OTC (HGHGF)
299,80-0.99%3,85-1.28%
LSE
GBX 299,80
18/11 12:37 -3,00
-0,99%
Cours préc. Ouverture
302,80 302,60
Bas haut
299,60 302,60
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  299,80 -%
Volume var. 1 mois
3 140 833 -%
24hGold TrendPower© : 24
Produit Gold
Développe Gold - Palladium - Platinum
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 04/03/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202056,47%314,00150,00
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,24 US$+2,51%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,60 CA$-3,35%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,13 CA$+3,40%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,89 CA$+1,07%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,80 US$+0,36%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :