Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Capstone Mining Corp.

Publié le 18 janvier 2016

Capstone Extends Pinto Valley Mine Life to 2039

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Capstone | Copper | Mines | Zinc |

Capstone Extends Pinto Valley Mine Life to 2039

(all amounts in US dollars)

Highlights

  • Proven and Probable Mineral Reserves increased to 473.8 million tonnes grading 0.31% copper, resulting in mine life to 2039, a 13 year increase over the previously published PV2 PFS (2014).
  • Life of Mine ('LOM') average annual production of copper in concentrate is estimated at 122.8 million pounds of copper and 1.9 million pounds of molybdenum.
  • Mill production increases to 20.4 million tonnes per year (56,000 tonnes per day ('tpd')) in 2017 from 19.8 million tonnes (54,000 tpd) in 2016 through improvements in maintenance and operational practices.
  • Expected LOM C1 cash costs are estimated to be per pound of payable copper (net of by-product credits and including capitalized stripping as an operating cost).
  • No significant capital is required for PV3 until stripping commences in 2020.

'The PV3 PFS adds significant value to the by more than doubling the remaining mine life to 23 years and increasing throughput by 8% without any major capital investment,' said , President and CEO of Capstone.

'The PV3 mine plan and capital schedule closely mirrors the PV2 mine plan for the next two years, but with increased throughput rates. The mine plan calls for relatively higher grade in 2016 and 2017 with low sustaining capital requirements, resulting in a C1 cost, including capitalized stripping, ranging from per pound of copper and an all-in cost ranging from per pound of copper in those years,' continued Mr. Pylot. 'The grade profile allows us to weather the current copper price environment and the mine plan gives us significant flexibility, with the next major decision point being to advance the first PV3 pushback in 2020. Our focus will continue to be on process improvements, with significant leverage to the upside when copper prices improve.'

(1)

This is alternative performance measure; please see 'Alternative Performance Measures' at the end of this release.

Pre-Feasibility Study
The PV3 PFS project was directed by Capstone with contributions from (geology, resource estimation), (reserve, geotechnical, mine design and schedule, equipment selection), (metallurgy), (tailings), (environmental), and Capstone (infrastructure and financial modelling). Personnel from each of these companies will be signing off as a Qualified Person ('QP') as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ('NI 43-101') for their specific responsibilities.

is a conventional open pit operation, with drilling, blasting, loading and hauling. The mill operation consists of a primary, secondary, tertiary crushing system, six ball mills, and flotation concentration.

The mill produces copper and molybdenum concentrates. The PV3 PFS contemplates that mill production increases will be achieved through improved maintenance and operating practices, resulting in increased operating hours and increased hourly throughput.

Mineral Resources
The mineral resources are effective . The estimate includes results from drill programs conducted in 2015 and a revised geological model.

Mineral Resource Estimate, January 2016, at a 0.17% Cu Cut-off Grade

Metric Tonnes

millions

Copper
%

Molybdenum
%

Contained Copper
M lbs

Contained

Molybdenum

M lbs

Measured (M)

647.9

0.34

0.008

4,843.7

118.6

Indicated (I)

772.3

0.26

0.006

4,387.8

105.6

Total M&I

1,420.2

0.30

0.007

9231.5

224.1

Inferred

126.0

0.25

0.005

686.7

13.9

(2)

Mineral Resources are reported inclusive of Mineral Reserves.

(3)

Totals may not sum exactly due to rounding.

(4)

QP Garth Kirkham, P. Geo., Kirkham Geosystems Ltd.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Resource Estimates do not account for mineability, selectivity, mining loss and dilution. These Mineral Resource Estimates include Inferred Mineral Resources that are normally considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is also no certainty that these Inferred Mineral Resources will be converted to Measured and Indicated categories through further drilling, or into Mineral Reserves, once economic considerations are applied.

Mineral Reserves
The PV3 PFS Mineral Reserve was estimated without any tailings or land boundary constraints. The study assumes that additional permits and land are available when required (see permitting section below). The Mineral Reserve was developed by tabulating the contained measured and indicated (proven and probable) material inside of the designed pit at the mill cut-off grades.

Mineral Reserve Estimate, January 2016

Classification

Cut-off Grade

Mineral Reserve

Contained Metal

Cu %

M tonnes

Cu %

Mo %

Cu M lbs

Mo M lbs

Proven

0.17-0.18

350.1

0.33%

0.009%

2,550

72

Probable

0.17-0.18

123.7

0.25%

0.007%

691

20

Proven + Probable

0.17-0.18

473.8

0.31%

0.009%

3,242

92

(5)

Economic inputs to the block model were USD$2.75/lb copper, USD$12.50/lb Molybdenum.

(6)

Cut-off Grade - variable between 0.17% Cu to 0.18% Cu through the LOM. The minimum mill feed cut-off grade is 0.17% Cu, but in years where sufficient higher grade mill feed is available, the mill cut-off grade may be higher, resulting in material between the yearly mill cut-off grade and 0.18% being stockpiled. The additional 0.01% from 0.17% to 0.18% is to cover the additional cost of rehandling material from the stockpile to the mill. Material between 0.17% to 0.18% that is not fed directly to the mill is not stockpiled as it cannot pay for the mining re-handling cost at the price assumptions used.

(7)

QP - John Marek, Independent Mining Consultants Inc.

Mine Production Schedule
The increase in ore reserves will extend mining to 2038 and mineral processing to 2039, an increase of 13 years from the current mine plan of 2026. Total mine production will increase to approximately 48.5 million tonnes in 2018 through 2031 then decreasing thereafter through 2039. Life of mine strip ratio is 0.92:1.

Mine Plan

Year

Mill Cut-Off

Ore Mined to Mill

Ore Mined to Low Grade Stockpile

Waste

Total
Mined

Cu %

M tonnes

Cu %

Mo%

M tonnes

Cu %

Mo%

M tonnes

M
tonnes

2016

0.18

19.76

0.36%

0.008%

0.00

0.00%

0.000%

22.72

42.48

2017

0.19

20.44

0.34%

0.008%

0.99

0.18%

0.007%

23.47

44.90

2018

0.19

20.44

0.32%

0.011%

1.84

0.19%

0.007%

26.22

48.50

2019

0.17

20.44

0.32%

0.011%

0.00

0.00%

0.000%

28.16

48.60

2020

0.18

20.44

0.35%

0.013%

0.00

0.00%

0.000%

28.06

48.50

2021

0.19

20.44

0.35%

0.008%

0.81

0.19%

0.005%

27.25

48.50

2022

0.18

20.44

0.32%

0.007%

0.00

0.00%

0.000%

28.06

48.50

2023

0.17

20.44

0.29%

0.007%

0.00

0.00%

0.000%

28.06

48.50

2024

0.17

20.44

0.29%

0.008%

0.00

0.00%

0.000%

28.06

48.50

2025

0.17

20.44

0.36%

0.010%

0.00

0.00%

0.000%

28.06

48.50

2026

0.17

20.44

0.40%

0.014%

0.00

0.00%

0.000%

28.06

48.50

2027

0.17

20.44

0.33%

0.014%

0.00

0.00%

0.000%

28.06

48.50

2028

0.17

20.44

0.30%

0.010%

0.00

0.00%

0.000%

28.06

48.50

2029

0.22

20.44

0.28%

0.009%

9.57

0.20%

0.007%

18.49

48.50

2030

0.22

20.44

0.31%

0.009%

1.60

0.20%

0.007%

26.46

48.50

2031

0.18

20.44

0.32%

0.010%

0.00

0.00%

0.000%

28.06

48.50

2032

0.19

20.44

0.31%

0.009%

0.15

0.19%

0.006%

4.10

24.69

2033

0.17

20.44

0.28%

0.008%

0.00

0.00%

0.000%

3.00

23.44

2034

0.17

20.44

0.29%

0.007%

0.00

0.00%

0.000%

3.01

23.45

2035

0.17

20.44

0.27%

0.008%

0.00

0.00%

0.000%

1.38

21.82

2036

0.17

20.44

0.25%

0.008%

0.00

0.00%

0.000%

0.29

20.73

2037

0.17

20.44

0.29%

0.006%

0.00

0.00%

0.000%

0.00

20.44

2038

0.17

9.87

0.28%

0.004%

0.00

0.00%

0.000%

0.00

9.87

Total

458.87

0.31%

0.009%

14.97

0.20%

0.007%

437.08

910.92

The PV3 PFS has identified the need for additional mining equipment that will be purchased in 2019 to enter service in 2020 to move the increased waste and ore tonnages.

Major Mining Equipment

Current Fleet

Additional Fleet at Peak (2020)

Drills

3

0

Cat 994 Loaders

2

0

Hydraulic Shovel

2

0

Cat 789

18

2

Processing
In the fourth quarter of 2015 mill production averaged above 54,000 tpd, up from the planned 52,000 tpd, accomplished through improvements in maintenance and operating practices. Continuation of these improvements is expected to maintain production at 54,000 tpd in 2016 and increase to 56,000 tpd in 2017. Metal recoveries average 88% for copper and 46% for molybdenum.

Mill Ore Schedule

Year

Mill Feed

Mill Head Grade

Payable Copper

Payable Moly

Copper Cathode

M tonnes

% Cu

% Mo

Concentrate M lbs

M lbs

M lbs

2016

19.76

0.36%

0.008%

133.3

1.0

4.8

2017

20.44

0.34%

0.008%

130.9

1.4

4.5

2018

20.44

0.32%

0.011%

120.0

2.2

4.2

2019

20.44

0.32%

0.011%

124.4

2.2

0.0

2020

20.44

0.35%

0.013%

134.8

2.6

0.0

2021

20.44

0.35%

0.008%

132.2

1.6

0.0

2022

20.44

0.32%

0.007%

122.2

1.3

0.0

2023

20.44

0.29%

0.007%

110.5

1.3

0.0

2024

20.44

0.29%

0.008%

110.5

1.6

0.0

2025

20.44

0.36%

0.010%

138.3

2.0

0.0

2026

20.44

0.40%

0.014%

153.9

2.9

0.0

2027

20.44

0.33%

0.014%

127.4

2.8

0.0

2028

20.44

0.30%

0.010%

115.7

2.0

0.0

2029

20.44

0.28%

0.009%

106.5

1.7

0.0

2030

20.44

0.31%

0.009%

119.1

1.9

0.0

2031

20.44

0.32%

0.010%

122.2

2.1

0.0

2032

20.44

0.31%

0.009%

118.3

1.8

0.0

2033

20.44

0.28%

0.008%

106.1

1.6

0.0

2034

20.44

0.29%

0.007%

110.0

1.4

0.0

2035

20.44

0.27%

0.008%

102.6

1.6

0.0

2036

20.44

0.25%

0.008%

95.2

1.7

0.0

2037

20.44

0.29%

0.006%

109.1

1.2

0.0

2038

20.44

0.24%

0.006%

90.2

1.2

0.0

2039

4.40

0.20%

0.007%

16.0

0.3

0.0

Total

473.8

0.31%

0.009%

2,749.4

41.4

13.4

Payable copper and molybdenum production will average 119 million pounds and 1.8 million pounds per year through to 2039. Historically the has produced between 200,000 to 250,000 ounces of silver annually. Silver has not been estimated in the geological model and is not included in the Mineral Resource or Reserve estimate. As a result, silver represents potential upside to the study and has not been included in the study or estimated C1 costs. Copper cathode production will be phased out starting in 2018 due to lower production, higher operating costs and the need for waste rock storage area.

The study assumes that 80% of the concentrate will be sold internationally and 20% domestically, achieving an average concentrate shipping cost of /wet metric tonne. Copper concentrate terms are estimated at /dry metric tonne treatment and /pound refining cost with 96.5% payable copper.

Infrastructure
has existing mine, mill, water and power related infrastructure to support operational needs for the expanded mine life and increased mine equipment.

The tailings storage facility #4 ('TSF4') will be raised an additional 175 feet (53 metres) above the current permitted height of 800 feet (244 metres). Upgrades to the tailings pumping system will be needed and additional land will be required from the (see permitting section below).

Capital Cost Estimate
The total PV3 life of mine sustaining capital cost estimate is summarized below:

PV3 PFS - Summary of Capital Costs $M

Item

Units

Value

Site Sustaining Costs

US$M

191.6

Mine Equipment Purchases and Rebuilds

US$M

182.6

Mine Equipment Component Replacements

US$M

253.1

Tailings

US$M

24.0

Total Capex

US$M

651.3

Closure Costs

US$M

143.4

Operating Cost Estimate

Summary of Average Life of Mine Operating Costs

Item

Units

Value

Mining Cost

$/tonne moved

1.67

Mining Cost

$/tonne milled

3.25

Milling Cost

$/tonne milled

5.10

G&A Cost

$/tonne milled

1.48

Total

$/tonne milled

9.83

Transportation/TC/RC

$/lb Cu payable

0.48

SX/EW Cost (2016-2018)

$/lb Cu payable

1.85

Life-of-Mine C1 Cash Cost (including cathode)

$/lb Cu payable

2.05

Life-of-Mine Sustaining Capital

$/lb Cu payable

0.24

Life-of-Mine All-In Cost

$/lb Cu payable

2.29

(1)

This is alternative performance measure; please see 'Alternative Performance Measures' at the end of this release.

Permitting
Extending the mine life to 2039 from 2026 will require revisions of two major permits:

  • Aquifer Protection Permit ('APP') issued by the ('ADEQ') to expand an existing tailings facility and permit a new mine waste rock storage facility.
  • An amendment to the Plan of Operations ('POO'), issued by the , related to:
    • Tailings storage expansion, 409 acres,
    • Mine expansion, 61 acres,
    • Outstanding permit renewals.

Technical Report
The full NI 43-101 Technical Report will be filed under Capstone's profile on SEDAR at www.sedar.com within 45 days of the date of this news release.

About
is a Canadian base metals mining company, focused on copper. We are committed to the responsible development of our assets and the environments in which we operate. Our three producing mines are the copper mine located in , US, the Cozamin copper-silver mine in Zacatecas State, and the copper mine in . In addition, Capstone has two development projects; the large scale 70% owned copper-iron project in Region III, , in partnership with , and the 100% owned Kutcho copper-zinc project in , as well as exploration properties in . Capstone's strategy is to continue extend the lives of our current mines with mineral resource and reserve expansions, maintain the optionality on the development project, prudently progress the exploration portfolio and grow through acquisitions in politically stable, mining-friendly regions. We will pace our growth with our financial capacity, ensuring we retain, as a priority, sufficient financial flexibility to meet the requirements of our existing operations and our committed development projects, while maintaining an adequate cushion to deal with market volatility and operating risks inherent in the mining industry. Our headquarters are in and we are listed on the (TSX). Further information is available at www.capstonemining.com.

Cautionary Note Regarding Forward-Looking Information
This document may contain 'forward-looking information' within the meaning of Canadian securities legislation and 'forward-looking statements' within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, 'forward-looking statements'). These forward-looking statements are made as of the date of this document and (the 'Company') does not intend, and does not assume any obligation, to update these forward-looking statements, except as required under applicable securities legislation.

Forward-looking statements relate to future events or future performance and reflect Company management's expectations or beliefs regarding future events and include, but are not limited to, statements with respect to the estimation of mineral reserves and mineral resources, the conversion of mineral resources to mineral reserves, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. In certain cases, forward-looking statements can be identified by the use of words such as 'plans', 'expects' or 'does not expect', 'is expected', 'outlook', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates' or 'does not anticipate', or 'believes', or variations of such words and phrases or statements that certain actions, events or results 'may', 'could', 'would', 'might' or 'will be taken', 'occur' or 'be achieved' or the negative of these terms or comparable terminology. In this document, certain forward-looking statements are identified by words including 'plan', 'estimated', 'indicates', 'contemplates', 'may' and 'expected'. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, risks related to changes in project parameters as plans continue to be refined; future prices of resources; possible variations in ore reserves; grade or recovery rates; assumptions related to geotechnical conditions of tailings facilities; accidents; dependence on key personnel; labour pool constraints; labour disputes; availability of infrastructure required for the development of mining projects; delays in obtaining financing or in the completion of development or construction activities; changes in general economic conditions; increased operating and capital costs; operating in foreign jurisdictions with risk of changes to governmental regulation; impact of climatic conditions; increasing energy prices; our ability to integrate new acquisitions into our operations, compliance with government regulation; reliance on, and potential delays, in approvals, licences and permits from governmental authorities; land reclamation and mine closure obligations; and other risks of the mining industry as well as those factors detailed from time to time in the Company's interim and annual financial statements and management's discussion and analysis of those statements, all of which are filed and available for review under the Company's profile on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Quality Assurance and National Instrument 43-101 Compliance
, P. Eng., Senior Vice President and Chief Operating Officer for Capstone, a QP under NI 43-101, reviewed and approved all Technical Information in this news release. The following QP's will author the technical report: , P.Eng., , P.Geo. of , . of , . of , Tony Freiman, P.E. of and . of

Based on the Mineral Resource Estimate, a standard methodology for pit limit analysis, mining sequence, and cut-off grade optimization, including application of mining dilution, process recovery, economic criteria and physical mine and plant operating constraints, has been followed to design the pit and determine the Mineral Reserve Estimate summarized in the Mineral Reserve table. Information on data verification and exploration information is included in the report titled ' 2014 Prefeasibility Study, NI 43-101 Technical Report, , ', dated .

Alternative Performance Measures
The items marked with a '' are alternative performance measures and readers should refer to Alternative Performance Measures in the Company's Consolidated Interim Management's Discussion and Analysis for the quarter ended as filed on SEDAR and as available on the Company's website.

Cautionary Note to
This news release contains disclosure that has been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of US securities laws. Without limiting the foregoing, this news release may refer to technical reports that use the terms 'Indicated' and 'Inferred' Resources. US investors are cautioned that, while such terms are recognized and required by Canadian securities laws, the does not recognize them. Under US standards, mineralization may not be classified as a 'Reserve' unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the Reserve determination is made. US investors are cautioned not to assume that all or any part of Indicated Resources will ever be converted into Reserves. US investors should also understand that 'Inferred Resources' have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically. It cannot be assumed that all or any part of 'Inferred Resources' will ever be upgraded to a higher category. Therefore, US investors are also cautioned not to assume that all or any part of Inferred Resources exist, or that they can be mined legally or economically. Accordingly, information concerning descriptions of mineralization and resources contained in this news release may not be comparable to information made public by US companies subject to the reporting and disclosure requirements of the .

Lire la suite de l'article sur www.noodls.com

Capstone Mining Corp.

PRODUCTEUR
CODE : CS.TO
ISIN : CA14068G1046
CUSIP : 14067U104
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Capstone Mining est une société de production minière de cuivre basée au Canada.

Capstone Mining est productrice de cuivre, d'argent, d'or, de plomb et de zinc au Canada et au Mexique, en développement de projets d'argent, de cuivre, d'or et de zinc au Canada.

Ses principaux projets en production sont MINTO MINE au Canada et COZAMIN BACIS au Mexique et son principal projet en développement est KUTCHO au Canada.

Capstone Mining est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 3,7 milliards CA$ (3,0 milliards US$, 2,6 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 06 décembre 2002 à 0,11 CA$, et son plus haut niveau récent le 17 avril 2024 à 9,51 CA$.

Capstone Mining possède 390 500 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Capstone Mining Corp.
31/12/2007Corporate Presentation
Dans les médias de Capstone Mining Corp.
26/11/2018Capstone Mining mulls selling stake in Chile-based copper-ir...
Rapports annuels de Capstone Mining Corp.
2007 Annual Report
Nominations de Capstone Mining Corp.
14/05/2013Capstone Appoints D. James Slattery as Chief Financial Offic...
04/06/2012Capstone Mining Appoints Director
14/09/2011Capstone Appoints Santo Domingo General Manager and Awards E...
14/04/2011Reports Change to its Board
Rapports Financiers de Capstone Mining Corp.
28/07/2015Second Quarter 2015 Financial Results
21/02/2014Capstone Mining Reports Financial Results
21/02/2014Reports Financial Results for Pivotal Year
13/01/2014Capstone Mining 2013 Fourth Quarter and Full
30/10/2013Capstone Mining 2013 Third Quarter Continues
10/10/2013Capstone Mining 2013 Third Quarter
11/07/2013Capstone Mining 2013 Second Quarter
08/05/2013Capstone Mining 2013 First Quarter Financial
11/04/2013Capstone Mining 2013 First Quarter
08/11/2012Capstone Reports 2012 Third Quarter Financial Results; Cash ...
15/08/2012Capstone Reports 2012 Second Quarter
10/05/2012Capstone Reports Solid 2012 First Quarter
15/08/2011Capstone Reports Second Quarter 2011
25/05/2011Capstone Reports First Quarter 2011 Financial Results
07/11/2008Reports Financial Results For The Third Quarter
23/07/2008To Release Second Quarter Results
09/07/2008Announces Production and Sales for the Second Quarter of 200...
30/04/2008 Reports Record Operating Profit Of $15.9 Million For The Fi...
23/04/2008To Release First Quarter Results On Tuesday April 29, 2008
16/04/2008 Announces Production And Sales For The First Quarter Of 200...
15/11/2007Year-End and Fourth Quarter Results
Projets de Capstone Mining Corp.
22/09/2014(Minto Mine)Receives Quartz Mining License Amendment for Minto Mine
03/12/2013Capstone Mining Provides Pinto Valley Production Update
11/10/2013Capstone Mining Completes Acquisition of
08/08/2013Capstone Mining Acquires Option on 350,000 Hectare Explorati...
11/06/2013Capstone Mining Provides Update on Pinto Valley Acquisition
25/10/2012Capstone adds 101 Million Pounds of Copper in Indicated Mine...
18/06/2012Capstone Completes Minto Mine Phase VI
08/02/2012Capstone Updates Mineral Resource Estimate for Footwall Zone...
02/02/2012Capstone Completes Another Successful Drill Season at Minto ...
20/06/2011Capstone Announces Initial Mineral Resource
17/06/2011Capstone Completes Acquisition of Far West Mining and Transa...
14/06/2011Capstone Mining and Far West Mining Approve Acquisition and ...
30/05/2011Capstone Adds 219 Million Pounds of Copper in M&I Mineral Re...
02/05/2011Capstone Reports Additional High Grade
14/04/2011Capstone Reports High Grade Intercepts at
14/03/2011Capstone Completes Prefeasibility Study on Phase V Expansion...
24/02/2011(Kutcho)Reports 2011 Prefeasibility Study for Kutcho Copper-Zinc Pro...
24/02/2011Capstone Reports 2011 Prefeasibility Study
17/02/2009(Minto)Reports 5th New High Grade Copper-Gold Discovery at Minto Mi...
09/02/2009Announces Robust Mineral Resource Update for High Grade Kutc...
04/02/2009(Cozamin Bacis)Reports Record Copper Production for 2008 and Increases Fore...
10/01/2008(Cozamin Bacis)Highlights Production and Sales for the Four Months Ended De...
16/10/2007(Cozamin Bacis)Capstone Increases Resources to 8.6 Million Tonnes at the Co...
11/10/2007(Cozamin Bacis) Declares Expanded Commercial Production at Cozamin and High...
Communiqués de Presse de Capstone Mining Corp.
26/07/2016Capstone reports 2Q loss
26/04/2016Capstone reports 1Q loss
19/01/2016Capstone Mining to Attend Upcoming Investor Conferences
18/01/2016Capstone Mining 2016 Operating and Capital Guidance
18/01/2016Capstone Extends Pinto Valley Mine Life to 2039
06/01/2016Edited Transcript of CS.TO earnings conference call or prese...
25/11/2015Capstone Mining to Attend Upcoming Investor Conferences
27/10/2015Capstone reports 3Q loss
13/10/2015Capstone Mining 2015 Third Quarter Production Results
09/09/2015Capstone Mining Announces Spending Cuts in Response to Marke...
08/09/2015Capstone Mining to Attend Upcoming Investor Conference
27/08/2015Edited Transcript of CS.TO earnings conference call or prese...
05/08/2015Capstone Mining Receives Water Use Licence for Minto Mine
03/08/2015Zacks Investment Ideas feature highlights: Avino Silver and ...
28/07/2015Capstone Mining Second Quarter 2015 Financial Results
13/07/2015Capstone Mining 2015 Second Quarter Production Results
08/07/2015Capstone Mining Receives Approval of Environmental Impact As...
13/04/2015Capstone Mining 2014 First Quarter Production Results
01/04/2015Capstone Mining Publishes Inaugural Sustainability Report
01/04/2015Publishes Inaugural Sustainability Report
19/02/2015to Attend Upcoming Investor Conferences
01/12/2014to Attend Upcoming Investor Conferences
29/10/2014Capstone Mining Reports Another Quarter of Record Cash Flow
14/10/2014Capstone Mining to Attend Upcoming Investor Conference
12/09/2014Discontinues Planned Offering of $300 million Senior Notes
05/09/2014Announces Launch of $300 million Senior Notes Offering
07/05/2014Reports Operating Cash Flow Increases 134% to $47.1 Million
10/04/2014Record 2014 First Quarter Production Results
26/03/2014Extends Pinto Valley Mine Life to 2026
20/01/2014Capstone Mining to Attend Upcoming Investor Conferences
20/01/2014to Attend Upcoming Investor Conferences
20/01/2014to Attend Upcoming Investor Conferences
13/01/20142013 Fourth Quarter and Full Year Production Results
11/12/2013Capstone Mining Files Updated Technical Report for Pinto Val...
11/12/2013Files Updated Technical Report for Pinto Valley
14/11/2013Capstone Mining to Attend Upcoming Investor Conferences
14/11/2013to Attend Upcoming Investor Conferences
07/10/2013Capstone Mining Provides Update on Pinto
07/10/2013Provides Update on Pinto Valley Acquisition
31/07/2013Capstone Mining Delivers Consistent 2013
11/07/20132013 Second Quarter Production Results
13/06/2013Capstone Mining Files Pinto Valley 43-101 Mineral Resource E...
11/06/2013Provides Update on Pinto Valley Acquisition
30/05/2013Capstone Mining to Attend Upcoming Investor Conferences
10/05/2013Capstone Mining Reports Annual General Meeting Voting Result...
29/04/2013Capstone Mining to Purchase Pinto Valley
28/04/2013to Purchase Pinto Valley Copper Mine
13/03/2013Capstone Mining Reports 2012 Year End
18/02/2013to Present at Upcoming Investor Conferences
10/01/2013Capstone 2012 Fourth Quarter and Full Year Production Result...
10/01/20132012 Fourth Quarter and Full Year Production Results Meet Gu...
31/10/2012Capstone Reports Senior Management Change
31/10/2012Reports Senior Management Change
23/10/2012Capstone Reports Board Change
23/10/2012Reports Board Change
11/10/2012Capstone 2012 Third Quarter Production Results on Track
12/07/2012Capstone 2012 Second Quarter Production Results On Target
14/05/2012Capstone Reports Board Change
13/04/2012Capstone Mining Announces New $200 Million
12/04/2012Capstone 2012 First Quarter Production
14/03/2012Capstone Reports Strong 2011 Results
10/02/2012Capstone Mining Reports Board Change
26/01/2012Capstone 2012 Operating and Capital Guidance
17/01/2012Capstone Fourth Quarter and Full Year 2011 Production Result...
16/01/2012Capstone Awards Contract for Santo Domingo
06/10/2011Capstone Third Quarter Production Results
15/08/2011Capstone Reports Pre-Feasibility Study
10/08/2011to Hold Second Quarter and Santo Domingo PFS Conference Call...
06/07/2011Capstone Second Quarter Production Results
20/06/2011Capstone Mining Board of Director Changes
14/06/2011and Far West Mining Approve Acquisition and KORES Agreement
02/06/2011Independent Proxy Firms Recommend Capstone Shareholders Vote...
23/05/2011Mails Information Circular with Respect to Acquisition of Fa...
20/05/2011Capstone Mining Mails Information Circular
10/05/2011to Hold First Quarter Conference Call May 25, 2011
26/04/2011Capstone Reports First Quarter Production
17/04/2011Capstone Mining to Acquire Far West Mining
14/04/2011Capstone Reports Change to its Board
15/03/2011Capstone Reports Record Revenue and Strong
26/01/2009Commences US$ 3 Million Resource Expansion Drill Program at ...
22/01/2009Reports Debt Repayments, Funding of Debenture Repurchase and...
10/12/2008Reports Final Drill Intercepts of Near Surface Copper-Gold a...
25/11/2008Reports Minto Mine Connected to Yukon Electrical Grid
24/11/2008Sherwood and Capstone Announce Closing of Business Combinati...
14/11/2008Shareholders Overwhelmingly Approve Business Combination wit...
08/09/2008Announce Combination to Create Intermediate Copper Producer
29/07/2008Reports Record Revenues of $35.3 Million and Record Operatin...
15/07/2008Announces Normal Course Issuer Bid
28/02/2008December 31, 2007 Four Month Stub Period Results
21/02/2008to Release 4 Months Ended December 31, 2007 Results on Thurs...
17/01/2008Provides 2008 Expansion And Exploration Plans And Increases ...
08/11/2007 To Release 2007 Year End Results On Wednesday November 14,...
19/07/2007Provides Cozamin Mine Expansion Update
28/06/2007Reports Q3 Results: Operating Profit of $7.8 Million, $0.09 ...
05/04/2007Closes Previously Announced Agreement to Sell Cozamin Silver...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (CS.TO)FRANKFURT (OUW.F)
9,51-0.83%5,45-2.68%
TORONTO
CA$ 9,51
17/04 17:00 -0,080
-0,83%
Cours préc. Ouverture
9,59 9,62
Bas haut
9,38 9,77
Année b/h Var. YTD
6,02 -  9,59 47,90%
52 sem. b/h var. 52 sem.
4,49 -  9,59 31,90%
Volume var. 1 mois
2 441 782 17,55%
24hGold TrendPower© : 40
Produit Copper - Gold - Silver
Développe Copper - Gold - Silver - Zinc
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 05/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202456,41%
202323,08%7,254,90
2022-8,52%7,792,25
2021126,89%6,642,41
2020226,03%2,490,33
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,68 AU$-0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,89 US$-1,36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,36 CA$-3,28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,64 CA$+2,69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+7,89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+6,25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,67 US$-0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$-2,94%Trend Power :