Publié le 01 février 2016

Q3 Production Release - Correction

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Aluminium | Copper | Cycle | Hong Kong | Jersey | Liberia | Mines | Sri Lanka | Zinc |

Q3 Production Release - Correction

Q3 Production Release - Correction

Please note the correction on net debt in line 5 on page 13: the correct figure is US$7.9bn, instead of the previous US$8.6bn.

29 January 2016

Vedanta Resources plc

Production Release for the Third Quarter Ended 31 December 2015

Q3 Highlights

· EBITDA of US$494 million and 23% EBITDA margin in a weak commodity price environment

· Zinc-India: Strong refined metal production; record quarterly refined silver production of 3.7 million ounces

· Oil & Gas: Stable production q-o-q with19 kboepd contribution from Mangala EOR; Rajasthan water flood operating costs continue to improve

· Copper :

o Zambia: Strong mined metal production at 32,000 tonnes with improvement of hoisting capacity and equipment availability at Konkola; continued improvement in cost of production despite higher power costs

o India: 89% utilization, affected by floods and unplanned shutdowns

· Aluminium: Record metal production; 7% lower cost of production q-o-q driven by the cost optimisation programme; received approval for conversion of 3 units of 2,400 MW Jharsuguda IPP to CPP

· Power: Second 660 MW unit of 1,980 MW Talwandi Sabo plant capitalised; 85% availability for unit - I and II

· Iron ore: Stable operations in Karnataka; slower ramp up in Goa due to transportation issues

· Actively managing balance sheet, with a focus on optimizing opex and capex to maximize free cash flow; refinancing and terming out maturing debt; and simplifying the group structure

o Robust financial position with total cash and liquid investments of US$8.9 billion and undrawn committed facilities of US$0.8 billion

Tom Albanese, Chief Executive Officer, Vedanta Resources plc, said: 'In the weak commodity price environment, we remain committed to optimising our operations, leveraging our high quality asset base, and proactively managing our balance sheet. I am encouraged to see the positive results of our cost reduction programme gaining momentum, and believe that this relentless focus on efficiency will not only make our business more resilient through the cycle but position us favourably for any future improvement in market conditions. Despite challenging market conditions, these efforts have allowed us to generate a robust EBITDA margin of 23%.'

Oil & Gas

Q3

Q2

Nine months period

Particulars

FY2016

FY2015

% change YoY

FY2016

% change QoQ

FY2016

FY2015

% change YoY

OIL AND GAS (boepd)

Average Daily Total Gross Operated Production

211,843

228,622

(7)%

214,247

(1)%

214,663

219,757

(2)%

Average Daily Gross Operated Production (boepd)

202,668

218,900

(7)%

205,361

(1)%

205,909

210,399

(2)%

Rajasthan

170,444

180,010

(5)%

168,126

1%

170,258

175,451

(3)%

Ravva

21,703

27,783

(22)%

26,064

(17)%

25,430

24,107

5%

Cambay

10,521

11,107

(5)%

11,172

(6)%

10,221

10,842

(6)%

Average Daily Working Interest Production (boepd)

128,402

136,701

(6)%

128,021

0%

128,991

132,576

(3)%

Rajasthan

119,311

126,007

(5)%

117,688

1%

119,180

122,815

(3)%

Ravva

4,883

6,251

(22)%

5,864

(17)%

5,722

5,424

5%

Cambay

4,208

4,443

(5)%

4,469

(6)%

4,089

4,337

(6)%

Total Oil and Gas (million boe)

Oil & Gas- Gross

18.65

20.14

(7)%

18.89

(1)%

56.62

57.86

(2)%

Oil & Gas-Working Interest

11.81

12.58

(6)%

11.78

0%

35.47

36.46

(3)%

Brent ($/boe)

44

77

(43)%

50

(12)%

52

96

(46)%

Average Price Realisation ($/boe)

35.2

68.1

(48)%

43.7

(19)%

45.0

85.2

(47)%

Oil - $/bbl

35.0

68.7

(49)%

43.7

(20)%

45.1

86.2

(48)%

Gas - $/mscf

7.2

6.3

14%

7.0

3%

6.9

6.4

8%

Revenue (US $ million)

307.8

565.0

(46)%

342.3

(10)%

1,063.1

1,968.7

(46)%

EBITDA (US $ million)

95.5

346.0

(72)%

158.4

(40)%

469.2

1358.2

(65)%

Third quarter FY 2016 vs. second quarter FY 2016

Average gross production for Q3 FY2016 was 202,668 barrels of oil equivalent per day (boepd), 1% lower, primarily due to lower volumes from offshore assets. Rajasthan production increased 1.4% to 170,444 boepd as volumes from Mangala Enhanced Oil Recovery (EOR) continue to ramp up, as expected. Aishwariya recorded strengthening of volumes on account of five more infill wells coming online. Bhagyam production was largely steady as execution of work-over activities in the last quarter helped us arrest the natural decline.

The Mangala Polymer injection ramp-up is on track as it has been increased from 200,000 barrels of polymer solution per day in Q2 FY2016 to 330,000 barrels of polymer solution per day in Q3 FY2016. A further increase in injection volume to 400,000 barrels per day is expected by March 2016. In-line with our plan, average production from Mangala EOR increased to 19,000 boepd in the quarter and is expected to ramp-up further to support Rajasthan production in Q4.

During the quarter, the Salaya Bhogat Pipeline (SBPL), storage terminal and the marine export facilities at Bhogat were commissioned and consequently the first cargo of Rajasthan crude oil was successfully loaded through the terminal for Mangalore Refinery Petroleum Ltd, realizing superior pricing.

Rajasthan water flood operating cost reduced by 6% from US$5.5 per boe to US$ 5.1 per boe through improvement in operational efficiency and re-negotiations with vendors.Ramp-up in the polymer injection volumes has increased the blended operating cost including the cost of polymer injection by 7.8% to US$ 6.9 per boe, in line with guidance.

EBITDA for the quarter was lower by 40% at US$ 96 million, primarily due to the lower oil price and a higher discount of 19%.

Third quarter FY 2016 vs. third quarter FY 2015

Gross production from Rajasthan declined 5%, primarily due to underperformance of the Bhagyam reservoir and natural decline in the Mangala and Aishwariya fields. This has been partly offset by the ramp up of volumes from the Mangala EOR, infill wells at Aishwariya and reservoir management initiatives at Bhagyam. Production from Ravva and Cambay declined by 22% and 5% respectively, due to natural decline in the respective fields.

Zinc - India

Particulars

Q3

Q2

Nine months period

FY2016

FY2015

% change YoY

FY2016

%

change QoQ

FY2016

FY2015

% change YoY

Zinc India (kt)

Mined metal content

228

242

(6)%

240

(5)%

700

618

13%

Refined Zinc - Total

206

196

5%

211

(2)%

605

517

17%

Refined Zinc - Integrated

206

192

8%

211

(2)%

605

504

20%

Refined Zinc - Custom

-

4

-

-

-

-

13

-

Refined Lead - Total

35

30

17%

40

(13)%

107

91

17%

Refined Lead - Integrated

35

25

42%

39

(10)%

102

72

42%

Refined Lead - Custom

-

5

-

1

-

5

19

(76)%

Silver - Total (in million ounces)

3.73

2.72

37%

3.59

4%

9.73

7.94

23%

Silver - Integrated (in million ounces)

3.73

2.24

67%

3.54

5%

9.64

6.19

56%

Silver - Custom (in million ounces)

-

0.48

-

0.05

-

0.09

1.75

(95)%

Average LME - Zinc ($/t)

1,613

2,235

(28)%

1,847

(13)%

1,878

2,209

(15)%

Average LME - Lead ($/t)

1,681

2,000

(16)%

1,714

(2)%

1,776

2,093

(15)%

Average Silver Prices ($/oz.)

14.8

16.5

(10)%

14.9

(1)%

15.3

18.6

(18)%

Zinc CoP

796

809

(2)%

771

3%

789

869

9%

Revenue (US$ million)

508.7

612.0

(17)%

592.3

(14)%

1,659.2

1,706.0

(3)%

EBITDA (US$ million)

217.8

336.0

(35)%

326.4

(33)%

799.7

887.2

(10)%

Third quarter FY 2016 vs. second quarter FY 2016

Mined metal production in Q3 was 5% lower at 228,000 tonnes, primarily on account of a change in mining mix with an increased contribution from the Sindesar Khurd and Kayad mines, resulting in lower average grades.

The cost of production (CoP) was US$796 tonne, up 3% on account of lower volume & lower acid realisation.

EBITDA was 33% lower at US$218 million on account of lower LME, volumes and additional regulatory cost.

Third quarter FY 2016 vs. third quarter FY 2015

Mined metal production was 6% lower y-o-y. Refined metal production during the quarter was higher than mined metal production primarily on account of conversion of existing inventory and enhanced smelter efficiency. Integrated zinc, lead and silver metal production during the quarter increased by 8%, 42% and 67% respectively y-o-y. Record refined silver production was due to higher volumes from the Sindesar Khurd (SK) mine.

The CoPwas lower at US$796 per tonne compared to US$809 per tonne in the corresponding prior quarter, primarily due to cost reduction initiatives, higher volumes of refined metals and currency depreciation.

Zinc - International

Q3

Q2

Nine months period

Particulars (in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

% change QoQ

FY2016

FY2015

% change YoY

Zinc International

51

80

(36)%

63

(19)%

184

242

(24)%

Zinc -refined -Skorpion

13

26

(49)%

17

(24)%

55

86

(35)%

Mined metal - Lisheen

21

41

(50)%

30

(32)%

81

113

(29)%

Mined metal - BMM

17

13

34%

16

6%

48

44

10%

Average LME - Zinc (US$/tonne)

1,613

2,235

(28)%

1,847

(13)%

1,878

2,209

(15)%

CoP including royalty

1,579

1,364

16%

1,477

7%

1,475

1,339

10%

Revenue(US$ million)

64.3

178.3

(64)%

105.2

(39)%

308.8

485.3

(36)%

EBITDA(US$ million)

(0.2)

63.2

(100)%

19.2

(101)%

56.4

156.2

(64)%

Third quarter FY 2016 vs. second quarter FY 2016

Production at Zinc International was lower at 51,000 tonnes as a result of closure of the Lisheen mine in November 2015 andlower production from Skorpion.

Skorpion produced 13,000 tonnes during the quarter, lower than the prior quarter due to the extended planned 30-day maintenance shutdown and a delay in start-up. The plant commenced operations on 20 November 2015 and has been producing Special High Grade (SHG) zinc since December 2015.

Q3 CoP was at US$1,579 per tonne compared with US$1,477 per tonne in Q2 FY2016, higher on account of lower volumes and shutdown expense at Skorpion. Q4 CoP is expected to be in the range of US$1,100-1,200/tonne, driven by higher grades, increased volumes, and procurement initiatives.

EBITDA for Q3 was lower due to lower LME prices, lower volumes and maintenance cost at Skorpion.

At Gamsberg, we achieved 365 LTIFR-free days to date. Pre-stripping continues in line with plan and to date 4 million tonnes of waste has been excavated. Based on the modular approach adopted to project development, the capital expenditure programme for FY2017 is currently in the process of being reviewed in light of current market conditions. Capital expenditure at Gamsberg stands at US$13 million for 9M FY2016, of which US$5 million was spent in the current quarter.

Third quarter FY 2016 vs. third quarter FY 2015

Mined metal production at BMM was at 17,000 tonnes, up 34% due to higher feed grade.

EBITDA was lower compared to the corresponding prior quarter, primarily due to lower LME and volumes following the closure of Lisheen mine and extended shutdown at Skorpion.

Iron Ore

Q3

Q2

Nine months period

Particulars (in million dry metric tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

% change QoQ

FY2016

FY2015

% change YoY

IRON ORE

Sales

1.5

0.1

-

0.6

138%

2.7

1.2

126%

Goa

0.6

-

-

-

-

0.6

-

-

Karnataka

0.9

0.1

-

0.6

48%

2.1

1.2

78%

Production of Saleable Ore

1.4

-

-

0.8

63%

2.4

0.3

-

Goa

0.3

-

-

-

-

0.3

-

-

Karnataka

1.1

-

-

0.8

43%

2.1

0.3

-

Production ('000 tonnes)

Pig Iron

146

166

(12)%

150

(3)%

466

465

-

Revenue(US$ million)

81.7

90.8

(10)%

62.2

31%

219.5

265.0

(17)%

EBITDA(US$ million)

11.1

7.0

59%

3.8

192%

18.3

34.6

(47)%

Third quarter FY 2016 vs. second quarter FY 2016

At Goa, mining and shipments commenced in Q3 post receipt of approvals. We produced 0.3 million tonnes and sold 0.6 million tonnes during the quarter. Production was impacted due to transportation issues and we are currently working on a resolution. Sales were higher as we participated in e-auction trading, wherein we dispatched 0.54 million tonnes ore purchased from the auction. We expect to achieve sales of c.3.5 million tonnes in FY 2016 from Goa.

At Karnataka production was 1.1 million tonnes and sales were 0.9 million tonnes.

Production of pig iron was lower at 146,000 tonne primarily due to temporary curtailment of production in November due to lower demand & unplanned stoppage at one of the blast furnace. Production has since been restored to capacity.

We are engaging with respective state government for enhancing mining cap in Goa and Karnataka and are receiving positive responses from them.

The company is working with the Government for removal of export duty on low grade iron ore exported from Goa. Besides, we continue to work towards resolving the matter on duplication of taxes (Goa Permanent Fund and District Mineral Foundation) which is currently being heard by the Honourable Supreme Court.

EBITDA was at US$11 million in the quarter, up 192% primarily due to increase in sales.

Third quarter FY 2016 vs. third quarter FY 2015

EBITDA in Q3 was US$11 million as compared to US$7 million, primarily due to the ramp up of iron ore volumes post resumption of mine production both at Goa and Karnataka. The Pig Iron business continues to face pricing pressure due to depressed market condition, in part offset by weakness in iron ore and coking coal prices.

Copper - India

Q3

Q2

Nine months period

Particulars (in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

% Change QoQ

FY2016

FY2015

% change YoY

COPPER- INDIA

Copper - Cathodes

89

99

(11)%

94

(5)%

282

266

6%

Tuticorin Power Plant Sales (MU)

40

164

(75)%

118

(66)%

334

483

(31)%

Realized TC/RC (USc/lb)

23.5

22.6

4%

25.2

(7)%

23.9

21.0

14%

Conversion cost - India (USc/lb)

4.4

3.3

34%

2.2

100%

3.1

4.6

(32)%

Revenue(US$ million)

686.9

947.2

(27)%

819.1

(16)%

2,383.4

2,797.4

(15)%

EBITDA(US$ million)

91.3

84.6

8%

87.8

4%

261.5

194.6

34%

Third quarter FY 2016 vs. second quarter FY 2016

The Tuticorin smelter produced 89,000 tonnes of cathodes during the quarter. Production was lower due to flooding in the state and unplanned shutdowns.

The 160MW power plant at Tuticorin operated at a lower Plant Load Factor (PLF) of 52% due to lower off-take by the Tamil Nadu Electricity Board (TNEB). However, we have received compensation at Rs1.1/unit for shortfall of off-take below 80% of contracted capacity.

Tc/Rc was marginally lower at USc23.5/lb in Q3. CY2016 Tc/Rc's are expected to be slightly lower, in line with global prices.

EBITDA was 4% higher q-o-q on account of a one-time benefit regarding the export incentive schemes based on the Supreme Court judgement in October 2015.

Net unit cost of conversion in Q3 was USc4.4/lb compared to USc2.2/lb in Q2 FY2016. Cost of conversion was higher y-o-y due to lower recovery credit and sulphur acid credit in falling commodity price scenario.

Third quarter FY 2016 vs. third quarter FY 2015

Tuticorin smelter production decreased 11% to 89,000 tonnes, while the EBITDA has increased by 8% due to the one-time benefit of export incentive scheme as mentioned above.

Copper - Zambia

Q3

Q2

Nine months period

Particulars (in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

% Change QoQ

FY2016

FY2015

% change YoY

COPPER -ZAMBIA

Mined metal

32

29

11%

33

(3)%

94

88

7%

Copper - Total

45

45

1%

47

(2)%

136

121

13%

Integrated

28

30

(6)%

32

(13)%

89

85

4%

Custom

17

15

15%

15

13%

47

35

35%

Average LME - Copper (US$/t)

4,892

6,624

(26)%

5,259

(7)%

5,387

6,803

(21)%

C1 cash cost (USc/lb)

175

267

(34)%

208

(16)%

199

271

(27)%

Revenue(US$ million)

195.5

294.3

(34)%

235.9

(17)%

720.6

819.0

(12)%

EBITDA(US$ million)

10.8

0.0

-

(30.4)

136%

(13.5)

16.2

(183)%

Third quarter FY 2016 vs. second quarter FY 2016

During Q3, mined metal was stable at 32,000 tonne.

During the quarter, the Nchanga underground (NUG) operations were put under managed care and maintenance. The resulting production losses will be compensated by additional CRO feed for the concentrators and purchased concentrates for smelting. Placing the NUG operations under care and maintenance will reduce operating costs by approximately US$1 million per month.

At the Tailings Leach Plant, production continued to improve and was at 14,500 tonnes.

Q3 integrated CoP (C1) was significantly lower by 16% q-o-q at USc175/lb, primarily due to higher volumes, cost saving initiatives and reduced power consumption. The company achieved a 12% reduction in power consumption during the quarter, following the placement of NUG under care and maintenance, refinery optimization and measures to reduce power consumption at administrative units.

Power tariffs were increased by 25% from 1 January 2016. This will have a US$3 million per month adverse impact on the cost of production. The company is exploring a range of possible solutions, as discussions with interested parties, including the government, are underway.

Third quarter FY 2016 vs. second quarter FY 2015

During Q3, mined metal production was at 32,000 tonnes, 11% higher than the corresponding prior quarter.

At Konkola, production was 48% higher due to improved efficiency, higher equipment availability and higher copper grade. Trackless equipment availability has improved and developed reserves have increased to 4 months of production. Hoisting from Shaft 1 resumed in Q1 FY2016, while hoisting from Shaft 4 is expected to recommence in Q4 FY2016.

Aluminium

Q3

Q2

Nine months period

Particulars(in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

% Change QoQ

FY2016

FY2015

% change YoY

Aluminium

Alumina-Lanjigarh

218

244

(10)%

272

(20)%

760

703

8%

Total Aluminum Production

234

224

5%

233

-

697

648

8%

Jharsuguda-I

131

133

(2)%

130

1%

392

403

(3)%

Jharsuguda-II

19

5

-

19

-

57

5

-

Korba-I

65

65

0%

65

-

192

190

1%

Korba-II

19

20

(7)%

19

-

56

50

12%

Average CoP - Aluminium (US$/tonne)

1,528

1,741

(12)%

1,648

(7)%

1,620

1,789

(9)%

Revenue(US$ million)

1,495

1,966

(24)%

1,591

(6)%

1,615

1,920

(16)%

Revenue(US$ million)

418.9

563.7

(26)%

421.1

(1)%

1,270.4

1,538.2

(17)%

EBITDA(US$ million)

20.9

134.1

(84)%

23.6

(11)%

42.6

313.8

(86)%

Third quarter FY 2016 vs. second quarter FY 2015

In Q3, production was stable at the 500kt Jharsuguda-I smelter. The 1.25 million tonnes Jharsuguda II smelter produced 19,000 tonnes during the quarter with 80 pots capitalised on 1 December. CoP at Jharsuguda was at US$1,485 per tonne compared to US$1,599 per tonne in Q2, primarily due to lower alumina cost and lower power cost driven by coal prices.

245kt Korba-I smelter produced 65,000 tonne during the quarter. The 325kt Korba-II smelter produced 19,000 tonnes during the quarter with 82 pots operational. CoP at the Korba has improved significantly to US$1,599 per tonne, compared to US$1,725 per tonne. The significant cost improvement was on account of lower alumina price and reduced power cost driven by improved coal mix & lower coal prices.

The Alumina price index has moved further lower in the quarter from US$ 292 per tonne in Q2 to US$ 234 per tonne. We expect further benefit of lower alumina and bauxite price to be realized in Q4.

In order to optimize costs, the Lanjigarh alumina refinery operated a single stream and produced 218,000 tonnes during Q3. The alumina cost during Q3 FY2016 was US$293 per tonne compared with US$323 per tonne in Q2 FY2016. We have received approvals for expansion of the Lanjigarh refinery to 6 mtpa, which will be considered when we have further visibility on bauxite sources.

On 27 January, we received the approval from the regulatory authorities (Orissa Electricity Regulatory Commission) to use the power generated from three units of the 2,400 MW (4 x 600 MW) Jharsuguda power plant for captive use and will commence ramp up of the pot lines at Jharsuguda-II smelter from 1 April 2016. One unit of 600 MW will continue to sell power externally.

The first 300 MW CPP unit of BALCO 1,200 MW power plant at Korba, was capitalized on 1 December 2015 and the second unit is expected to be synchronized in Q4 FY2016.

Third quarter FY 2016 vs. third quarter FY 2015

Production was 5% higher compared to Q3 FY2015 due to ramp up at Jharsuguda - II. EBITDA was lower by 84% primarily due to lower LME and premiums.

Power

Q3

Q2

Nine months period

Particulars (in million units)

FY2016

FY2015

% change YoY

FY2016

% Change QoQ

FY2016

FY2015

% change YoY

Power

Total Power Sales

2,934

2,663

10%

2,718

8%

8,728

7,312

19%

Jharsuguda 2400 MW

1,593

1,873

(15)%

1,554

3%

5,413

5,681

(5)%

MALCO

26

233

(89)%

127

(80)%

345

666

(48)%

TSPL

839

502

67%

693

21%

1,922

523

267%

HZL Wind Power

67

55

22%

158

(58)%

353

371

(5)%

Balco 270 MW power Sales

41

-

-

28

46%

169

71

137%

Balco 600 MW

368

-

-

158

133%

526

-

-

Revenue(US$ million)

175.0

181.1

(3)%

152.3

15%

517.5

492.3

5%

EBITDA(US$ million)

45.4

41.6

9%

49.1

(8)%

138.1

150.5

(8)%

Third quarter FY 2016 vs. second quarter FY 2016

The second 660MW unit of TSPL was capitalized on 1 December after successful completion of trial runs. The two units operated at a PLF of 47% and an average availability of 85% during the quarter. TSPL's Power Purchase Agreement with the Punjab State Electricity Board (PSEB) compensates based on the availability of the plant. The third unit is expected to be synchronised by the end of FY2016.

The first 300 MW IPP unit of BALCO 1200 MW operated at a PLF of 65% in Q3. The second 300 MW IPP unit is expected to be synchronised in Q4 FY2016.

The 100MW MALCO power plant operated at lower PLF due to lower power off-take by Tamil Nadu Electricity Board (TNEB). However, we have received compensation at Rs 1.10 per unit for shortfall of off-take below 80% of contracted capacity.

Third quarter FY 2016 vs third quarter FY 2015

The Jharsuguda 2,400MW power plant operated at a PLF of 35% in Q3, lower than corresponding prior period, primarily due to lower demand and softer power rates.

EBITDA has increased 9% to US$45 million, primarily due to higher volumes contributed by TSPL.

Average realisation for Q3 excluding TSPL was INR 2.88 per unit (USc4.37 per unit) compared with INR 3.36 per unit (USc 5.42 per unit) in Q3 FY2015. The NSR was lower compared to corresponding prior quarter on account of weaker demand, resulting in a lower power price environment in India. Average power CoP excluding TSPL for Q3 was INR 2.21 per unit (USc3.35 per unit) compared to INR 2.25 per unit (USc 3.64 per unit) in Q3 FY2015, primarily due to lower volumes.

Realisation and CoP of TSPL was at INR 5.46 per unit and INR 3.62 per unit respectively for 47% PLF. We are also compensated capacity charge by c. Rs. 1.35/unit for a declared capacity of 85% which is included in above realisation.

Balance Sheet Management

The Company is actively managing its balance sheet in light of the current commodity price environment, with a focus on maximizing free cash flow, refinancing and terming out maturing debt, and simplifying the group structure. Our financial position remains robust, with total cash and liquid investments of c. US$8.9 billion and undrawn committed facilities of US$0.8 billion as at 31 December 2015. Gross debt and net debt was at US$16.8 billion and US$7.9 billion, respectively, at 31 December 2015, higher than US$16.5 billion and US$7.5 billion at 30 September 2015. Gross and net debt, compared with 30 September 2015, was higher primarily on account of project capex, unwinding of working capital as guided earlier, payment of dividends by subsidiaries, and translation of INR-denominated cash balances at subsidiaries on account of rupee depreciation. The Net Debt is expected to go back to 30 September levels in the current quarter, with further working capital initiatives.

As at 31 December 2015, FY2016 debt maturities at Vedanta plc are US$0.3 billion, for which refinancing is in place. The FY2016 maturities at the subsidiaries are US$ 1.1 billion, which we intend to meet through committed term loans of c. $0.6 billion, cash and liquid investments of $0.25 billion, and the balance would be funded through a combination of undrawn committed facilities and further term loans that are in the process of being tied up.

Regarding the FY2017 maturities at Vedanta plc, we have tied up term loans of $0.3 billion at Vedanta plc, and $0.8 billion of the inter-company loan has been repaid by Vedanta Limited till date. The balance amount will be repaid by further term loans being tied up at Vedanta plc and/or further repayment of inter-company loan from Vedanta Limited (inter-company loan outstanding as on date is $1.8 billion).

On 20 January, Vedanta plc completed the buyback of part of its outstanding convertible bonds issued by Vedanta Resources Jersey Limited maturing in July 2016, through a modified Dutch auction. We purchased outstanding convertible bonds of $227.4 million through the tender offer at a price of $91,000 for the $100,000 par value of the bonds paying a total purchase value of $201 million. Following this buyback, the FY2017 Vedanta plc debt maturities are US$1.8 billion.

Production Summary (Unaudited)

(in '000 tonnes, except as stated)

Particulars

Q3

Q2

Nine months period

FY 2016

FY 2015

% Change YoY

FY 2016

% Change QoQ

FY 2016

FY 2015

% Change YoY

OIL AND GAS (boepd)

Average Daily Total Gross Operated Production

211,843

228,622

(7)%

214,247

(1)%

214,663

219,757

(2)%

Average Daily Gross Operated Production (boepd)

202,668

218,900

(7)%

205,361

(1)%

205,909

210,399

(2)%

Rajasthan

170,444

180,010

(5)%

168,126

1%

170,258

175,451

(3)%

Ravva

21,703

27,783

(22)%

26,064

(17)%

25,430

24,107

5%

Cambay

10,521

11,107

(5)%

11,172

(6)%

10,221

10,842

(6)%

Average Daily Gross Operated Production (boepd)

128,402

136,701

(6)%

128,021

0%

128,991

132,576

(3)%

Rajasthan

119,311

126,007

(5)%

117,688

1%

119,180

122,815

(3)%

Ravva

4,883

6,251

(22)%

5,864

(17)%

5,722

5,424

5%

Cambay

4,208

4,443

(5)%

4,469

(6)%

4,089

4,337

(6)%

Total Oil and Gas Production (million boe)

Oil & Gas - Gross

18.65

20.14

(7)%

18.89

(1)%

56.62

57.86

(2)%

Oil & Gas - Working Interest

11.81

12.58

(6)%

11.78

0%

35.47

36.46

(3)%

ZINC INDIA

Mined metal content

228

242

(6)%

240

(5)%

700

618

13%

Refined Zinc - Total

206

196

5%

211

(2)%

605

517

17%

Refined Zinc - Integrated

206

192

8%

211

(2)%

605

504

20%

Refined Zinc - Custom

-

4

-

-

-

-

13

-

Refined Lead - Total

35

30

17%

40

(13)%

107

91

17%

Refined Lead - Integrated

35

25

42%

39

(10)%

102

72

42%

Refined Lead - Custom

-

5

-

1

-

5

19

(76)%

Saleable Silver - Total (in '000 ounces)

3.73

2.72

37%

3.59

4%

9.73

7.94

23%

Saleable Silver - Integrated
(in '000 ounces)

3.73

2.24

67%

3.54

5%

9.64

6.19

56%

Saleable Silver - Custom
(in '000 ounces)

-

0.48

-

0.05

-

0.09

1.75

(95)%

ZINC INTERNATIONAL

51

80

(36)%

63

(19)%

184

242

(24)%

Zinc -refined

13

26

(49)%

17

(24)%

55

86

(35)%

Mined metal - Lisheen

21

41

(50)%

30

(32)%

81

113

(29)%

Mined metal - BMM

17

13

34%

16

6%

48

44

10%

IRON ORE (in million dry metric tonnes, or as stated)

Sales

1.5

0.1

-

0.6

138%

2.7

1.2

126%

Goa

0.6

-

-

-

-

0.6

-

-

Karnataka

0.9

0.1

-

0.6

48%

2.1

1.2

78%

Production of Saleable Ore

1.4

-

-

0.8

63%

2.4

0.3

-

Goa

0.3

-

-

-

-

0.3

-

-

Karnataka

1.1

-

-

0.8

43%

2.1

0.3

-

Particulars

FY 2016

FY 2015

% Change YoY

FY 2016

% Change QoQ

FY 2016

FY 2015

% Change YoY

Pig Iron

146

166

(12)%

150

(3)%

466

465

-

COPPER - INDIA/AUSTRALIA

Copper - Mined metal content

-

-

-

-

-

-

-

-

Copper - Cathodes

89

99

(11)%

94

(5)%

282

266

6%

Tuticorin power sales
(million units)

40

164

(75)%

118

(66)%

334

483

(31)%

COPPER - ZAMBIA

Mined Metal

32

29

11%

33

(3)%

94

88

7%

Copper - Total

45

45

1%

47

(2)%

136

121

13%

Integrated

28

30

(6)%

32

(13)%

89

85

4%

Custom

17

15

15%

15

13%

47

35

35%

ALUMINIUM

Alumina - Lanjigarh

218

244

(10)%

272

(20)%

760

703

8%

Total Aluminum Production

234

224

5%

233

-

697

648

8%

Jharsuguda-I

131

133

(2)%

130

1%

392

403

(3)%

Jharsuguda-II

19

5

-

19

-

57

5

-

Korba I

65

65

0%

65

-

192

190

1%

Korba II

19

20

(7)%

19

6%

56

50

12%

POWER (in million units)

Total Power Sales

2,934

2,663

10%

2,718

8%

8,728

7,312

19%

SEL

1,593

1,873

-15%

1,554

3%

5,413

5,681

-5%

MALCO

26

233

-89%

127

(80)%

345

666

-48%

TSPL

839

502

67%

693

21%

1,922

523

267%

HZL Wind Power

67

55

22%

158

(58)%

353

371

-5%

Balco 270 MW power Sales

41

-

-

28

46%

169

71

137%

Balco 600 MW

368

-

-

158

133%

526

-

-

Ports - VGCB (in million tonnes)

Cargo Discharge

1.8

1.8

2%

2.1

(14)%

5.5

5.3

3%

Cargo Dispatches

1.9

1.8

5%

2.1

(10)%

5.7

5.3

7%

1. EBITDA margin excluding custom smelting

2. Including Internal Gas Consumption

3. Excluding captive consumption of 2,051 tonnes in Q3 FY2016 vs 2,394 tonnes in Q3 FY2015,1,514 tonnes in Q2 FY 2016 and 5,749 tonnes in nine months period FY2016 vs 5,845 tonnes in nine months period FY2015

4. Excluding captive consumption of 3,44,000 ounces in Q3 FY2016 vs 4,02,000 ounces in Q3 FY2015, 2,51,000 ounces in Q2 FY 2016and 956,000 ounces in nine months period FY2016 vs 9,75,000 ounces in nine months period FY2015

5. Revenues from silver not credited to CoP with IFRIC adjustment, w/o royalty. Without IFRIC adjustment, the CoP was $795/t in Q3 FY 2016 and $771/t in Q2 FY 2016.

6. Includes trial run production of 12 Kt in Q3 FY 2016 vs 5Kt in Q3 FY 2015,19Kt in Q2 FY 2016 and 51Kt in nine months period in FY 2016 vs 5Kt in nine months period in FY 2015

7. Includes trial production of Nil in 9M FY 2016 vs 24Kt in 9M FY 2015

8. VGCB refers to Vizag General Cargo Berth

Financial Summary (Unaudited):

(in US$ milllion, except as stated)

Group Revenue

Q3

Q2

Nine months period

FY 2016

FY 2015

% Change YoY

% Change YoY

% Change QoQ

FY 2016

FY 2015

% Change YoY

Zinc

573.0

790.3

(27)%

697.5

(18)%

1,968.0

2,191.3

(10)%

India

508.7

612.0

(17)%

592.3

(14)%

1,659.2

1,706.0

(3)%

International

64.3

178.3

(64)%

105.2

(39)%

308.8

485.3

(36)%

Oil and Gas

307.8

565.0

(46)%

342.3

(10)%

1,063.1

1,968.7

(46)%

Iron Ore

81.7

90.8

(10)%

62.2

31%

219.5

265.0

(17)%

Copper

882.4

1,241.5

(29)%

1,055.0

(16)%

3,104.0

3,616.4

(14)%

India/ Australia

686.9

947.2

(27)%

819.1

(16)%

2,383.4

2,797.4

(15)%

Zambia

195.5

294.3

(34)%

235.9

(17)%

720.6

819.0

(12)%

Aluminium

418.9

563.7

(26)%

421.1

(1)%

1,270.4

1,538.2

(17)%

Power

175.0

181.1

(3)%

152.3

15%

517.5

492.3

5%

Others

(3.5)

(76.6)

-

17.8

-

(7.7)

(260.2)

-

Total Group Revenue

2,435.3

3,355.8

(27)%

2,748.2

(11)%

8,134.8

9,811.7

(17)%

(in US$ milllion, except as stated)

Group EBITDA

Q3

Q2

Nine months period

FY 2016

FY 2015

% Change YoY

FY 2016

% Change QoQ

FY 2016

FY 2015

% Change YoY

Zinc

217.6

399.2

(45)%

345.6

(37)%

856.1

1043.4

(18)%

India

217.8

336.0

(35)%

326.4

(33)%

799.7

887.2

(10)%

International

(0.2)

63.2

(100)%

19.2

(101)%

56.4

156.2

(64)%

Oil and Gas

95.5

346.0

(72)%

158.4

(40)%

469.2

1358.2

(65)%

Iron Ore

11.1

7.0

59%

3.8

192%

18.3

34.6

(47)%

Copper

102.1

84.6

21%

57.4

78%

248.0

210.8

18%

India/ Australia

91.3

84.6

8%

87.8

4%

261.5

194.6

34%

Zambia

10.8

0.0

-

(30.4)

136%

(13.5)

16.2

(183)%

Aluminium

20.9

134.1

(84)%

23.6

(11)%

42.6

313.8

(86)%

Power

45.4

41.6

9%

49.1

(8)%

138.1

150.5

(8)%

Others

1.0

2.7

-

3.1

-

6.9

8.9

-

Total Group EBITDA

493.6

1015.2

(51)%

641.0

(23)%

1779.2

3120.2

(43)%

There will be a conference call at 9:00 a.m. UK time (2:30 p.m. India time) where senior management will discuss the results.

Dial in:

UK toll free: 0 808 101 1573

International & UK: +44 20 3478 5524

USA toll free: 1 866 746 2133

USA: +1 323 386 8721

India: +91 22 3938 1017 and +91 22 6746 8333

Singapore toll free: 800 101 2045

Hong Kong toll free: 800 964 448

Please allow time to register your name and company, or pre-register online at:

http://services.choruscall.in/diamondpass/registration?confirmationNumber=4169828

For further information, please contact:

Communications

Roma Balwani

President - Group Communications, Sustainability

and CSR

Tel: +91 22 6646 1000

[email protected]

Investors

Ashwin Bajaj

Director - Investor Relations

Radhika Arora

Associate General Manager - Investor Relations

Ravindra Bhandari

Manager - Investor Relations

Finsbury

Daniela Fleischmann

Tel: +44 20 7251 3801

[email protected]

Tel: +91 22 6646 1531

[email protected]

About Vedanta Resources plc

Vedanta Resources plc ('Vedanta') is a London listed diversified global natural resources company. The group produces aluminium, copper, zinc, lead, silver, iron ore, oil & gas and commercial energy. Vedanta has operations in India, Zambia, Namibia, South Africa, Ireland, Liberia, Australia and Sri Lanka. With an empowered talent pool globally, Vedanta places strong emphasis on partnering with all its stakeholders based on the core values of trust, sustainability, growth, entrepreneurship, integrity, respect and care. For more information, please visit www.vedantaresources.com.

Disclaimer

This press release contains 'forward-looking statements' - that is, statements related to future, not past, events. In this context, forward-looking statements often address our expected future business and financial performance, and often contain words such as 'expects,' 'anticipates,' 'intends,' 'plans,' 'believes,' 'seeks,' 'should' or 'will.' Forward-looking statements by their nature address matters that are, to different degrees, uncertain.

RNS Number : 5011N

Vedanta Resources PLC

29 January 2016

Q3 Production Release - Correction

Please note the correction on net debt in line 5 on page 13: the correct figure is US$7.9bn, instead of the previous US$8.6bn.

29 January 2016

Vedanta Resources plc

Production Release for the Third Quarter Ended 31 December 2015

Q3 Highlights

· EBITDA of US$494 million and 23% EBITDA margin in a weak commodity price environment

· Zinc-India: Strong refined metal production; record quarterly refined silver production of 3.7 million ounces

· Oil & Gas: Stable production q-o-q with19 kboepd contribution from Mangala EOR; Rajasthan water flood operating costs continue to improve

· Copper :

o Zambia: Strong mined metal production at 32,000 tonnes with improvement of hoisting capacity and equipment availability at Konkola; continued improvement in cost of production despite higher power costs

o India: 89% utilization, affected by floods and unplanned shutdowns

· Aluminium: Record metal production; 7% lower cost of production q-o-q driven by the cost optimisation programme; received approval for conversion of 3 units of 2,400 MW Jharsuguda IPP to CPP

· Power: Second 660 MW unit of 1,980 MW Talwandi Sabo plant capitalised; 85% availability for unit - I and II

· Iron ore: Stable operations in Karnataka; slower ramp up in Goa due to transportation issues

· Actively managing balance sheet, with a focus on optimizing opex and capex to maximize free cash flow; refinancing and terming out maturing debt; and simplifying the group structure

o Robust financial position with total cash and liquid investments of US$8.9 billion and undrawn committed facilities of US$0.8 billion

Tom Albanese, Chief Executive Officer, Vedanta Resources plc, said: 'In the weak commodity price environment, we remain committed to optimising our operations, leveraging our high quality asset base, and proactively managing our balance sheet. I am encouraged to see the positive results of our cost reduction programme gaining momentum, and believe that this relentless focus on efficiency will not only make our business more resilient through the cycle but position us favourably for any future improvement in market conditions. Despite challenging market conditions, these efforts have allowed us to generate a robust EBITDA margin of 23%.'

Oil & Gas

Q3

Q2

Nine months period

Particulars

FY2016

FY2015

% change YoY

FY2016

% change QoQ

FY2016

FY2015

% change YoY

OIL AND GAS (boepd)

Average Daily Total Gross Operated Production

211,843

228,622

(7)%

214,247

(1)%

214,663

219,757

(2)%

Average Daily Gross Operated Production (boepd)

202,668

218,900

(7)%

205,361

(1)%

205,909

210,399

(2)%

Rajasthan

170,444

180,010

(5)%

168,126

1%

170,258

175,451

(3)%

Ravva

21,703

27,783

(22)%

26,064

(17)%

25,430

24,107

5%

Cambay

10,521

11,107

(5)%

11,172

(6)%

10,221

10,842

(6)%

Average Daily Working Interest Production (boepd)

128,402

136,701

(6)%

128,021

0%

128,991

132,576

(3)%

Rajasthan

119,311

126,007

(5)%

117,688

1%

119,180

122,815

(3)%

Ravva

4,883

6,251

(22)%

5,864

(17)%

5,722

5,424

5%

Cambay

4,208

4,443

(5)%

4,469

(6)%

4,089

4,337

(6)%

Total Oil and Gas (million boe)

Oil & Gas- Gross

18.65

20.14

(7)%

18.89

(1)%

56.62

57.86

(2)%

Oil & Gas-Working Interest

11.81

12.58

(6)%

11.78

0%

35.47

36.46

(3)%

Brent ($/boe)

44

77

(43)%

50

(12)%

52

96

(46)%

Average Price Realisation ($/boe)

35.2

68.1

(48)%

43.7

(19)%

45.0

85.2

(47)%

Oil - $/bbl

35.0

68.7

(49)%

43.7

(20)%

45.1

86.2

(48)%

Gas - $/mscf

7.2

6.3

14%

7.0

3%

6.9

6.4

8%

Revenue (US $ million)

307.8

565.0

(46)%

342.3

(10)%

1,063.1

1,968.7

(46)%

EBITDA (US $ million)

95.5

346.0

(72)%

158.4

(40)%

469.2

1358.2

(65)%

Third quarter FY 2016 vs. second quarter FY 2016

Average gross production for Q3 FY2016 was 202,668 barrels of oil equivalent per day (boepd), 1% lower, primarily due to lower volumes from offshore assets. Rajasthan production increased 1.4% to 170,444 boepd as volumes from Mangala Enhanced Oil Recovery (EOR) continue to ramp up, as expected. Aishwariya recorded strengthening of volumes on account of five more infill wells coming online. Bhagyam production was largely steady as execution of work-over activities in the last quarter helped us arrest the natural decline.

The Mangala Polymer injection ramp-up is on track as it has been increased from 200,000 barrels of polymer solution per day in Q2 FY2016 to 330,000 barrels of polymer solution per day in Q3 FY2016. A further increase in injection volume to 400,000 barrels per day is expected by March 2016. In-line with our plan, average production from Mangala EOR increased to 19,000 boepd in the quarter and is expected to ramp-up further to support Rajasthan production in Q4.

During the quarter, the Salaya Bhogat Pipeline (SBPL), storage terminal and the marine export facilities at Bhogat were commissioned and consequently the first cargo of Rajasthan crude oil was successfully loaded through the terminal for Mangalore Refinery Petroleum Ltd, realizing superior pricing.

Rajasthan water flood operating cost reduced by 6% from US$5.5 per boe to US$ 5.1 per boe through improvement in operational efficiency and re-negotiations with vendors.Ramp-up in the polymer injection volumes has increased the blended operating cost including the cost of polymer injection by 7.8% to US$ 6.9 per boe, in line with guidance.

EBITDA for the quarter was lower by 40% at US$ 96 million, primarily due to the lower oil price and a higher discount of 19%.

Third quarter FY 2016 vs. third quarter FY 2015

Gross production from Rajasthan declined 5%, primarily due to underperformance of the Bhagyam reservoir and natural decline in the Mangala and Aishwariya fields. This has been partly offset by the ramp up of volumes from the Mangala EOR, infill wells at Aishwariya and reservoir management initiatives at Bhagyam. Production from Ravva and Cambay declined by 22% and 5% respectively, due to natural decline in the respective fields.

Zinc - India

Particulars

Q3

Q2

Nine months period

FY2016

FY2015

% change YoY

FY2016

%

change QoQ

FY2016

FY2015

% change YoY

Zinc India (kt)

Mined metal content

228

242

(6)%

240

(5)%

700

618

13%

Refined Zinc - Total

206

196

5%

211

(2)%

605

517

17%

Refined Zinc - Integrated

206

192

8%

211

(2)%

605

504

20%

Refined Zinc - Custom

-

4

-

-

-

-

13

-

Refined Lead - Total

35

30

17%

40

(13)%

107

91

17%

Refined Lead - Integrated

35

25

42%

39

(10)%

102

72

42%

Refined Lead - Custom

-

5

-

1

-

5

19

(76)%

Silver - Total (in million ounces)

3.73

2.72

37%

3.59

4%

9.73

7.94

23%

Silver - Integrated (in million ounces)

3.73

2.24

67%

3.54

5%

9.64

6.19

56%

Silver - Custom (in million ounces)

-

0.48

-

0.05

-

0.09

1.75

(95)%

Average LME - Zinc ($/t)

1,613

2,235

(28)%

1,847

(13)%

1,878

2,209

(15)%

Average LME - Lead ($/t)

1,681

2,000

(16)%

1,714

(2)%

1,776

2,093

(15)%

Average Silver Prices ($/oz.)

14.8

16.5

(10)%

14.9

(1)%

15.3

18.6

(18)%

Zinc CoP

796

809

(2)%

771

3%

789

869

9%

Revenue (US$ million)

508.7

612.0

(17)%

592.3

(14)%

1,659.2

1,706.0

(3)%

EBITDA (US$ million)

217.8

336.0

(35)%

326.4

(33)%

799.7

887.2

(10)%

Third quarter FY 2016 vs. second quarter FY 2016

Mined metal production in Q3 was 5% lower at 228,000 tonnes, primarily on account of a change in mining mix with an increased contribution from the Sindesar Khurd and Kayad mines, resulting in lower average grades.

The cost of production (CoP) was US$796 tonne, up 3% on account of lower volume & lower acid realisation.

EBITDA was 33% lower at US$218 million on account of lower LME, volumes and additional regulatory cost.

Third quarter FY 2016 vs. third quarter FY 2015

Mined metal production was 6% lower y-o-y. Refined metal production during the quarter was higher than mined metal production primarily on account of conversion of existing inventory and enhanced smelter efficiency. Integrated zinc, lead and silver metal production during the quarter increased by 8%, 42% and 67% respectively y-o-y. Record refined silver production was due to higher volumes from the Sindesar Khurd (SK) mine.

The CoPwas lower at US$796 per tonne compared to US$809 per tonne in the corresponding prior quarter, primarily due to cost reduction initiatives, higher volumes of refined metals and currency depreciation.

Zinc - International

Q3

Q2

Nine months period

Particulars (in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

% change QoQ

FY2016

FY2015

% change YoY

Zinc International

51

80

(36)%

63

(19)%

184

242

(24)%

Zinc -refined -Skorpion

13

26

(49)%

17

(24)%

55

86

(35)%

Mined metal - Lisheen

21

41

(50)%

30

(32)%

81

113

(29)%

Mined metal - BMM

17

13

34%

16

6%

48

44

10%

Average LME - Zinc (US$/tonne)

1,613

2,235

(28)%

1,847

(13)%

1,878

2,209

(15)%

CoP including royalty

1,579

1,364

16%

1,477

7%

1,475

1,339

10%

Revenue(US$ million)

64.3

178.3

(64)%

105.2

(39)%

308.8

485.3

(36)%

EBITDA(US$ million)

(0.2)

63.2

(100)%

19.2

(101)%

56.4

156.2

(64)%

Third quarter FY 2016 vs. second quarter FY 2016

Production at Zinc International was lower at 51,000 tonnes as a result of closure of the Lisheen mine in November 2015 andlower production from Skorpion.

Skorpion produced 13,000 tonnes during the quarter, lower than the prior quarter due to the extended planned 30-day maintenance shutdown and a delay in start-up. The plant commenced operations on 20 November 2015 and has been producing Special High Grade (SHG) zinc since December 2015.

Q3 CoP was at US$1,579 per tonne compared with US$1,477 per tonne in Q2 FY2016, higher on account of lower volumes and shutdown expense at Skorpion. Q4 CoP is expected to be in the range of US$1,100-1,200/tonne, driven by higher grades, increased volumes, and procurement initiatives.

EBITDA for Q3 was lower due to lower LME prices, lower volumes and maintenance cost at Skorpion.

At Gamsberg, we achieved 365 LTIFR-free days to date. Pre-stripping continues in line with plan and to date 4 million tonnes of waste has been excavated. Based on the modular approach adopted to project development, the capital expenditure programme for FY2017 is currently in the process of being reviewed in light of current market conditions. Capital expenditure at Gamsberg stands at US$13 million for 9M FY2016, of which US$5 million was spent in the current quarter.

Third quarter FY 2016 vs. third quarter FY 2015

Mined metal production at BMM was at 17,000 tonnes, up 34% due to higher feed grade.

EBITDA was lower compared to the corresponding prior quarter, primarily due to lower LME and volumes following the closure of Lisheen mine and extended shutdown at Skorpion.

Iron Ore

Q3

Q2

Nine months period

Particulars (in million dry metric tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

% change QoQ

FY2016

FY2015

% change YoY

IRON ORE

Sales

1.5

0.1

-

0.6

138%

2.7

1.2

126%

Goa

0.6

-

-

-

-

0.6

-

-

Karnataka

0.9

0.1

-

0.6

48%

2.1

1.2

78%

Production of Saleable Ore

1.4

-

-

0.8

63%

2.4

0.3

-

Goa

0.3

-

-

-

-

0.3

-

-

Karnataka

1.1

-

-

0.8

43%

2.1

0.3

-

Production ('000 tonnes)

Pig Iron

146

166

(12)%

150

(3)%

466

465

-

Revenue(US$ million)

81.7

90.8

(10)%

62.2

31%

219.5

265.0

(17)%

EBITDA(US$ million)

11.1

7.0

59%

3.8

192%

18.3

34.6

(47)%

Third quarter FY 2016 vs. second quarter FY 2016

At Goa, mining and shipments commenced in Q3 post receipt of approvals. We produced 0.3 million tonnes and sold 0.6 million tonnes during the quarter. Production was impacted due to transportation issues and we are currently working on a resolution. Sales were higher as we participated in e-auction trading, wherein we dispatched 0.54 million tonnes ore purchased from the auction. We expect to achieve sales of c.3.5 million tonnes in FY 2016 from Goa.

At Karnataka production was 1.1 million tonnes and sales were 0.9 million tonnes.

Production of pig iron was lower at 146,000 tonne primarily due to temporary curtailment of production in November due to lower demand & unplanned stoppage at one of the blast furnace. Production has since been restored to capacity.

We are engaging with respective state government for enhancing mining cap in Goa and Karnataka and are receiving positive responses from them.

The company is working with the Government for removal of export duty on low grade iron ore exported from Goa. Besides, we continue to work towards resolving the matter on duplication of taxes (Goa Permanent Fund and District Mineral Foundation) which is currently being heard by the Honourable Supreme Court.

EBITDA was at US$11 million in the quarter, up 192% primarily due to increase in sales.

Third quarter FY 2016 vs. third quarter FY 2015

EBITDA in Q3 was US$11 million as compared to US$7 million, primarily due to the ramp up of iron ore volumes post resumption of mine production both at Goa and Karnataka. The Pig Iron business continues to face pricing pressure due to depressed market condition, in part offset by weakness in iron ore and coking coal prices.

Copper - India

Q3

Q2

Nine months period

Particulars (in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

% Change QoQ

FY2016

FY2015

% change YoY

COPPER- INDIA

Copper - Cathodes

89

99

(11)%

94

(5)%

282

266

6%

Tuticorin Power Plant Sales (MU)

40

164

(75)%

118

(66)%

334

483

(31)%

Realized TC/RC (USc/lb)

23.5

22.6

4%

25.2

(7)%

23.9

21.0

14%

Conversion cost - India (USc/lb)

4.4

3.3

34%

2.2

100%

3.1

4.6

(32)%

Revenue(US$ million)

686.9

947.2

(27)%

819.1

(16)%

2,383.4

2,797.4

(15)%

EBITDA(US$ million)

91.3

84.6

8%

87.8

4%

261.5

194.6

34%

Third quarter FY 2016 vs. second quarter FY 2016

The Tuticorin smelter produced 89,000 tonnes of cathodes during the quarter. Production was lower due to flooding in the state and unplanned shutdowns.

The 160MW power plant at Tuticorin operated at a lower Plant Load Factor (PLF) of 52% due to lower off-take by the Tamil Nadu Electricity Board (TNEB). However, we have received compensation at Rs1.1/unit for shortfall of off-take below 80% of contracted capacity.

Tc/Rc was marginally lower at USc23.5/lb in Q3. CY2016 Tc/Rc's are expected to be slightly lower, in line with global prices.

EBITDA was 4% higher q-o-q on account of a one-time benefit regarding the export incentive schemes based on the Supreme Court judgement in October 2015.

Net unit cost of conversion in Q3 was USc4.4/lb compared to USc2.2/lb in Q2 FY2016. Cost of conversion was higher y-o-y due to lower recovery credit and sulphur acid credit in falling commodity price scenario.

Third quarter FY 2016 vs. third quarter FY 2015

Tuticorin smelter production decreased 11% to 89,000 tonnes, while the EBITDA has increased by 8% due to the one-time benefit of export incentive scheme as mentioned above.

Copper - Zambia

Q3

Q2

Nine months period

Particulars (in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

% Change QoQ

FY2016

FY2015

% change YoY

COPPER -ZAMBIA

Mined metal

32

29

11%

33

(3)%

94

88

7%

Copper - Total

45

45

1%

47

(2)%

136

121

13%

Integrated

28

30

(6)%

32

(13)%

89

85

4%

Custom

17

15

15%

15

13%

47

35

35%

Average LME - Copper (US$/t)

4,892

6,624

(26)%

5,259

(7)%

5,387

6,803

(21)%

C1 cash cost (USc/lb)

175

267

(34)%

208

(16)%

199

271

(27)%

Revenue(US$ million)

195.5

294.3

(34)%

235.9

(17)%

720.6

819.0

(12)%

EBITDA(US$ million)

10.8

0.0

-

(30.4)

136%

(13.5)

16.2

(183)%

Third quarter FY 2016 vs. second quarter FY 2016

During Q3, mined metal was stable at 32,000 tonne.

During the quarter, the Nchanga underground (NUG) operations were put under managed care and maintenance. The resulting production losses will be compensated by additional CRO feed for the concentrators and purchased concentrates for smelting. Placing the NUG operations under care and maintenance will reduce operating costs by approximately US$1 million per month.

At the Tailings Leach Plant, production continued to improve and was at 14,500 tonnes.

Q3 integrated CoP (C1) was significantly lower by 16% q-o-q at USc175/lb, primarily due to higher volumes, cost saving initiatives and reduced power consumption. The company achieved a 12% reduction in power consumption during the quarter, following the placement of NUG under care and maintenance, refinery optimization and measures to reduce power consumption at administrative units.

Power tariffs were increased by 25% from 1 January 2016. This will have a US$3 million per month adverse impact on the cost of production. The company is exploring a range of possible solutions, as discussions with interested parties, including the government, are underway.

Third quarter FY 2016 vs. second quarter FY 2015

During Q3, mined metal production was at 32,000 tonnes, 11% higher than the corresponding prior quarter.

At Konkola, production was 48% higher due to improved efficiency, higher equipment availability and higher copper grade. Trackless equipment availability has improved and developed reserves have increased to 4 months of production. Hoisting from Shaft 1 resumed in Q1 FY2016, while hoisting from Shaft 4 is expected to recommence in Q4 FY2016.

Aluminium

Q3

Q2

Nine months period

Particulars(in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

% Change QoQ

FY2016

FY2015

% change YoY

Aluminium

Alumina-Lanjigarh

218

244

(10)%

272

(20)%

760

703

8%

Total Aluminum Production

234

224

5%

233

-

697

648

8%

Jharsuguda-I

131

133

(2)%

130

1%

392

403

(3)%

Jharsuguda-II

19

5

-

19

-

57

5

-

Korba-I

65

65

0%

65

-

192

190

1%

Korba-II

19

20

(7)%

19

-

56

50

12%

Average CoP - Aluminium (US$/tonne)

1,528

1,741

(12)%

1,648

(7)%

1,620

1,789

(9)%

Revenue(US$ million)

1,495

1,966

(24)%

1,591

(6)%

1,615

1,920

(16)%

Revenue(US$ million)

418.9

563.7

(26)%

421.1

(1)%

1,270.4

1,538.2

(17)%

EBITDA(US$ million)

20.9

134.1

(84)%

23.6

(11)%

42.6

313.8

(86)%

Third quarter FY 2016 vs. second quarter FY 2015

In Q3, production was stable at the 500kt Jharsuguda-I smelter. The 1.25 million tonnes Jharsuguda II smelter produced 19,000 tonnes during the quarter with 80 pots capitalised on 1 December. CoP at Jharsuguda was at US$1,485 per tonne compared to US$1,599 per tonne in Q2, primarily due to lower alumina cost and lower power cost driven by coal prices.

245kt Korba-I smelter produced 65,000 tonne during the quarter. The 325kt Korba-II smelter produced 19,000 tonnes during the quarter with 82 pots operational. CoP at the Korba has improved significantly to US$1,599 per tonne, compared to US$1,725 per tonne. The significant cost improvement was on account of lower alumina price and reduced power cost driven by improved coal mix & lower coal prices.

The Alumina price index has moved further lower in the quarter from US$ 292 per tonne in Q2 to US$ 234 per tonne. We expect further benefit of lower alumina and bauxite price to be realized in Q4.

In order to optimize costs, the Lanjigarh alumina refinery operated a single stream and produced 218,000 tonnes during Q3. The alumina cost during Q3 FY2016 was US$293 per tonne compared with US$323 per tonne in Q2 FY2016. We have received approvals for expansion of the Lanjigarh refinery to 6 mtpa, which will be considered when we have further visibility on bauxite sources.

On 27 January, we received the approval from the regulatory authorities (Orissa Electricity Regulatory Commission) to use the power generated from three units of the 2,400 MW (4 x 600 MW) Jharsuguda power plant for captive use and will commence ramp up of the pot lines at Jharsuguda-II smelter from 1 April 2016. One unit of 600 MW will continue to sell power externally.

The first 300 MW CPP unit of BALCO 1,200 MW power plant at Korba, was capitalized on 1 December 2015 and the second unit is expected to be synchronized in Q4 FY2016.

Third quarter FY 2016 vs. third quarter FY 2015

Production was 5% higher compared to Q3 FY2015 due to ramp up at Jharsuguda - II. EBITDA was lower by 84% primarily due to lower LME and premiums.

Power

Q3

Q2

Nine months period

Particulars (in million units)

FY2016

FY2015

% change YoY

FY2016

% Change QoQ

FY2016

FY2015

% change YoY

Power

Total Power Sales

2,934

2,663

10%

2,718

8%

8,728

7,312

19%

Jharsuguda 2400 MW

1,593

1,873

(15)%

1,554

3%

5,413

5,681

(5)%

MALCO

26

233

(89)%

127

(80)%

345

666

(48)%

TSPL

839

502

67%

693

21%

1,922

523

267%

HZL Wind Power

67

55

22%

158

(58)%

353

371

(5)%

Balco 270 MW power Sales

41

-

-

28

46%

169

71

137%

Balco 600 MW

368

-

-

158

133%

526

-

-

Revenue(US$ million)

175.0

181.1

(3)%

152.3

15%

517.5

492.3

5%

EBITDA(US$ million)

45.4

41.6

9%

49.1

(8)%

138.1

150.5

(8)%

Third quarter FY 2016 vs. second quarter FY 2016

The second 660MW unit of TSPL was capitalized on 1 December after successful completion of trial runs. The two units operated at a PLF of 47% and an average availability of 85% during the quarter. TSPL's Power Purchase Agreement with the Punjab State Electricity Board (PSEB) compensates based on the availability of the plant. The third unit is expected to be synchronised by the end of FY2016.

The first 300 MW IPP unit of BALCO 1200 MW operated at a PLF of 65% in Q3. The second 300 MW IPP unit is expected to be synchronised in Q4 FY2016.

The 100MW MALCO power plant operated at lower PLF due to lower power off-take by Tamil Nadu Electricity Board (TNEB). However, we have received compensation at Rs 1.10 per unit for shortfall of off-take below 80% of contracted capacity.

Third quarter FY 2016 vs third quarter FY 2015

The Jharsuguda 2,400MW power plant operated at a PLF of 35% in Q3, lower than corresponding prior period, primarily due to lower demand and softer power rates.

EBITDA has increased 9% to US$45 million, primarily due to higher volumes contributed by TSPL.

Average realisation for Q3 excluding TSPL was INR 2.88 per unit (USc4.37 per unit) compared with INR 3.36 per unit (USc 5.42 per unit) in Q3 FY2015. The NSR was lower compared to corresponding prior quarter on account of weaker demand, resulting in a lower power price environment in India. Average power CoP excluding TSPL for Q3 was INR 2.21 per unit (USc3.35 per unit) compared to INR 2.25 per unit (USc 3.64 per unit) in Q3 FY2015, primarily due to lower volumes.

Realisation and CoP of TSPL was at INR 5.46 per unit and INR 3.62 per unit respectively for 47% PLF. We are also compensated capacity charge by c. Rs. 1.35/unit for a declared capacity of 85% which is included in above realisation.

Balance Sheet Management

The Company is actively managing its balance sheet in light of the current commodity price environment, with a focus on maximizing free cash flow, refinancing and terming out maturing debt, and simplifying the group structure. Our financial position remains robust, with total cash and liquid investments of c. US$8.9 billion and undrawn committed facilities of US$0.8 billion as at 31 December 2015. Gross debt and net debt was at US$16.8 billion and US$7.9 billion, respectively, at 31 December 2015, higher than US$16.5 billion and US$7.5 billion at 30 September 2015. Gross and net debt, compared with 30 September 2015, was higher primarily on account of project capex, unwinding of working capital as guided earlier, payment of dividends by subsidiaries, and translation of INR-denominated cash balances at subsidiaries on account of rupee depreciation. The Net Debt is expected to go back to 30 September levels in the current quarter, with further working capital initiatives.

As at 31 December 2015, FY2016 debt maturities at Vedanta plc are US$0.3 billion, for which refinancing is in place. The FY2016 maturities at the subsidiaries are US$ 1.1 billion, which we intend to meet through committed term loans of c. $0.6 billion, cash and liquid investments of $0.25 billion, and the balance would be funded through a combination of undrawn committed facilities and further term loans that are in the process of being tied up.

Regarding the FY2017 maturities at Vedanta plc, we have tied up term loans of $0.3 billion at Vedanta plc, and $0.8 billion of the inter-company loan has been repaid by Vedanta Limited till date. The balance amount will be repaid by further term loans being tied up at Vedanta plc and/or further repayment of inter-company loan from Vedanta Limited (inter-company loan outstanding as on date is $1.8 billion).

On 20 January, Vedanta plc completed the buyback of part of its outstanding convertible bonds issued by Vedanta Resources Jersey Limited maturing in July 2016, through a modified Dutch auction. We purchased outstanding convertible bonds of $227.4 million through the tender offer at a price of $91,000 for the $100,000 par value of the bonds paying a total purchase value of $201 million. Following this buyback, the FY2017 Vedanta plc debt maturities are US$1.8 billion.

Production Summary (Unaudited)

(in '000 tonnes, except as stated)

Particulars

Q3

Q2

Nine months period

FY 2016

FY 2015

% Change YoY

FY 2016

% Change QoQ

FY 2016

FY 2015

% Change YoY

OIL AND GAS (boepd)

Average Daily Total Gross Operated Production

211,843

228,622

(7)%

214,247

(1)%

214,663

219,757

(2)%

Average Daily Gross Operated Production (boepd)

202,668

218,900

(7)%

205,361

(1)%

205,909

210,399

(2)%

Rajasthan

170,444

180,010

(5)%

168,126

1%

170,258

175,451

(3)%

Ravva

21,703

27,783

(22)%

26,064

(17)%

25,430

24,107

5%

Cambay

10,521

11,107

(5)%

11,172

(6)%

10,221

10,842

(6)%

Average Daily Gross Operated Production (boepd)

128,402

136,701

(6)%

128,021

0%

128,991

132,576

(3)%

Rajasthan

119,311

126,007

(5)%

117,688

1%

119,180

122,815

(3)%

Ravva

4,883

6,251

(22)%

5,864

(17)%

5,722

5,424

5%

Cambay

4,208

4,443

(5)%

4,469

(6)%

4,089

4,337

(6)%

Total Oil and Gas Production (million boe)

Oil & Gas - Gross

18.65

20.14

(7)%

18.89

(1)%

56.62

57.86

(2)%

Oil & Gas - Working Interest

11.81

12.58

(6)%

11.78

0%

35.47

36.46

(3)%

ZINC INDIA

Mined metal content

228

242

(6)%

240

(5)%

700

618

13%

Refined Zinc - Total

206

196

5%

211

(2)%

605

517

17%

Refined Zinc - Integrated

206

192

8%

211

(2)%

605

504

20%

Refined Zinc - Custom

-

4

-

-

-

-

13

-

Refined Lead - Total

35

30

17%

40

(13)%

107

91

17%

Refined Lead - Integrated

35

25

42%

39

(10)%

102

72

42%

Refined Lead - Custom

-

5

-

1

-

5

19

(76)%

Saleable Silver - Total (in '000 ounces)

3.73

2.72

37%

3.59

4%

9.73

7.94

23%

Saleable Silver - Integrated
(in '000 ounces)

3.73

2.24

67%

3.54

5%

9.64

6.19

56%

Saleable Silver - Custom
(in '000 ounces)

-

0.48

-

0.05

-

0.09

1.75

(95)%

ZINC INTERNATIONAL

51

80

(36)%

63

(19)%

184

242

(24)%

Zinc -refined

13

26

(49)%

17

(24)%

55

86

(35)%

Mined metal - Lisheen

21

41

(50)%

30

(32)%

81

113

(29)%

Mined metal - BMM

17

13

34%

16

6%

48

44

10%

IRON ORE (in million dry metric tonnes, or as stated)

Sales

1.5

0.1

-

0.6

138%

2.7

1.2

126%

Goa

0.6

-

-

-

-

0.6

-

-

Karnataka

0.9

0.1

-

0.6

48%

2.1

1.2

78%

Production of Saleable Ore

1.4

-

-

0.8

63%

2.4

0.3

-

Goa

0.3

-

-

-

-

0.3

-

-

Karnataka

1.1

-

-

0.8

43%

2.1

0.3

-

Particulars

FY 2016

FY 2015

% Change YoY

FY 2016

% Change QoQ

FY 2016

FY 2015

% Change YoY

Pig Iron

146

166

(12)%

150

(3)%

466

465

-

COPPER - INDIA/AUSTRALIA

Copper - Mined metal content

-

-

-

-

-

-

-

-

Copper - Cathodes

89

99

(11)%

94

(5)%

282

266

6%

Tuticorin power sales
(million units)

40

164

(75)%

118

(66)%

334

483

(31)%

COPPER - ZAMBIA

Mined Metal

32

29

11%

33

(3)%

94

88

7%

Copper - Total

45

45

1%

47

(2)%

136

121

13%

Integrated

28

30

(6)%

32

(13)%

89

85

4%

Custom

17

15

15%

15

13%

47

35

35%

ALUMINIUM

Alumina - Lanjigarh

218

244

(10)%

272

(20)%

760

703

8%

Total Aluminum Production

234

224

5%

233

-

697

648

8%

Jharsuguda-I

131

133

(2)%

130

1%

392

403

(3)%

Jharsuguda-II

19

5

-

19

-

57

5

-

Korba I

65

65

0%

65

-

192

190

1%

Korba II

19

20

(7)%

19

6%

56

50

12%

POWER (in million units)

Total Power Sales

2,934

2,663

10%

2,718

8%

8,728

7,312

19%

SEL

1,593

1,873

-15%

1,554

3%

5,413

5,681

-5%

MALCO

26

233

-89%

127

(80)%

345

666

-48%

TSPL

839

502

67%

693

21%

1,922

523

267%

HZL Wind Power

67

55

22%

158

(58)%

353

371

-5%

Balco 270 MW power Sales

41

-

-

28

46%

169

71

137%

Balco 600 MW

368

-

-

158

133%

526

-

-

Ports - VGCB (in million tonnes)

Cargo Discharge

1.8

1.8

2%

2.1

(14)%

5.5

5.3

3%

Cargo Dispatches

1.9

1.8

5%

2.1

(10)%

5.7

5.3

7%

1. EBITDA margin excluding custom smelting

2. Including Internal Gas Consumption

3. Excluding captive consumption of 2,051 tonnes in Q3 FY2016 vs 2,394 tonnes in Q3 FY2015,1,514 tonnes in Q2 FY 2016 and 5,749 tonnes in nine months period FY2016 vs 5,845 tonnes in nine months period FY2015

4. Excluding captive consumption of 3,44,000 ounces in Q3 FY2016 vs 4,02,000 ounces in Q3 FY2015, 2,51,000 ounces in Q2 FY 2016and 956,000 ounces in nine months period FY2016 vs 9,75,000 ounces in nine months period FY2015

5. Revenues from silver not credited to CoP with IFRIC adjustment, w/o royalty. Without IFRIC adjustment, the CoP was $795/t in Q3 FY 2016 and $771/t in Q2 FY 2016.

6. Includes trial run production of 12 Kt in Q3 FY 2016 vs 5Kt in Q3 FY 2015,19Kt in Q2 FY 2016 and 51Kt in nine months period in FY 2016 vs 5Kt in nine months period in FY 2015

7. Includes trial production of Nil in 9M FY 2016 vs 24Kt in 9M FY 2015

8. VGCB refers to Vizag General Cargo Berth

Financial Summary (Unaudited):

(in US$ milllion, except as stated)

Group Revenue

Q3

Q2

Nine months period

FY 2016

FY 2015

% Change YoY

% Change YoY

% Change QoQ

FY 2016

FY 2015

% Change YoY

Zinc

573.0

790.3

(27)%

697.5

(18)%

1,968.0

2,191.3

(10)%

India

508.7

612.0

(17)%

592.3

(14)%

1,659.2

1,706.0

(3)%

International

64.3

178.3

(64)%

105.2

(39)%

308.8

485.3

(36)%

Oil and Gas

307.8

565.0

(46)%

342.3

(10)%

1,063.1

1,968.7

(46)%

Iron Ore

81.7

90.8

(10)%

62.2

31%

219.5

265.0

(17)%

Copper

882.4

1,241.5

(29)%

1,055.0

(16)%

3,104.0

3,616.4

(14)%

India/ Australia

686.9

947.2

(27)%

819.1

(16)%

2,383.4

2,797.4

(15)%

Zambia

195.5

294.3

(34)%

235.9

(17)%

720.6

819.0

(12)%

Aluminium

418.9

563.7

(26)%

421.1

(1)%

1,270.4

1,538.2

(17)%

Power

175.0

181.1

(3)%

152.3

15%

517.5

492.3

5%

Others

(3.5)

(76.6)

-

17.8

-

(7.7)

(260.2)

-

Total Group Revenue

2,435.3

3,355.8

(27)%

2,748.2

(11)%

8,134.8

9,811.7

(17)%

(in US$ milllion, except as stated)

Group EBITDA

Q3

Q2

Nine months period

FY 2016

FY 2015

% Change YoY

FY 2016

% Change QoQ

FY 2016

FY 2015

% Change YoY

Zinc

217.6

399.2

(45)%

345.6

(37)%

856.1

1043.4

(18)%

India

217.8

336.0

(35)%

326.4

(33)%

799.7

887.2

(10)%

International

(0.2)

63.2

(100)%

19.2

(101)%

56.4

156.2

(64)%

Oil and Gas

95.5

346.0

(72)%

158.4

(40)%

469.2

1358.2

(65)%

Iron Ore

11.1

7.0

59%

3.8

192%

18.3

34.6

(47)%

Copper

102.1

84.6

21%

57.4

78%

248.0

210.8

18%

India/ Australia

91.3

84.6

8%

87.8

4%

261.5

194.6

34%

Zambia

10.8

0.0

-

(30.4)

136%

(13.5)

16.2

(183)%

Aluminium

20.9

134.1

(84)%

23.6

(11)%

42.6

313.8

(86)%

Power

45.4

41.6

9%

49.1

(8)%

138.1

150.5

(8)%

Others

1.0

2.7

-

3.1

-

6.9

8.9

-

Total Group EBITDA

493.6

1015.2

(51)%

641.0

(23)%

1779.2

3120.2

(43)%

There will be a conference call at 9:00 a.m. UK time (2:30 p.m. India time) where senior management will discuss the results.

Dial in:

UK toll free: 0 808 101 1573

International & UK: +44 20 3478 5524

USA toll free: 1 866 746 2133

USA: +1 323 386 8721

India: +91 22 3938 1017 and +91 22 6746 8333

Singapore toll free: 800 101 2045

Hong Kong toll free: 800 964 448

Please allow time to register your name and company, or pre-register online at:

http://services.choruscall.in/diamondpass/registration?confirmationNumber=4169828

For further information, please contact:

Communications

Roma Balwani

President - Group Communications, Sustainability

and CSR

Tel: +91 22 6646 1000

[email protected]

Investors

Ashwin Bajaj

Director - Investor Relations

Radhika Arora

Associate General Manager - Investor Relations

Ravindra Bhandari

Manager - Investor Relations

Finsbury

Daniela Fleischmann

Tel: +44 20 7251 3801

[email protected]

Tel: +91 22 6646 1531

[email protected]

About Vedanta Resources plc

Vedanta Resources plc ('Vedanta') is a London listed diversified global natural resources company. The group produces aluminium, copper, zinc, lead, silver, iron ore, oil & gas and commercial energy. Vedanta has operations in India, Zambia, Namibia, South Africa, Ireland, Liberia, Australia and Sri Lanka. With an empowered talent pool globally, Vedanta places strong emphasis on partnering with all its stakeholders based on the core values of trust, sustainability, growth, entrepreneurship, integrity, respect and care. For more information, please visit www.vedantaresources.com.

Disclaimer

This press release contains 'forward-looking statements' - that is, statements related to future, not past, events. In this context, forward-looking statements often address our expected future business and financial performance, and often contain words such as 'expects,' 'anticipates,' 'intends,' 'plans,' 'believes,' 'seeks,' 'should' or 'will.' Forward-looking statements by their nature address matters that are, to different degrees, uncertain. For us, uncertainties arise from the behaviour of financial and metals markets including the London Metal Exchange, fluctuations in interest and or exchange rates and metal prices; from future integration of acquired businesses; and from numerous other matters of national, regional and global scale, including those of a political, economic, business, competitive or regulatory nature. These uncertainties may cause our actual future results to be materially different that those expressed in our forward-looking statements. We do not undertake to update our forward-looking statements.

This information is provided by RNS

The company news service from the London Stock Exchange


ENDQRTEALFNASFKEFFFor us, uncertainties arise from the behaviour of financial and metals markets including the London Metal Exchange, fluctuations in interest and or exchange rates and metal prices; from future integration of acquired businesses; and from numerous other matters of national, regional and global scale, including those of a political, economic, business, competitive or regulatory nature. These uncertainties may cause our actual future results to be materially different that those expressed in our forward-looking statements. We do not undertake to update our forward-looking statements.
Lire la suite de l'article sur www.publicnow.com
Données et statistiques pour les pays mentionnés : Hong Kong | Jersey | Liberia | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Hong Kong | Jersey | Liberia | Tous

Vedanta Resources PLC

PRODUCTEUR
CODE : VED.L
ISIN : GB0033277061
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Vedanta Res. est une société de production minière de zinc et de plomb basée au Royaume-Uni.

Vedanta Res. est productrice de zinc, de plomb, de bauxite, de cuivre et d'or en Australie, en Armenie, en Inde et en Zambie, en développement de projets de plomb et de zinc en Inde.

Ses principaux projets en production sont KONKOLA en Zambie, MT LYELL en Australie, ZOD en Armenie et MAINPAT, RAMPURA AGUCHA, RAJPURA DARIBA, ZAWAR et KAYAR en Inde, son principal projet en développement est SINDESAR KHURD en Inde et son principal projet en exploration est BAMNIA KALAN en Inde.

Vedanta Res. est cotée au Royaume-Uni et en Allemagne. Sa capitalisation boursière aujourd'hui est 227,1 milliards GBX (195,8 milliards €).

La valeur de son action a atteint son plus haut niveau récent le 03 février 2006 à 999,98 GBX, et son plus bas niveau récent le 28 septembre 2018 à 832,60 GBX.

Vedanta Res. possède 272 776 398 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Vedanta Resources PLC
01/06/2019Production stalled at Vedanta Resources' Konkola Copper Mine...
03/09/2018India's Anil Agarwal succeeds with Vedanta Resources buyout
12/04/2018Vedanta Resources expects supply constraints to sustain zinc...
Nominations de Vedanta Resources PLC
08/08/2016Board Committee Changes
Projets de Vedanta Resources PLC
26/10/2015Notifications of major interests in shares
Communiqués de Presse de Vedanta Resources PLC
30/08/2016Update and Aluminium and Power
19/08/2016Mailing of Circular and Notice of General Meeting
08/08/2016Result of 2016 Annual General Meeting
06/08/2016Result of AGM 2016
01/08/2016Vedanta Resources announce Q1 FY2017 results
01/08/2016Q1 FY2017 Production Release
29/07/2016Total Voting Rights Announcement
29/07/2016Vedanta Ltd announces Q1 FY2017 results
22/07/2016Vedanta lts Cairn: Revised merger terms release
22/07/2016Vedanta ltd. Cairn: Revised merger term
22/07/2016Vedanta Ltd and Cairn India Revised merger terms
22/07/2016Vedanta Limited and Cairn India Limited Revised Terms for Me...
14/07/2016Repayment of Convertible Bonds
13/07/2016Vedanta Limited Awarded for Environment Management at the Go...
01/02/2016Bond Buyback Tender Offer Launch
01/02/2016Q3 Production Release - Correction
30/01/2016Vedanta Conducts Safety Workshop to Drive Awareness
29/01/2016Block Listing
29/01/2016Q3 Production Release
28/01/2016Vedanta’s Value Addition Business Gets recommendation of EAC...
28/01/2016Vedanta Limited announces Q3 Results
22/01/2016Zambia's 2015 copper output up despite power woes, weak pric...
21/01/2016Hindustan Zinc announces Q3 results
18/01/2016[$$] BP outperforms market on broker upgrade
04/01/2016Director/PDMR Shareholding
31/12/2015Mr. Anil Agarwal, Chairman, Vedanta, tweeted - ‘I wish you a...
22/12/2015Press Statement- Vedanta at HT Leadership Summit 2015
22/12/2015HIV AIDS awareness campaigns and prevention programmes at Ve...
22/12/2015Vedanta Limited Wins ‘National Energy Conservation Award-201...
18/12/2015Vedanta Limited Wins ‘National Energy Conservation Award-201...
17/12/2015Vedanta’s Sterlite Copper comes to the rescue of Tamil Nadu ...
16/12/2015Vedanta’s BALCO wins IMEA 2015 Gold Award in ‘Mega Industrie...
30/11/2015Director/PDMR shareholding
30/11/2015Total Voting Rights
27/11/2015Director/PDMR shareholding
26/11/2015Is Vedanta Ltd (ADR) (VEDL) Going to Burn These Hedge Funds?
24/11/2015Director/PDMR Shareholding
23/11/2015Director/PDMR shareholding
04/11/2015Edited Transcript of VED.L earnings conference call or prese...
04/11/2015Vedanta drops dividend after profit slide
04/11/2015Interim Results
04/11/2015Release- Interim Results for the Six Months ended 30 Septemb...
04/11/2015Presentation- Interim Results for the Six Months ended 30 Se...
26/10/2015Vedanta wins the ‘Excellence in Corporate Governance’ Award ...
21/10/2015Cairn announces Q2 results
21/10/2015Cairn India-Results for the Second Quarter ended 30th Sep, 2...
20/10/2015Clarification on media speculation
19/10/2015Hindustan Zinc announces Q2 results
19/10/2015Vedanta exports first shipment of Iron after resuming operat...
15/10/2015Notice of FY2016 Interim Results
13/10/2015Mr Anil Agarwal Chairman Vedanta tweeted about Vedanta's Fro...
12/10/2015Vedanta’s Sesa Goa assists Educational Excellence
01/10/2015Block Listing Return
30/09/2015Total Voting Rights
29/09/2015Notice of Q2 Production Release
28/09/2015Vedanta wins “Best Practices in Developing Top Leaders” Awar...
23/09/2015Mr Anil Agarwal, Chairman, Vedanta tweets on 4000 Anganwadi ...
21/09/2015Notifications of Major Interests in Shares
21/09/2015Ministry for Women and Child Development and Vedanta sign an...
21/09/2015Appointment of Mr Duggal as CEO of Hindustan Zinc
16/09/2015Former Anglo American CEO Cynthia Carroll joins Vedanta Reso...
16/09/2015Appointment of Cynthia Carroll
15/09/2015Update on Merger of Cairn India and Vedanta Ltd
11/09/2015Vedanta celebrates World Literacy Week in Tuticorin
03/09/2015Director/PDMR shareholding
28/08/2015Total Voting Rights
28/08/2015Lack of Bauxite from Odisha forces Vedanta to initiate closu...
20/08/2015Vedanta revives Computer Literacy Program in Sanquelim
18/08/2015Vedanta Corporate Announcement
17/08/2015Vedanta Limited Salutes PM’s Vision To Foster Entrepreneursh...
11/08/2015Mr. Anil Agarwal, Chairman, Vedanta, tweeted: ‘We resumed ir...
10/08/2015Director/PDMR shareholding
10/08/2015Major Shareholding notification
10/08/2015Commencement of Iron Ore operations at Goa
06/08/2015Vedanta awards scholarships to students inspired by former p...
04/08/2015Chairman, Mr. Anil Agarwal addressed the Vedanta Resources P...
03/08/2015Result of AGM
03/08/2015Vedanta retreats on worries over risk of breaching loan cove...
03/08/2015AGM - Chairman's Statement
03/08/2015Chairman's Statement
03/08/2015Vedanta reports Sustainable Development performance as per G...
31/07/2015Total Voting Rights
31/07/2015Vedanta plc Q1 Production Release
31/07/2015Q1 Production Release
03/07/2015FY2015 Annual Report
03/07/2015Notice of AGM
02/07/2015Vedanta Resources Plc hosts first Sustainable Development Da...
22/06/2015Director/PDMR Shareholding
19/06/2015Director/PDMR Shareholding
18/06/2015Director/PDMR Shareholding
17/06/2015Director/PDMR Shareholding
17/06/2015Mr. Anil Agarwal was conferred the prestigious ‘Dhaturatna’ ...
16/06/2015Director/PDMR Shareholding
16/06/2015Edited Transcript of VEDL.NSE M&A conference call or present...
16/06/2015Edited Transcript of VEDL.NSE M&A conference call or present...
14/06/2015Vedanta Resources confirms controversial Cairn India merger ...
09/06/2015Vedanta: less is more
09/06/2015Anil Agarwal plans merger of Vedanta units to reduce debt
14/05/2015Vedanta hit by $6.6bn impairment on oil and gas assets
24/04/2015Notice of Preliminary Results for the year ended 31st March,...
24/04/2015Notice of FY2015 Results
23/04/2015Cairn India announces Q4 results
22/04/2015Sesa Sterlite Limited renamed Vedanta Limited
20/04/2015HZL announces Q4 results
20/04/2015Vedanta wins four awards at IndiaCSR
16/04/2015Vedanta appoints Group Counsel
15/04/2015Vedanta appoints Mukesh Bhavnani as Group Legal Counsel & Ch...
14/04/2015Mr. Anil Agarwal, Chairman, Vedanta Group, tweeted, “Vedanta...
10/04/2015Q4 Production Release
09/04/2015Vedanta committed to a Healthy India
07/04/2015Notice of FY2015 Production Release
07/04/2015Cairn India files writ petition against tax demand
01/04/2015Block Listing Interim Review
31/03/2015Total Voting Rights
27/03/2015Director/PDMR Shareholding
27/03/2015Vedanta serves notice of claim
25/03/2015Vedanta Pledges support for Women Equality
24/03/2015Vedanta recycles 34 million cubic metres of water by January...
20/03/2015Vedanta Resources rallies on tax claim denial
20/03/2015Vedanta Resources plc Capital Markets Day Press Release
20/03/2015Vedanta Capital Markets Day
19/03/2015Director/PDMR Shareholding
12/06/2009Pricing and size increase of Vedanta Convertible bond to $1....
06/11/2008Interim Results announcement
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
LSE (VED.L)FRANKFURT (VR9.F)
832,60+0.87%9,34+0.02%
LSE
GBX 832,60
28/09 16:35 7,20
0,87%
Cours préc. Ouverture
825,40 824,60
Bas haut
824,60 838,00
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  832,60 -%
Volume var. 1 mois
149 454 -%
24hGold TrendPower© : 22
Produit Copper - Gold - Lead - Zinc
Développe Lead - Zinc
Recherche Lead - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 20/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,73 AU$-1,90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,98 US$-2,48%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX-3,12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,39 CA$-4,02%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,19 CA$-1,43%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,73 CA$+0,29%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,86 US$-1,57%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+3,03%Trend Power :