Quarterly Activities and Cashflow Report

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   9/11 | Copper | Hamptons | K Street |

Quarterly Activities and Cashflow Report

29 July 2016‌

QUARTERLY REPORT

For the Period Ending 30 June 2016

Redstone Resources Limited (ASX Code: RDS) ("Redstone" or "the Company") presents its quarterly report for the period ending 30 June 2016 ("the Quarter").

Redstone's primary focus is the advancement of the Tollu Project ("Tollu" or the "Project"), located in the southeast portion of the West Musgrave region of Western Australia. This Project hosts a giant swarm of hydrothermal copper rich veins in a mineralised system covering an area at least 5km2. Copper mineralisation is exposed at the surface and forms part of a dilation system between two major shears.

Redstone expects the Project's mineralised area and the volume of hydrothermal mineralisation to increase significantly with further drilling.

HIGHLIGHTS

  • Initial JORC 2012 resource of 3.8 million tonnes at 1% Cu, containing 38,000 tonnes of copper at the Tollu Project defined

  • The Tollu JORC resource includes 8,000 tonnes approx. of copper oxide, which provides scope for the evaluation of a low cost expedited development path as part of the broader development of higher grade sulphide prospects.

  • Review and significant upgrade of the Conceptual Exploration Target for the Tollu Project resulting in a significant increase in size to 31 to 47 million tonnes of mineralisation at a conceptual grade range of 0.8 to 1.3% Cu, containing 259,000 to 626,000 tonnes of copper. The potential quantity and grade of this target is conceptual in nature. It is important to note that there has been insufficient exploration to estimate a Mineral Resource for the Target and it is uncertain if further exploration will result in the estimation of a Mineral Resource for the Target.

  • Significant upgrade of the Forio Prospect at the Tollu Project following the success of the 2015 drilling program, which identified mineralised strike over 250m open in all directions, despite displaying limited surface expression and not yet being effectively drilled out below 50m. Results at Forio displayed the widest and strongest copper mineralisation discovered at this depth to date at the Tollu Project.

Redstone Resources Limited ABN 42 090 169 154 www.redstone.com.au

60 Havelock Street, West Perth WA 6005 Tel: 08 9328 2552 Fax: 08 9328 2660 Email: [email protected]

1

  • Identification of seven additional new Forio analogues and three existing Forio analogue prospects

  • Prospectivity of tenement further increased

  • Planning underway for follow‐up drilling at Forio and at four of the identified Forio analogues, which have been elevated in priority for further testing, with a proposed RC drilling program comprising 53 holes for a total of 8,000m.

  • WA Government awards EIS co‐funded drilling grant of up to $200,000 for the Tollu Project, planned to be used for a single deep diamond drill hole of approximately 1,000m at the Chatsworth Prospect.

TOLLU PROJECT

Maiden Mineral Resource Estimate

During the Quarter the Company announced its first Mineral Resource estimate, reported in accordance with the 2012 JORC Code, for its 100% owned Tollu Project in the West Musgrave, Western Australia. The initial Mineral Resource estimate at Tollu is 3.8Mt @ 1.0% copper, which equates to 38,000 tonnes of contained copper (the "Mineral Resource") (Tables 1 and 2). The Tollu Mineral Resource was prepared by BM Geological Services Pty Ltd, a Kalgoorlie based, independent geological consulting group and is reported in line with the guidelines of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves 2012 edition (JORC 2012).

The definition of a maiden resource at Tollu represents a major milestone for Redstone and for the advancement of the Project.

Tollu Project

Mineral Resource Estimate - June 2016

Prospect

Tonnes

Cu%

Contained Copper

Chatsworth

798,308

1.6%

12,780

Forio

671,898

1.1%

7,233

Main Reef

850,210

0.7%

5,633

Hamptons

266,576

0.9%

2,436

Eastern Reef

1,309,138

0.8%

10,047

Total

3,896,130

1.0%

38,129

Table 1 Mineral Resource Estimate by Prospect

The defined Mineral Resource also includes 8,000 tonnes of JORC oxide resource. Accordingly, there is excellent potential to significantly expand the Mineral Resource with future drilling, both to extend the mineralisation in the near‐surface, open pittable environment as well as targeting extensions of the higher grade sections of mineralisation.

The Board is confident that after further drilling, evaluation can commence of the economic viability of the near surface copper mineralisation at Tollu. If studies prove it to be viable, the near surface copper oxide may present short term development options generating early cash flow with significantly lower up front capital expenditure.

Tollu Project

Mineral Resource Estimate - June 2016

Resource Classification

Prospect

Tonnes

Cu%

Contained Copper

Indicated

Chatsworth

394,607

1.6%

6,323

Forio

69,268

1.1%

759

Sub‐Total

463,875

1.5%

7,081

Inferred

Chatsworth

403,701

1.6%

6,458

Forio

602,630

1.1%

6,474

Main Reef

850,210

0.7%

5,633

Hamptons

266,576

0.9%

2,436

Eastern Reef

1,309,138

0.8%

10,047

Sub‐Total

3,432,255

0.9%

31,048

Total Indicated

+ Inferred

Chatsworth

798,308

1.6%

12,780

Forio

671,898

1.1%

7,233

Main Reef

850,210

0.7%

5,633

Hamptons

266,576

0.9%

2,436

Eastern Reef

1,309,138

0.8%

10,047

Total Indicated and Inferred

3,896,130

1.0%

38,129

Table 2 Indicated and Inferred Mineral Resource Estimate by Prospect

Increased Conceptual Exploration Target

During the Quarter Redstone defined a significantly increased Conceptual Exploration Target for the Tollu Project of 31 to 47 million tonnes of mineralisation at a conceptual grade range of 0.8 ‐ 1.3% Cu, containing 259,000 to 626,000 tonnes of copper (the "Target"). This Target is based on the current geological understanding of the mineralised outcrop area at Tollu, coupled with geophysical evidence to suggest that the mineralised environment extends beneath cover to the north and south. Table 3 describes the Target breakdown by Prospect. This represents a substantial 41% increase to the upper range of the previously existing target (49% when the Mineral Resource is included).

Given the drilling data is constrained to less than 2% of the tenement area and only on one project (Tollu) out of six, the upside to the Mineral Resource remains unlimited.

Prospect

Tonnes Lower

Tonnes Upper

Grade Lower Cu%

Grade Upper Cu%

Contained Copper Lower

Contained Copper Upper

Huntington

1,872,000

2,808,000

0.9%

1.5%

16,800

42,100

Drummond

1,248,000

1,872,000

0.9%

1.5%

11,200

28,000

Stourhead

2,028,000

3042000

0.9%

1.5%

18,200

45,600

Exbury

520,000

780,000

0.9%

1.5%

4,600

11,700

Butchart

1,664,000

2,496,000

0.9%

1.5%

14,900

37,400

Main Reef South

4,784,000

7,176,000

0.8%

1.2%

38,200

86,100

Isola

936,000

1,404,000

0.9%

1.5%

8,400

21,000

Kilruddery

780,000

11,70,000

0.9%

1.5%

7,000

17,500

Bodnant

520,000

780,000

0.9%

1.5%

4,600

11,700

Sanssouci

1,456,000

2,184,000

0.9%

1.5%

13,100

32,700

Forio

1,976,000

2,964,000

1.2%

1.8%

23,700

53,300

Forio Deeps

1,393,000

2,090,000

1.2%

1.8%

16,700

37,600

Forio South

416,000

624,000

1.2%

1.8%

4,900

11,200

Eastern Reef

11,667,000

17,500,000

0.6%

1.0%

70,000

175,000

Dawyck

204,000

306,000

2.0%

3.0%

4,000

9,100

Hampton

175,000

262,000

0.8%

1.2%

1,300

3,100

Boboli

94,000

140,000

1.2%

1.8%

1,100

2,500

Tiergarten

42,000

62,000

1.2%

1.8%

400

1,100

31,775,000

47,660,000

0.8%

1.3%

259,100

626,700

Table 3 ‐ Tollu Project ‐ Target - Prospect Breakdown

The Tollu deposit is located in a large, reverse fault system where Cu mineralisation is focused into low stress dilatational jog positions along a north‐south structural corridor (Figure 1). High grade Cu mineralisation appears to be constrained to late stage veining within the dilatational positions which results in a limited strike length of the mineralisation. Drilling at the Project has showed these mineralised jogs have a steep plunge competent which has been tested down to a vertical depth of 360 metres. Mineralised jog positions occur at relatively regular intervals of 100

- 300 metres along the structural corridor.

Lire la suite de l'article sur www.publicnow.com

REDSTONE RESOURCES LIMITED

CODE : RDS.AX
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

REDSTONE RESOURCES Ltd. est une société d’exploration minière basée en Australie.

REDSTONE RESOURCES Ltd. détient divers projets d'exploration au Bresil et en Australie.

Ses principaux projets en exploration sont PONTAL au Bresil et BLACKSTONE RANGE et STRIPEYS en Australie.

REDSTONE RESOURCES Ltd. est cotée en Australie. Sa capitalisation boursière aujourd'hui est 1,5 millions AU$ (987 205 US$, 922 148 €).

La valeur de son action a atteint son plus haut niveau récent le 18 février 2011 à 0,61 AU$, et son plus bas niveau récent le 24 avril 2024 à 0,00 AU$.

REDSTONE RESOURCES Ltd. possède 379 800 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Communiqués de Presse de REDSTONE RESOURCES LIMITED
29/07/2016Quarterly Activities and Cashflow Report
01/10/2015Full Year Statutory Accounts
07/09/2015Director Resignation and Appendix 3Z
03/08/2015Quarterly Activities and Cashflow Report
30/07/2015Drilling Preparations Underway at Tollu Project
13/03/2015Consolidated Financial Report For The Half-Year Ended 31 Dec...
30/01/2015Quarterly Activities and Cashflow Report
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (RDS.AX)
0,004+0.00%
AUSTRALIA
AU$ 0,004
24/04 11:00 -
0%
Cours préc. Ouverture
0,004 0,004
Bas haut
0,004 0,004
Année b/h Var. YTD
- -  0,010 -60,00%
52 sem. b/h var. 52 sem.
- -  0,011 -60,00%
Volume var. 1 mois
48 842 -
24hGold TrendPower© : -21
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-42,86%
2023-12,50%0,010,01
2022-42,86%0,020,01
20217,69%0,020,01
202062,50%0,060,00
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :