|
|
|
| 24hGold - Publicnow |
Beaufield expands drill program at Urban |
June 16, 2016
Beaufield Resources Inc. ('Beaufield') (TSX- V: BFD) is pleased to provide a progress report of its drill program on its 12,915 hectare, Urban property. To date, 1,169 metres has been completed during the first half June on the Macho block, including the follow-up on the Lucky 7 zone where drill hole BU-15-07 had intersected 7.86 g/t Au over 6 metres near surface (BFD news release, December 8th, 2015).
Drill core samples from the program have been sent to ALS Laboratories in Vasamedi 2 juillet 2016 |
|
| 24hGold - Publicnow |
Beaufield undertakes geophysics for more drilling at Urban |
June 28, 2016
Ottawa, June 28, 2016 - Beaufield Resources Inc. ('Beaufield') (TSX- V: BFD) is pleased to report that ground geophysics consisting of a deep penetrating induced polarization (IP) survey and a magnetometer survey has started on the Kent Block in Urban township, Quebec (BFD June 21, 2016 news release).
The surveys are designed to cover the interpreted extension of Osisko's Souart historical gold deposit which is located less than 500 metres from Beaufield's property. The Souart samedi 2 juillet 2016 |
|
| 24hGold - Publicnow |
Beaufield drills Urban property |
June 8, 2016
Beaufield Resources Inc. ('Beaufield') (TSX- V: BFD) is pleased to announce that they have mobilized a diamond drill to its 100% owned, 12,915 hectares, Urban property to undertake an initial summer drill program. Beaufield is planning exploration to evaluate its Urban holdings in detail.
The drilling will first focus on a series of targets on the Macho block, including the Lucky 7 zone where In December 2015, Beaufield announced results from a fall drill program, where drill hosamedi 2 juillet 2016 |
|
|
| 24hGold - Publicnow |
Publish on 06-30-2016 METANOR INTERSECTS 10.4 g/t Au OVER 8.8 M AT BACHELOR MINE |
June 30, 2016 - Val-d'Or, Quebec, Canada: Metanor Resources Inc. ('Metanor') (TSXV: MTO) is pleased to provide this update on its underground exploration drilling program at Bachelor Mine. The development of a ramp below level 14 toward level 15 in the Main vein allowed the construction of a drill station well positioned to define additional resources below level 14. The drilling began in early June.
The details of the intersections obtained from the drill holes are described in the table belojeudi 30 juin 2016 |
|
| 24hGold - Publicnow |
GOLD Publish on 06-23-2016 METANOR INCREASES TOTAL OUNCES IN NEW GOLD RESOURCE ESTIMATE AT BARRY PIT |
June 22, 2016 - Val-d'Or, Québec, Canada: Metanor Resources Inc. (« Metanor ») (TSX-V: MTO) has received an updated Mineral Resource estimate on its Barry property located 116 km from the Bachelor mill. The independent mineral resource estimate was prepared by GoldMinds Geoservices Inc. (GMG) and update the previous resource estimate of 2010. A technical report (NI43-101 compliant) will be available on SEDAR within 45 days.
The new estimate is based on a total database of 1,100 diamond drill hjeudi 23 juin 2016 |
|
| 24hGold - Publicnow |
GOLD Publish on 06-23-2016 METANOR INCREASES TOTAL OUNCES IN NEW GOLD RESOURCE ESTIMATE AT BARRY PIT |
June 22, 2016 - Val-d'Or, Québec, Canada: Metanor Resources Inc. (« Metanor ») (TSX-V: MTO) has received an updated Mineral Resource estimate on its Barry property located 116 km from the Bachelor mill. The independent mineral resource estimate was prepared by GoldMinds Geoservices Inc. (GMG) and update the previous resource estimate of 2010. A technical report (NI43-101 compliant) will be available on SEDAR within 45 days.
The new estimate is based on a total database of 1,100 diamond drill hjeudi 23 juin 2016 |
|
| 24hGold - Publicnow |
Beaufield developing more drill targets in Urban |
June 20, 2016
Montreal, June 21st, 2016 - In addition to continued drilling at Macho and Rouleau Blocks, Beaufield Resources Inc. ('Beaufield') (TSX- V: BFD) reports it has started linecutting on its Kent Block, 100% owned, Urban property, Quebec. The objective is to establish new drill targets on the Kent Block.
A 28.6 kilometre grid is being established on the Kent Block, located adjacent to the Souart property which was recently acquired by Osisko Mining (Previously Oban Mining). The Osismardi 21 juin 2016 |
|
| 24hGold - Publicnow |
GOLD Publish on 06-13-2016 METANOR DISCOVERS NEW GOLD ZONES ON THE MOROY PROPERTY |
June 13, 2016 - Val-d'Or, Québec, Canada: Metanor Resources Inc. (« Metanor ») (TSX-V: MTO) is pleased to announce the results of the surface diamond drilling campaign on the Moroy property located 1 km from the Bachelor mill.
To date, approximately 14,600 meters of drilling have been completed on the Moroy property as part of the ongoing 60,000 meter drilling campaign intended to increase the mineral resource in this area.
All of the drill holes contain gold and some have intersected up to mardi 14 juin 2016 |
|
| 24hGold - Publicnow |
June 6, 2016 - Urbana intersects 19.85 g/t Au and 82.0 g/t Ag over 1.1 metres at Urban |
232fb4d1-7fc8-4a3e-8e62-d8ac14d32497.pdf
/NOT FOR DISTRIBUTION TO U.S. WIRE SERVICES OR FOR DISSEMINATION IN THE U.S./
News Release Listed: TSX and CSE: URB, URB.A
Urbana intersects 19.85 g/t Au and 82.0 g/t Ag over 1.1 metres at Urban
Toronto, Ontario - Monday, June 6th, 2016 - Urbana Corporation ("Urbana") (TSX and CSE: URB, URB.A) is pleased to announce results from its winter drill program on its 100% owned Urban Township property, Quebec. Eleven exploration drill holes totaling 1,621lundi 6 juin 2016 |
|
| 24hGold - Publicnow |
Publish on 05-19-2016 METANOR INTERSECTS 2.3 g/t Au OVER 60M ON SURFACE AT THE BARRY PROJECT |
May 19, 2016 - Val-d'Or, Québec, Canada: Metanor Resources Inc. (« Metanor ») (TSX-V: MTO) is pleased to announce the complete results from the diamond drilling campaign recently completed at the Barry property located 116 km from the Bachelor mill. A total of 1,370 meters were drilled during this campaign.
Recent highlights:
2.3 g/t Au over 60m in hole MB-16-11, east extension of the main pit;
1.3 g/t Au over 55m in hole MB-16-10, east extension of the main pit.
Including:
4.6 g/t jeudi 19 mai 2016 |
|
| 24hGold - Publicnow |
Publish on 05-11-2016 METANOR INTERSECTS 2.1 g/t Au OVER 40M AND CONFIRMS NEW ZONE TO THE WEST OF THE EXISTING PITS |
May 11, 2016 - Val-d'Or, Québec, Canada: Metanor Resources Inc. (« Metanor ») (TSX-V: MTO) is pleased to announce the additional drilling results from the diamond drilling campaign recently completed at the Barry property, located 116 km from the Bachelor mill, for a total of 1,370 meters drilled.
Drill campaign highlights to date:
40m at 2.1 g/t Au in hole MB-16-14, east extension of the main pit;
33m at 1.9 g/t Au in hole MB-16-12, central extension of the main pit;
30m at 1.8 g/t Au jeudi 12 mai 2016 |
|
|
| 24hGold - Publicnow |
GOLD Sandstorm Gold Announces First Quarter Results |
Vancouver, British Columbia | May 5, 2016
Sandstorm Gold Ltd. ('Sandstorm' or the 'Company') (NYSE MKT: SAND, TSX: SSL) has released its results for the first quarter ended March 31, 2016 (all figures in U.S. dollars).
FIRST QUARTER HIGHLIGHTS
Attributable gold equivalent ounces sold of 11,381 ounces (Q1 2015 - 12,460 ounces);
Revenue of $13.4 million (Q1 2015 - $15.3 million);
Average cash cost per attributable gold equivalent ounce of $267 resulting in cash operating margins of $909jeudi 5 mai 2016 |
|
| 24hGold - Publicnow |
Publish on 04-27-2016 METANOR CONFIRMS HIGH GRADE EXTENSION OF BARRY PIT INTERSECTS 5.4 g/t Au OVER 9M |
April 27, 2016 - Val-d'Or, Québec, Canada: Metanor Resources Inc. (« Metanor ») (TSX-V: MTO) is pleased to announce the preliminary drilling results from the 1,200 m diamond drilling campaign at the Barry property, located 116 km from the Bachelor mill.
The drilling program at Barry aimed to test the extension of high grade mineralization and the new mineralization model proposed by GoldMinds Geoservices Qualified Person (QP), Claude Duplessis P.Eng. The drill program is almost completed.
Prmercredi 27 avril 2016 |
|
| 24hGold - Publicnow |
GOLD Publish on 04-20-2016 Metanor confirms the extension of the gold structure at depth on the Moroy property |
April 20, 2016 - Val-d'Or, Québec, Canada: Metanor Resources Inc. (« Metanor ») (TSX-V: MTO) is pleased to announce the drilling results for the new zone on the Moroy property located 1 km from the Bachelor mill.
The drilling from the last few weeks allowed to define the extension of the gold structure from surface down to 650 m deep; the structure was intercepted by drill holes at depth of 50, 100, 400, 600, and 650 meters, see section below.
These first 3,800 meters of the drill campaign amercredi 27 avril 2016 |
|
| 24hGold - Publicnow |
GOLD Publish on 04-12-2016 Metanor begins drilling campaign to update the mineral resources of the Barry Gold Project |
April 12, 2016 - Val-d'Or, Québec, Canada: Metanor Resources Inc. (« Metanor ») (TSX-V: MTO) is pleased to announce the start of a drilling campaign to update the mineral resource of its Barry Gold Project.
The campaign of 1,200 meters will include validation drilling of the high-grade zones and of the extensions of certain mineralized zones, for eventual open pit mining.
The campaign and the mineral resource update, to be completed under the supervision of the firm GoldMinds Geoservices Incmardi 12 avril 2016 |
|
|
|