Oued Amizour (Tala Hamza) |
|
Pays |
Algeria
|
|
|
|
|
|
|
Statut |
FEASIBILITY
|
|
|
Superficie |
125 km² / 30 888 acres |
|
|
Latitude / Longitude |
36 N 49 / 4 E 00 |
|
|
|
|
Légende
|
|
|
|
|
|
|
|
|
Risques / Pays : Important |
|
|
|
|
|
|
|
|
|
|
|
 | Terramin Australia Ltd Joint venture: 65% |
 |  |  |  |  |
Titre | Profil de la Compagnie | Tous les projets | Site web de la compagnie | Page projet de la compagnie |
|
Terramin manages the project through its 65% of
Western Mediterranean Zinc SpA, a JV company
formed with ENOF, a government owned corporation
that is engaged in mining and production of non-ferrous
commodities. |
|
|
|
|
The Oued Amizour zinc project is based on several
zinc deposits located in Algeria, only 10km from
an international airport and shipping terminal in the
western Mediterranean.
|
|
|
Terramin manages the project through its 65% of
Western Mediterranean Zinc SpA, a JV company
formed with ENOF, a government owned corporation
that is engaged in mining and production of non-ferrous
commodities.
|
|
|
|
The tenement area covers the entire outcrop of the Oued Amizour massif, a Miocene volcanic complex, part of the Atlas mountain chain which stretches along the Mediterranean Sea in NW Africa. The plutonic-volcanic complex comprises granitoids, followed by two or three volcanic episodes. The magmatic rocks belong to a potassic rich calc-alkaline series with ages varying from 24.4Ma to 12.4Ma.
|
|
|
|
|
|
|
Objectifs de Production |
Métal | 2022 | 2023 | 2024 | 2025 |
ZINC (lbs) | 200 000 000 | 200 000 000 | 200 000 000 | 200 000 000 |
|
|
|
|
|
|
Données mises à jour le : 15/11/2009
|
Conditions d'utilisation
|
Toutes les informations présentes sur cette page proviennent de sources internes et externes considérées comme fiables. Ces informations peuvent ne pas être à jour, il est vous donc vivement conseillé de recouper ces informations avant de faire quoi que ce soit. Merci de nous contacter dans le cas ou une information manquerait ou s'avererait incorrecte.
|
|
|
|