Chart audGOLD   Chart audSILVER  
 
Matière à reflexion
L'objet de la monnaie fiduciaire est de taxer subrepticement par l'inflation
.  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1391,2028,40
Silver 22,670,46
Platinum 1457,25-3,25
Palladium 737,10-5,15
MARCHES MONDIAUX
DOWJONES 1533130
NASDAQ 34651
NIKKEI 14484-1143
ASX 5041-101
CAC 40 3967-84
DAX 8352-179
HUI 2603
XAU 97-3
MONNAIES (€)
AUS $ 1,3283
CAN $ 1,3328
US $ 1,2932
GBP (£) 0,8561
Sw Fr 1,2534
YEN 131,7800
RATIOS & INDEXES
Gold / Silver61,37
Gold / Oil14,48
Dowjones / Gold11,02
MATIERES PREMIERES
Copper 3,32-0,06
WTI Oil 96,05-0,11
Nat. Gas 4,260,07
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
( 0 vote, 0/5 ) Imprimer l'article
     
Tweet

 

 

 

Candax Energy Inc. Provides  El Bibane Project and Corporate Update

February 4, 2008, Toronto, On, Canada - Candax Energy Inc. ("Candax") [TSX: CAX] announces that the installation of the offshore production platform at the EBB-4 location and tie in to the oil and gas export pipeline has been completed, successfully pressure tested and certified for production operational start up.  EBB-4 will not commence production until completion of the three well program and the installation of the gas recycling system, which will allow re-compression of the gas onshore and injection into the system, including gas-lifting both EBB-4 and EBB-3. A considerable volume of water was lost into the EBB-4 well during the drilling of the horizontal section, which will need to be removed from the near-wellbore area by gas-lifting with the re-compressed gas. 

Although continued bad weather during January further delayed project completion, the installation and tie in of the EBB-5 platform is progressing. The jacket has been installed offshore and the topsides/deck is currently being mated and welded to the jacket.  Upon completion, the gas injection line and risers will be installed and commissioned, and then the well will be tied into the onshore gas compression system. The West Titania rig is currently drilling the EBB-3 well, the final well in the program. Upon completion of drilling, the West Titania drilling rig will be released and the installation of the EBB-3 platform and pipeline hookups with the other wells will commence. The full field development is now expected to be completed in March.

Michael Wood, President and Chief Executive Officer, commented:
"Although the delays in project completion due to uncharacteristically bad weather in this region and the inability of bringing on early production from EBB-4, due to the water lost while drilling, are frustrating, Candax is looking forward to the completion of the last of our three well program and to the release of the West Titania rig.  We are working on the completion of the platform installations and necessary pipeline hookups and commissioning of the integrated production and gas recycling project for start up as soon as possible."

Candax also announces that it has drawn down US$29 million, on its credit facility with Bank of Scotland. Together with the US$20 million draw down in December 2007, the total of US$49 million is underpinned by Candax's existing reserves.

The credit facility was established to provide financial flexibility, substantially for new business development opportunities and also for support on continued investment activities in Tunisia and for general working capital purposes.
Candax Energy Inc. is an international energy company with its head office in Toronto, Ontario, Canada and management offices in London, Dubai and Tunis. The Company holds a number of concessions in Tunisia through its subsidiary companies and is involved in the exploration and production of oil, gas and power generation in the country.  Candax was formed through the combination of a highly experienced executive management team with successful Canadian founders and financiers, to develop an international upstream oil and gas project portfolio. Candax is initially focusing its growth activities on production and development projects in the Middle East and North Africa, where the group has strong relationships as well as extensive management experience.


For more information,
please contact:    John Clarke, Executive Vice President, Corporate
T: 416.361.2824  F: 416.364.5400  E: jclarke@candax.com
  
Not for distribution to United States newswire services or for dissemination in the United States.
This press release includes "forward looking statements", within the meaning of applicable securities legislation, which are based on the opinions and estimates of Management and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward looking statements. 
Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "budget", "plan", "continue", "estimate", "expect", "forecast", "may", "will", "project", "predict", "potential", "targeting", "intend", "could", "might", "should", "believe" and similar words suggesting future outcomes or statements regarding an outlook.  Such risks and uncertainties include, but are not limited to, risks associated with the oil and gas industry (including operational risks in exploration development and production; delays or changes in lans with respect to exploration or development projects or capital expenditures; the uncertainty of reserve estimates; the uncertainty of estimates and projections in relation to production, costs and expenses; the uncertainty surrounding the ability of Candax Energy Inc. to obtain all permits, consents or authorizations required for its operations and activities; and health safety and environmental risks), the risk of commodity price and foreign exchange rate fluctuations, the ability of Candax Energy Inc. to fund the capital and operating expenses necessary to achieve the business objectives of Candax Energy Inc., the uncertainty associated with commercial negotiations and negotiating with foreign governments and risks associated with international business activities, as well as those risks described in public disclosure documents filed by Candax Energy Inc.  Due to the risks, uncertainties and assumptions inherent in forward-looking statements, prospective investors in securities of Candax Energy Inc. should not place undue reliance on these forward-looking statements.  Statements in relation to "reserves" are deemed to be forward-looking statements, as they involve the implied assessment, based on certain estimates and assumptions, that the reserves described can be profitably produced in the future.

 

 

pro-edge logoContact Information
Tracy Weslosky or Fred Cowans
Managing Partners
pro-edge consultants inc
Tel: 416.581.0177
Fax: 416.581.0144
Toll free in North America 1866.544.9622

 

 

 

 

pro-edge consultants | 80 Richmond Street West, Suite 600 | Toronto | On | M5H 2A4 | Canada

Tweet

Candax Energy Inc.

EN DÉVELOPPEMENT
CODE : CAX.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Candax Energy Inc.
2009 Annual Report
Annual Report 2007
Financements de Candax Energy Inc.
17/02/2012Receives Shareholder Approval of Private Placement at Specia...
27/05/2010Candax Receives $6=2E4 Million from Geofinance Exercise of W...
01/04/2010Candax Closes Private Placement With Geofinance NV and Final...
19/03/2010Candax Provides Update to Timetable for Private Placement an...
11/03/2010Candax Receives Shareholder Approval in Respect of Private P...
05/12/2007Increases Bank of Scotland Credit Facility
Nominations de Candax Energy Inc.
29/03/2012Announces Appointment of Jean Pouzet to Board of Directors
21/12/2011Announces Management Appointments and IFC Investment Update
31/08/2011Appoints John Younger President and Chief Executive Officer
08/07/2011Candax Announces Appointment of John Younger to Board of Dir...
09/06/2011Candax Announces Appointment of Chief Operating Officer
03/04/2008 Announces Appointment of New CFO
14/01/2008(audio) Executive Vice President - Corporate, John A. Clarke...
18/09/2007an update with John Clarke, executive Vice President.
Rapports Financiers de Candax Energy Inc.
13/05/2013Announces First Quarter Financial & Operating Results
28/03/2013Announces Year End Financial & Operating Results
13/11/2012Reports Third Quarter 2012 Results, Change of Director
10/08/2012Reports Second Quarter 2012 Results
11/05/2012Reports First Quarter 2012 Results
15/11/2011Candax Reports Third Quarter 2011 Results
16/08/2011Candax Reports Second Quarter 2011 Results
15/06/2011Candax Reports First Quarter 2011 Results
01/04/2011Candax Reports 2010 Results
12/11/2010Candax Reports Third Quarter 2010 Results
14/11/2008Reports Strong Third Quarter and Nine Months Results
14/08/2008Reports Second Quarter Profit
15/05/2008Reports 2008 Q1 Financial Results
31/03/2008Reports 2007 Financial Results
Projets de Candax Energy Inc.
14/06/2010(Ezzaouia)Commences Work-over Program at Ezzaouia
Communiqués de Presse de Candax Energy Inc.
28/01/2013Reports Update on Deep Triassic Prospect, Debt Rescheduling
28/12/2012(Ezzaouia)Reports Update on Ezzaouia Wells
28/12/2012(Ezzaouia)Reports Update on Ezzaouia Wells
23/11/2012(Ezzaouia)Reports on Ezzaouia Remedial Work
22/10/2012Reports on El Bibane Gas Cycling Progress
22/10/2012Reports on El Bibane Gas Cycling Progress
24/02/2012Closes $12 Million Private Placement
16/01/2012Signs Investment Agreements for $11 Million Private Placemen...
17/12/2010Candax Comments on Listing Review Process
25/11/2010Candax Announces Resignation of Actis Nominee
19/10/2010Candax Provides Operations Update
13/09/2010Provides Update on El Bibane Operations
28/09/2010Provides Update on Chaal Permit
19/08/2010Provides Update on El Bibane Operations
11/05/2010Enters Into Farm-Out Agreement on Chaal Permit
22/04/2010Candax Provides Operations Update
25/03/2010Extend Target Date for Closing
03/03/2010Candax Receives Credit Approval from Bank of Scotland
21/09/2009Candax Operations Update
24/08/2009Candax Operations Update
30/03/2009Reports 2008 Results
30/03/2009 Reports 2008 Results
03/03/2009Candax Provides Operational Update
14/11/2008Provides Operations Update and Guidance for 2009
05/09/2008Receives CanaccordAdams Research Update
04/09/2008Commences Seismic Campaign in Madagascar
28/08/2008Provides Production Update
22/08/2008Spuds Ezzaouia 18 Well Onshore Tunisia
01/08/2008Provides an Update on the El Bibane Development and Ezzaouia...
01/08/2008Receives Tristone Capital Research Update
30/05/2008(TSX:CAX) Commences Ezzaouia Drilling Onshore Tunisia
30/04/2008Updates El Bibane Development and Production Outlook
29/04/2008Present at COPIC
28/04/2008Announces 2008 Drilling Program
09/04/2008Reports Year End 2007 Reserves
25/03/2008 Announces El Bibane Production Start Up
04/02/2008Provides El Bibane Project and Corporate Update
21/12/2007 Provides Update for El Bibane Project
13/11/2007 Provides Development Update for El Bibane Project
12/11/2007 Reports Q3 2007 Results
06/11/2007 Live Webcast Today: 10:20 AM EST
17/10/2007 Provides Update on Exploration Activity in Madagascar
09/10/2007Provides Operational Update on Tunisian Drilling
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (CAX.TO)OTHER OTC (CXEYF.PK)
0,040+33.33%0,030+0.00%
TORONTO
CA$ 0,040
23/05 13:24 0,010
33,33%
Cours préc. Ouverture
0,030 0,040
Bas haut
0,040 0,040
Année b/h Var. YTD
0,020 -  0,040 -%
52 sem. b/h var. 52 sem.
0,020 -  0,060 -20,00%
Volume var. 1 mois
6 000 100,00%
24hGold TrendPower© : -3
Produit
Développe Oil
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
2013-20,00%
2012-44,44%0,100,04
201180,00%0,090,04
2010-37,50%0,170,04
2009-20,00%0,260,05
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois