Chart canGOLD   Chart canSILVER  
 
Matière à reflexion
Ceux qui sont trop intelligents pour entrer en politique sont punis en étant gouvernés par ceux qui le sont moins
Platon  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1380,50-4,00
Silver 21,79-0,08
Platinum 1424,50-8,70
Palladium 708,00-4,00
MARCHES MONDIAUX
DOWJONES 15180101
NASDAQ 345229
NIKKEI 12996-37
ASX 480530
CAC 40 386459
DAX 821688
HUI 2621
XAU 1030
MONNAIES (€)
AUS $ 1,4023
CAN $ 1,3590
US $ 1,3344
GBP (£) 0,8506
Sw Fr 1,2324
YEN 126,5130
RATIOS & INDEXES
Gold / Silver63,35
Gold / Oil14,12
Dowjones / Gold11,00
MATIERES PREMIERES
Copper 3,200,00
WTI Oil 97,800,03
Nat. Gas 3,890,02
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
( 0 vote, 0/5 ) Imprimer l'article
     
Tweet
Mots clés associés :   Copper |

 

NEWS RELEASE

TSX: NCU

Nevada Copper Drills Over 650 Feet Of Greater Than 0.70% Copper In Three Separate Intervals Including 126.5 Feet Of 1.38% Copper

April 23, 2010 - Nevada Copper Corp. (TSX: NCU) ("Nevada Copper") is pleased to announce further drill results at the 100% owned Pumpkin Hollow Property located in Nevada. The drill results continue to demonstrate continuity of mineralization and upgrading of the copper resource. Drill results reported here represent results from Nevada Copper?s recently completed 2009-2010 drilling program which totaled over 27,000 meters of resource drilling. To date, results from 32 of 48 holes drilled have been received and reported with further drill results pending. As a result of the very positive drilling results to date, Nevada Copper has expanded its current drilling program.  Currently, three drill rigs are operating at the Pumpkin Hollow Property as part of this expanded program.

 

Drill hole NC10-13 was drilled as an infill hole in the open pit South Deposit where previous holes were either shallow or low grade.  Drill hole NC10-13 was collared 37 meters (121ft) southeast of L-59 where three mineralized zones were intersected, 78.9 meters (259ft) averaging 0.61% copper,  85.3 meters (280ft) averaging 0.33% copper and 27.7 meters (91ft) averaging 0.42% copper. Drill hole NC10-13 also intersected three mineralized zones and copper grades were significantly higher. The zones are 73.6 meters (241.5 ft) averaging 0.72% copper, 87.3 meters (286.5ft) averaging 0.70% copper and a deeper high grade zone of 38.5 meters (126.5 ft) averaging 1.38% copper. Drill Hole NC10-12 was drilled along the down dip extension where the mineralization is narrowing.

 

A plan map of the South Deposit and respective drill collars is available at www.nevadacopper.com. Drill results announced here represent true thicknesses and are summarized below:

 

SOUTH DEPOSIT ? Assays greater than 1% Cu

Drill Hole #

From

(m)

To

(m)

Length

(m)

Length

(ft)

True

Length

(m)

Copper

(%)

Gold

(g/t)

Silver

(g/t)

Iron

(%)

NC10-12

123.8

132.6

8.8

29.0

6.7

0.35

0.065

0.8

14.9

 

321.4

338.0

16.6

54.5

12.7

0.85

0.211

5.3

21.7

 

396.2

402.3

6.1

20.0

4.7

0.45

0.076

2.2

15.0

 

445.0

449.6

4.6

15.0

3.5

0.32

0.022

0.7

7.5

NC10-13

150.9

224.5

73.6

241.5

56.4

0.72

0.134

2.5

37.9

 

320.0

407.3

87.3

286.5

66.9

0.70

0.074

1.7

11.8

 

414.1

452.6

38.5

126.5

29.5

1.38

0.165

4.0

29.4

 

Drill holes NC10-04 and NC10-19 were drilled as infill holes to determine the continuity of the open pit grade mineralization of the North Deposit. The holes intersected multiple zones of mineralization and continue to confirm continuity. One of the larger zones encountered was in drill hole NC10-19 where the hole intersected 74.2 meters (243.5 ft), 52.5 meters true thickness averaging 0.42% copper. Drill hole NC10-04 confirmed the continuity of mineralization where previous drill holes had encountered drill and sampling problems.  Drill hole NC10-24 confirmed continuity and extended mineralization along the southeast portion of the North Deposit.

 


NORTH DEPOSIT ? Assays greater than 0.3% Cu

Drill Hole #

From

(m)

To

(m)

Length

(m)

Length

(ft)

True

Length

(m)

Copper

(%)

Gold

(g/t)

Silver

(g/t)

Mo

(%)

NC10-04

65.5

76.2

   10.7

35

8.2

0.59

0.009

1.0

0.007

 

 142.3

146.6

4.3

14.0

3.3

0.60

0.023

1.5

0.008

 

179.2

187.8

8.5

28.0

6.5

0.93

0.050

3.1

0.007

 

251.0

276.8

25.8

84.5

19.8

0.68

0.129

2.3

0.004

 

302.7

341.4

38.7

127

29.6

0.51

0.059

1.6

0.048

 

388.6

432.8

44.2

145

33.9

0.51

0.053

1.1

0.002

 

442.0

458.7

16.8

55

15.1

0.53

0.079

1.7

0.001

 

485.5

497.7

12.2

40

9.3

0.45

0.084

2.1

<0.001

NC10-19

77.7

83.8

6.1

20

4.3

0.71

0.006

1.0

0.004

 

146.6

164.9

18.3

60

12.9

0.55

0.046

1.9

0.023

 

187.8

201.5

13.7

45

9.7

0.56

0.062

1.8

0.002

 

211.8

227.0

15.2

50

10.7

0.42

0.011

0.8

0.002

 

238.0

260.9

22.9

75

16.2

0.39

0.038

0.9

0.002

 

269.0

343.2

74.2

243.5

52.5

0.42

0.020

0.9

0.003

 

369.1

375.6

7.5

24.5

5.1

0.71

0.038

2.4

0.006

 

414.5

419.1

5.6

15

4.0

0.44

0.023

1.2

0.005

NC10-24

203.3

224.9

21.6

71.0

21.6

0.76

0.035

1.4

0.001

 

230.9

258.0

27.1

89

27.1

0.35

0.027

1.0

0.001

 

272.8

276.9

4.1

13.5

4.1

0.65

0.014

0.5

<0.001

 

The recent holes drilled in the East and E-2 Deposits focused on defining or expanding the edges of the higher grade areas. Drill holes NC10-14 through 17 defined the edges of mineralization. Both drill hole NC10-10 and NC10-18 expanded the higher grade mineralized zones. Hole NC10-18 intersected several zones with the two largest; 17.5 meters (57.5 ft), averaging 2.04% copper and 14.0 meters (46.0ft), averaging 2.50% copper. A follow up drill hole is planned for the NC10-18 area.

 

EAST DEPOSIT ? Assays greater than 1% Cu

Drill Hole #

From

(m)

To

(m)

Length

(m)

Length

(ft)

Copper

(%)

Gold

(g/t)

Silver

(g/t)

Iron

(%)

NC10-10

576.2

578.2

2.0

6.5

4.60

0.300

4.5

12.0

 

601.7

609.2

7.5

24.5

1.10

0.073

2.4

5.1

 

620.9

632.9

12.0

39.5

1.67

0.178

2.1

12.3

 

658.8

662.3

3.5

11.5

1.46

0.068

1.4

3.4

 

670.0

673.3

3.3

10.7

1.04

0.129

2.8

8.8

NC10-14

531.7

536.4

4.7

15.5

2.40

0.069

4.7

6.4

NC10-16

513.0

516.3

3.3

11.0

1.24

0.035

1.6

6.8

 

668.3

671.6

3.3

11.0

2.28

0.167

2.4

7.1

NC10-17

528.2

531.5

3.3

11.0

2.10

0.216

2.1

24.2

NC10-18

473.7

491.2

17.5

57.5

2.04

0.313

5.7

18.5

 

519.7

522.1

2.4

7.8

8.18

0.841

121.8

13.6

 

581.9

595.9

14.0

46.0

2.50

0.392

12.1

22.6

 

615.4

624.8

9.4

31.0

1.72

0.252

8.2

16.8

 


E2 DEPOSIT ? Assays greater than 1% Cu

Drill Hole #

From

(m)

To

(m)

Length

(m)

Length

(ft)

True

Length

(m)

Copper

(%)

Gold

(g/t)

Silver

(g/t)

Iron

(%)

NC10-15

651.7

654.7

3.0

10

1.3

1.41

0.017

4.1

10.6

 

About Nevada Copper

Nevada Copper is an emerging copper company, responsibly developing its advanced stage Pumpkin Hollow copper-gold-silver-iron property into Nevada's next copper mine. Concurrent with a resource delineation drilling program, metallurgical, geotechnical, hydrological, and environmental baseline data are being collected and processed for inclusion in a Pre-Feasibility Study currently in progress and scheduled for completion by the third quarter.

 

To date over 530 drill holes containing in excess of 223,000 meters of drilling have been incorporated into the resource database.

 

In December 2009, Nevada Copper updated its National Instrument 43-101 Preliminary Economic Assessment (?PEA?) for its 100% owned Pumpkin Hollow IOGC Property in Nevada which incorporated a High Grade Case. This is an update to the PEA results published on March 17, 2008 both of which are available on Nevada Copper?s website.

 

The Pumpkin Hollow drilling program is under the supervision of Gregory French, CPG #10708, a Qualified Person as defined in Canadian National Instrument 43-101, who is responsible for the preparation of the technical information in this news release. All assaying and whole rock geochemistry is processed at the American Assay Laboratories (AAL) in Reno, Nevada. Samples are delivered from the project core logging facility to AAL by Nevada Copper or AAL personnel. A Quality Assurance and Quality Control Assay Protocol have been implemented whereby blanks and standards are inserted into the assay stream and check samples are sent to Chemex-Reno and Inspectorate-Reno laboratories.

 

For additional information about Nevada Copper please visit our website at www.nevadacopper.com.

 

NEVADA COPPER CORP.

 

 

Giulio T. Bonifacio
President & CEO

 

This news release includes certain statements that may be deemed ?forward-looking statements?. All statements in this release, other than statements of historical facts, including the likelihood of commercial mining and possible future financings are forward-looking statements. Although Nevada Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include unsuccessful exploration results, changes in metals prices, changes in the availability of funding for mineral exploration, unanticipated changes in key management personnel and general economic conditions. Mining is an inherently risky business. Accordingly the actual events may differ materially from those projected in the forward-looking statements. Mineral resources that are not mineral reserves do not have demonstrated economic viability. For more information on Nevada Copper and the risks and challenges of its business, investors should review Nevada Copper?s annual filings that are available at www.sedar.com

 

For further information call:                                       OR:

Eugene Toffolo, Corporate Communications                    Giulio T. Bonifacio, President & CEO

Phone:    604-683-8266                                                  Phone: 604-699-0023

Tollfree: 1-877-687-5755

Email: etoffolo@nevadacopper.com

 

 

Tweet

Nevada Copper

EN DÉVELOPPEMENT
CODE : NCU.TO
CUSIP : 64128F
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Nevada Copper
27/04/2010Closes $23,7 Million Bough-Deal Private Placement Financing
09/04/2010$20.6 Million Bought-Deal Private Placement Financement
27/10/2009$11,250,000 Private Placement with Capstone Mining Corp.
Nominations de Nevada Copper
28/02/2012Appoints New Director and Launches Project Website
17/11/2010NCU - NEVADA COPPER ANNOUNCES INVESTMENT BY PALA, EXERCISE O...
Projets de Nevada Copper
28/04/2011(Pumpkin Hollow)Provides Update on Feasibility Study & Engages Merit for Pre...
31/03/2011(Pumpkin Hollow)s Mineral Resource Estimate and Clarifies Technical Disclosu...
08/02/2011S FEASIBILITY STUDY PROGRESS
25/11/2010(Pumpkin Hollow)Announces Expansion of Drilling Program and Selection of Tet...
09/11/2010(Pumpkin Hollow)Announces Positive Metallurgical Test Results
01/11/2010(Pumpkin Hollow)Announces Decision to Proceed Directly to Definitive Feasibi...
26/10/2010(Pumpkin Hollow)Intersects 305 Feet of 1.02% Copper in the Open Pittable Nor...
05/10/2010(Pumpkin Hollow)Drilling Update
30/09/2010(Pumpkin Hollow)Continues to Intersect Multiple Zones Totaling 481 feet Incl...
08/09/2010(Pumpkin Hollow)Intersects Over 1,258 feet of 0.58% Copper in Four Separate ...
04/08/2010(Pumpkin Hollow)Intersects 230 Feet of 1.46% Copper in The Open Pittable Nor...
08/07/2010(Pumpkin Hollow)E2 Deposit Drilling Intersects 145 Feet of 2.37% Copper and ...
16/06/2010(Pumpkin Hollow)Mineralization Remains Open at North Deposit: Intersecting 9...
27/05/2010(Pumpkin Hollow)Increases Drilling Program
18/05/2010(Pumpkin Hollow)Discovers Two New Zones Intersecting 275 Feet of 0.98% Coppe...
06/05/2010(Pumpkin Hollow)Step Out Drilling Expands the Open Pittable North Deposit: I...
23/04/2010(Pumpkin Hollow)Drills Over 650 Feet Of Greater Than 0.70% Copper In Three S...
03/03/2010(Pumpkin Hollow)Intersects 4.18% Copper Over 29.7 Meters (97.5 Ft)
16/02/2010(Pumpkin Hollow)Continues to Intersect High Grade Copper
21/01/2010(Pumpkin Hollow)Intersects 31.1 Meters of 2.45% Copper
14/01/2010Files NI 43-101 Preliminary Economic Assessment
08/12/2009(Pumpkin Hollow)Commences Pre-Feasibility & 25,000 Meter Drilling Program
25/08/2009(Pumpkin Hollow)Files resource update NI 43-101 on Sedar
15/07/2009(Pumpkin Hollow)Reports Significant Resource Increase to 9.3 Billion Pounds ...
28/04/2009(Pumpkin Hollow)Drills High Grade in the East Deposit
Communiqués de Presse de Nevada Copper
17/06/2013North Deposit Drilling Intersects Multiple Zones of Minerali...
10/06/2013Receives Reclamation Permit
28/05/2013Provides Update on State Permits
07/05/2013s Lyon County Bill Status
23/04/2013(Pumpkin Hollow)to Proceed With Two-Stage Approach to Building Pumpkin Hollo...
17/04/2013s Permitting and Yerington Land Bill Status
17/04/2013s Permitting and Yerington Land Bill Status
28/03/2013Closes US$200 Million Loan Facility and Concentrate Off-Take...
11/03/2013North Deposit Mineralization Continues to Expand Intersectin...
15/02/2013-Permitting and Feasibility Study Update
03/01/2013Status of Congressional Action-Lyon County Land Bill
21/12/2012Senators Reid and Heller Introduce Land Bills to U.S. Senate
13/12/2012Announces Positive Feasibility Study Results for Stage 1 Und...
05/12/2012to Start Follow-Up Drilling of Discovery Hole NC12-34 Which ...
05/12/2012to Start Follow-Up Drilling of Discovery Hole NC12-34 Which ...
05/12/2012to Start Follow-Up Drilling of Discovery Hole NC12-34 Which ...
19/11/2012Announces Positive Feasibility Study Results for Stage 1 Und...
30/10/2012North Deposit Mineralization Remains Open Intersecting 119 F...
19/10/2012Files Resource Update NI 43-101 Technical Report on SEDAR
05/10/2012to Purchase 17.8% of Mercator Minerals
27/02/2012Appoints New Director & Launches Project Website
19/10/2010NCU - Nevada Copper PERMIT APPROVAL
19/10/2010Permit Approval
01/12/2009Robust Economic Results
01/12/2009Reports robust economic results
03/11/2009Capstone Mining Makes Strategic Investment in Nevada Copper
29/06/2009US$2,000,000 Convertible Debenture
02/05/2007Press Release: Augusta Files Q1 Financials - Negotiates Sale...
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (NCU.TO)FRANKFURT (ZYT.F)
2,33+0.00%1,71+2.63%
TORONTO
CA$ 2,33
17/06 15:59 -
0%
Cours préc. Ouverture
2,33 2,38
Bas haut
2,33 2,39
Année b/h Var. YTD
2,27 -  4,01 -37,53%
52 sem. b/h var. 52 sem.
1,88 -  4,01 15,92%
Volume var. 1 mois
25 900 1,30%
24hGold TrendPower© : -2
Produit
Développe Copper - Gold - Silver
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
2013-30,86%
2012-34,05%5,611,75
201110,61%6,423,12
201056,61%4,741,82
20091452,63%3,220,17
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois