VANCOUVER, Jan. 19, 2015 /CNW/ - Copper Mountain Mining Corporation (TSX: CUM) (the "Company" or "Copper Mountain") announces production results for the year ended December 2014 from the Copper Mountain mine located in southern British Columbia.

In 2014 the mine produced 81 million pounds of copper, 22.6 thousand ounces of gold, and 443.7 thousand ounces of silver.  The mill averaged 89.4% operating time for the year and a total of 11.1 million tonnes of ore was milled at an average grade of 0.40 % Copper.  Copper production in the fourth quarter totaled 20.3 million pounds.

The new secondary crusher that was put into operation in August is now operating at its designed capacity of 3,000 tpoh.  Following several key adjustments to the secondary crusher circuit at the end of December, immediate improvements to mill throughput were seen. The mill has started the year on a positive note with an average throughput of 36,000 tpd in the first half of January with a 92.2 percent operating time.     

During the 2014 year, mining activities continued from both the Pit 2 and Pit 3 areas and averaged approximately 176,300 tonnes per day.  A total of 60.1 million tonnes of material was mined, including 18.8 million tonnes of ore and 41.3 million tonnes of waste. The projected life of mine strip ratio is 2 to 1 but higher in the early years. 

The Company's goal for 2015 is to continue to optimize performance of the Copper Mountain Mine and to maximize copper production in spite of the slightly lower projected head grade for 2015. The new secondary crusher is working well and is providing a consistently finer feed to the SAG mill which has resulted in a smoother operation with higher throughput. The majority of ore is scheduled from Pit 2 in 2015. The planned mining rate is 185,000 tpd for the year. The 2015 copper production forecast is 80 million pounds based on a mill throughput rate of 37,500 tpd and a mill feed grade of 0.33% Cu.

About Copper Mountain Mining Corporation:

Copper Mountain's flagship asset is the 75% owned Copper Mountain mine located in southern British Columbia near the town of Princeton. The Company has a strategic alliance with Mitsubishi Materials Corporation who owns the remaining 25%. The key development for 2014 was the installation of the secondary crusher as a permanent solution to maximize production and improve overall efficiencies for the company.  Secondary crusher construction was completed in August on budget and on schedule. The 18,000 acre site has a large resource of copper that remains open laterally and at depth. The mine has significant exploration potential that will need to be explored over the next few years to fully appreciate the property's full development potential.  Additional information is available on the Company's web page at www.CuMtn.com.

A conference call and audio webcast will be held on Friday February 20th, 2014 at 7:30 am (Pacific Standard Time) for management to discuss the 2014 year end results. This discussion will be followed by a question-and-answer period with investors.
 

Live Dial-in information

Toronto and international: 416-764-8688

North America (toll-free):    888-390-0546

To participate in the webcast live via your computer go to: http://www.newswire.ca/en/webcast/detail/1470513/1636877

 

Replay call information

Toronto and international: 416-764-8677,  passcode  045842

North America (toll-free):  888-390-0541,  passcode  045842

 

The conference call replay will be available from 10:30 am (PST) on February 20, 2015 until 11:59 pm PST on March 6, 2015

Participant audio webcast will also be available on the company's website at http://www.cumtn.com

 

On behalf of the Board of

COPPER MOUNTAIN MINING CORPORATION

"Jim O'Rourke"

Jim O'Rourke, P.Eng.
Chief Executive Officer

Note:  This release contains forward-looking statements that involve risks and uncertainties.  These statements may differ materially from actual future events or results.  Readers are referred to the documents, filed by the Company on SEDAR at www.sedar.com, specifically the most recent reports which identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements.  The Company undertakes no obligation to review or confirm analysts' expectations or estimates or to release publicly any revisions to any forward-looking statement.

SOURCE Copper Mountain Mining Corporation

For further information: Galina Meleger, Corporate Communications, 604-682-2992 ext.224, Email: Galina @CuMtn.com or Rod Shier, Chief Financial Officer, 604-682-2992 ext.222, Email: Rod@CuMtn.com; Website: www.CuMtn.com

Copper Mountain Mining Corp.

DEVELOPMENT STAGE
CODE : CUM.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Copper Mountain is a copper development stage company based in Canada.

Copper Mountain holds various exploration projects in Canada.

Its main asset in development is COPPER MOUNTAIN PROJECT in Canada and its main exploration property is SIMILCO MINE in Canada.

Copper Mountain is listed in Canada and in Germany. Its market capitalisation is CA$ 119.2 millions as of today (US$ 89.7 millions, € 83.4 millions).

Its stock quote reached its lowest recent point on November 28, 2008 at CA$ 0.31, and its highest recent level on June 03, 2011 at CA$ 8.15.

Copper Mountain has 132 390 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Copper Mountain Mining Corp.
3/14/2008Canaccord initiates Coverage On Copper MiountainReceived: fr...
In the News and Medias of Copper Mountain Mining Corp.
1/10/2019Copper Mountain produces 79m lb in 2018, sets guidance for n...
3/27/2018Copper Mountain gains approval for $71m acquisition of Alton...
2/9/2018Former millwright suing Copper Mountain for wrongful dismiss...
Annual reports of Copper Mountain Mining Corp.
Annual Report 2007
Financings of Copper Mountain Mining Corp.
12/18/2007 Closes An Additional $2.2 Million Private PlacementReceived...
Nominations of Copper Mountain Mining Corp.
6/24/2013Report on Voting Results for Directors from the 2013 Annual ...
Financials of Copper Mountain Mining Corp.
2/20/2015Announces 2014 Year End Results
11/12/2014Announces 2014 Third Quarter Results
10/8/2013Provides Third Quarter Operational Update
7/11/2013provides second quarter operational update
4/16/2013provides operational update and first quarter results
2/26/20082007 REVIEW AND FINANCIAL RESULTSReceived: from mailer
Project news of Copper Mountain Mining Corp.
4/14/2015announces production results for Q1-2015
1/19/2015announces production results for 2014
7/9/2014Copper Mountain mine achieved record second quarter copper p...
4/9/2014Copper Mountain mine achieved record first quarter copper pr...
1/15/2014announces production results for 2013
12/11/2013provides 2014 production guidance and operational update
5/16/2013SAG Mill Motor Transformer Failure at Copper Mountain Mine
1/17/2013announces production results for 2012
1/17/2013announces production results for 2012
5/29/2011(Copper Mountain Project)MITSUBISHI ISSUES STANDARD FORCE MAJEURE NOTICE TO COPPER MO...
4/20/2011(Copper Mountain Project)COMMISSIONS PRIMARY CRUSHER WITH ORE ON SCHEDULE
3/29/2011(Copper Mountain Project)Drilling below Pit 2 intersects 127.5m grading 1.01% Cu, 2.3...
3/20/2011(Copper Mountain Project)PROJECT UNAFFECTED BY JAPAN EARTHQUAKE
3/7/2011(Copper Mountain Project)- Drilling extends Pit 2 mineralization below planned Super ...
3/3/2008(Copper Mountain Project)NEW HIGH GRADE ZONE IDENTIFIED AT COPPER MOUNTAIN: INTERSECT...
2/7/2008(Copper Mountain Project)Intersects 215 FT. GRADING 0.85% Cu, 0.45 g/t Au, and 4.93 g...
Corporate news of Copper Mountain Mining Corp.
7/13/2016Copper Mountain Increases Size of Bought Deal Offering
7/12/2016Copper Mountain Announces C$5 Million Bought Deal Offering
7/12/2016Copper Mountain Announces Production Results For Q2-2016
6/8/2016Copper Mountain Appoints Dan Gibbons to Investor Relations
5/19/2016Premier of BC Visits Copper Mountain
5/2/2016Copper Mountain Mining Announces Positive Q1 2016 Results
4/19/2016Copper Mountain Receives Mine Safety Award for Second Consec...
1/21/2016Copper Mountain Mining to Present at TD Securities Mining Co...
1/14/2016Copper Mountain Announces Production Results For 2015
9/2/2015Edited Transcript of CUM.TO earnings conference call or pres...
7/9/2015mine announces production results for Q2-2015
6/24/2015Copper Mountain Mining Corporation Report on Voting Results ...
4/22/2015Safety Performance Honoured by the BC Government
1/19/2015Copper Mountain announces production results for 2014
11/12/2014Copper Mountain Announces 2014 Third Quarter Results
10/8/2014Copper Mountain Mine Achieved Record Third Quarter Copper Pr...
8/11/2014Copper Mountain announces 2014 second quarter results
6/20/2014Copper Mountain Mining Corporation Report on Voting Results ...
6/18/2014construction of secondary crusher on schedule and budget
6/18/2014Copper Mountain construction of secondary crusher on schedul...
5/2/2014Copper Mountain announces 2014 first quarter results
4/9/2014mine achieved record first quarter copper production
2/21/2014s construction progress on secondary crusher
2/14/2014announces 2013 year end conference call details
2/4/2014announces secondary crusher construction on schedule for sum...
12/3/2013closes Cdn $30 million bought deal financing
11/22/2013reports Ball Mill transformer interruption
10/25/2013announces third quarter 2013 conference call details
7/29/2013announces 2013 second quarter conference call details
6/10/2013mine back in full operation one week ahead of schedule
5/22/2013mine back in operation earlier than expected
5/6/2013announces 2013 first quarter conference call details
4/3/20132012 drilling extends mineralization to the north and below ...
3/14/2013announces 2012 year end conference call details
11/6/2012Announces 2012 Third Quarter Conference Call Details
10/30/2012Jim O'Rourke, CEO is inducted into the Canadian Mining Hall ...
10/16/2012announces 2012 third quarter production and sales results
9/17/2012Operational Update
10/4/2011Mitsubishi Lifts Force Majeure Notice to Copper Mountain
7/12/2011produces first concentrate and commences trucking to port
6/6/2011MINE PROCESSES FIRST ORE
9/8/2009FILES PRELIMINARY PROSPECTUSReceived: from mailer
3/18/2008Former BMO Nesbitt Burns Inc Managing Director Carl Renzoni ...
8/14/2007MINERALIZED ZONES CONTINUE TO BE EXTENDED AT COPPER MOUNTAIN...
7/31/2007Drill program progresses at Copper Mountain
7/12/2007New Mineralized Zones Intersected at Copper MountainReceived...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (CUM.TO)FRANKFURT (COQ.F)
0.900+13.92%1.69-1.51%
TORONTO
CA$ 0.900
12/05 15:59 0.110
13.92%
Prev close Open
0.790 0.830
Low High
0.830 0.910
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.900 -%
Volume 1 month var.
862,778 -%
24hGold TrendPower© : 16
Produces
Develops Copper
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/2/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.62-0.52%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.10-3.31%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.71-1.39%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.05-9.09%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52-4.55%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.36-8.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.21-2.33%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 2.31-7.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 48.80-1.95%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-3.23%Trend Power :