B2Gold Corp.

Published : August 05th, 2008

Announces Continued Positive Exploration Drill Results . . .

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

B2 GOLD

B2Gold Corp. Announces Continued Positive Exploration Drill Results from the Quebradona and Gramalote Gold Properties in Colombia

Vancouver, August 5, 2008 - B2Gold Corp. (TSX-V: BTO) ("B2Gold" or the "Company"), is pleased to announce further exploration drilling results from the Quebradona property in Colombia, and the Company's first drilling results from the Gramalote property, also in Colombia. The Quebradona and Gramalote properties are joint ventures with AngloGold Ashanti Limited ("AngloGold Ashanti").

The new drilling results from Quebradona confirm and extend the good grade results from the first six holes (see press release dated 02/07/08) in the Aurora system, while the results from the first 11 holes at Gramalote are similar to the good grade results from AngloGold Ashanti's previous 43 drill holes (see press release dated 06/23/08).

Quebradona Property

The Quebradona property is located 60 kilometres ("km") southwest of Medellin, Colombia. The new results from Quebradona are from an additional 14 holes, totaling 3,639 metres ("m") on the Aurora system. The first 5,300 m drill program at Quebradona focused on the Aurora and Isabella systems, which are two of five gold-bearing porphyry systems outlined by prior surface sampling on the six by four km Quebradona property. The Company is planning to drill the remaining three systems comprising La Sola, Chaquiro and Tenedor in the next several months.

The Aurora system consists of two strong gold occurrences contained within a suite of intermediate intrusive and volcanic rocks. Aurora covers an 800 by 700 m area and is comprised of the La Mama zone and the La Isla zone, separated by 200 m of late unmineralized porphyry.

An additional 10 holes totaling 2,836 m have been drilled at Aurora, including seven holes totaling 1,685 m at La Mama that followed up the initial six hole 1,662 m program (see press release dated 05/28/08). Three holes totaling 1,151 m also tested the La Isla zone.

Drilling has now tested a 700 by 400 m area of the La Mama zone with intercepts up to 162 m of 0.97 grams per tonne ("g/t") gold ("Au") in Hole 1 and 85 m of 1.20 g/t Au in Hole 11. Significant gold mineralization has been outlined over a 400 m long by 100 m wide zone extending to at least 250 m in depth. The zone remains open at depth. Further drilling will in-fill the zone with the objective of defining an inferred resource by early 2009.

At La Isla, significant gold mineralization has been outlined over a 300 m long by 50 to 100 m wide zone extending to at least 350 m in depth with the zone remaining open in all directions. Drilling at La Isla has encountered significant mineralization over a 250 by 200 m area with intercepts up to 182 m at 1.07 g/t Au in Hole 8. Further drilling will test the extensions of the zone.

Six km southwest of Aurora, surface panel sampling at Isabella returned up to 19.9 m at 3.15 g/t Au and 9.5 m at 1.49 g/t Au in a 70 m wide structural corridor containing stockwork and sheeted quartz-sulphide veining in potassic-altered volcanic rocks. Drilling of four holes totaling 803 m tested a 250 by 150 m area with results up to 125 m at 1.00 g/t Au in chlorite altered volcanics and intrusives with magnetite-quartz-sulphide veining. Although the results from Hole 1 are encouraging, the size of the mineralized system appears to be limited. Additional drilling is planned to follow up the mineralization intersected in ISA-001.

Highlights of the results from the first twenty drill holes are shown below. All reported values have been validated by B2Gold's quality control procedures:

La Mama Drill Holes 1 to 16 and Isabella Drill Holes 1 to 4 Assay Result

Location

Hole #

From
(m)

To
(m)

Metres
(m)

Gold
(g/t)

Silver
(g/t)

Copper
(%)

La Mama

1

4.05

165.92

161.87

0.97

2.50

0.154

La Mama

2*

0

52.70

52.70

1.36

2.10

0.144

La Mama

3

0

86.15

86.15

0.99

2.10

0.134

La Mama

incl.

0

32.90

32.90

1.67

2.60

0.167

La Mama

4

0.70

87.00

86.30

2.08

2.60

0.166

La Mama

5

0

65.80

65.80

0.94

2.50

0.162

La Mama

6

5.40

235.00

229.60

0.79

2.00

0.152

La Mama

incl.

29.00

154.00

125.00

1.07

2.00

0.163

La Mama

7

No significant values

La Isla

8

0

439.00

439.00

0.60

1.00

0.127

La Isla

incl.

256.60

439.00

182.40

1.07

1.20

0.189

La Isla

9

136.00

223.00

87.00

0.54

1.80

0.138

La Isla

and

251.00

272.90

21.90

0.53

1.70

0.138

La Mama

10

1.00

268.00

267.00

0.50

1.60

0.101

La Mama

11

211.00

296.00

85.00

1.20

2.80

0.247

La Mama

incl.

258.00

296.00

38.00

1.66

2.80

0.269

La Mama

12

Low Grade

La Mama

13

No significant values

La Isla

14

182.00

262.70

80.70

1.02

0.80

0.176

La Mama

15

0

49.00

49.00

0.34

0.90

0.081

La Mama

16

Low Grade

  

Isabella

ISA 1

0

234.69

234.69

0.70

**

**

Isabella

incl.

4.00

129.00

125.00

1.00

0.90

0.100

Isabella

incl.

22.00

60.00

38.00

2.02

2.10

0.194

Isabella

ISA 2

26.50

56.00

29.50

0.41

0.20

0.048

Isabella

ISA 3

No significant values

Isabella

ISA 4

72.00

105.00

33.00

0.42

0.70

0.116

*Lost hole at 52.70 m in mineralization.
**Pending quality control validation.

Under its Colombian joint venture agreement with AngloGold Ashanti, B2Gold has the right to carry out the first 5,000 m of exploration drilling on each property assigned to the joint venture. Upon completion of the first 5,000 m drill program, AngloGold Ashanti has the following options: (i) elect to participate in future exploration as the operator at 65% and free carry B2Gold to feasibility; (ii) elect to be the operator and fund on a pro-rata basis of 51% AngloGold Ashanti and 49% B2Gold; or (iii) elect to fund as the owner of a 49% interest with B2Gold as operator owning and funding to 51%. The Company completed the 5,000 m drill program at Quebradona on May 28, 2008 and expects a participation decision by AngloGold Ashanti by the end of August. In the event AngloGold Ashanti decides to fund as the owner of a 49% interest with the Company as the operator, the Company plans to commence an aggressive drill program to further drill test the Aurora zones as well as carry out initial exploration drilling on the other three defined porphyry gold targets as well as the prominent magnetic high targets outlined by the 1,320 line-km airborne magnetic survey on the Quebradona property.

Since completing the initial 5,000 m, an additional six holes totaling 2,836 m have now been drilled in the La Mama zone for a total of 22 holes and 6,090 m drilled at Aurora to date. Several of these additional drill holes have encountered similar stockwork mineralization encountered in the first 16 holes. Assay results from these additional holes are pending, and will be released as available.

Gramalote Property (B2Gold 51%, AngloGold Ashanti 49%)

Drilling is ongoing with five drills at the Gramalote property located 230 km northwest of Bogota and 80 km northeast of Medellin in central Colombia. The current drill program is testing the Gramalote Ridge and Trinidad zones. Twenty nine holes totaling 9,547 m have been completed at Gramalote Ridge for a total of 14,631 m in 42 holes, which includes 13 holes totaling 5,085 m completed at Trinidad. Drilling at Gramalote Ridge has tested a 900 by 450 m area and results are similar to those that AngloGold Ashanti found in previous drilling of 43 holes. In-fill drilling is ongoing with four drills at Gramalote Ridge. The plan is to complete a resource study once all results for the in-fill program are received. At Trinidad, initial drilling has encountered similar mineralization to that of Gramalote Ridge over a 600 m by 500 m area. Partial results for the first 11 holes at Gramalote Ridge are listed below and results from the first round of drilling at Trinidad are expected to be released by the end of August.

Hole  

From
(m)

To
(m)

Length
(m)

Gold
g/t

Gold capped
at 20 g/t

Silver
g/t

Comments  

  

GR08-044

24.76

186.65

161.89

0.54

0.54

0.69

  

and

258.05

281.15

23.10

3.59

2.72

2.13

  

  

GR08-045

35.47

98.40

62.93

0.53

0.53

0.70

  

and

111.80

181.05

69.25

1.23

1.23

0.95

  

and

233.15

356.60

123.45

1.59

1.46

2.96

  

and

356.60

457.75

101.15

0.51

0.51

2.10

  

  

GR08-046

0

86.10

86.10

0.72

0.72

0.83

  

and

110.30

175.00

64.70

1.02

1.00

1.02

  

and

207.20

241.30

34.10

2.60

1.59

3.80

  

and

356.50

421.00

64.50

0.85

0.85

0.94

  

  

GR08-047

72.82

162.07

89.25

1.66

1.05

1.24

  

and

195.63

250.12

54.49

0.93

0.93

0.92

Portion of interval to be rerun

and

279.49

383.90

104.41

0.99

0.98

0.62

  

  

GR08-048

281.80

390.30

108.50

0.49

0.49

1.54

Portion of interval to be rerun

and

428.90

460.27

31.37

3.10

2.86

2.48

  

  

GR08-049

0

72.00

72.00

1.19

1.19

2.05

  

and

217.60

282.00

64.40

0.64

0.64

1.17

  

  

GR08-050

74.08

227.06

152.98

0.92

0.92

1.06

  

  

GR08-051

0

10.20

10.20

0.96

0.95

5.22

  

and

54.55

112.40

57.85

1.33

0.99

0.67

  

and

152.90

166.00

13.10

3.13

2.89

1.12

  

and

207.26

237.35

30.09

  

  

  

Results pending

and

237.35

245.65

8.30

1.57

1.57

1.48

  

  

GR08-052

156.08

194.80

38.72

0.78

0.78

0.70

  

and

304.43

327.28

22.85

1.07

1.07

0.68

  

  

GR08-053

237.20

316.90

79.70

0.99

0.59

0.78

  

  

GR08-054

102.16

110.51

8.35

0.94

0.94

2.47

  

and

129.99

196.05

66.06

  

  

  

Results pending

and

213.38

240.90

27.52

4.67

3.42

3.51

  

  

GR08-055

82.78

177.48

94.70

1.58

1.58

1.48

  

and

198.50

327.75

129.25

1.77

1.51

1.19

  

  

GR08-056

212.70

278.10

65.40

1.61

1.40

1.18

  

  

GR08-057

0

46.3

46.3

  

  

  

Results pending

and

53.05

74.66

21.61

0.46

0.46

1.18

  

and

265.00

336.15

71.15

  

  

  

Results pending

and

336.15

348.20

12.05

1.24

1.24

1.54

  

and

348.2

389.75

41.55

  

  

  

Results pending

  

GR08-058

58.60

203.15

144.55

1.13

1.10

0.94

  

B2Gold is planning to drill a total of 25,000 m at Gramalote for 2008. At the 100% owned Mocoa copper molybdenum deposit B2Gold is currently drilling with two drills as part of a 3,800 m drill program. B2Gold has a 2008 Colombian exploration budget of US$21.8 million.

The drilling program at the Quebradona and Gramalote properties are reviewed and the results approved by Tom Garagan, B2Gold's Qualified Person under Natural Instrument 43-101. Both the Quebradona and Gramalote drill programs utilize extensive QAQC (quality assurance and quality control) protocols for assaying and core sample handling that consist of the systematic insertion of blanks, standards and duplicates as well as using a secondary laboratory for regular check assaying. Core samples are cut with a diamond saw with one-half of the core placed in sealed bags and shipped directly to ALS Chemex Labs in Bogota, Colombia for sample preparation with the pulps subsequently sent to ALS Chemex Labs in Lima, Peru for gold fire assay and ICP analyses.
  

On Behalf of B2GOLD CORP.

"Clive T. Johnson"
President and Chief Executive Officer

For more information on B2Gold please visit the Company web site at www.b2gold.com or contact:

Ian MacLean
Vice President, Investor Relations
604-681-8371
investor@b2gold.com

Kerry Suffolk
Manager, Investor Relations
604-681-8371
investor@b2gold.com

The TSX Venture Exchange neither approves nor disapproves the information contained in this News Release.

The securities described herein have not been and will not be registered under the United States Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from registration requirements.

Some of the statements contained in this release are forward-looking statements, such as estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements.


http://b2gold.cmail3.com/o/479375/91tl4d4i/o.gif

B2Gold Corp.

PRODUCER
CODE : BTO.TO
ISIN : CA11777Q2099
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

B2Gold is a gold producing company based in Canada.

Its main assets in production are LIMON and LIBERTAD MINE in Nicaragua, its main assets in development are OROSI in Nicaragua and GRAMALOTE in Colombia and its main exploration properties are MOCOA and QUEBRADONA in Colombia, SAN PEDRO, CALIBRE, TREBOL, EL PAVON and MESTIZA-LA INDIA in Nicaragua, BELLAVISTA in Costa Rica and CEBOLLATI in Uruguay.

B2Gold is listed in Canada and in United States of America. Its market capitalisation is CA$ 3.5 billions as of today (US$ 2.5 billions, € 2.4 billions).

Its stock quote reached its lowest recent point on October 24, 2008 at CA$ 0.30, and its highest recent level on August 07, 2020 at CA$ 9.99.

B2Gold has 973 449 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of B2Gold Corp.
5/24/2019B2Gold said to be in talks to buy Zimbabwe gold project
3/27/2019B2Gold goes ahead with $50 million expansion of Fekola mine
12/24/2014One employee shot dead at B2Gold Masbate project in the Phil...
Annual reports of B2Gold Corp.
2008 Annual report
Financials of B2Gold Corp.
4/1/2011Record Fourth Quarter and 2010 Financial Results
1/29/2011Reports on Fourth Quarter 2010 Gold Production ...
1/29/2011Reports on Fourth Quarter 2010 Gold Production ...
1/29/2011Reports on Fourth Quarter 2010 Gold Production ...
Project news of B2Gold Corp.
10/14/2015B2Gold says to restart operations at Nicaragua mine
10/7/2015Policeman dies amid labor dispute at Nicaragua gold mine
2/18/2014(Calibre)Calibre and B2Gold Initiate Trenching Program on the Minneso...
10/7/2013(Calibre)Calibre and B2Gold Sampling Expands Mineralized Zone at the ...
9/10/2013(Calibre)Calibre Mining and B2Gold Sign Definitive Joint Venture Agre...
1/29/2013Completes Earn Into 51% and Approves Initial $2.0 Million Ph...
2/22/2012(Trebol)Radius & B2Gold Provide Trebol Update: Strong Gold-in-Soil A...
9/19/2011(Gramalote)Gramalote Exploration and Prefeasibility Update
9/16/2011(Cebollati)Cebollati Exploration Results
9/15/2011(Libertad Mine)La Libertad Exploration Results
1/22/2010(Orosi)Exploration Results Near the Orosi Mine, Nicaragua
1/19/2010(Kupol)Kupol West Drill Results Confirm the Presence of Multiple Go...
11/16/2009(Limon)The Limon Mine Labour Dispute Has Been Resolved and the Min...
1/26/2009(Gramalote)Announces an Updated Resource Calculation for the Gramalote ...
1/20/2009(Mocoa)Announces Positive Results from the Diamond Drill Program at...
1/12/2009(Gramalote)Announces Continued Positive Exploration Drill Results from ...
12/18/2008(Quebradona)Announces Additional Positive Exploration Drill Results from...
9/4/2008(Gramalote)Announces a New Gold Discovery at the Gramalote Property in ...
8/5/2008(Quebradona)Announces Continued Positive Exploration Drill Results . . .
7/3/2008(Mocoa)Announces Commencement of Diamond Drill Program at the Moco...
5/28/2008(Quebradona)Announces Positive Stage One Exploration Drill Results From ...
Corporate news of B2Gold Corp.
7/29/2016B2Gold Corp.: Second Quarter and First-Half 2016 Results/Con...
7/29/2016ASX Quarterly Report - June 2016
7/13/2016B2Gold Corp. Achieves Record Second Quarter and First-Half 2...
6/29/2016B2Gold 2016 Exploration Update: West Africa
6/15/2016B2Gold Corp. Announces Results of Vote for Election of Board...
6/9/2016B2Gold Corp.: Notice of 2016 Annual General Meeting - Confer...
5/12/2016B2Gold Corp. Reports First Quarter Results 2016
4/28/2016B2Gold Corp. Reports Quarterly Gold Production for First Qua...
1/22/2016B2Gold Corp. Announces Casualty at the Otjikoto Mine
1/20/2016B2Gold 2015 Exploration Update: High Grade Step Out and Infi...
1/19/2016B2Gold Corp. Announces Filing of Final Base Shelf Prospectus
1/19/2016B2Gold Corp. Reports Record Fourth Quarter and Full-Year 201...
1/14/2016B2Gold Corp. Reports Record Fourth Quarter and Full-Year 201...
12/14/2015B2Gold Corp. Announces Filing of Preliminary Base Shelf Pros...
12/14/2015Ground-Breaking of B2Gold Corp.'s Fekola Project, Mali
10/21/2015Wednesday, October 21, 2015B2Gold Corp. Achieves Record Thir...
10/21/2015B2Gold Corp. Achieves Record Third Quarter and Year-to-Date ...
10/19/2015Edited Transcript of BTO.TO earnings conference call or pres...
10/13/2015Nicaraguan government denies permit to B2Gold mining project
10/7/2015Wednesday, October 7, 2015B2Gold Corp.: El Limon Mine Update...
10/5/2015Monday, October 5, 2015B2Gold Corp.: El Limon Mine Update do...
10/5/2015B2Gold Corp.: El Limon Mine Update
9/11/2015S&P Dow Jones Indices Announces Changes to the S&P/TSX Canad...
8/13/2015B2Gold reports 2Q loss
8/13/2015Thursday, August 13, 2015B2Gold Reports Second Quarter 2015 ...
8/13/2015B2Gold Reports Second Quarter 2015 Results
8/11/2015B2Gold Corp.: Second Quarter Results Conference Call
7/25/2015Saturday, July 25, 2015B2Gold Announces Filing of Technical ...
7/24/2015B2Gold Announces Filing of Technical Report on the Fekola Pr...
7/23/2015Thursday, July 23, 2015B2Gold Corp. Achieves Record Second Q...
7/23/2015B2Gold Corp. Achieves Record Second Quarter and First-Half 2...
7/17/2015Friday, July 17, 2015B2Gold Corp. Announces Results of Vote ...
7/17/2015B2Gold Corp. Announces Results of Vote for Election of Board...
4/15/2015Wednesday, April 15, 2015B2Gold Corp. Reports Record Quarter...
4/15/2015B2Gold Corp. Reports Record Quarterly Gold Production for Fi...
4/15/2015Reports Record Quarterly Gold Production for First Quarter 2...
3/16/2015CANADA STOCKS-TSX set to open higher
3/13/2015Friday, March 13, 2015B2Gold Corp. Achieved Record 2014 Quar...
3/13/2015B2Gold Corp. Achieved Record 2014 Quarterly/Full Year Produc...
3/10/2015Tuesday, March 10, 2015B2Gold Corp. Announces Commercial Gol...
3/10/2015B2Gold Corp. Announces Commercial Gold Production Ahead of S...
2/19/2015B2Gold Corp.: Fourth Quarter and Year End 2014 Results Confe...
1/21/2015B2Gold Corp. Achieves Record 2014 Fourth Quarter and Full-Ye...
1/20/2015B2Gold Announces Updated Higher Grade Gold Resource at Wolfs...
12/23/2014Tuesday, December 23, 2014Fourth Quarter Update at B2Gold Co...
12/23/2014Fourth Quarter Update at B2Gold Corp.'s Masbate Gold Mine
12/11/2014Thursday, December 11, 2014B2Gold Announces First Gold Pour ...
12/11/2014B2Gold Announces First Gold Pour at Otjikoto Ahead of Schedu...
12/9/2014Tuesday, December 9, 2014B2Gold Corp.: Masbate Mine Operatin...
12/9/2014B2Gold Corp.: Masbate Mine Operating Normally Following Typh...
11/14/2014B2Gold Reports 2014 Third Quarter Operational and Financial ...
10/28/2014B2Gold Reports 2014 Third Quarter Gold Production and Revenu...
10/24/2014Friday, October 24, 2014B2Gold Corp.: Third Quarter 2014 Res...
10/24/2014B2Gold Corp.: Third Quarter 2014 Results Conference Call
10/3/2014B2Gold Corp. and Papillon Resources Limited Complete Merger
9/22/2014B2Gold Corp.: Scheme of Arrangement Receives Final Court App...
9/12/2014B2Gold Corp. Shareholders Overwhelmingly Approve the Merger ...
8/15/2012Latest Research - Delivering another solid quarter
4/26/2012(Calibre)Calibre and B2Gold Advance the Minnesota Gold-Copper Project...
4/9/2012(Trebol)Joint News Release B2Gold Corp. Acquires Trebol and Pavon Pr...
5/4/2011Reports First Quarter 2011 Gold Production, Provides Explora...
7/26/2010Sells Interest in Kupol East and West Licenses in Russia to ...
6/21/2010Additional Positive Exploration Results ...
6/15/2010Annual General and Special Meeting Conference Call and Webca...
5/11/2010Corporate Update
8/5/2009Announces Exercise of Over-Allotment Option
7/22/2009Completes $25 Million Common Share Offering
5/20/2009May 19-09
2/9/2009Feb 9
1/27/2009Proposes a Superior Business Combination to Central Sun
7/16/2008Issue of Shares
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (BTO.TO)NYSE (BTG)
3.56+0.85%2.61+1.16%
TORONTO
CA$ 3.56
06/14 17:00 0.030
0.85%
Prev close Open
3.53 3.56
Low High
3.54 3.59
Year l/h YTD var.
3.19 -  4.17 -14.63%
52 week l/h 52 week var.
3.19 -  4.99 -25.37%
Volume 1 month var.
1,776,045 -6.81%
24hGold TrendPower© : 40
Produces Gold
Develops Gold
Explores for Copper - Gold - Molybdenum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/20/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.44-0.53%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.36+0.97%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.63-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.05+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.19+3.30%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 14.70-0.88%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.25+2.04%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.16-2.94%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 2.29-0.43%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 45.56-0.44%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :