Taranis Resources Inc.

Published : October 11th, 2011

Intersects 88 meters Composite Total of Mineralization, and 2.61% CuEQ / 3.43 m Extending High-Grade

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Cobalt |
Smoy Drill
Smoy tracked drill used to conduct drilling at Naakenavaara

Lakewood, Colorado, October 11, 2011

 

Taranis Resources Inc. ("Taranis") [TSX.V: TRO] is pleased to report on the final seven drill holes of a ten hole exploration program completed on its 100% owned Naakenavaara copper-gold project located 9 km northeast of Kittil�, Finland.

 

These drill holes were completed on the east and south sides of a prominent geophysical anomaly called the "Bulls-Eye", a structural feature measuring 2.5 km east-west by 750 m north-south which is known to be related to widespread precious and base metal mineralization.

 

"Bulls-Eye" Area

 

Drill Hole N-25 (-500)

 

Hole N-25 was drilled 100 m south of previously reported drill hole R-618 (0.73% CuEQ/13.0 m + 1.34% CuEQ/9.8 m) drilled by the Geological Survey of Finland ("GTK"). 

 

From

To

Meters

CuEQ (%)

Gold (ppb)

Cobalt (%)

Copper (%)

Nickel (%)

Sulphur (%)

93.75

97.75

4.00

0.49

98

0.01

0.20

0.07

1.55

120.80

125.97

5.17

1.16

142

0.02

0.65

0.09

2.71

127.66

132.16

4.50

1.05

212

0.02

0.52

0.09

3.91

142.30

166.00

23.70

0.85

195

0.01

0.47

0.06

1.84

190.94

199.52

8.58

0.81

227

0.02

0.45

0.05

1.31

Composite

Total

 

 

45.95

 

 

 

 

 

 

 

  

Drill Hole N-26 (-450)

 

N-26 was drilled 100 m north of drill hole GTK drill hole R-617 (0.51% CuEQ / 31.0 m) and clipped the northern edge of a large antiform in the OKI Zone. 

 

 

From

To

Meters

CuEQ (%)

Gold (ppb)

Cobalt (%)

Copper (%)

Nickel (%)

Sulphur (%)

48.61

52.00

3.39

0.57

140

0.02

0.33

0.02

2.31

52.53

55.26

2.73

0.39

37

0.04

0.06

0.03

4.08

85.80

90.90

5.10

0.76

100

0.03

0.47

0.02

3.63

  

Drill Hole N-27 (-600)

 

Drill hole N-27 is located 100 m south of drill hole R-617, and intersected a near continuous zone of mineralization from 114.57-207.01 m and is open to the south. 

 

 

From

To

Meters

CuEQ (%)

Gold (ppb)

Cobalt (%)

Copper (%)

Nickel (%)

Sulphur (%)

68.66

73.20

4.54

0.70

129

0.01

0.41

0.06

3.10

74.00

76.25

2.25

0.37

74

0.01

0.14

0.04

2.79

114.57

142.00

27.43

0.48

98

0.02

0.21

0.04

1.95

148.73

153.28

4.55

0.51

99

0.01

0.28

0.03

1.56

158.10

207.01

48.91

0.34

61

0.02

0.12

0.02

2.46

Composite

Total

 

 

87.68

 

 

 

 

 

 

 

  

Drill Hole N-28 (-450)

 

Drill hole N-28 was drilled due south, and targeted an airborne geophysical anomaly. It intersected ultramafic rocks that are known to occur in the structural hanging-wall of the deposit, and was drilled down-dip. It was drilled to a depth of 163.5 m and did not intersect the desired target. 

 

From

To

Meters

CuEQ (%)

Gold (ppb)

Cobalt (%)

Copper (%)

Nickel (%)

Sulphur (%)

117.61

119.57

1.96

0.84

211

0.03

0.46

0.03

4.71

126.84

148.15

21.31

0.27

48

0.01

0.15

0.02

1.51

 

 Drill Hole N-31 (-700)

 

Drill Hole N-31, drilled due south, intersected a several wide zones of low-grade mineralization. It was drilled almost perpendicular to drill hole N-24 that intersected 133.52 m of composite mineralization (see News Release dated September 12th, 2011), the best mineralization occurred from 76.00-152.30 m. This hole clearly demonstrates that the low-grade form of mineralization is uniformly distributed and widespread throughout the OKI Zone. 

 

From

To

Meters

CuEQ (%)

Gold (ppb)

Cobalt (%)

Copper (%)

Nickel (%)

Sulphur (%)

42.22

51.00

8.78

0.60

115

0.02

0.31

0.04

2.20

76.00

98.90

22.90

0.42

112

0.01

0.23

0.03

1.68

129.02

152.30

23.28

0.55

105

0.02

0.28

0.04

1.69

Composite

Total

 

 

54.96

 

 

 

 

 

 

  

 

Chiisai Zone

 

Drill holes N-30 and N-29 were 750 m "step-outs" to the west of the high-grade Chiisai Zone that was previously shown to contain numerous high-grade copper and gold intercepts (see Taranis News Releases dated November 8 & 24th, 2010), including 1.01% Cu and 3.9 g/t Au / 2.73 m in hole N-13. The holes were drilled on the results of a recently completed SkyTEM airborne survey identifying a continuous single EM conductor extending over 2.5 km in length. N-30 the initial hole drilled to a depth of 168 m was not drilled deep enough. N-29 drilled 260 m to the east was allowed to continue to a depth of 191.55 m where it hit a high-grade zone of copper-gold mineralization at a depth of 170.68 m. 

 

Drill Hole N-30 (-70O)

 

 

From

To

Meters

CuEQ (%)

Gold (ppb)

Cobalt (%)

Copper (%)

Nickel (%)

Sulphur (%)

46.53

49.25

2.72

0.33

39

0.02

0.02

0.06

0.93

 

  

Drill Hole N-29 (-70O)

 

Drill Hole N-29 contained a higher grade interval within green-quartz-sericite breccia, and included assays up to 1.4 g/t Au and 2.7% Cu. It is possible that the mineralization extends below the current depth of the drill hole, since the hole was only drilled to a depth of 191.55 m. This presence of an EM conductor 250 m south of this intercept suggests the continuation of this zone at least 250 m south of the known mineralization in the "Bulls-Eye", well beyond the known limits of mineralization in the area. 

 

 

From

To

Meters

CuEQ (%)

Gold (ppb)

Cobalt (%)

Copper (%)

Nickel (%)

Sulphur (%)

59.55

62.60

3.05

0.63

28

0.01

0.10

0.17

0.52

86.70

88.60

1.90

0.49

47

0.01

0.38

0.02

1.60

123.00

132.00

9.00

0.41

22

0.03

0.09

0.04

4.71

170.68

174.11

3.43

2.61*

553

0.03

2.02

0.03

5.20

* This interval also contained 1.7 g/t Ag and 0.01% Zn

  

Drill holes R-607 and R-604 drilled by the GTK 350 m to the northwest of hole N-29 intersected similar mineralization (R-607 intersected 2.30 m of 3.87% CuEQ, including 1.57% Cu and 3.36 g/t Au at a depth of 143.70-146.00 m. Drill hole R-604 drilled 200 m north from R-607 intersected 2.00 m of 1.50% CuEQ, including 0.02% Cu and 2.1 g/t Au from 173.0-175.0 m).

 

Analyses of Results

 

Mineralization has two modes of occurrences at Naakenavaara - a very widespread pervasive low-grade form found in the "Bulls-Eye" area, and a much higher grade variety over thinner intervals found in the Chiisai Zone along the south side of the "Bulls-Eye". Both are restricted to a single stratigraphic horizon that is characterized by intense hydrothermal alteration.

 

The recent drilling and the airborne geophysical survey have shown that Naakenavaara is a major copper-gold resource with tremendous potential for expansion. The unique combination of widespread mineralization and near surface nature of the low-grade zones makes Naakenavaara an ideal situation for both open-pit and underground mining. Taranis is confident that the mineralization in the "Bulls-Eye" is continuous, and has outlined a major exploration program aimed at producing an NI 43-101 Resource Estimate for the "Bulls-Eye".

 

Maps Showing Location of Drill Holes

 

Taranis has posted several maps on its website that show the location of these drill holes in relation to other holes, and are available at http://www.taranisresources.com

 

Reporting of Copper Equivalents

 

The base and copper mineralization seen at Naakenavaara occur in two distinct types of mineralization, and included massive and disseminated types. The Copper Equivalent Value ("CuEQ") was calculated using the formula [CuEQ=Copper (%)+Cobalt (%)*5.71+Nickel (%)*2.85+Zinc (%)*0.286+Gold (g/t)*0.6037+Silver (g/t)*0.010057]. Metallurgical recoveries and net smelter returns are assumed to be 100%.

 

Quality Control and Analytical Procedures

 

Analytical work for the Naakenavaara Project was completed by Labtium Oy, Sodankyl� that is certified to SFS-EN ISO/IEC 17025:2005. Drill core was logged in the Sodankyl� core laboratory and was halved for analysis. Taranis has implemented a stringent quality control program on the analyses that includes the submission of analytical standards every tenth sample.

 

Exploration activities at Naakenavaara were overseen by John Gardiner (P. Geol.) and Jim Helgeson (P. Geo.), both Qualified Persons under the meaning of Canadian National Instrument 43-101.

About Taranis Resources Inc.

 

Taranis currently has 29,823,260 shares issued and outstanding (39,257,260 shares on a fully-diluted basis).

Taranis Resources Inc. 

John Gardiner (303)-716-5922
George Kent (416)-323-0783

Forward email



This email was sent to .com by johnjgardiner@earthlink.net |  
Update Profile/Email Address | Instant removal with � | Privacy Policy.


Taranis Resources Inc. | 14247 West Iliff Avenue | Lakewood | CO | 80228
Data and Statistics for these countries : Finland | All
Gold and Silver Prices for these countries : Finland | All

Taranis Resources Inc.

DEVELOPMENT STAGE
CODE : TRO.V
ISIN : CA87609B1076
CUSIP : 87609B 10 7
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Taranis Res. is a copper exploration company based in United states of america.

Taranis Res. develops copper and gold in Finland, and holds various exploration projects in Finland.

Its main asset in development is NAAKENVAARA in Finland and its main exploration properties are WSM, RIIKONDOSKI, KETTUKUUSIKKO, NÄLKÄJÄRVI-RIIKONKUMPU and MARSINKUUSIKKO in Finland and THOR in Canada.

Taranis Res. is listed in Canada and in United States of America. Its market capitalisation is CA$ 13.9 millions as of today (US$ 10.2 millions, € 9.4 millions).

Its stock quote reached its highest recent level on January 23, 2004 at CA$ 0.95, and its lowest recent point on July 24, 2015 at CA$ 0.03.

Taranis Res. has 55 450 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Taranis Resources Inc.
2007 Annual report
Financings of Taranis Resources Inc.
6/27/2016engages FronTier Merchant Capital Group for Investor Relatio...
1/13/2012Announces Financing and Launches New Website
4/16/2010Closing of Private Placement
9/8/2009Announces Private Placement
2/4/2009Announces Private Placement
5/8/2008announces Closing of a Flow-Through Private Placement with t...
4/25/2008Announces Flow-Through Private Placement with the MineralFie...
4/7/2008Engages Kingsdale Capital to Raise $2,000,000 By Way of Priv...
Project news of Taranis Resources Inc.
1/27/2014Acquires Key Claims at Willa Deposit in Slocan Mining Divisi...
10/28/2013(Thor)Five-Year Exploration Permit Approved for Thor
9/19/2013(Thor)Assays 21.25 g/t Au over 11.45 meters at Thor's SIF Prospect...
9/5/2013(Thor)Completes Mapping and Panel Sampling of SIF Zone and Identif...
12/12/2012(Thor)Outlines Two Large Targets in 2012 Exploration Program at Th...
9/11/2012Identifies Second High-Grade Gold Occurrence 750 m Southeast...
7/19/2012(Thor)Finds New Zones of High-Grade Mineralization at Thor, Britis...
5/10/2012Identifies Six Mag-EM Targets Up To 2.5 km from "Bulls-Eye" ...
4/24/2012(Kettukuusikko)Assembles 73 km2 Copper-Gold Project in Finland Linking the ...
3/1/2012Engages Computational Geoscience Inc. to Undertake Evaluatio...
2/22/2012Acquires Mavrik Project between Naakenavaara and Riikonkoski...
11/24/2011Identifies Copper-Nickel-Cobalt Target
10/11/2011Intersects 88 meters Composite Total of Mineralization, and ...
9/12/2011Intersects 133.52 meters Composite Total of Mineralization i...
8/23/2011(Kettukuusikko)Completes Detailed Ground Geophysical Survey over Kettukuusi...
8/2/2011Completes Summer Drilling Program at Naakenavaara and Contin...
7/18/2011(Nälkäjärvi-riikonkumpu)Taranis Explores Nälkäjärvi-Riikonkumpu Block and Locates Nu...
6/2/2011(Naakenvaara)Taranis Commences Drilling at Naakenavaara
5/13/2011Intersects Widespread Zones of Iron Formation at Marskinkuus...
5/12/2011(Naakenvaara)Completes Geophysical Surveys at Naakenavaara, Expands Surve...
4/28/2011(Kettukuusikko)Commences Airborne Surveys in Finland, Prepares Riikonkoski ...
3/18/2011Commences Drilling at Marskinkuusikko and Provides Update of...
2/14/2011Engages Drillcon-Smoy for Drilling at Marskinkuusikko and Na...
8/11/2010(Naakenvaara)Updates Exploration Activities
8/9/2010(Naakenvaara)Reports on Regional Exploration Around Naakenavaara Cu-Au-Co...
6/18/2010(Naakenvaara)Commences Drilling and Files Additional Mining Claim Applica...
6/17/2010(Naakenvaara)Intersects 0.43% Nickel, 0.22% Cobalt in New Massive Sulphid...
6/2/2010(Kettukuusikko)Intersects 4.20 g/t Au over 3.06 m under the Kettukuusikko S...
4/20/2010(Kettukuusikko)Updates Drilling at Naakenavaara and Kettukuusikko Projects,...
3/4/2010(Naakenvaara)Engages SMOY Drilling to Undertake Naakenavaara Exploration
11/18/2009(Thor)Activities at the Thor Property, Southeast British Columbia
10/5/2009(Naakenvaara)s Exploration Activities in Finland
8/26/2009(Naakenvaara)Samples 31 meters of 0.31% Copper, and 0.7 meters of 10.8 g/...
8/18/2009(Marskinkuusikko)Identifies Gold Target at Marskinkuusikko Project, Finland
7/15/2009(Naakenvaara)Identifies Large Copper-Gold Target at Naakenavaara, Finland
5/28/2009(Naakenvaara)Commences Ground Geophysical Surveys at Naakenavaara Gold/Co...
2/24/2009(Marskinkuusikko)Acquires Two New Gold Projects in Finland
2/11/2009(Thor)Drills 3.05 m of 5.70 g/t Au, 190.4 g/t Ag and 9.47% Cu-Pb-Z...
2/9/2009(Thor)Drills 10.51 g/t Au Over 1.53 Meters in the Great Northern Z...
1/21/2009(Thor)Drills 880 g/t Ag, 3.34 g/t Au, 15.36% combined Cu-Pb-Zn in ...
11/19/2008(Kettukuusikko)Gets Approval for Kettukuusikko Mining Claims in Finland and...
11/17/2008(Thor)Intersects 10.86 m of 0.05% Cu, 1.57% Pb, 3.48% Zn, 0.57 g/t...
8/18/2008(Thor)Adds Third Core Drill to Thor Project, British Columbia
8/8/2008(Thor)Intersects 29% Combined Cu-Pb-Zn, 3.51 g/t Au and 697 g/t Ag...
6/20/2008(Thor)Starts Drilling at Thor Project
5/9/2008(Thor)Increases Land Position at Thor 370% and Selects Atlas Drill...
3/25/2008(Thor)Verifies 38.48 grams/tonne Au Over 1.50 m Prospect between B...
3/11/2008(Midway East) Updates Nevada Exploration Activities
3/10/2008(Thor)Acquires Metallurgical Data on Thor Project
1/25/2008(Thor) Intersects 12.07 m of 0.53 g/t Au in Newly Discovered Anker...
1/24/2008(Thor)Intersects 4.54% Zn, 2.83% Pb, 0.21% Cu, 1.31 g/t Au and 176...
1/22/2008(Thor)Intersects 12.32% Zn, 3.57% Pb, 0.17% Cu, 1.09 g/t Au and 28...
1/9/2008(Midway East) Commences Drilling at Midway East Project, Nevada
1/2/2008(Thor) Extends Thor Mineralization 590m North of True Fissure Zone...
12/11/2007(Thor) Intersects 5.07% Zn, 4.07% Pb, 0.26% Cu, 1.59 g/t Au and 29...
11/27/2007(Thor) Channel Sampling Returns 3.75 m of 7.80% Zn, 7.86% Pb, 0.22...
11/5/2007Resources Taranis Intersects 3.29 g/t Au, 305.8 g/t Ag, 0.03...
10/30/2007(Thor)Surface Grab Sampling at Thor Returns 2,281.24 g/t Ag, 10.79...
10/25/2007 Intersects 11.17% Zn & 1.26 g/t Au Over 3.57 m in True Fiss...
Corporate news of Taranis Resources Inc.
9/24/2015Taranis Initiates Environmental Baseline Monitoring Program ...
10/22/2014Taranis Acquires Riikonkoski Copper-Gold Deposit in Finland ...
10/20/2014Taranis Samples 30.59 g/t Au over 17.55 m at SIF in Panel Sa...
10/20/2014Taranis Resources Inc. Completes Delineation Drilling, Sampl...
2/27/2014Board Announces Proposed Change to Share Capital Structure
1/13/2014(Thor)Engages ALS Metallurgy for Thor Project, SE British Columbia
12/11/2013(Thor)Announces Private Placement and Outlines 5 Phases to Permitt...
11/22/2013(Thor)Identifies Two Geochemical Targets Outside of Existing Depos...
10/22/2013announces Closing of $500,000 Private Placement
9/23/2013announces results of Annual General and Special Meeting of S...
9/18/2013Receives Final Approval for Naakenavaara 5-14 Mining Claims ...
8/3/2013(Thor)Files NI 43-101 Resource Estimate for Thor
7/17/2013(Thor)Completes Geochemical Soil and Environmental Baseline Sampli...
6/20/2013(Thor)Completes Initial NI 43-101 Resource Estimate at Thor
4/30/2013(Thor)Outlines Advancement at Thor and Provides Update on NI 43-10...
2/4/2013Completes Hearings on Naakenavaara 5-14 Exploration Claims
10/30/2012(Thor)Engages Roscoe Postle Associates Inc. to Undertake NI 43-101...
10/11/2012(Thor)Finds Another New Zone at Thor Assaying up to 6.6 g/t Au, 2....
9/18/2012Identifies Widespread Gold and Silver Mineralization in the ...
8/31/2012(Thor)Identifies High-Grade SIF Occurrence Assaying up to 90.1 g/t...
5/24/2012(Kettukuusikko)Outlines Five Exploration Targets at Kettukuusikko Gold Prop...
5/4/2012to be featured on CEO Clips on The Documentary Channel
2/27/2012Visit Taranis at the P.D.A.C March 4th - March 7th in Toront...
2/23/2012Acquires N=E4lk=E4j=E4rvi Copper Prospect in Finland
2/22/2012Announces Closing of Private Placement
1/17/2012Visit Taranis at the Cordilleran Roundup January 25-26th in ...
10/12/2011(Kettukuusikko)Outlines 90,000 Ounces of Gold at Kettukuusikko - Targets Ne...
8/5/2011Documents Gold Content Associated with Wide Copper Intercept...
5/18/2011(Kettukuusikko)Identifies Large EM Target Under High-Grade Gold Zone at Ket...
2/24/2011(Kettukuusikko)to Undertake Resource Estimate at the Kettukuusikko Gold Pro...
2/22/2011to Undertake Airborne Geophysical Survey at Naakenavaara, Fi...
3/2/2010Acquires WSM Gold Property in Nevada
2/3/2010Plans Further Work on Three Areas in Nevada Identified From ...
1/12/2010Visit Taranis at the Cordilleran Roundup January 20-21st in ...
12/31/2009Completes Gravity Surveys on Six Target Areas in Nevada
11/30/2009Commences DiRT Exploration in Nevada
11/12/2009Acquires 3 Gold Projects South Of Kimberley and Completes Ge...
1/23/2009Visit Taranis at the Cordilleran Roundup January 28-29th in ...
1/8/2009Drills 1,008 g/t Ag, 1.22 g/t Au, 0.34% Cu, 8.67% Pb and 10....
12/19/2008Exposes 100 m of South end of Great Northern Zone, and Repor...
12/11/2008Cuts 4.33 m of 2.01 g/t Au, 667.35 g/t Ag, 0.19% Cu, 6.37% P...
4/4/2007Identifies New Copper-Gold Zone in Kettukuusikko Center Zone...
3/14/2007Selects Quantec to Undertake Deep Penetration E.M. Surveys a...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (TRO.V)Other OTC (TNREF)
0.250+6.38%0.200+17.65%
TSX-V
CA$ 0.250
05/28 10:30 0.020
6.38%
Prev close Open
0.235 0.250
Low High
0.250 0.250
Year l/h YTD var.
0.160 -  0.340 25.00%
52 week l/h 52 week var.
0.110 -  0.340 61.29%
Volume 1 month var.
27,000 13.64%
24hGold TrendPower© : -5
Produces
Develops Copper - Gold
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 3/3/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202425.00%0.340.16
202317.65%0.250.11
2022112.50%0.240.08
2021-40.74%0.140.08
202092.86%0.160.04
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.71+0.52%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.13+6.87%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.64-2.44%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.46+0.82%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.97+1.86%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+2.27%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 2.61+6.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 48.91+1.58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :