Orosur Mining

Published : April 19th, 2018

=2D Q3 2018 Results

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
View this email in your browser
Orosur Mining Inc. - Q3 2018 Results

MONTEVIDEO, Uruguay, April 16, 2018. Orosur Mining Inc. , a South American-focused gold producer, developer and explorer announces its unaudited results for its third quarter ended February 28, 2018 (�Q3 18� or the �Quarter�).All dollar figures are stated in US$�000 unless otherwise noted.
 

HIGHLIGHTS 
  • In Colombia, high grade drilling continued at APTA during the Quarter with results from the current diamond drilling campaign including 4.89 g/t Au over 13.9m, 4.86 g/t Au over 25.0m, 9.42 g/t Au over 7.0m, 9.62 g/t Au over 6.0m and 5.28 g/t Au over 12.0m.
  • This campaign has already extended the known mineralization at APTA down dip, up dip and along strike with early indications at the present drilling at Charrascala appearing promising.
  • In Uruguay, following definition of a weaker mineralized structure at San Gregorio (SG) UG at depth and to the East in Q2 18, the mine plan and sequencing was redesigned with SRK to optimise economics, including the cancellation of development of deeper stopes from the previous mine plan and incorporation of marginal stopes from current levels at SGW into Q3 18.
  • As a result, Q3 18 production grades declined and production in the Quarter was 6,859 oz of gold, which is below original expectations, and compares to 7,820 oz in Q3 17. 
  • In the current quarter, the Company expects an improvement in grades and lower capital expenditure.  However, as a result of the lower grades processed in Q2 18 and Q3 18, and with an increased focus on profitability and not purely ounces produced, the Company�s production guidance has been reduced to 27,000 � 30,000 oz Au from 30,000 oz, as well as an increase in the operating cash cost guidance to US$900 - US$1,000/oz from US$800 � US$900/oz.
  • Development work in Q3 18 focused on the shift of mining activities from SGW to SG Central and included the completion of a 230m tunnel to provide access to the first planned stope at SGC towards the end of the Quarter.  The Company also finalised the pre-stripping of the Sobresaliente open pit which is planned to be mined in Q4 18 as well as finalised the fourth phase of the tailings dam which is planned to provide tailings storage for the next 36 months. 
  • During the Quarter, and in large part due to the performance of the SG UG, the Company commenced the implementation of a strategic initiative to reduce costs and corporate structure aimed at improving profitability and preserving cash.  The Company continuously considers strategic options and is currently in discussions regarding several alternatives to bolster capital resources available for its suite of projects.
 
COLOMBIA EXPLORATION HIGHLIGHTS
 
On February 20th and April 4th, the Company reported high grade drilling and assay results from its current step-out drilling campaign at APTA in Colombia from 18 holes drilled to date (MAP_054 to MAP_071) totaling 6,314 metres, including 4.89 g/t Au over 13.9m, 4.86 g/t Au over 25.0m, 9.42 g/t Au over 7.0m, 9.62 g/t Au over 6.0m and 5.28 g/t Au over 12.0m.  Recent drilling in this campaign has extended the known mineralization at APTA down dip, up dip and along strike. Mineralization remains open along strike and at depth at APTA.  Of the 18 holes drilled to date in this exploration campaign, 6 holes (33%) have intercepted mineralised intervals grading in excess of 10 g/t Au.
 
Orosur is presently finalising the last phase of this exploration campaign focusing on maiden scout drilling at Charrascala, the highest priority untested target, located 1.5 km to the west of the APTA discovery. Preliminary indications at Charrascala appear positive, with drilling of the first hole having encountered sulphide polymetallic mineralization (pyrite, chalcopyrite and sphalerite) associated with a set of structures with intense silicification.Assay results of the five planned drill holes at Charrascala are expected to be received during May 2018 and announced shortly thereafter.
  
OPERATIONS IN URUGUAY AND FY18 OUTLOOK
 
The broader San Gregorio underground mine (SG UG) is a continuation of the San Gregorio open pit deposit at depth. The historic open pit produced approximately 536,000 oz of gold at an average grade of 2.12 g/t Au.  Since November 2016, the SG UG West (SGW) has been the primary source of ore feed to the plant.  Mining in the SGW sector is forecast to be complete in H2 18 when development and initial production of SG UG Central (SGC) commences.  SGC is planned to be the main source of underground ore feed to the plant during the remainder of H2 18 and H1 19.  The current mine plan then assumes continuation of ore production shifting from SGC to SG UG East, followed by the Veta A underground project.
 

Isometric view of San Gregorio Pit & SG UG deposits at the end of Q3 18, including tunnel & development to SGC. Not to scale.
 
In Q2 18, a revised block model for SGC was finalized showing that the mineralized structure to be less economically viable at depth and to the East of the sector with reductions in both ore grade and thickness.  To date, SG UG has produced 465,943 tonnes at 1.49 g/t Au (approximately 22Koz Au), representing approximately a 30% reduction in grade from historical SG open pit operations, which delivered an average of 2.12 g/t Au.
 
Following definition of this weaker mineralized structure at SG UG, the Company redesigned the mine plan with SRK Argentina (�SRK�) and changed its sequencing for Q3 18.  Development into deeper stopes was removed from the mine plan and marginal stopes from current levels at SGW were incorporated into Q3 18 in order to optimise economics based on development costs already incurred.  As a consequence of these initiatives, Q3 18 grades declined and production was approximately 2,000 oz below expectations.  In an effort to partially compensate for this production shortfall, additional remnants from open pit reserves were mined during the Quarter.  
 
Primarily as a consequence of these lower grades, Q3 18 production was 6,859 oz of gold, compared to 7,820 oz in Q3 17 with average cash operating costs for the Quarter of $1,065/oz, compared to $858/oz in Q3 17. 
 
During the Quarter, development work focused on the shift of mining activities from SGW to SGC completing a 230m tunnel, which provided access to the first planned stope at SGC towards the end of the Quarter.  In addition, the Company finalised the pre-stripping of the Sobresaliente open pit which is planned to be mined in Q4 18 as well as finalised the fourth phase of the tailings dam which will provide tailings storage for the next 36 months, or until March 2021, on the basis of the current mine plan.  All-In-Sustaining Costs (�AISC�) were $1,395/oz compared to $1,289/oz in Q2 17, an increase of 8%. 
 
The Company expects in Q4 an improvement in grades and lower capital expenditure.  However, with the lower grades processed in Q2 18 and Q3 18 and with an increased focus on profitability and not purely ounces produced, the FY 18 production guidance has been reduced to 27,000 � 30,000 oz Au from 30,000 oz and the Company�s operating cash cost guidance increased to US$900 � US$1,000/oz from US$800 � US$900/oz.
 
During the Quarter, and in large part due to the performance of the SG UG, the Company commenced the implementation of a strategic initiative to reduce costs in Uruguay and corporate structure aimed at improving profitability and preserving cash.  As part of this initiative, during Q3 18, greenfield exploration was suspended and non-essential corporate and support costs have been drastically reduced, with Directors and officers agreeing to reduce their fees and salaries by 20%.   Further, the Company plans to discontinue mining from marginal open pits during Q4 18.  As a part of this initiative, a reduction of 120 staff members has occurred from November 2017 to the end of March 2018.
 
The Company is currently accelerating its preparation of Veta A, a new underground project that is 1.2km from the plant. In March 2018, the Company submitted a permit application to DINAMA, the environmental agency in Uruguay.   Initial work indicates Veta A is currently the highest-grade source of underground ore available in the San Gregorio mine complex.  Veta A was previously mined as an open pit, producing 29,000 oz with an average grade of 3.1 g/t between September 2006 and March 2008. Reserves at the end of May 2017 were 9,440 oz (122,328 tonnes at 2.40 g/t Au) and the Company is targeting a significant increase in reserves after proving the continuity and extension of the ore body over 140 metres from the current defined reserves while it remains still open at depth and along strike.  

The Company continuously considers and analyses strategic options and potential partnerships to develop its Uruguayan, Colombian and Chilean assets to create shareholder value and is currently in discussions on several alternatives to bolster capital resources at its suite of projects.

Q3 18 FINANCIAL SUMMARY 
  • Operating profit was $1,168 compared to an operating profit of $1,848 in Q3 17. 
  • Loss after tax was $1,976 compared to a profit of $363 in Q3 17. This was mainly due to higher depreciation and the recognition of a provision for staff retrenchments.
  • Cash flow from operations before changes in working capital was $(155) compared to $1,674 in Q2 17.
  • The Company invested $1,753 in capital expenditures and $1,236 in exploration compared to $3,218 and $449 respectively in Q2 17. The Company significantly increased its exploration as a result of the current drilling campaign in Colombia.
  • The Company�s cash balance at February 28, 2018 was $1,392 compared to $3,357 at May 31, 2017. The Company has drawn on the Santander line of credit in the amount of $1,500 during Q3 18.
 
 
Operational & Financial Summary1        
Q3 18 Q3 17 Diff YTD 18 YTD 17 Diff
Operating Results        
Gold produced Ounces 6,859 7,820 (961) 22,536 24,623 (2,087)
Operating cash cost3 US$/oz 1,065 858 207 943 807 136
AISC US$/oz 1,395 1,289 106 1,416 1,184 232
Average price received US$/oz 1,288 1,198 90 1,280 1,263 17
Financial Results (unaudited)        
Net profit/(loss) after tax US$ �000 (1,976) 363 (2,339) (2,518) 4,064 (6,582)
Cash flow from operations2 US$ �000 (155) 1,674 (1,829) 3,459 8,703 (5,244)
               
Cash & Debt Summary (unaudited) Feb. 28, 2018 Nov 30, 2017 Diff Feb. 28, 2018 May 31, 2017 Diff
Cash balance US$ �000 1,392 2,064 (672) 1,392 3,357 (1,965)
Total debt US$ �000 1,726 1,773 (47) 1,726 403 1,323
Cash net of debt US$ �000 (334) 291 (625) (334) 2,954 (3,288)
                 
 

 1 Results are based on IFRS and expressed in US dollars
2 Before non-cash working capital movements
3 Operating cash cost is total cost discounting royalties and capital tax on production assets.
 

 
Ignacio Salazar, CEO of Orosur, said:
 

�In Uruguay, we are taking drastic measures to restore profitability. As of today, SG Central is now in production, and we are quickly advancing a new higher-grade underground mine at Veta A.  The Company is currently contemplating several strategic alternatives to advance its projects and unlock the value of our assets for the benefit of our shareholders.
 
We are delighted with exploration progress in Colombia. Anz� is located in the most prospective district in Colombia.  Our strategy for this drilling campaign is to demonstrate the potential scale of the project and the results to date from APTA together with the quality of the other untested targets in our 200km� property support this approach.� 

Qualified Person's Statement

The technical information related to the current assets of Orosur Mining in this presentation has been reviewed by Miguel Fuentealba, a Mining Engineer who is considered to be a Qualified Person under NI 43-101 reporting guidelines. Mr. Fuentealba is a graduate in Mining Engineering from the University of Santiago de Chile and is an AusIMM Member and Qualified Person of Chilean Mining Commission. Mr. Fuentealba has 20 years of professional experience in the field of mining engineering, mine development and management.
 
About Orosur Mining Inc.
 
Orosur Mining Inc. (TSX: OMI; AIM: OMI) is a fully integrated gold producer, developer and explorer focused on identifying and advancing gold projects in South America. The Company operates the only producing gold mine in Uruguay (San Gregorio) and has assembled an exploration portfolio of high quality assets in Uruguay, Chile and Colombia. 
 
For further information, please contact:
 
Orosur Mining, Inc.
Ignacio Salazar, Chief Executive Officer
info@orosur.ca
Tel: +1 (778) 373-0100
 
Cantor Fitzgerald Europe � Nomad & Joint Broker
David Porter/Keith Dowsing
Tel: +44 (0) 20 7894 7000
 
Numis Securities Limited � Joint Broker
John Prior / James Black / Paul Gillam
Tel: +44 (0) 20 7260 1000
 
The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation ("MAR"). Upon the publication of this announcement via Regulatory Information Service, this inside information is now considered to be in the public domain. If you have any queries on this, then please contact Ignacio Salazar, Chief Executive Officer of the Company (responsible for arranging release of this announcement) on: +1 (778) 373-0100.
 
Forward Looking Statements

All statements, other than statements of historical fact, contained or incorporated by reference in this news release, including any information as to the future financial or operating performance of the Company, constitute "forward-looking statements" within the meaning of certain securities laws, including the "safe harbour" provisions of the Securities Act (Ontario) and the United States Private Securities Litigation Reform Act of 1995 and are based on expectations estimates and projections as of the date of this news release. There can be no assurance that such statements will prove to be accurate. Such statements are subject to significant risks and uncertainties, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements include, without limitation success of exploration activities; permitting time lines; the failure of plant; equipment or processes to operate as anticipated; accidents; labour disputes; requirements for additional capital title disputes or claims and limitations on insurance coverage. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events and such forward-looking statements, except to the extent required by applicable law.

 

 

 

     
     






This email was sent to newsrelease@24hgold.com
why did I get this?        
OROSUR � Costa Rica 1667 of. 105 � Montevideo 11000 � Uruguay

Email Marketing Powered by MailChimp

Orosur Mining

PRODUCER
CODE : OMI.V
ISIN : CA6871961059
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Orosur is a gold producing company based in Canada.

Orosur holds various exploration projects in Chile and in Uruguay.

Its main asset in production is SAN GREGORIO MINE in Uruguay, its main asset in development is ARENAL DEEPS in Uruguay and its main exploration properties are INCAHUASI, ANILLO and PANTANILLO in Chile, RIVERA, PASO DE LUGO, NUEVA HELVECIA, ISLA PATRULLA, MAL ABRIGO AND CERROS NEGROS, LASCANO, RETAMOSA, CASUPA-CRUCERA, PRESIDENTE TERRA, VOLCADERO, CHAMIZO, BRAGADO, MARIA ALBINA, TEXAS - ISLA PATRULLA DISTRICT, ISLA CRISTALINA BELT, CASTRILLÓN, OLD TEXAS, ARROYO POLANCO and CASUPA MADRE in Uruguay and ESTE DE LA ALUMBRERA in Argentina.

Orosur is listed in Canada, in Germany and in United Kingdom. Its market capitalisation is CA$ 8.4 millions as of today (US$ 6.1 millions, € 5.7 millions).

Its stock quote reached its highest recent level on February 03, 2006 at CA$ 5.96, and its lowest recent point on September 11, 2023 at CA$ 0.04.

Orosur has 98 865 201 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Orosur Mining
Posting of Annual Report
2007 Annual Report
Option Grants of Orosur Mining
6/1/2010Stock Options Granted
Nominations of Orosur Mining
7/12/2013News Alert - Appointment of DirectorsReceived: from [184.170...
5/10/2013Appointment of new Interim Chairman and Resignation of Direc...
4/2/2013announces Strategy update and appointment of Interim Managin...
10/11/2012Announces Appointment of Non Executive Director
6/4/2012appoints Seymour Pierce as Joint Broker
9/15/2011Announces Appointment of Non-Executive Director
Financials of Orosur Mining
4/14/2016Fiscal Q3 2016 Results & Operating Update
4/11/2013announces Third Quarter Results of Financial Year 2013
1/11/2013Announces Second Quarter Results
4/16/2012Announces Results for the Third Quarter and Nine Months Ende...
1/13/2012Announces Results for the Second Quarter Ended November 30, ...
10/14/2011Announces Results for the First Quarter Ended August 31, 201...
4/14/2011Announces Results for the Third Quarter and Nine Months Ende...
3/10/2008 25,150 Ounces Produced for Third Quarter of 2007/08
Project news of Orosur Mining
6/6/2013announces Operational Update Full Year Production above expe...
5/28/2013(Anillo)Drilling commenced at Anillo
4/9/2013announces Update on Exploration Activities in Chile
8/15/2012Announces Exploration and Development Update
6/1/2012(Pantanillo)Announces Updated Results of the Preliminary Economic Assess...
3/7/2012(Arenal Deeps)Announces Grant of Permits to Fully Exploit Ore from its Und...
3/5/2012commences drilling at Mahoma Project, Uruguay
8/30/2011Announces Definitive Acquisition signed for Talca
6/9/2011Announces Acquisition of Chilean Gold Property and Placing o...
5/25/2011(Maria Albina)Southern Uruguay Project Farm Out
5/25/2011(Old Texas)Southern Uruguay Project Farm Out
5/25/2011(Arroyo Polanco)Southern Uruguay Project Farm Out
5/25/2011(Casupa Madre)Southern Uruguay Project Farm Out
5/25/2011(Mal Abrigo And Cerros Negros)Southern Uruguay Project Farm Out
3/24/2011(Isla Cristalina Belt)announces Gladiator earns its first 20% I
3/22/2011(Arenal Deeps)Announces First Blasting at Arenal Deeps following Grant of ...
3/20/2011(Arenal Deeps)Secures US$5.5 million Debt Facility with HSBC for Arenal De...
Corporate news of Orosur Mining
2/13/2014News Alert - Director=E2??s DealingReceived: from [192.154.1...
2/13/2014News Alert - GRANT OF SHARE OPTIONSReceived: from [192.154.1...
1/31/2014News Alert - Orosur announces Non-Executive Director resigna...
1/21/2014News Alert - Orosur announces additions to executive managem...
1/14/2014News Alert - Q2 Fiscal 2014 ResultsReceived: from [184.170.1...
12/19/2013News Alert - OROSUR MINING INC. ANNOUNCES SALE OF TALCA FOR...
12/10/2013News Alert - Q2 Results. Improved Guidance and Increased Res...
11/20/2013News Alert - Annual and Special Meeting ResultsReceived: fro...
11/13/2013News Alert - Arenal Pillar Recovery Feasibility Study =E2?? ...
10/15/2013News Alert - Q1 Fiscal 2014 ResultsReceived: from [184.170.1...
9/17/2013News Alert - Director\'s DealingReceived: from [184.170.140....
9/10/2013News Alert - Operating UpdateReceived: from [184.170.140.130...
8/15/2013News Alert - Full Year 2013 ResultsReceived: from [184.170.1...
4/29/2013Operational Update
4/16/2013Announces Stock Options Grant
2/14/2013(Arenal Deeps)Completion of Arenal Deeps ramp
2/1/2013(Arenal Deeps)Announces that is has placed on its website a video of the r...
10/18/2012Announces Strategy of the Company
9/17/2012Issue of Ordinary Shares upon Exercise of Stock Options
9/10/2012Upcoming Announcement on Strategy
8/15/2012Announces Results for the Full year Ended May 31, 2012
8/7/2012Announces Change of Board Composition
8/1/2012Announces Change of Adviser
7/10/2012Announces Grant of Operation Permit for the new Tailings Sto...
7/9/2012Announces Appointment of Walter Muehlebach as General Manag...
6/14/2012Announces New staff appointments at San Gregorio
6/14/2012Announces Production Update for the fourth quarter and Fisca...
6/6/2012Issue of Ordinary Shares upon Exercise of Stock Options
5/18/2012Issue of Ordinary Shares upon Exercise of Stock Options
5/14/2012to Commence Trading on the Toronto Stock Exchange (TSX)
4/12/2012announces drill results for the Mahoma Project, Uruguay
3/7/2012(Pantanillo)Announces Initial Drilling Results in Talca and Commences Dr...
1/17/2012Announces Change of Chairman
1/12/2012(Anillo)Announces Results of the Preliminary Economic Assessment on ...
8/18/2011Announces Results for the Full year Ended May 31, 2011
8/8/2011Announces Change of Nomad and Broker
2/14/2011Announces Exploration Update
5/27/2009Diamond Farm-out
12/5/2008Production for the Quarter Ended November 30, 2008
8/1/2008 Engages Breakstone Group as Investor Relations Consultant
1/24/2008 Purchases Its Own Shares
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (OMI.V)
0.085+0.00%
TSX-V
CA$ 0.085
04/18 15:23 -
0%
Prev close Open
0.085 0.085
Low High
0.085 0.085
Year l/h YTD var.
0.040 -  0.095 70.00%
52 week l/h 52 week var.
0.030 -  0.130 -29.17%
Volume 1 month var.
15,000 112.50%
24hGold TrendPower© : -44
Produces Gold
Develops Gold
Explores for Copper - Diamonds - Gold - Lead - Nickel - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/4/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024112.50%
2023-55.56%0.150.04
2022-64.00%0.270.08
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :