ASX RELEASE        1 September 2008

 

 

EAGLE DOWNS COAL PROJECT PRE-FEASIBILITY STUDY CONFIRMS POTENTIAL FOR COKING

 

 C Highlights:          

 

?          Pre-Feasibility Study demonstrates technical and financial potential of both single and multi longwall mining options

?          Initial capital expenditure for the project estimated to be A$892M to produce 4Mtpa of hard coking coal

?          FOB operating costs  of approximately A$72 per tonne sold

?          Project has secured 4Mtpa port allocation through Abbott Point Coal Terminal expansion sufficient for a single longwall operation

?          At 4Mtpa production and at current coal prices, the Eagle Downs Coal Project generates EBITDA of approximately A$900M per year from a single longwall operation

?          Mine life in excess of 37 years at production rate of 7Mtpa

?          Further potential to implement a second longwall development increasing production to 7Mtpa

?          First sales to commence in 2012 subject to satisfactory completion of further Feasibility Studies and receipt of regulatory approvals

 

OA

 

Eagle Downs Coal Project - Proximity to BMA?s Peak Downs Mine

 

Aquila Resources Limited (ASX:AQA ?Aquila? or ?the Company?) is pleased to announce the positive results of the Pre-Feasibility Study for the Eagle Downs Coal Project in which the Company has a 50% interest with Vale Australia Pty Ltd, a wholly-owned subsidiary of Vale (?Vale?).

 

The Eagle Downs Coal Project is located approximately 25km south-east of the township of Moranbah within the northern part of the Bowen Basin. The project area is immediately down dip of BMA?s Peak Downs Mine as shown in the figure above and is 7km south of the Isaac Plains Coal Mine and Integrated Isaac Plains South Project, which are also jointly held by the Company and Vale.

 

The Pre-Feasibility Study has built on the outcomes of the 2007 Conceptual Mining Study conducted by IMC Mining Solutions and also the ongoing exploration and evaluation programmes which have targeted extraction of multiple coal seams within the Moranbah Coal Measures.

 

The principal seams identified are the Q, Harrow Creek Upper (?HCU?), Harrow Creek Lower (?HCL?) and Dysart (?DY?), with the preferred mining plan initially targeting the upper seams (Q, HCU) followed by the mining of the lower seams (HCL and DY) when the Q and HCU seams are depleted.

Typical LTCC Face Support with Articulated Rear Canopy

 

At full production it is envisaged that the Eagle Downs Coal Project will produce approximately 7Mtpa of coking coal from two longwall units, accessed by a shaft and drift entry. Four mining scenarios were assessed as part of the Pre-Feasibility Study, based on the assumption of either a single longwall unit or two longwall units operating simultaneously in the same coal seam or within different seams. In addition, the potential to utilise longwall top coal caving (?LTCC?) is also being evaluated for the thicker HCL and DY coal seams.


The four mining configurations evaluated by the Pre-Feasibility Study are summarised as follows:

 

 

Mining Scenario

Nominal Production

Mine Life

Case 1

Single longwall mining of all seams sequentially

4Mtpa

90yrs

Case 2

Single longwall mining of HCU, HCL and DY seams only (excludes Q seam)

4Mtpa

73yrs

Case 3

Two longwall units mining all seams

7Mtpa

46yrs

Case 4

Two longwall units mining the HCU, HCL and DY seams only (excludes Q seam)

7Mtpa

37yrs

 

 

Capital and operating costs are estimated for each case as follows:

 

 

Initial Capital Cost

Capital Cost of Additional Longwall Unit

Total

Capital Cost

FOB Operating Cost Per Tonne Sold

Case 1

A$862M

-

A$862M

A$73.55/t

Case 2

A$892M

-

A$892M

A$71.80/t

Case 3

A$872M

A$439M

A$1,381M

A$71.33/t

Case 4

A$892M

A$413M

A$1,305M

A$70.81/t

 

Longwall panel layouts were modified from those developed during the previous Conceptual Mining Study in 2007 in relation to the mining of the Q seam. After further evaluation of the large inter-burden distance between the Q and the HCU coal seams, the Q seam longwall panels were offset, with the lower HCU, HCL and DY seams stacked as shown below.

 

 

Proposed Eagle Downs Coal Project Underground Mine Layout

 

Set-out below is the underground shaft and drift configuration for the initial development to the Q and HCU coal seams, followed by access to the underlying HCL and DY seams.

 

 

Eagle Downs Coal Project Underground Access Configuration

 

 

The single longwall option shown in Case 2 above represents an attractive first stage of development, enabling the earlier delivery of Eagle Downs Coal Project hard coking coal into the export market and providing significant cashflow to fund the installation of a second longwall in order to increase production to 7Mtpa when additional port capacity becomes available.

 

Subject to the completion of the northern missing link and all requisite approvals, Eagle Downs has secured 4Mtpa of capacity through the proposed expansion of the Abbott Point Coal Terminal.  This capacity is expected to provide sufficient capacity to develop the project and establish production with a single longwall unit commencing in the financial year ending 30 June 2012.

 

Although the separate longwall mining of the Q seam is shown to be marginally less attractive in comparison to starting production directly from the HCU seam, the potential quality of the Q seam coal will necessitate further study work aimed at achieving incremental or supplementary production volumes with which to further enhance the overall project economics.

 


Indicative Eagle Downs Coal Project product specifications by seam are presented below:

 

Seam

Ash

CSN

Phosphorus

Sulphur

Volatiles

Q Primary

9..7%

9

0..010%

0..65%

20-23%

Q Secondary

19.5%

7..5

0..020%

0..56%

17-21%

Harrow Creek Upper

9..5%

7..5

0..040%

0..57%

16-18%

Harrow Creek Lower

10.2%

8..0

0..015%

0..55%

15-18%

Dysart

9..0%

8..5

0..070%

0..55%

15-17%

 

 

 

 

 

 

L MI

 

 

 

 

N The HCU, HCL and DY seams are all expected to produce a single hard coking coal product, whilst the Q seam could potentially produce a primary hard coking coal with a higher ash secondary product. The Q and DY coal seams have the potential to provide premium hard coking coal products.

 

Following these encouraging results, the Stage 4 exploration programme has been commenced with the objective of increasing the measured and indicated resource status of the project, closing the drill spacing within the first 10 years of operation to approximately 500m, completing 3-D seismic assessment and progressing the continuing technical evaluation and mine design studies.

 

The Eagle Downs Coal Project is expected to provide Aquila with a further opportunity to significantly expand its activities in the production and development of quality metallurgical coal projects within the Bowen Basin region of Queensland. As a result, the Company is in the process of finalising approval for Feasibility Studies on the Eagle Downs Coal Project, including the Stage 4 exploration programme, which in total amount to approximately A$55 million over the next two years.

 

 

Tony Poli

Executive Chairman

 

For further information regarding this announcement, please contact Tony Poli.

 

Telephone:           (08) 9423 0111   

Facsimile:             (08) 9423 0133   

Email address:     mail@aquilaresources..com.au

Visit us at:              www.aquilaresources.com.au

 

Warrick Hazeldine

Purple Communications

Tel: +61 8 9485 1254

Mob: +61 417 944 616

whazeldine@purplecom.com.au

 

 

***

 

Issued by

Purple Communications

Level 3, 28 Kings Park Road, WEST PERTH WA 6005

Ph: 08 9485 1254     Fax: 08 6263 0455

purple@purplecom.com.au    

 

 

 

 

E



Message protected by MailGuard: e-mail anti-virus, anti-spam and content filtering.
http://www.mailguard.com.au/mg
 
 
Data and Statistics for these countries : Australia | All
Gold and Silver Prices for these countries : Australia | All

Aquila Resources ltd.

EXPLORATION STAGE
CODE : AQA.AX
ISIN : AU000000AQA9
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Aquila Res. is a iron and coal development stage company based in Australia.

Aquila Res. holds various exploration projects in Australia.

Its main exploration properties are PILBARA and WILCHERRY HILL in Australia.

Aquila Res. is listed in Australia, in Canada, in Germany and in United States of America. Its market capitalisation is AU$ 1.4 billions as of today (US$ 1.3 billions, € 959.0 millions).

Its stock quote reached its lowest recent point on November 30, 2001 at AU$ 0.22, and its highest recent level on December 09, 2007 at AU$ 9.99.

Aquila Res. has 411 800 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Aquila Resources ltd.
12/21/2018Wisconsin court rejects lawsuit over Aquila Resources wetlan...
Nominations of Aquila Resources ltd.
8/19/2008Demerger Update and Appointment of Advisers
Project news of Aquila Resources ltd.
9/1/2008(ASX:AQA) Eagle Downs Coal Project Pre-feasibility Study Con...
7/8/2008Intersects Further High Grade Manganese at the Avontuur Proj...
5/6/2008West Pilbara Iron Ore Project Pre-Feasibility Study delivers...
4/8/2008Discovers High Grade Manganese in South Africa
Corporate news of Aquila Resources ltd.
9/11/2008(ASX: AQA) Demerger Update
8/25/2008(ASX:AQA) Mining Lease Applications Lodged for Belvedere Coa...
8/6/2008 Isaac Plains Coal Mine Set to Deliver Significant Earnings ...
6/19/2008 Red Hill Coal Project Initial Resource Statement 75Mt Insit...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (AQA.AX)
3.370
AUSTRALIA
AU$ 3.37
07/24 18:10 -
0%
Prev close Open
3.40 3.40
Low High
3.36 3.40
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  3.37 -%
Volume 1 month var.
60,716 -%
24hGold TrendPower© : -8
Produces
Develops
Explores for Iron - Iron ore
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70+0.06%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.48-3.77%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.72-5.64%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64+1.93%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 17.79+1.66%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+4.76%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 2.50-1.19%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 49.77-0.50%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-3.23%Trend Power :