Eagle Plains Resources Ltd.

Published : February 28th, 2009

/Prize Mining Execute Letter of Intent to Form Joint-Venture to Produce Gold at Yellowjacket

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Diamond | Gold | Gold Production | Recovery | Uranium |

 
Suite 200, 16 ? 11th Ave. S. Cranbrook, BC VIC 2P1   Ph: 866 486 8673    Fax: (250) 426-6899
Email:
info@eagleplains.com or visit our Website at www.eagleplains.com

Eagle Plains/Prize Mining Execute Letter of Intent to Form
Joint-Venture to Produce Gold at Yellowjacket

Cranbrook, B.C., 28 February, 2009: Eagle Plains Resources Ltd. (EPL:TSX-V) and Prize Mining Corp. (PRZ:TSX-V) jointly announce that the companies have executed a Letter of Intent containing the principle terms by which, subject to the satisfaction of certain conditions, the two parties will form a joint-venture to facilitate the production of gold and conduct further exploration and development of the Yellowjacket Zone on the Atlin Gold Property, located 9 kilometres east of Atlin, in north-western British Columbia.

Under terms of the Letter of Intent, Eagle Plains will purchase a 40% interest in the project by providing $2,000,000 CDN in working capital. These funds will be used to clear existing liens and obligations on the property, in addition to completing upgrades of the existing mill facility and covering costs related to engineering, permitting and environmental compliance. Eagle Plains will in turn receive 60% of all net proceeds of production up to $2,000,000, at which time it will revert to a 40/60 working interest. Eagle Plains will have the option of increasing its working interest to 60% by making payments to Prize totaling $2,000,000 by the sixth anniversary. It is expected that commercial production activity will commence by the third quarter of 2009. The joint venture remains subject to regulatory approvals and other customary conditions, including the execution of the definitive purchase and joint venture agreement.

Yellowjacket Zone History


The Yellowjacket Zone of the Atlin Gold Property is accessible year-round by all-weather road. The claims lie along the Pine Creek valley which is an historic and continuing placer gold producing area. Basic supplies and material to support mining activity can be readily sourced out of Atlin, and specialty services may be secured in Whitehorse, Yukon, located 180 kilometres north via Highway 7 and the Alaska Highway. Hydro-electric power has been recently established to within three kilometres of the property boundary.


The Atlin placer camp ranks as the second largest producer of placer gold in the province. Mining has been the economic mainstay for the town of Atlin since the discovery of gold on Pine Creek in 1897. The mineralized zone at Yellowjacket underlies significant historical surface disturbance. Downstream topographical features have rendered Pine Creek a ?low-value? fish habitat.


Gold mineralization at Yellowjacket consists of coarse gold hosted in quartz stockworks and silicified zones in brittle volcanic and altered ultramafic rocks. Gold mineralization occurs along a prominent fault structure which is interpreted to control the distribution of placer gold reported in the area.


In 1983, local area prospectors staked the Yellowjacket Property, and subsequently optioned the property to Canova and Tri-Pacific Resources. During 1984 and 1985 these companies conducted programs of ground geophysics, rotary and Diamond drilling. In 1986 Homestake Mineral Development Company optioned the property from Canova and from 1986 to 1988 initiated programs of mapping, reverse circulation drilling and Diamond drilling (52 holes totaling 8,057 metres).

At the completion of this program, Homestake reported a resource estimate of 453,500 tonnes grading 10.26 g/t (Schroeter, T.G. and Pinsent, R.H; BC Ministry of Energy and Mines Open File 2000-2: Gold Production and Resources in BC (1858 - 1998). (Though these estimates are considered by Eagle Plains and Prize management to be relevant, they were prepared prior to the institution of National Instrument 43-101 standards. Their reliability has not been confirmed, but will constitute a target basis for future exploration work).


Prize Mining (formerly Muskox Minerals) optioned the property in 2003 and from 2003 to 2006 drilled 57 holes for a total of 6,873 metres. A number of impressive intercepts were encountered during drilling, with values ranging from ?no significant results? to grades as summarized below:

Drillhole Interval Width Grade
YJ03-01 13.95m to 19.51m 5.56m 513.5 g/t Au

YJ04-07

including:

48.85m to 54.45m

53.95m to 54.45m

6.10m

0.31m

40.1 g/t Au

588.9 g/t Au

TW05-02

including:

10.67m to 12.79m

10.67m to 11.58m

2.62m

0.91m

853.0 g/t Au

2,397.0 g/t Au

TW05-02 20.05m to 41.50m 21.45m 11.5 g/t Au

The general area encompassed by drilling covers approximately 300 metres x 100 metres, with the deepest mineralized intersection encountered at 140 metres. The deposit appears to be open along strike in both directions and to depth.


The Yellowjacket Zone coarse gold mineralization has a pronounced ?nugget effect? where adjacent samples within the same mineralized zone can have widely varying gold values. This prompted Prize in 2006 to proceed with a bulk-sampling program in order to evaluate the deposit in an economic framework. Prize engaged a number of prominent engineering, metallurgical and environmental consultants to carry out permitting, pit design, mill design and fabrication work. Regular consultation was made with the Taku River Tlingit First Nation (?TRTFN?).


Excavation activity commenced in 2007 under a 10,000 tonne bulk sample permit. A modern milling facility was constructed, and includes a 1000 kW generator, ball mill, SAG mill, feeders, pumps, conveyors, three Knelson concentrators, magnetic separator, Diester and Gemini tables and an on-site assay laboratory. Test work indicated preliminary recoveries of 81%, with ore head-grades of approximately 9.0 g/t gold. Test work done on the rock units excavated from the pit have found them to be non-acid generating.

Consultants retained by Prize have recommended modifications to the mill circuit that are expected to increase recoveries to 90% and capacity to 350 tonnes per day. Work from 2003 until present has been carried out under the supervision of Linda Dandy, P.Geo., who will continue with the project as Mine Manager.

A photo gallery of the property and mill equipment may be found here:

Eagle Plains and Prize Mining presently intend to meet the following objectives during 2009 pursuant to the joint venture agreement:

  ? compile all existing geological, geophysical, environmental and engineering data into a GIS database
? remove liens and encumbrances on the property
? complete application for BC Small Mines Permit (up to 75,000 tonnes per year)
? complete modifications to existing mill facility
? resume milling of stockpiled ore
? dewater existing pit
? commence expansion of existing pit
? commence commercial production with target of 35,000 tonnes throughput during Q3
? explore possibilities for year-round custom milling
? study feasibility of connecting to newly established hydro-electric facility
? design and execute exploration program for future expansion

Tim Termuende, President and CEO of Eagle Plains states ?we are excited about participating with Prize Mining on this project. We recognize the quality and incredible amount of work required to bring the project to this stage, and are pleased to be able to provide financial and technical assistance to advance it, ultimately to the benefit of the local community, the Taku River Tlingit First Nation, Prize Mining and shareholders of Eagle Plains?. Harry McGucken, President of Prize Mining, added ?we are extremely pleased with this new association and what Eagle Plains and its team bring to this project. The addition of their technical expertise will now enable the project to get to the next level of development for the benefit of all concerned?.


The proposed Yellowjacket Joint Venture will be committed to working on the Yellowjacket project in a sustainable and responsible manner. The project is situated within the traditional territory of the TRTFN, and as such, will only move forward with the trust and support of the TRTFN leadership and membership, and the people of the Atlin community. The project proponents look forward to establishing a strong relationship with all stakeholders, based on responsible economic and environmental stewardship and mutual respect.

About Eagle Plains Resources
Eagle Plains Resources continues to conduct research, acquire and explore metal projects in western Canada. The Company controls over 35 gold, base-metal and uranium projects, many with third parties including Teck Limited (TSX:TCK.B), Alexco Resource Corp. (TSX-V:AXR), Sandstorm Resources Ltd. (TSX-V:SSL.P), Waterloo Resources Ltd (TSX-V:WAT.P), Mountain Capital Inc. (TSX-V:MCI.P) and XO Gold Resources Ltd. (a private B.C. company). These agreements expose Eagle Plains to over $15.0 million in exploration expenditures over a five year period. In recent years, Eagle Plains has completed option agreements with Billiton Metals, Rio Algom Exploration, NovaGold Resources, Kennecott Exploration and numerous other junior exploration companies, resulting in over 52,000m (158,500') of drilling and over $27.0 million in exploration spending on its projects since 1998. 2008 expenditures on Eagle Plains' projects were approximately $6,000,000, funded equally between Eagle Plains and third party partners. In 2009, management anticipates approximately $1.2 million in exploration expenditures funded by partners.


This news release has been reviewed and approved by Tim J. Termuende, P.Geo., hereby designated as a ?Qualified Person? under National Instrument 43-101.

On behalf of the Board of Directors

Signed

?Tim J. Termuende?
President and CEO


For further information, please contact Mike Labach at
1 866 HUNT ORE (486 8673)
Email:
mgl@eagleplains.com or visit our website at http://www.eagleplains.com

 

Cautionary Note Regarding Forward-Looking Statements


The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. There is no certainty that the parties will enter into the definitive purchase and joint venture agreement. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.



 
For more information please contact Mike Labach
Suite 200, 16 ? 11th Ave. S. Cranbrook, BC VIC 2P1   Ph: 866 486 8673   Fax: (250) 426-6899
Email:
info@eagleplains.com or visit our Website at www.eagleplains.com
<
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Eagle Plains Resources Ltd.

PRODUCER
CODE : EPL.V
ISIN : CA2699062022
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Eagle Plains Res. is a exploration company based in Canada.

Eagle Plains Res. produces gold in Canada, and holds various exploration projects in Canada.

Its main asset in production is YELLOWJACKET in Canada and its main exploration properties are BRONCO, IRON RANGE, AB, KARIN LAKE, KULYK LAKE, BLACK DIAMOND, HOT PUNCH, ACACIA, BOOTLEG, IRONMIKE, PELLY MOUNTAIN, FINEX, ZNK, MACKENZIE VALLEY ZINC, PROSPERITY, TITAN, DRAGON LAKE, EAGLE LAKE, SOUTH FINDLAY, ICE RIVER, ELSIAR (LCR), NORTH FINDLAY, KOKANEE CREEK, HALL LAKE (CRETIN), COYOTE CREEK, WILDHORSE, KALUM, FINLAY GREENLAND CREEK, RUSTY SPRINGS, K9, BOHAN and GAYNA RIVER in Canada.

Eagle Plains Res. is listed in Canada and in United States of America. Its market capitalisation is CA$ 9.3 millions as of today (US$ 6.8 millions, € 6.3 millions).

Its stock quote reached its highest recent level on June 02, 2006 at CA$ 1.95, and its lowest recent point on January 08, 2016 at CA$ 0.05.

Eagle Plains Res. has 84 260 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Eagle Plains Resources Ltd.
2007 Annual Report
Project news of Eagle Plains Resources Ltd.
7/11/2011(Dragon Lake)/Olympic Commence Drilling Program at Dragon Lake Gold Proje...
5/23/2011(Iron Range)(angl) Conduct Geophysical and Geochemical Surveys on th
3/29/2011(Iron Range)Providence Resources/Eagle Plains Provide Analytical Results...
3/15/2011(Finlay Greenland Creek)and MMG Announce Letter of Intent on the Findlay Property
2/15/2011(Iron Range)/Providence Add Second Drill Rig to Iron Range Project and P...
2/1/2011(Ab)Enters into Agreement with Aben Resources on Two Yukon Prope...
2/1/2011(Hit)Enters into Agreement with Aben Resources on Two Yukon Prope...
2/1/2011(Sprogge)Enters into Agreement with Aben Resources on Two Yukon Prope...
8/19/2010(Yellowjacket)Completes 100% Acquisition of Yellowjacket Gold Project
8/12/2010(Kalum)/Windstorm Commence Drilling on Kalum High Grade Gold Projec...
7/12/2010(Karin Lake)/Slater Mining Execute Option Agreement on Karin Lake REE/Ur...
6/2/2010(Wildhorse)& Partners Launch Aggressive Exploration Season with Wildhor...
5/18/2010(Iron Range)/Providence Capital Execute Option Agreement on Iron Range P...
5/3/2010(Coyote Creek)/Heemskirk Advance
4/15/2010(Elsiar (lcr))Parkside Execute Option Agreement on Elsiar Copper-Gold Porp...
3/11/2010(Wildhorse)Excelsior Execute Option Agreement on Wildhorse Gold/Copper ...
2/16/2010Copper Canyon Stakes High-Grade Gold Property - Tintina Gold...
1/13/2010(Eagle Lake)Results of Eagle Lake Uranium Project
11/17/2009(Ice River)/Waterloo Complete 2009 Fieldwork on Ice River Rare-Earth-El...
11/6/2009(Sphinx)Complete Geophysical Survey, Commence Drill Program at Sphin...
11/4/2009/Windstorm Complete Fieldwork on Kalum Gold Property, New Hi...
10/7/2009(Yellowjacket)Prize Mining Pour Gold at Yellowjacket Project, Atlin, BC
9/16/2009(Eagle Lake)Commences Fieldwork on Eagle Lake Uranium Project
8/27/2009(Yellowjacket)Yellowjacket Mine Achieves Full Commercial Production, New G...
8/26/2009(Kalum)Commence Fieldwork on Kalum Gold Property
8/19/2009(Ice River)Waterloo Commence Fieldwork at Ice River Rare Earth (REE) Pr...
7/15/2009(Yellowjacket)Prize Mining Receive Small Mines Permit for Yellowjacket Gol...
6/4/2009(Yellowjacket)Yellowjacket Completes Mill Modifications, Commences Bulk-Sa...
6/2/2009(Iron Range)Commences 2009 Follow-up on Iron Range Gold Discovery
5/13/2009(Yellowjacket)Yellowjacket Gold Project Commences Operations, Atlin, BC
2/28/2009(Yellowjacket)/Prize Mining Execute Letter of Intent to Form Joint-Venture...
1/22/2009(Blende)/Blind Creek Release Results from 2008 Drilling Program at B...
12/15/2008Diamond Drilling Results Released from Kalum Gold Project
9/9/2008(Bohan)Diamond Drilling Commences on Eagle Plains' Bohan Project
8/1/2008(Blende)Commence Drilling Program at Blende Silver/Base-Metal Deposi...
6/27/2008(Eagle Lake)Announces Craig Bay Drill Results
2/15/2008(Blende) Results from Drilling Program at Blende Silver/Base-Metal D...
11/16/2007(Sphinx Claims (crawford Bay)) Reports Results from 2007 Drilling Program on Sphinx Molyb...
10/3/2007(Titan Claims)/XO Gold Complete Option Agreement for Titan Property, Explo...
8/23/2007(North Findlay)Commences Diamond Drilling Program On Findlay Base-Metal Pro...
7/19/2007Commences Diamond Drilling Program In Bronco Discovery Area
12/31/2005(Mcquesten)2005 Technical report
Corporate news of Eagle Plains Resources Ltd.
6/29/2016Eagle Plains Completes Geological Compilation at Fisher Gold...
6/20/2016Eagle Plains Commences Fieldwork at Iron Range
6/15/2016Eagle Plains Clarifies Fisher Project Land Holdings News Rel...
6/14/2016Eagle Plains Increases Fisher Project Land Holdings- Seabee/...
5/31/2016Eagle Plains Commences Fieldwork at Vulcan
4/12/2016Eagle Plains Completes Land Consolidation in Seabee Gold Min...
4/8/2015Wildhorse
12/10/2014Santa Fe/Eagle Plains Complete Heavy Mineral Concentrate Sam...
11/24/2014Eagle Plains Announces Stornoway Participation in Orchid Pro...
10/29/2014Eagle Plains Receives Cash, Share Payments and Additional Re...
3/7/2011NovaGold and Copper Canyon Agree to Plan of Arrangement Tran...
6/10/2010Offer to Purchase
6/1/2010Updated Resource Calculation
5/27/2010RB Milestone Group Invites Eagle Plains Resources Ltd. onto ...
3/5/2010Results from Drill Program
3/2/2010Copper Canyon Announces Financing
2/12/2010/Touchdown Capital Release Analytical Results from Drill Pro...
1/18/2010/99 Capital Release Results of Baska-Eldorado REE/Uranium Pr...
12/23/2009Closes $855,600 Financing
11/25/2009Financing
11/12/2009Copper Canyon/Bling Terminate Abo Letter of Intent
9/21/2009Visit Eagle Plains Resources at the 2009 Silver Summit Confe...
8/19/2009Closes $1,881,500 Financing
8/13/2009Increases Financing
7/22/2009Announces Financing
12/18/2008Copper Canyon and Egoli Gold Amend Abo Option Agreement
9/26/2008/Waterloo Execute Option Agreement for Ice River Rare Earth ...
6/19/2008Commences Summer Field Programs
5/7/2008 Amends Terms of Strategic Alliance
4/30/20082008 SaskRocks Conference
12/3/2007 Re-prices Recent Financing
6/20/2007Commences Systematic Exploration Program In Bronco Discovery...
5/28/2007CGC Inc to Commence Drilling on Eagle Plains' Coyote Creek P...
5/9/2007Acquires Yukon Zinc Projects
4/24/2007Commences 2007 Drilling Program on Sphinx Molybdenum Project
4/10/2007/Wellstar Execute Option Agreement on Kulyk Lake Uranium Pro...
3/16/2007Receives Recent Media Coverage
2/6/2007Signs Letter of Intent with Wellstar Energy on Saskatchewan ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (EPL.V)Other OTC (EGPLF)
0.110+0.00%0.077+0.00%
TSX-V
CA$ 0.110
04/24 12:15 -
0%
Prev close Open
0.110 0.110
Low High
0.110 0.110
Year l/h YTD var.
0.105 -  0.135 -15.38%
52 week l/h 52 week var.
0.105 -  0.345 -63.33%
Volume 1 month var.
29,500 -%
24hGold TrendPower© : -17
Produces Gold
Develops
Explores for Copper - Gallium - Gold - Iron - Iron ore - Lead - Molybdenum - Nickel - Platinum - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-12.00%
2023-34.21%0.360.12
202211.76%0.250.15
202117.24%0.190.14
202045.00%0.180.07
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.98-1.18%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.39-3.24%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.28+0.20%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.76-1.68%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.00-1.07%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :