Newcrest Mining Limited - Quarterly Report for the Three Months Eended 30 June 2013
Published : July 25, 2013
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | Copper | Europe | Gold | Gold Production | Market | Report |

Newcrest Mining Limited - Quarterly Report for the Three Months Eended 30 June 2013

MELBOURNE, Victoria, July 25, 2013 /CNW/ - Newcrest Mining Limited (Newcrest) (News - Market indicators) (TSX: NM) is pleased to announce its quarterly report for the three months ended 30 June 2013 (these figures are unaudited*)

Overview

Newcrest's production for the 2013 financial year was 2,109,784 ounces of gold and 80,366 tonnes of copper at a cash cost of A$750 per ounce and total cost of A$1,040 per ounce, following production in the June 2013 quarter of 642,032 ounces of gold and 22,818 tonnes of copper.

The production performance for the June 2013 quarter represents a 25% increase in gold production and a 20% increase in copper production over the March 2013 quarter.  This increase was principally driven by increased plant capacity at Lihir, the ongoing ramp-up of the Cadia East panel cave, and mining of higher grade stopes at Gosowong.

At Cadia Valley, Cadia East continued to perform in line with the Company's expectations. Panel Cave 1 produced at an annualised rate of 5.4Mtpa for the June 2013 quarter.  The development of Panel Cave 2 continued in line with the Company's expectations.  Ridgeway ore production was maintained at a rate of 8Mtpa.

At Lihir, the plant performed in line with the Company's expectations during the June 2013 quarter. The projects to expand flotation capacity and to refurbish the Neutralisation Cyanidation Adsorption (NCA) circuit were both completed in the June 2013 quarter.  Increased production at Gosowong and Telfer during the June 2013 quarter was primarily associated with higher gold grades. At Hidden Valley, the crusher at the front of the overland conveyor commenced commissioning.

Exploration continued during the June 2013 quarter with positive drilling results at Gosowong, Telfer and Wafi Golpu.

As announced in previous Company releases, Newcrest is focused on maximising free cash flow and production outcomes will reflect the Company operating in this manner. Newcrest has responded to the current market environment by reducing the production of high cost ounces, operating and corporate costs, capital expenditure and exploration activities.

Guidance

Newcrest's 2013 financial year gold production of 2.11 million ounces was within the 2.00 to 2.15 million ounces range announced to the market on 28 March 2013.  Full year copper production of 80,366 tonnes was within the original guidance of 75 to 85 thousand tonnes.  Total site costs# of A$2.43 billion were within the original aggregate guidance range of A$2.34 to A$2.47 billion, and expected total capital expenditure for the 2013 financial year remains within the original guidance range of A$1.8 to A$2.0 billion.

As announced on 7 June 2013, gold production for the 2014 financial year is expected to be 2.0 to 2.3 million ounces, with capital expenditure around A$1 billion and exploration expenditure around A$85 million.  Copper production for the 2014 financial year is expected to be 75 to 85 thousand tonnes.  The first quarter gold production for financial year 2014 is expected to be lower than the June 2013 quarter, with production expected

to progressively increase over the course of the financial year.  Production and costs will continue to be actively managed to target a free cash flow neutral or positive outcome for the Company for the 2014 financial year.

Key Points

  • Quarterly gold production 642,032oz (a 25% increase on 514,421oz in the March 2013 quarter)
  • Quarterly copper production 22,818t (a 20% increase on 19,023t in the March 2013 quarter)
  • Quarterly cash cost A$762/oz (A$799/oz in the March 2013 quarter)
  • Quarterly gross cash margin A$672/oz (A$785/oz in the March 2013 quarter)
  • Quarterly total cost of A$1,069/oz (A$1,086/oz in the March 2013 quarter)
  • Cadia East Panel Cave 1 and Lihir plant expansion production performance in line with Company expectations
  • Cadia East Panel Cave 2 development on schedule
  • New Lihir flotation plant and NCA circuit both completed and in commissioning
  • Hidden Valley crusher at the front of the overland conveyor in commissioning

Forward Looking Statements

These materials include forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as "may", "will", "expect", "intend", "plan", "estimate", "anticipate", "continue", and "guidance", or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.

Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the company's actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the company operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation.

Forward looking statements are based on the company and its management's good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the company's business and operations in the future.  The company does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the company's business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the company or management or beyond the company's control.

Although the company attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the company.  Accordingly, readers are cautioned not to place undue reliance on forward looking statements.  Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the company does not undertake any obligation to publicly update or revise any of the forward looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.

Ore Reserves and Mineral Resources Reporting Requirements

As an Australian company with securities listed on the Australian Securities Exchange ("ASX"), Newcrest is subject to Australian disclosure requirements and standards, including the requirements of the Corporations Act and the ASX. Investors should note that it is a requirement of the ASX listing rules that the reporting of ore reserves and mineral resources in Australia comply with the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the "JORC Code") and that Newcrest's ore reserve and mineral resource estimates comply with the JORC Code. As a company listed on the Toronto Stock Exchange ("TSX"), Newcrest is subject to certain Canadian disclosure requirements and standards, including the requirements of National Instrument 43-101 - Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101").  In accordance with NI 43-101, Newcrest reports its ore reserves and mineral resources estimates in compliance with the JORC Code, along with reconciliation to the material differences between the JORC Code and the applicable definitions adopted by the Canadian Institute of Mining, Metallurgy and Petroleum (CIM Definition Standards). In relation to the December 2012 Resources and Reserves Statement, the reconciliation is set out in Newcrest's Canadian News Release dated 8 February 2013, and is available at www.sedar.com and at Newcrest's website www.newcrest.com.au.  Except as otherwise noted in that document, there are no material differences between the definitions of Measured, Indicated and Inferred Mineral Resources, and Proven and Probable Reserves, under the CIM Definition Standards and the equivalent or corresponding definitions in the JORC Code.

Competent Person's Statement

The information in this quarterly report that relates to Exploration Results and other scientific and technical information is based on information compiled by C. Moorhead, EGM Minerals for Newcrest Mining Limited who is a Fellow of The Australasian Institute of Mining and Metallurgy, and a full-time employee of Newcrest Mining Limited. Mr Moorhead has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the JORC Code and is a Qualified Person within the meaning of NI 43-101. Mr Moorhead consents to and has approved the inclusion in this quarterly report of the matters based on this information in the form and context in which it appears including sampling, analytical and test data underlying the results.  For details of exploration reports refer to the Newcrest website at www.newcrest.com.au.


* Site cost, cash cost, total cost and all-in sustaining cost are all non-IFRS financial information and have not been subject to audit by the Company's external auditor.
# Site cost is the sum of mining, milling, and administration & other costs.  This measure excludes smelting, refining & transport costs, royalties, stripping and inventory, and by-product credits.

SOURCE Newcrest Mining Limited

For further information:

Investor Enquiries - North America / Europe
Steve Warner
T: + 1 212 351 5064
E: steve.warner@newcrest.com.au

Investor Enquiries - Australia / Asia
Spencer Cole
T: +61 3 9522 5316
E: spencer.cole@newcrest.com.au

Media Enquiries
Kerrina Watson
T: +61 3 9522 5593
E: kerrina.watson@newcrest.com.au

This information is available at www.newcrest.com.au and at www.sedar.com.

Data and Statistics for these countries : Australia | All
Gold and Silver Prices for these countries : Australia | All

Newcrest Mining Ltd

PRODUCER
CODE : NCM.AX
ISIN : AU000000NCM7
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Newcrest is a gold and copper producing company based in Australia.

Newcrest produces gold, copper, silver in Australia, in Indonesia and in Papua New Guinea, develops copper, gold and silver in Australia, in Indonesia and in Papua New Guinea, and holds various exploration projects in Australia and in Indonesia.

Its main assets in production are MT RAWDON, CRACOW, TELFER GOLD MINE, CADIA HILL, TELFER UNDERGROUND, HIDDEN VALLEY, CADIA EAST OPEN PIT, RIDGEWAY and CADIA in Australia, LIHIR ISLAND, LIHIR, BONIKRO and HAMATA in Papua New Guinea and GOSOWONG MINE (KENCANA) and GOSOWONG in Indonesia, its main assets in development are KIRKALOCKA, MAIN DOME OPEN PIT, CADIA EAST UNDERGROUND and RIDGEWAY DEEPS in Australia, HIDDEN VALLEY & KAVEROI in Papua New Guinea and KENCANA UNDERGROUND in Indonesia and its main exploration properties are ASHBURTON and DALGARANGA in Australia, NAMOSI in Fiji, GOLPU in Papua New Guinea and TEMBANG, PT BUG (BENGKULU UTARA GOLD) and TALIWANG in Indonesia.

Newcrest is listed in Australia and in Germany. Its market capitalisation is AU$ 20.0 billions as of today (US$ 14.4 billions, € 13.7 billions).

Its stock quote reached its lowest recent point on October 18, 2013 at AU$ 10.01, and its highest recent level on October 13, 2023 at AU$ 26.06.

Newcrest has 766 739 968 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Newcrest Mining Ltd
3/11/2019Newcrest grabs majority stake in Canadian copper-gold mine
2/14/2019Newcrest Mining H1 profit surges 104% on strong gold product...
9/14/2018Total wins Newcrest Lihir Gold Mine mining contract
Annual reports of Newcrest Mining Ltd
- Newcrest releases its 2014 Notice of Annual General Meetin...
- Newcrest releases its Notice of Annual General Meeting and...
Nominations of Newcrest Mining Ltd
8/12/2016Newcrest Board Renewal
4/23/2014- Managing Director and Chief Executive Officer's Transition...
1/28/2014- New Senior Appointment
Financials of Newcrest Mining Ltd
8/18/2014- Financial Results for the 12 months ending 30 June 2014
8/12/2013- Financial Results for the 12 months ending 30 June 2013
Project news of Newcrest Mining Ltd
9/30/2015Newcrest divests remaining interest in Evolution
10/23/2014(Cadia)- Cadia East Mine reaches major milestone
1/15/2014- Newcrest production update
9/9/2013and Finance: Newcrest freezes executive pay and SA gold prod...
8/12/2013and Finance: Los Calatos optimisation improves project and N...
Corporate news of Newcrest Mining Ltd
7/27/2016Quarterly Report Ended 30 June 2016
7/24/2016June 2016 Quarterly Report
7/8/201608/07/16: NTL enters binding agreement with Newcrest Mining ...
6/27/2016Citi Mining Exploration Day 2016
6/13/2016Mine production resumed at Kencana
5/5/2016Newcrest renews its bank lending facilities
5/4/2016Further hedging of Telfer’s gold sales
5/2/2016New Gold Targets Identified at Topacio
4/25/2016March 2016 Quarterly Report
4/11/2016Executive Appointment at Newcrest
1/27/2016December 2015 Quarterly Report
12/22/2015Release of Newcrest Mining Sustainability Report
12/17/2015Change in Reporting Currency
11/22/2015Cadia Concentrator 1 SAG mill back in operation
10/28/2015Cadia Concentrator 1 SAG mill remains offline
10/19/2015September 2015 Quarterly Report
9/29/2015Update on Telfer Future Options Review
9/28/20152015 Notice of Annual General Meeting
9/28/20152015 Annual Report
9/20/2015Mining recommences at Ridgeway
9/11/2015Operations resume at Cadia
9/11/2015Permit granted to increase Cadia process plant capacity
9/8/2015Fatality at Newcrest Cadia Operation
8/19/2015Australia shares set to drop on global cues, weaker commodit...
8/17/2015Edited Transcript of NCM.AX earnings conference call or pres...
8/16/20152014/15 Full Year Financial Results
7/22/2015June 2015 Quarterly Report
7/19/2015Fatality at Hidden Valley
4/22/2015March 2015 Quarterly Report
4/9/2015Newcrest applies to increase production capacity at Cadia
4/9/2015Newcrest releases Sustainability Report 2014
2/26/2015Newcrest reduces ownership of Evolution Mining Limited
12/2/2014(Golpu)- PNG Mining and Petroleum Investment Conference - Wafi Golp...
12/2/2014(Hidden Valley)- PNG Mining and Petroleum Investment Conference - Hidden Va...
10/20/2014- Quarterly Report for the three months ending 30 September ...
9/23/2014to cease being a reporting issuer in Canada
9/15/2014- Presentation
9/15/2014Newcrest Mining Limited - Listing Rule 3.13.1 Disclosure
8/18/2014Newcrest Mining Limited - Financial Results for the 12 month...
7/24/2014- Quarterly Report for the three months ending 30 June 2014
7/24/2014- Expected asset impairment
7/22/2014- Slater & Gordon Commences Class Action Against Newcrest
6/19/2014- Newcrest reaches settlement with ASIC
5/21/2014- Australia's largest underground mine opened by NSW Premier
4/23/2014- Quarterly Report for the three months ending 31 March 2014
4/1/2014(Lihir)- Newcrest releases Telfer and Lihir Technical Reports
2/24/2014- BMO Global Metals and Mining Conference Presentation
1/25/2014December 2013 Quarterly Presentation
1/23/2014- Quarterly Report for the three months ending 31 December 2...
1/23/2014Newcrest Mining Limited - Quarterly Report for the three mon...
1/21/2014December 2013 Quarterly Report
1/15/2014Newcrest Mining Limited - Newcrest production update
1/14/2014Gold mining: Squandered opportunity
1/14/2014- Newcrest increases its Bilateral Bank Loan Facilities
12/23/2013- Potential Representative Proceedings
10/17/2013- Quarterly Report for the three months ending 30 September ...
10/17/2013- New Bilateral Bank Loan Facilities and Voluntary R&D Tax A...
10/17/2013- New Bilateral Bank Loan Facilities and Voluntary R&D Tax A...
9/23/2013- Newcrest releases the Denver Gold Forum Presentation
7/25/2013- Quarterly Report for the Three Months Eended 30 June 2013
4/23/2013- Quarterly Report for the three months ending 31 March 2013
2/8/2013December 2012 Resources and Reserves Statement
10/18/2012- Quarterly Report for the three months ending 30 Septem...
10/12/2012(Golpu)- Newcrest releases Wafi-Golpu Technical Report
10/1/2012- Newcrest Rejects Claims By Exploration Company
9/21/2012(Lihir)- Temporary reduction in plant capacity at Lihir
9/20/2012- Newcrest releases its Notice of Meeting and Annual Rep...
8/22/2007Buffalo, Bondi and Newcrest Complete Arrangement for Uranium...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (NCM.AX)
26.06+1.01%
AUSTRALIA
AU$ 26.06
10/13 16:50 0.260
1.01%
Prev close Open
25.80 25.87
Low High
25.74 26.25
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
23.71 -  29.80 -10.48%
Volume 1 month var.
4,115,583 -%
24hGold TrendPower© : 3
Produces Copper - Gold - Silver
Develops Copper - Gold - Silver
Explores for Copper - Gold - Molybdenum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/24/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-2.10%
202328.97%30.2820.57
2022-15.69%28.9615.72
2021-5.04%29.2721.85
2020-12.99%38.1520.70
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.23+2.43%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-0.56%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65-1.49%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.99+2.50%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-1.07%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.37-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :