Chart usGOLD   Chart usSILVER  
 
Food for thought
Lack of money is the root of all evil
Mark Twain  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1319.10-26.98
Silver 20.36-0.84
Platinum 1406.50-1.50
Palladium 683.60-6.50
WORLD MARKETS
DOWJONES 15112-203
NASDAQ 3443-39
NIKKEI 13015-231
ASX 4744-98
CAC 40 3770-69
DAX 8020-177
HUI 246-8
XAU 1030
CURRENCIES (€)
AUS $ 1.4357
CAN $ 1.3635
US $ 1.3219
GBP (£) 0.8561
Sw Fr 1.2324
YEN 129.4680
CURRENCIES ($)
AUS $ 1.0862
CAN $ 1.0314
Euro 0.7565
GBP (£) 0.6477
Sw Fr 0.9317
YEN 97.9390
RATIOS & INDEXES
Gold / Silver64.79
Gold / Oil13.67
Dowjones / Gold11.46
COMMODITIES
Copper 3.09-0.05
WTI Oil 96.51-1.73
Nat. Gas 3.93-0.03
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
( 0 vote, 0/5 ) Print article
     
Tweet

 

 

Dear 24h

February 6, 2008

 

 

We are pleased to forward you our recent News Release announcing that :
Monument's Phase I Drilling Program Confirms Previous Drill Results on Buffalo Reef Project 

Vancouver, B.C. Monument Mining Limited (TSX-V:MMY and FSE:D7Q1) ("Monument" or the "Company") is pleased to announce the first assay results from 1,000 metres of confirmation drilling during the second quarter of fiscal 2008 on Buffalo Reef Project, located in the Mukim of Hulu Jelai, District of Kuala Lipis, as part of the northwest Pahang State of Peninsular Malaysia.

 The gold deposit on Buffalo Reef Project is part of the 4.2km continuous and contiguous ductile & brittle north trending shear hosted gold mineralization. This shear zone is believed to be related to thrusting. The current drilling program is planned to test the gold deposition along the north trending shear system that dips moderately to steeply to the east. At Selinsing which represents the southern part of the system, the deposition of gold is associated with multiple parallel high grade quartz fissure veins within the 200m width of ductile and brittle shear zone.

 In September 2007, the Company announced commencement of the Phase I Exploration Program on Buffalo Reef Project. The phase I drilling program involves 1000m of RC drilling and 1400m of Diamond Drilling.  The purpose of the Phase I program is to confirm previous results, achieve a better understanding of Buffalo Reef Project and to undertake both confirmation RC drilling as well as some diamond drilling as recommended  by Vancouver consultants Orequest Consultants Ltd. in its NI-43-101 Summary Report on the Buffalo Reef Project filed on SEDAR on 19th June 2007. To date Monument has completed the stage 1 RC drilling program. The first assay results have been reported in January, 2008 by Ultratrace Pty Ltd Analytical Laboratories of Perth, Western Australia, a NATA accredited laboratory which complies with requirements of ISO/IEC 1725:2005.  The assay results are summarized in Table 1.

 

Table1.   Assay Results Summary 

HOLE

FROM

TO

Downhole Thickness (m)

Average Grade (g/t)

MBRRC0003

41

54

13m

5.76

Includes

46

48

2m

26.9

MBRRC0004

43

45

2m

7.77

Includes

43

44

1m

14.3

MBRRC0004

50

54

4m

1.46

MBRRC0004

59

61

2m

6.34

MBRRC0004

63

64

1m

4.62

MBRRC0005

25

28

3m

3.09

MBRRC0005

29

30

1m

8.74

MBRRC0005

32

36

4m

3.61

MBRRC0006

32

35

3m

5.5

MBRRC0007

24

26

2m

1.35

 

 

 

 

 

MBRRC0007

35

42

7m

2.43

MBRRC0008

48

55

6m

1.3

Includes

54

55

1m

4.96

MBRRC0009

7

14

7m

3.99

Includes

9

13

4m

6.13

MBRRC0009

48

49

1m

2.79

MBRRC0010

4

8

4m

3.28

MBRRC0011

19

26

7m

5.51

Includes

24

25

1m

17.6

MBRRC0012

23

27

4m

5.48

MBRRC0013

5

9

4m

2.58

MBRRC0014

5

12

7m

1.29

MBRRC0015

16

19

3m

5.48

MBRRC0016

16

27

11m

5.91

Includes

21

23

2m

16.85

MBRRC0017

29

36

7m

4.11

MBRRC0017

30

33

3m

7.6

 

The first 1000m of the RC confirmation drilling program was conducted at the southern zone of the Buffalo Reef gold mineralization. The program was carried out at a nominal 20m x 20m drill pattern that covers a strike length of approximately 200m. The drillholes were drilled at 60˚ toward 270˚ to a downhole depth of 60m to 70m. Mr. Zaidi Huran, Vice President of Exploration, said: "We are very pleased with the first drilling results. They demonstrate the good continuity of mineralization along strike and down dip and at the same time it is expected to upgrade the resources category from inferred to indicated and measured."

The diamond drilling as part of Phase I program will be conducted once the diamond drill rig is made available towards the end of the third quarter of fiscal 2008.  In the meantime the Phase II RC drilling program has commenced.

The Phase II Drilling program involves 10,000m of RC Drilling which is planned to be carried out at a nominal 20m x 20m drill pattern that will cover a broadly defined 1.5 km strike length of the Southern and Central ore body and 800m of mineralization at the Northern ore body. This exercise will also test the dip extension of the ore body at all three discreet mineralization areas as well as a possible extension of the ore body along the strike length.

Michael Andrew AusIMM, of Snowden Mining Industry Consultants Pty Ltd, a qualified person under National Instrument 43-101, is overseeing the drilling program and quality assurance and quality control ("QAQC") programs on behalf of Monument Mining Limited and has reviewed the contents of this news release.

Monument's program includes rigorous QAQC procedures.  Ultratrace Pty Ltd Analytical Laboratories of Perth, Western Australia, a NATA accredited laboratory which complies with requirements of ISO/IEC 1725:2005, and an accredited quarantined laboratory for handling imported samples, performs the sample pulverization and assaying for the project. Gold analysis is by 40 g Fire Assay fusion with an Inductively Coupled Plasma-Emission Spectroscopy (ICP-OES) finish.  Monument follows industry standard practice and includes field duplicates and independently certified standards and blanks, blindly inserted in the sample stream. This is in addition to the laboratory's internal quality control work. 

Robert F. Baldock, President and CEO
Monument Mining Limited
Park Place, Suite 500, 666 Burrard Street
Vancouver B.C. Canada V6C 3P6
604-669-2929

The TSX Venture Exchange has in no way passed upon the merits of the proposed transaction
and has neither approved nor disapproved the contents of this news release.

Not for distribution to U.S. news wire services or dissemination in the United States.  The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of the information contained herein.  Certain disclosures in this release, including management's assessment of the Company's plans and projects, constitute forward-looking statements that are subject to numerous risks, uncertainties and other factors relating to the Company's operation as a mineral exploration company that may cause future results to differ materially from those expressed or implied in such.

 

 

 




 

 

| Subscribe | Send to a Friend | Update Profile

Copyright � 2007 Monument Mining Limited

 

Tweet

Monument Mining Limited

PRODUCER
CODE : MMY.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Monument Mining Limited
2/13/2013Announces Closing of First Tranche of Brokered Private Place...
10/17/2012Announces Private Placement
10/12/2011Announces Private Placement of up to $70=2C000=2C000
8/12/2010Closes $13.0 Million Financing
7/22/2008Closes $38.1 M Private Placement and Convertible Note Financ...
Option Grants of Monument Mining Limited
12/7/2010Grants 600,000 Stock Options to its Newly Appointed Director...
10/5/2010Grants Stock Options to its Directors and Officers
Nominations of Monument Mining Limited
9/20/2012Appoints Chief Operating Officer
6/29/2012Appoints Gerald Ruth to Board
1/25/2012Grants Share Purchase Options to its Directors
12/21/2011Appoints Graham Dickson as Chairman of the Board
9/1/2010Appoints VP, Business Development
6/9/2010Grants 1,600,000 options to CHF investor relation firm
6/9/2010Engages CHF in Investor Relations and Updates $12 Million Fi...
6/30/2009Appoints New Director
12/17/2008Appoints New Directors and Names George Brazier Chairman of ...
8/25/2008Appoints General Manager and Mine Manager
6/20/2008Appoints AXINO AG to provide Investor Relation Services (Rev...
Financials of Monument Mining Limited
11/30/2012Reports First Quarter of Fiscal 2013 Results
6/1/2012=E2??s 2012 Third Quarter Results
3/1/20122012 Second Quarter Results
1/5/2012=E2??s 2012 First Quarter Results
5/30/2011 2011 Third Quarter Results
5/9/2011 Third Quarter Production and Sales Results
3/1/2011 2011 Second Quarter Results
1/15/20112011 First Quarter Results
Project news of Monument Mining Limited
7/26/2011(Selinsing)Releases Positive Drill Results from Selinsing Property in M...
7/22/2011(Selinsing)to Expand Tailings Storage Facility at Selinsing Gold Mine i...
6/1/2011(Mengapur)Agrees to Acquire a 70% interest in the Mengapur Polymetalic...
5/29/2011(Buffalo Reef)REPORTS NI43-101 RESOURCES AT BUFFALLO REEF PROPERTY
3/3/2011(Selinsing)to Increase Gold Production
11/1/2010(Selinsing)’s Selinsing Gold Mine Opening Ceremony in Malaysia
9/20/2010(Selinsing)Achieves Commercial Gold Production
2/21/2010(Selinsing)Starts Commissioning CIL Circuit While Gravity Circuit is in...
11/4/2009(Selinsing)Pours First Gold From Gravity Circuit
9/1/2009(Selinsing)Obtains Power Connection at the Selinsing Gold Project and
7/20/2009(Selinsing)Commences Open-Pit Mining at the Selinsing Gold Project
2/11/2009(Buffalo Reef)Confirms Amended Plan for Gold Production from Phase I Gravi...
2/2/2009(Buffalo Reef)Releases Drill Results, Selinsing Developments and Director’...
3/7/2008(Buffalo Reef)Releases Positive Drill Results?Phase II Program at Buffalo ...
3/4/2008(Buffalo Reef)Positive Drill Results?Phase II Program at Buffalo Reef
2/7/2008(Buffalo Reef)'s Phase I Drill Program Confirms Previous Drill Results on ...
Corporate news of Monument Mining Limited
12/17/2012Announces Private Placement of Up to $80 Million
12/17/2012Announces Private Placement of Up to $80 Million
12/17/2012Announces Private Placement of Up to $80 Million
4/23/2010CEO Interview
1/15/2010Fundamental Research Report Update #2
12/21/2009to Raise $12.0 M in Convertible Debenture and Forward Gold S...
9/18/2009to Issue Shares for Debt to Avocet Mining PLC
7/8/2009Moves to New Office
5/13/2009Releases Selinsing Gold Project Update
2/13/2009 Grants Stock Purchase Options to its Key Staff and Consulta...
12/24/2008Amends Selinsing Gold Project Construction Plan
10/31/2008Announces Gold Production Decision at Selinsing
10/31/2008featured on Mining Industry TV this Weekend
9/24/2008Fundametal Initial Research Report
8/20/2008Announces TSXV’s Acceptance of its Ball Mill Acquisition fro...
8/15/2008Grants Stock Purchase Options to its Directors Officers unde...
8/8/2008Commences Action for Injunction and Damages
7/28/2008Closes Avocet Mill Transaction For Future Plant Upgrade
7/8/2008Acquires Package of Additional Adjacent Land - Update
6/20/2008Notice of Change of Business Address
5/26/2008Acquires Second Mill for Future Production Plant Upgrade
5/13/2008Monument Announces $38.0 M Capital Raising to Commence Plant...
1/21/2008Acquires Package of Additional Adjacent Land
10/25/2007 Q1 Project Development Update
9/13/2007Commences Exploration Program
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (MMY.V)FRANKFURT (D7Q1.F)
0.300-3.23%0.218-0.46%
TSX-V
CA$ 0.300
06/19 13:44 -0.010
-3.23%
Prev close Open
0.310 0.300
Low High
0.300 0.300
Year l/h YTD var.
0.300 -  0.440 -26.83%
52 week l/h 52 week var.
0.300 -  0.540 -21.05%
Volume 1 month var.
14,500 -18.92%
24hGold TrendPower© : -18
Produces Gold
Develops
Explores for Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-33.33%
201212.50%0.500.35
2011-36.51%0.740.39
201080.00%0.700.24
2009105.88%0.520.17
 
5 years chart
 
3 months chart
 
3 months volume chart