Serabi Gold Plc

Published : July 15th, 2011

(UK) - Drilling result confirms potential structural and mineralized continuity of the Palito and Cu

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Brazil |

Drilling result confirms potential structural and mineralized continuity of the Palito and Currutela prospects

 

Drilling result confirms potential structural and mineralized continuity of the Palito and Currutela prospects

 

Serabi Mining plc (AIM:SRB, TSX:SBI and SBI.WT), the Brazilian focused gold exploration Company, is pleased to announce results from a drill hole between the Palito and Currutela prospects at its 100% owned Jardim do Ouro project in the Tapajos region.

 

Further to the drilling update dated 11 July 2011, assay results have since been received for drill hole PDD0470, a drill hole spaced 300 metres to the south-east of the last known intersection of the Palito gold deposit and 900 metres north-west of the closest Currutela drill hole (PDD0469) targeting an interpreted structural lineament potentially hosting both prospects. Drilling intersected multiple zones of hydrothermally altered granite, similar to previously reported Palito and Currutela intercepts, at down-hole depths between 84 metres and 102 metres. 

 

The bulk mineralised zone returned 17.06m @ 1..17g/t Au from 84.25 metres down hole depth, equivalent to a vertical depth of approximately 65 metres.

 

A number of promising assays were returned using Serabi's intersection calculation criteria, including:

Hole

East

North

RL

Hole Depth

Dip/Azm

From

To

Width

Au

 

(UTM)

(UTM)

(UTM)

(m)

 

(m)

(m)

(m)

g/t

PDD0470

634661.32

9300795.13

201.01

145.55

-49/217

84.25

85.01

0.76

1.14

 

 

 

 

 

 

89.50

93.82

4.32

1.58

 

 

 

 

 

including

90.98

91.86

0.88

5.25

 

 

 

 

 

 

97.78

101.31

3.53

2.89

 

 

 

 

 

including

100.70

101.31

0.61

10.90

 

Note: Assay intercepts are calculated based on a minimum weighted average grade of 0.5g/t Au using a 0.5g/t Au weighted average lower cut and a maximum internal waste interval of 1.2m. All assays were completed by EcoTech Laboratory using a 30gm Fire Assay charge with an AAS analysis.

 

As reported by the Company in its announcement dated 23 May 2011, a re-interpretation of the structural setting of the Palito deposit and near mine environment using re-processed aeromagnetic data was recently completed. Particular emphasis was placed on the fault and lineament architecture.  The results of this review were sufficiently encouraging to undertake a single drill hole, PDD0470, to test the predicted continuity of the Palito host structure along a south-east trending strike extension towards the Currutela prospect where a discovery drill programme has been underway since May.

 

This drilling result indicates that the host structures can be reasonably interpreted from the aeromagnetic data and the Company intends to use this data to identify other potential target areas in its tenements and well as in prioritising existing target areas.

 

 

 

Mike Hodgson, Chief Executive, commented:

 

"This is an excellent result and lends support to our initial theory that the Palito and Currutela prospects could be hosted in a single structure that could bear mineralization over some three kilometres.  Furthermore, as the bulk intersection was at some 65 metres vertical depth, it is an encouraging sign for open pit mining potential in the area.  Not only is this hole 900 metres north-west of Currutela and some 300 metres south-east of the last known intersection at Palito, it is also 750m south-east of the limit of Palito's 650,000 gold ounce mineral resource inventory, which clearly opens up the possibility of an infill drilling programme..   

 

We are also very encouraged that, from the reprocessed aeromagnetic data, we can interpret other structural lineaments which coincide with those areas where we have received positive results from our airborne and surface geophysical targets.  This positive drill result gives us greater confidence in the potential for discovering mineralization when these prospects are drilled and will also assist with the planning, and we would hope the success, of these drill programmes.

 

We intend to undertake further Induced Polarisation ("IP") work to the north west of the Currutela prospect to extend the surface geophysical coverage in this area and continue to improve our understanding of the geology before undertaking further drilling of this potential strike extension."

 

Enquiries:

 

Serabi Mining plc

 

Michael Hodgson

Tel: +44 (0)20 7246 6830

Chief Executive

Mobile: +44 (0)7799 473621

 

 

Clive Line

Tel: +44 (0)20 7246 6830

Finance Director

Mobile: +44 (0)7710 151692

 

 

Email: contact@serabimining.com

 

Website:  www.serabimining.com

 

 

 

Beaumont Cornish Limited

Nominated Adviser

 

Roland Cornish

Tel: +44 (0)20 7628 3396

Michael Cornish

Tel: +44 (0)20 7628 3396

 

 

Fox Davies Capital Ltd

UK Broker

 

Simon Leathers

Tel: +44 (0)20 3463 5010

Jonathan Evans

Tel: +44 (0)20 3463 5010

 

 

Farm Street Communications

Public Relations

 

Simon Robinson

Tel: +44 (0)7593 340107

 

 

Fig House Communications

Investor Relations

 

Rebecca Greco

Tel: + 1 416 822 6483

 

Copies of this release are available from the Company's website at www.serabimining.com

 

Forward-looking statements

This press release contains forward-looking statements. All statements, other than of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future (including, without limitation, statements regarding the estimation of mineral resources, exploration results, potential mineralization, potential mineral resources and mineral reserves) are forward-looking statements. Forward-looking statements are often identifiable by the use of words such as "anticipate", "believe", "plan", may", "could", "would", "might" or "will", "estimates", "expect", "intend", "budget", "scheduled", "forecasts" and similar expressions or variations (including negative variations) of such words and phrases. Forward-looking statements are subject to a number of risks and uncertainties, many of differ materially from those discussed in the forward-looking statements. Factors that could cause actual results or events to differ materially from current expectations include, among other things, without limitation, failure to establish estimated mineral resources, the possibility that future exploration results will not be consistent with the Company's expectations, the price of gold and other risks identified in the Company's most recent annual information form filed with the Canadian securities regulatory authorities on SEDAR.com. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement.

 

Qualified Persons Statement

The information contained within this announcement has been reviewed and verified by Michael Hodgson, CEO of the Company.   Mr Hodgson is an Economic Geologist by training with over 25 years' experience in the mining industry.  He holds a BSc (Hons) Geology, University of London, a MSc Mining Geology, University of Leicester and is a Fellow of the Institute of Materials, Minerals and Mining and a Chartered Engineer of the Engineering Council of UK, recognizing him as both a Qualified Person for the purposes of Canadian National Instrument 43-101 and by the AIM Guidance Note on Mining. Oil and Gas Companies dated March 2006.

 

Quality Assurance and Quality Control Procedures Disclosure

 

The Company has implemented and maintains a Serabi quality assurance/quality control (QA/QC) protocol at its JDO Project as defined in its "NI 43-101 Technical Report for the Jardim Do Ouro Project, Para State, Brazil" dated 22 December 2010.  This ensures best industry practice in sampling and analysis of exploration and resource definition samples.  The insertion of field duplicates, certified standards and blank samples into the sample stream form part of the Serabi procedure (these act as an independent check on contamination, precision and accuracy in the analytical laboratory).

 

Assay results are reported once rigorous QAQC procedures have been approved

 

 

Data and Statistics for these countries : Brazil | All
Gold and Silver Prices for these countries : Brazil | All

Serabi Gold Plc

PRODUCER
CODE : SRB.L
ISIN : GB00B4T0YL77
CUSIP : 00B074J639
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Serabi Gold is a gold producing company based in United kingdom.

Serabi Gold holds various exploration projects in Brazil.

Its main asset in production is PALITO in Brazil and its main exploration properties are TAPAJOS - MODELO, JARDIM DO OURO, TAPAJOS - PIZON and PIAUI STRKE LENGTH in Brazil.

Serabi Gold is listed in Germany, in United Kingdom and in United States of America. Its market capitalisation is GBX 61.7 billions as of today (US$ 73.5 billions, € 65.9 billions).

Its stock quote reached its lowest recent point on October 31, 2008 at GBX 0.25, and its highest recent level on December 31, 2020 at GBX 99.55.

Serabi Gold has 700 843 570 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Serabi Gold Plc
7/1/2009- Investor Presentations
4/24/2008Corporate presentation 2008
4/5/2006Corporate presentation
Annual reports of Serabi Gold Plc
Notice of AGM and publication of Annual Report and Accounts
Financings of Serabi Gold Plc
3/30/2011 Completion of TSX Listing,C$4.95 million funding and Board ...
3/28/2011- Filing of Final Prospectus, C$4.95 million financing and B...
2/11/2011Filing of Preliminary Prospectus in Canada
Option Grants of Serabi Gold Plc
5/31/2011Awards 1.130.000 Options to its directors at C$0.60
1/28/2011Award of 1,455,000 stock options to directors
12/3/2007Award of 400,000 stock options
Nominations of Serabi Gold Plc
7/29/2013Serabi Gold plc : Appointment of new Director
1/17/2013Serabi Gold plc : Issue of 270,000,000 Ordinary Shares at 6 ...
7/4/2011(UK) - Appointment of Broker
Financials of Serabi Gold Plc
7/26/2017Strong second quarter production consolidating mid-year posi...
5/13/2016Unaudited Interim Financial Results for the three month peri...
11/14/2013Serabi Gold plc : Financial Results for the third quarter 20...
8/14/2013Serabi Gold plc : Interim Results for the 6 months to 30 Jun...
5/15/2012Serabi Gold plc : Financial Results for the First Quarter 20...
8/16/2011(UK) - INTERIM RESULTS FOR THE 6 MONTHS TO 30 JUNE 2011
5/17/2011- Release of Q1 Financial Results and Managment Discussion a...
1/21/2011 Unaudited financial results for the 9 months ended 30 Septe...
Project news of Serabi Gold Plc
4/20/2016First quarter update on gold operations at Palito and Sao Ch...
2/5/2014Serabi Gold plc - Exploration Results Continue to Reveal Pro...
1/24/2012Serabi Gold plc : Drilling Update - Upgraded Intercepts Enha...
9/12/2011(Piaui Strke Length)(UK) - Exploration Update - Piaui Strike Length could now ex...
8/11/2011(Jardim Do Ouro)(UK) - Exploration Update - New IP geophysical survey underw...
7/15/2011(Palito)(UK) - Drilling result confirms potential structural and min...
7/11/2011(UK) - Drilling update - Positive drill intersections contin...
6/14/2011(Jardim Do Ouro) - Drilling Update - High Grade Gold Intersected at Currutel...
4/7/2011- FIRST DRILL TEST OF GEOPHYSICAL TARGETS AT PIAUI INTERSECT...
2/18/2011(Palito)- IBAMA cancels US$2.2 million fine
2/22/2011(Palito)- Correction - Geochemical results from Piaui drill target a...
2/22/2011(Palito)- GEOCHEMICAL RESULTS FROM THE PIAUI DRILL TARGET AT PALITO
4/9/2010(Palito)Statement re Update on Palito Gold Project
1/28/2010(Palito)Progress Update
7/9/2008(Palito)Ore Reserve and Mineral Resource Update
10/4/2006(Palito)Commercial production at Palito
Corporate news of Serabi Gold Plc
5/17/2016Award of Share Options
3/30/2016Audited Results for the year ended 31 December 2015
1/6/2016Initial partial draw down of US$5 million convertible loan f...
12/31/2015US$5 million convertible loan facility
12/31/2015Serabi Gold Plc ("Serabi" or the "Company") US$5 million con...
10/29/2015Third quarter 2015 Operational Update
10/29/2015Serabi Gold plc ("Serabi" or the "Company") Third quarter up...
8/14/2015Financial Results for Second Quarter 2015 and Management’s D...
8/14/2015Serabi Gold plc ("Serabi" or the "Company") Unaudited Interi...
8/11/2015Serabi Gold Plc ("Serabi" or the "Company") Voting results f...
7/30/2015Cancellation of Share Premium Account and Deferred Shares
7/30/2015Serabi Gold plc ("Serabi" or the "Company") Cancellation of ...
7/28/2015Serabi Gold plc ("Serabi" or the "Company") Second quarter u...
3/31/2015Audited Results for the year ended 31 December 2014
3/31/2015Serabi Gold plc ("Serabi" or the "Company") Audited Results ...
1/28/2015Assay result of 42 g/t over 3.6 metres from Main Vein develo...
1/28/2015Serabi Gold plc ("Serabi" or the "Company") Assay result of ...
1/23/2015Award of Share Options
1/23/2015Serabi Gold plc ("Serabi" or the "Company") Award of Share O...
1/20/2015Serabi Gold plc ("Serabi" or the "Company") Operational upda...
11/25/2014Approval of Final Exploration Report for Sao Chico
2/12/2014Serabi Gold Plc - First Month of Gold Production at Palito G...
12/23/2013Serabi Gold plc : Directorate change
12/9/2013Serabi on schedule to commence commissioning of Palito plant...
10/8/2013Serabi Gold plc : Drilling at Sao Chico returns further exce...
9/5/2013Serabi Gold plc - Palito Operational Update
9/3/2013Serabi Gold plc : New High Grade Zones Discovered at Sao Chi...
7/8/2013Kenai Shareholders Approve Plan of Arrangement with Serabi G...
6/19/2013Serabi Gold plc : AGM Statement
3/28/2013Serabi Gold plc : Audited Results for the year ended 31 Dece...
1/28/2013Serabi Gold plc : Award of Share Options
1/22/2013Serabi Gold plc : Total voting rights
1/17/2013Serabi Gold plc - Operational Update
1/16/2013Serabi Gold plc : Result of General Meeting
6/18/2012Serabi Gold plc : Result of AGM
6/18/2012Serabi Gold plc : AGM Statement
6/13/2012Positive Preliminary Economic Assessment for Serabi's Palito...
5/21/2012Serabi Gold plc : Award of Share Options
3/29/2012Serabi Gold plc : Audited results for the year ended 31 Dece...
1/24/2012=?UTF-8?Q?Serabi_Gold_plc_:_Issue_of_Equity_-_Placing_of_27,...
1/24/2012Serabi Gold plc : Drilling Update - High Grade Intersections...
1/24/2012Serabi Gold plc : Issue of Equity - Proposed Placing
12/19/2011Serabi Gold plc : Directorate change
6/27/2011(UK) - Result of AGM
5/23/2011- 2011 AIRBORNE GEOPHYSICAL SURVEY RESULTS
5/16/2011- Notice of Annual General Meeting and Special Meeting
6/16/2010- Share Issue
6/16/2010- Share Subscription Agreement with Eldorado Gold Corporatio...
12/31/2009Total Voting Rights
12/21/2009Variation in Directors Terms of Employment
12/10/2009- Holding in Company
12/3/2009- Additional Placing
12/3/2009- Result of the Open Offer
12/1/2009- Total voting rights
11/20/2009- Holding(s) in Company
11/17/2009- Announcement of Open Offer
11/10/2009- Update on Placing and Issue of further Ordinary Shares
11/10/2009- Placing of Shares, Convertible Facility and Open Offer
10/15/2009- Holding(s) in Company
9/23/2009- Statement re Share Price Movement
9/15/2009- Holding(s) in Company
8/18/2009- Results of Annual General Meeting
8/18/2009- AGM Statement
7/30/2009- 2nd Quarter Investor Update
6/26/2009- Holding(s) in Company
3/9/2009- Holding in Company
2/27/2009- Change of Nomad and Broker
2/24/2009- Holding in Company
2/23/2009- Update on Corporate Events
1/28/2009- Result of General Meeting of Shareholders
1/2/2009- Circular re Proposed Capital Reorganisation
12/8/2008- Update on Strategic Review
11/4/2008- Rule 2.10 Announcement : CORRECTION
11/4/2008- Section 2.10 Announcement
11/3/2008- Announcement re: preliminary approaches
9/22/2008- Holding(s) in Company
7/30/2008- 2nd Quarter Investor Update
4/23/2008 1st Quarter Results - correction
1/14/2008Discovery of new mineralisation close to the Palito gold min...
11/23/2007Director/PDMR Shareholding
10/25/20073rd Quarter Results
9/14/2007Notification of Shareholding
9/11/2007 Exploration Release
7/26/20072nd Quarter Results
6/5/2007Exploration results indicate new mining potential at Palito
6/1/2007AGM Statement
5/17/2007Holding(s) in Company
4/11/2007Mining Final Results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
LSE (SRB.L)BERLIN (B9O.BE)
88.00+1.15%0.5400
LSE
GBX 88.00
09/20 19:05 1.00
1.15%
Prev close Open
87.00 87.89
Low High
87.32 88.90
Year l/h YTD var.
38.00 -  88.00 88.03%
52 week l/h 52 week var.
26.23 -  88.00 238.46%
Volume 1 month var.
217,752 27.54%
24hGold TrendPower© : -41
Produces Gold
Develops
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024100.00%84.8937.61
202347.90%45.9421.00
2022-47.35%62.5021.36
2021-41.15%98.0053.50
202054.84%99.5542.00
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
error

 

 

THE REQUESTED URL IS UNCORRECT

Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !