Comet Ridge Limited

Published : April 07th, 2016

11 March 2016 Financial Statements for Half-Year Ended 31 December 2015

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

11 March 2016 Financial Statements for Half-Year Ended 31 December 2015

47e94636-2768-4c8d-b0a8-96c6ad8ad0fd.pdf




A.B.N. 47 106 092 577


CONSOLIDATED FINANCIAL STATEMENTS FOR THE HALF-YEAR ENDED 31 DECEMBER 2015


Contents

Page

Directors' Report

1

Auditor's Independence Declaration

4

Consolidated Statement of Profit or Loss and Other Comprehensive Income

5

Consolidated Statement of Financial Position

6

Consolidated Statement of Changes in Equity

7

Consolidated Statement of Cash Flows

8

Notes to the Consolidated Financial Statements

9

Directors' Declaration

19

Independent Auditor's Review Report

20


Corporate Directory


Directors

James McKay Non-executive Chairman

Tor McCaul Managing Director

Gillian Swaby Non-executive Director Christopher Pieters Executive Director


Company Secretary

Stephen Rodgers

Registered Office

Level 3

283 Elizabeth Street

Brisbane Queensland 4000

Telephone: +61 7 3221 3661

Facsimile: +61 7 3221 3668 Website: www.cometridge.com.auEmail: [email protected]

Share Registry

Computershare Registry Services Pty Ltd 117 Victoria Street

West End Queensland 4101 Telephone: +61 7 3237 2100

Facsimile: +61 7 3229 9860

Securities Exchange Listing Australian Securities Exchange Ltd Home Exchange: Brisbane

ASX Code: COI

Auditors

Pitcher Partners

Level 30, Central Plaza One 345 Queen Street

Brisbane Queensland 4000

Telephone: +61 7 3222 8444

Facsimile: +61 7 3221 7779

COMET RIDGE LIMITED DIRECTORS' REPORT


The Directors present their report on the consolidated group ("the Group") consisting of Comet Ridge Limited ("Comet Ridge" or "Company") and the entities it controlled at the end of, or during, the half-year ended 31 December 2015.


Directors

The names of the Directors who held office at any time during the half-year and up to the date of this report are:


James McKay Non-Executive Chairman

Tor McCaul Managing Director

Gillian Swaby Non-Executive Director

Christopher Pieters Executive Director


All Directors have been in office since the start of the half-year to the date of this report unless otherwise stated.


Principal Activities

The principal activities of the Group during the half-year were to carry out coal seam gas (CSG) exploration and appraisal. The Group has tenement interests and exploration and evaluation activities in Australia and New Zealand and an investment in a limited liability company based in the United States.


There have been no significant changes in the nature of the Group's principal activities during the half-year.


Review of Operations and Results

The loss for the half-year after providing for income tax amounted to $1.759 million (December 2014: loss $1.3 million). Comments on the operations and results of those operations are set out below.

Exploration Activities

  1. ATP 1191 Mahalo - Bowen Basin, Qld (Comet Ridge 40%), Santos (30%), APLNG (30%) Mahalo Pilot

    The Mahalo pilot project has continued to operate over the six month period to 31 December 2015. The project is located approximately 240km west of Gladstone in the southern Bowen Basin and is 11 kilometres from an infrastructure connection to the Gladstone LNG market with significant gas supply requirements.


    The project has seen significant progress with strong and increasing gas production performance from the Mahalo 6 / 7 Vertical-Horizontal well combinations. Pump speed increases were applied throughout November 2015 and into the first half of December 2015, with each of these achieving successive increases in the gas rate from the well. Gas production during January 2016 passed 360,000 scf/d (standard cubic feet per day).


    An initial independent certification of Reserves at Mahalo was announced on 28 August 2014. As a result of the promising results being achieved from the Mahalo pilot project, in early December 2015 the Company was also able to achieve an upgraded 2P and 3P reserves certification for Mahalo Block. Both 2P and 3P Reserves were increased by converting part of the significant Contingent Resources in the block to the higher category of Reserves. The most significant part of this Reserves upgrade has been the conversion from the 1C Contingent Resource category, into the 3P Reserves category. In addition, some conversion of 3P to 2P Reserves has also been achieved.


    The Group is extremely pleased with the results in the Mahalo Block to date and believes it is a clear demonstration of strong commercial production potential. In the coming months, well deliverability at the Mahalo pilot will be the primary focus of the Group so as to continue the conversion of 3P to 2P reserves.


    The table below summarises the changes to the Company's Reserves and Resources position for Mahalo as contained in its announcement to the market on 2 December 2015:


    Page | 1

    COMET RIDGE LIMITED

    DIRECTORS' REPORT Continued


    Exploration Activities (continued)


    Mahalo Independent Reserve and Resource Upgrade (COI Net Interest 1)

    COI Net Equity Share 1

    Gas Reserve (PJ) 2

    Gas Contingent Resource (PJ)

    Category

    1P 3

    2P

    3P

    1C

    2C

    3C

    30 November 2015 certification

    -

    30

    219

    112

    232

    372

    27 August 2014 certification

    -

    22

    124

    208

    328

    468

    Increase (PJ)

    -

    8

    95

    -96

    -96

    -96

    Increase (%)

    -

    36%

    77%

    -46%

    -29%

    -21%


  2. COI has a 40% net equity share of Mahalo.

  3. COI's net Reserves have not been adjusted for fuel or shrinkage (estimated at approximately 3%) and have been calculated at the wellhead (which is the reference point for the purposes of Listing Rule 5.26.5).

  4. 1P Reserves have not been attributed to the Mahalo Block under SPE 2007 PRMS Guidelines as the field is not yet at development stage with an approved development plan.


  5. In accordance with Listing Rule 5.34.3, Comet Ridge confirms that it is not aware of any new information or data that materially affects the information in the announcement to the market of the Reserves 2 December 2015 and that all of the material assumptions and technical parameters underpinning the estimates in that announcement continue to apply and have not materially changed.


    During the half-year ATP 337, which includes the Mahalo Joint Venture Area ("MJVA") and the Mahalo pilot project, was converted from a 1923 Petroleum Act permit to a Petroleum and Gas (Production and Safety) Act 2004 permit with effect late in 2015 for a term of four years. As a consequence the permit has been allocated a different number and has been changed to ATP 1191. The change of permit number has had no impact on the area of the permit.


  6. ATP 743P and ATP 744P - Galilee Basin, Qld (Comet Ridge 100%) ATP 1015P - Galilee Basin, Qld (Comet Ridge 20%)


  7. During the half-year, activity in the Galilee Basin has concentrated on the Albany (formerly known as Carmichael) sandstone structure in ATP 744P. The Albany Structure is situated just north of the Gunn Project Area where Comet Ridge already holds a significant Contingent Resource Certification for coal seam gas (CSG).


    The structure was first drilled in the 1990's when the Carmichael-1 well was drilled in 1995 by Maple Oil & Exploration NL. This well was designed as an oil exploration well to test the petroleum potential of the Late Carboniferous Lake Galilee Sandstone over a robust seismically defined anticlinal structure in the then ATP 588P (now ATP 744P). The structure is approximately 15km long on its main axis. Three separate zones within the Lake Galilee Sandstone flowed gas to surface at low rates. An additional significant section of gas pay was not tested. The well discovered a large natural gas accumulation which was deemed uneconomic at the time based on drill stem test results, and historic very low gas prices, and the well was plugged and abandoned.


    Recent reprocessing and reinterpretation of the seismic data over the structure undertaken by the Group confirmed the presence of a large anticlinal feature with a significantly larger structural closure than had been previously mapped. This latest technical review also indicates the 1995 well was not optimally located over the crest of the structure, leading to significant upside for a future appraisal well. A review of the well data and results has been used to quantify key reservoir parameters. The well results also indicated that the productivity of the tight gas formation was not optimally tested in Carmichael-1 due to the significant overbalance in mud weight and the presence of liquid hydrocarbons decreasing relative permeability to gas. Further drilling is required to test the crest of the structure to demonstrate commercial flow rates for gas.



    Page | 2

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Australia | Georgia | New Zealand | All
Gold and Silver Prices for these countries : Australia | Georgia | New Zealand | All

Comet Ridge Limited

CODE : COI.AX
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile

Comet Ridge LTD is based in Australia.

Comet Ridge LTD is listed in Australia. Its market capitalisation is AU$ 109.3 millions as of today (US$ 71.8 millions, € 66.7 millions).

Its stock quote reached its lowest recent point on August 14, 2015 at AU$ 0.04, and its highest recent level on July 06, 2018 at AU$ 0.42.

Comet Ridge LTD has 575 340 032 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate news of Comet Ridge Limited
7/29/201627 July 2016 Quarterly Report - June 2016
5/11/201611 May 2016 MOU with APA Group for Galilee Basin Transporati...
5/5/201605 May 2016 APPEA - Inquiry acknowledges importance of natur...
4/29/201629 April 2016 Quarterly Activities Report - March 2016
4/7/201607 April 2016 APPEA - Senate Submission
4/7/201611 March 2016 Financial Statements for Half-Year Ended 31 De...
1/29/201629 January 2016 Quarterly Report - December 2016
1/25/201625 January 2016 Mahalo7 Horizontal Well Production Continues...
12/18/201518 December 2015 Mahalo 7 Horizontal Well Production Update
12/2/201526 November 2015 Managing Director's AGM Presentation
12/2/201526 November 2015 Chairman's 2015 Annual General Meeting Addr...
12/2/201502 December 2015 Increase in 2P & 3P Reserves at Mahalo Gas ...
11/19/201511 November 2015 APPEA - International Energy Agency upbeat ...
11/12/201511 November 2015 Mahalo 7 horizontal well project operationa...
10/30/201529 October 2015 Quarterly Cash Flow Report - September 2015
10/29/201529 October 2015 Quarterly Activities Report - September 2015
10/23/201523 October 2015 Notice of AGM & Proxy
9/28/201523 September 2015 Comet Ridge Full Year Statutory Accounts 2...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (COI.AX)
0.190+0.00%
AUSTRALIA
AU$ 0.190
05/03 15:08 -
0%
Prev close Open
0.190 0.190
Low High
0.190 0.190
Year l/h YTD var.
0.180 -  0.230 -13.64%
52 week l/h 52 week var.
0.135 -  0.230 40.74%
Volume 1 month var.
52,495 -5.00%
24hGold TrendPower© : 44
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-13.64%0.240.17
202337.50%0.220.12
202239.13%0.250.10
202159.72%0.150.06
2020-62.11%0.200.05
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.49+0.13%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.76+1.29%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-0.92%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.59-0.38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.15+0.80%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-7.84%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.79-2.72%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.54+0.40%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :