Nyrstar NV

Published : April 24th, 2013

2013 First Interim Management Statement

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
   

Published: 07:00 CEST 24-04-2013 /Thomson Reuters /Source: Nyrstar /XBRU: NYR /ISIN: BE0003876936

Nyrstar: 2013 First Interim Management Statement

Regulated Information

24 April 2013

HIGHLIGHTS

Zinc in concentrate production impacted by temporary suspension of mining activities at Campo Morado; full year guidance for all metals maintained

  • Own mine production of zinc in concentrate of 68,000 tonnes, down 8% on Q4 2012
  • Mining operations temporarily suspended at the Campo Morado mine during February and March due to administrative issue; operations restarted in early April with results achieved in-line with improvements of December and January, following Mining for Value programme. Recovery plan in place to catch-up on production during 2013
  • Low delivery volumes from Talvivaara; resulted in total zinc in concentrate down 15% on Q4 2012
  • Full year mining production guidance for all metals maintained

Zinc metal production was 263,000 tonnes in Q1 2013; full year zinc metal guidance maintained

  • Solid performance in Q1 2013, down 6% from a strong Q4 2012
  • Maintain full year 2013 zinc metal guidance of 1.0 - 1.1 million tonnes

Reported 2013 benchmark zinc treatment charge terms up 10%; Nyrstar continues to negotiate

  • Significant volumes of zinc concentrates already settled by Nyrstar at improved terms compared to reported settlement
  • Lead concentrate negotiations also continue and are at a less advanced stage

 

'000 tonnes unless otherwise indicated

Q1 2013

Q4 2012

D %

Mining

 

 

 

Total Zinc in concentrate[1]

70

82

(15)%

Own mine zinc in concentrate[2]

68

74

(8)%

Gold ('000 troy ounces)

10.0

26.5

(62)%

Silver ('000 troy ounces)[3]

1,094

1,385

(21)%

Copper in concentrate

2.8

3.3

(15)%

Smelting

 

 

 

Zinc metal

263

281

(6)%

Lead metal (Port Pirie)

40

45

(11)%

Market

 

 

 

Average LME zinc price (USD/t)[4]

2,033

1,947

4%

Average EUR:USD

1.32

1.30

2%

 

Zinc in concentrate production from Nyrstar's own mining operations in Q1 2013 was 8% down on Q4 2012. This was primarily due to the suspension of mining activities at the Campo Morado mine during February and March, caused by the temporary cancellation of the site's explosives permit. In early April, a new permit was issued and mining activities recommenced at the site with a recovery plan in place to catch-up on production throughout the remainder of 2013. Confidence in the recovery plan is in part based on the significant improvements in zinc, copper and gold grades and recoveries during December 2012 and January 2013 following the Mining for Value (optimisation) programme at Campo Morado in H2 2012. Results achieved in April are in-line with that trend. While not expected to have a material impact on full year mining segment performance, the suspension has had an impact on Q1 2013 mining production volumes and is expected to impact the H1 2013 average zinc mining C1 cash cost and mining segment financial performance.

Zinc in concentrate production at Nyrstar's other operated mines in Q1 2013 was largely comparable with Q4 2012. The El Toqui mine switched its focus from mining high gold to mining high zinc/lead ore faces, leading to a significant improvement in zinc in concentrate volumes. At the Langlois mine following the successful ramp-up of operations in H1 2012, the focus at site is now on optimisation. After the implementation of Nyrstar's Mining for Value at the Tennessee Mines and Campo Morado in 2012, the programme was rolled-out at Langlois at the end of Q1 / start Q2 2013. The main focus area identified is to increase the number of available ore faces for production and development, with a four part action plan in place to achieve that goal. The Tennessee mines continued to perform well in Q1 2013 on the back of significant improvements made in H2 2012.

Total zinc in concentrate volumes, down 15% in Q1 2013, were also impacted by low delivery volumes under the Talvivaara zinc stream. Production of other metals in concentrate in Q1 2013 was also impacted by the Campo Morado suspension, namely copper in concentrate, silver and gold production. In addition, gold production was also impacted by El Toqui firstly switching its focus to zinc production, and secondly stockpiling the majority of its gold as an intermediate product so that it can be processed into a higher margin dor� product in H2 2013, when a new gravitational flotation plant is commissioned.

Nyrstar maintains its 2013 full year guidance for all metals for the mining segment.

Nyrstar's smelters delivered a solid result in Q1 2013 with zinc metal production of approximately 263,000 tonnes, 6% lower compared to a strong performance achieved in Q4 2012. The Balen/Overpelt smelter had a strong first quarter, increasing zinc metal output from Q4 2012. Production at the Auby and Clarksville smelters were impacted by announced planned maintenance shuts, while record temperatures in Tasmania, Australia constrained production at the Hobart smelter due to power reductions.. Nyrstar maintains its 2013 full year zinc metal guidance

In the production of other metals in the smelting segment, Auby indium metal production has now stabilised at planned levels following the successful ramp up of operations in H2 2012. The Clarksville smelter increased the production of high margin germanium leach product by exclusively processing Middle Tennessee mine concentrate during a Q1 2013 campaign. Lead metal production at the Port Pirie smelter declined 11% in Q1 2013 due to an unplanned shut of the blast furnace following the installation of new equipment. Copper cathode and gold production at the site were both higher in Q1 2013, up 67% and 38% respectively, while silver production was 11% down due to the blast furnace shutdown.

During Q1 2013 Nyrstar entered into short-term strategic hedging arrangements with respect to zinc prices. The rationale for doing so is to improve the profitability of the business by, for example, providing targeted financial support for Nyrstar's assets or to take advantage of price conditions in the market. All hedge arrangements are compliant with a robust risk-reward framework. Nyrstar does not intend to enter into medium to long term structural hedges of the zinc price, thereby reducing its exposure to the medium to long term changes in the zinc price.

Following a strong opening to the year, the zinc and other metal prices declined sharply during March. The relatively high price environment at the start of the year led to a 4% higher than average zinc price in Q1 2013 compared to Q4 2012, however since the middle of March the price has traded between USD 1,800 to USD 1,900 per tonne. Other metal prices have also traded downwards, in particular the silver and gold price which have fallen sharply in April. The Euro strengthened against the US dollar during Q1 2013, with the average rate 2% compared to Q4 2012. As Nyrstar's earnings are largely denominated in US dollars, whereas it reports its earnings in Euros, a stronger Euro against the US dollar negatively impacts reported earnings. Due to the high sensitivity of Nyrstar's earnings to the zinc price, and increasingly with the gold and silver prices, and the Euro to US dollar exchange rate, its financial performance in 2013 will be impacted if this low metal price environment continues.


CONFERENCE CALL
Management will discuss this statement in a conference call with the investment community on 24 April 2013 at 9:00am Central European Time. The presentation will be webcast live on the Nyrstar website, www.nyrstar.com, and will also be available in archive. The webcast can be accessed via: http://www.media-server.com/m/p/kvnupy67

[1]Includes production from Nyrstar operated mines and deliveries under the Talvivaara streaming agreement
[2]Includes production from Nyrstar operated mines only
[3]75% of the silver produced by Campo Morado is subject to a streaming agreement with Silver Wheaton Corporation whereby only USD 3.90/oz is payable. In Q1 2013, Campo Morado produced approximately 145,000 troy ounces of silver
[4]Zinc price is average of LME daily cash settlement prices
 
About Nyrstar
Nyrstar is an integrated mining and metals business, with market leading positions in zinc and lead, and growing positions in other base and precious metals; essential resources that are fuelling the rapid urbanisation and industrialisation of our changing world. Nyrstar has mining, smelting, and other operations located in Europe, the Americas, China and Australia and employs over 7,000 people. Nyrstar is incorporated in Belgium and has its corporate office in Switzerland. Nyrstar is listed on NYSE Euronext Brussels under the symbol NYR. For further information please visit the Nyrstar website, www.nyrstar.com
 

For further information contact:

Jaideep Thatai   Manager Investor Relations   T: +41 44 745 8103   M: +41 79 722 3089  jaideep.thatai@nyrstar.com
Sheela Pawar de Groot   Group Manager Corporate Communications T: +41 44 745 8154 M: + +41 79 722 6917 sheela.pawar@nyrstar.com
Geert Lambrechts   Manager Corporate Communications   T: +32 14 449 646   M: +32 473 637 892  geert.lambrechts@nyrstar.com
 
The full press release can be downloaded from the following link:



Press Release (English)
Press Release (Dutch)
Press Release (French)



To unsubscribe, please click on the following link:


.
Data and Statistics for these countries : Australia | Belgium | China | Switzerland | Tasmania | All
Gold and Silver Prices for these countries : Australia | Belgium | China | Switzerland | Tasmania | All

Nyrstar NV

PRODUCER
CODE : NYR.BE
ISIN : BE0003876936
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Nyrstar is a zinc and silver producing company based in Belgium.

Nyrstar produces zinc, silver, copper, gold and lead in Mexico and in Peru, and holds various exploration projects in Mexico.

Its main assets in production are CORICANCHA in Peru and G-9 CAMPO MORADO in Mexico and its main exploration properties are CAMPO MORADO, EAST TENNESSEE and MIDDLE TENNESSEE in Mexico.

Nyrstar is listed in Germany. Its market capitalisation is €UR 459.4 millions as of today (US$ 588.4 millions, € 400.0 millions).

Its stock quote reached its highest recent level on June 24, 2005 at €UR 2.70, and its lowest recent point on November 28, 2008 at €UR 0.38.

Nyrstar has 935 640 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Nyrstar NV
11/14/2018Nyrstar plunges as analyst warns shares will get wiped out
10/31/2018Belgium's Nyrstar Q3 core profit plunges 74%
10/31/2018Falling zinc price hammers Trafigura-backed Nyrstar in Q3
9/25/2018Nyrstar profit warning highlights zinc's disconnects
5/4/2018Benchmark zinc treatment charges down 15 pct in 2018- Nyrsta...
Financings of Nyrstar NV
12/30/2015announces funding of metal prepay financing
Nominations of Nyrstar NV
12/23/2013Extraordinary and Special General Meeting: Approval of Conve...
Financials of Nyrstar NV
8/8/2016announces First Half Results
7/20/2016Announces 2016 Half Year Reporting Date and Webcast
4/27/2016Results of the Annual and Extraordinary General Shareholders...
4/27/2016First Quarter 2016 Interim Management Statement
Project news of Nyrstar NV
1/6/2014LESOP Executive Share Acquisition
10/1/2013enters into European strategic marketing agreement for commo...
4/18/2013Acquisition of own shares
4/16/2013reaches settlement with Glencore on Commodity Grade Off-take...
9/12/2011Acquisition of own shares
9/1/2011Acquisition of own shares
8/24/2011on Nyrstar's friendly Offer to acquire Breakwater Resources ...
5/11/2011Acquisition of own shares
Corporate news of Nyrstar NV
4/22/2016terminates European marketing agreement for commodity grade ...
2/6/2014announces 2013 Full Year Results
1/16/2014Announces 2013 Full Year Reporting Date and Webcast
1/15/2014Shareholder Notification
11/20/2013Market Update
11/15/2013on Nyrstar's zinc streaming agreement with Talvivaara
11/14/2013Extraordinary General Meeting
10/29/2013Outcome of the Smelting Strategic Review and update on the P...
10/24/20132013 Second Interim Management Statement
10/11/2013announces Second 2013 Interim Management Statement reporting...
8/14/2013adjusts conversion price of its convertible bond
8/8/2013announces details of the payment of the capital reduction
7/25/2013announces 2013 Half Year Results
7/16/2013Announces 2013 Half Year Reporting Date and Webcast
6/24/2013announces Organisational Restructure
5/23/2013Second Extraordinary General Meeting
5/23/2013Port Pirie Transformation Update
4/24/2013Annual and Extraordinary General Meeting
4/24/20132013 First Interim Management Statement
4/19/2013Shareholder Notification
4/10/2013announces First 2013 Interim Management Statement reporting ...
2/7/2013announces 2012 Full Year Results
1/24/2013Announces 2012 Full Year Reporting Date and Webcast
10/24/20122012 Second Interim Management Statement
10/5/2012announces Second 2012 Interim Management Statement reporting...
8/13/2012adjusts conversion price of its convertible bond
8/7/2012announces details of the payment of the capital reduction
7/27/2012announces 2012 Half Year Results
7/12/2012Potential Transformation of the Port Pirie Smelter - Media s...
7/6/2012Announces 2012 Half Year Reporting Date and Webcast
5/22/2012Second Extraordinary General Meeting
5/2/20122012 Second Extraordinary General Meeting
4/25/2012Annual and Extraordinary General Meeting
4/25/20122012 First Interim Management Statement
4/17/2012Shareholder Notification
4/11/2012Announces First 2012 Interim Management Statement Reporting ...
3/23/20122012 Annual and Extraordinary General Meeting
3/14/2012Shareholder Notification
2/29/2012and Sims Metal Management announce the successful completion...
2/23/2012announces 2011 Full Year Results
2/6/2012CORRECTION: Nyrstar Announces 2011 Full Year Reporting Date ...
2/6/2012Announces 2011 Full Year Reporting Date and Webcast
1/23/2012Shareholder Notification
10/26/20112011 Second Interim Management Statement
10/12/2011announces Second 2011 Interim Management Statement reporting...
9/19/2011Shareholder Notification
8/24/2011announces its friendly Offer to acquire Breakwater is now fr...
8/8/2011announces details of the payment of the capital reduction
7/15/2011Announces Half Year 2011 Reporting Date and Webcast
6/28/2011Special General Meeting
6/27/2011Extends Commodity Off-take Agreement with the Glencore Group
5/31/2011NYSE Euronext Brussels announces Nyrstar inclusion in BEL 20...
5/24/2011Extraordinary and Special General Meeting
5/23/2011Shareholder Notification
4/27/2011Annual and Extraordinary General Meeting
4/27/20112011 First Interim Management Statement
4/13/2011Announces First 2011 Interim Management Statement Reporting ...
3/25/2011Shareholder Notification
3/18/2011announces the issue of new shares pursuant to a capital incr...
2/24/2011announces 2010 Full Year Results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
BERLIN (NYR.BE)
0.4910
BERLIN
€UR 0.491
09/18 08:40 0.032
0%
Prev close Open
2.02 1.28
Low High
1.28 1.28
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.491 -61.64%
Volume 1 month var.
0 -61.64%
Produces Copper - Gold - Lead - Silver - Zinc
Develops
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 7/21/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.48+4.52%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65-1.49%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.06+2.95%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.64+0.07%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :