Molycor Gold Corp.

Published : July 08th, 2009

43-101 - 236 Million Tonne Magne

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

 

FOR IMMEDIATE RELEASE  

NI 43-101 � 236 million tonne magnesium resource

July 7, 2009 - Vancouver, British Columbia

Mr. Larry W. Reaugh, Chairman & Chief Executive Officer of Molycor Gold Corp. (TSX.V-MOR; Frankfurt-M1V; Pink Sheets-MLYFF) (�Molycor� or the �Company�) is pleased to report results of the NI 43-101 updated resource estimate on their 100% owned Tami-Mosi Magnesium project in Nevada.

The report, adhering to the NI 43-101 standards, quotes 236,183,772 tonnes of an inferred resource at a grade of 10.00% Mg.

The NI 43-101 Resource Study Estimate at 8.00% Mg cut-off is summarized as follows:

RESOURCE CALCULATIONS FOR THE TAMI-MOSI

 

SECTION

AREA
Sq.m.

HORIZ.
m.

VOLUME
CU.m.

TONNAGE
Tonnes

GRADE
% Mg

POUNDS Mg.

1

43500N

72450

100

7245000

20575800

12.12

5486331312

2

43200N

78378

100

7837800

22259352

10.62

5200675001

3

43100N

58873

100

5887300

16719932

10.16

3737239201

4

4300N

62513

100

6251300

17753692

12.22

4772902557

5

42700N

46354

100

4635400

13164536

10.09

2922263701

6

42600N

64290

100

6429000

18258360

9.19

3691475225

7

42500N

99316

100

9931600

28205744

10.5

6515526864

8

42000N

29483

100

2948300

8373172

10.16

1871571405

9

4200N

65001

100

6500100

18460284

11.02

4475511253

10

41800N

26558

100

2655800

7542472

9.74

1616200900

11

41800N

16897

100

1689700

4798748

11.38

1201414549

12

41300N

26491

100

2649100

7523444

9.45

1564124008

13

4100N

37326

100

3732600

10600584

9.33

2175875872

14

40900N

17436

100

1743600

4951824

10.21

1112278707

15

40900N

19400

100

1940000

5509600

9.1

1103021920

16

40800N

35264

100

6526400

10014976

9.95

2192278246

TOTAL POUNDS Mg.

49,638,690,722

TOTAL TONNES AND GRADE UNDILUTED

214,712,520

10.51

 

 

 

 

 

WITH 10% DILUTION AT THE LISTED GRADE

21,471,252

4.89

2,309,877,290

DILUTED TONNAGE AND GRADE

236,183,772

10.00

51,748,568,012

 

RESOURCE CALCULATION

 

POUNDS PER 1%/TONNE

22.06

DENSITY

2.84 TONNES PER CUBIC METER

The 2009 Mineral Resource Estimate is reported in accordance with Canadian Securities Administrators� National Instrument 43-101 (�NI 43-101�) and has been estimated in conformity with the Canadian Institute of Mining, Metallurgical and Petroleum (CIM) Mineral Resource and Mineral Reserve definitions referred to in NI 43-101, Standards of Disclosure for Mineral Projects.  Mineral resources are not mineral reserves and do not have demonstrated economic viability.  There is no certainty that all or any part of the mineral resource will be converted into mineral reserves.  The 2009 Mineral Resource Estimate was prepared by Norman Tribe, P.Eng, of N. Tribe & Associates Ltd., an independent qualified person as this term is defined in NI 43-101.

In order to arrive at an Inferred Mineral Resource estimate for the dolomite mineralization, the drill holes were plotted on 100 meter spaced cross section drawings.  The following parameters were used in this calculation:

  • Drill holes plotted and projected onto vertical cross sections oriented east west. (N90�E, looking north).
  • The Inferred Mineral Resource blocks were outlined on section, on grades exceeding 8% Mg and projected 100 meters along strike and down dip or half way to the next intersection whichever was smaller.
  • Although the dolomite bands are continuous along strike, no resource estimate was applied to those sections where the drill holes were more than 100 meters apart.
  • The resource blocks were projected to a depth of 200 meters below the existing surface.  This depth is considered to be a practical depth for open pit mining.
  • The mineral zones outline the Simonson dolomite unit which is only partially included in the resource.
  • A figure of 2.84 tonnes per cubic meter, was used to calculate the tonnage.  This figure is listed as a standard S.G. for dolomite.
  • An external dilution factor of 10% was taken into account.  The grade of this dilution was given a value of 4.89% Mg.  This being the average grade of material adjacent to the resource blocks.  Some minor internal dilution was taken into the calculation where practical.  These were isolated instances where samples were missing or grades were just slightly below the cut off.
  • The cut off was arbitrarily set at 8% Mg.

The samples were collected and bagged on site and transported to ALS Chemex Laboratory in Sparks where sample preparation was completed.  The samples were then forwarded to the ALS Chemex Laboratory in N. Vancouver for analysis.  The analytical method used was ALS �s method ICP-ME61 which gives values in percentages of magnesium.  Check samples were completed internally by ALS.

The new NI 43-101 technical report will be filed with regulators on SEDAR within 45 days of this news release.

The local geology consists of beds of Guilmette Limestone, Pilot Shale, Joanna Limestone and Chainman Shales dipping moderately to the west with block faulting disrupting the beds so that dips may steepen or even dip to the east in some localities.  Within the Guilmette are beds of dolomite altered from the limestone which are referred to as the Simonson Dolomite unit.

The initial drilling program by Molycor Gold Corp. consisted of 24 Diamond drill holes 12 in the vicinity of the magnesium discovery and 12 in the vicinity of the manganese discovery.

A resource was calculated using the drill hole data as well as surface sampling conducted by N. Tribe & Associates Ltd.

Mineral Processing and Metallurgical Testing

The recovery of magnesium from dolomite ores generally involves dissolving the dolomite with acids (CI) and precipitating a magnesium oxide or magnesium chloride for further processing.

Magnesium metal can be produced by one of two processes.  The electrolytic process uses magnesium chloride produced from either magnesite, seawater or brines rich in magnesium chloride.  The silicothermic process mixes calcined dolomite or magnesite with ferrosilicon (a combination of iron and silicon metal) to produce a magnesium vapour which is then condensed in cooling vessels to form magnesium metal.  Both processes are energy intensive and require low-cost electricity to be competitive.

The Company engaged Teck Cominco Global Discovery Labs to analyze a 9 meter (30 foot) section of hole #TM-07-13, from 270 � 300 feet, for purity of the dolomite.  Hole #TM-07-13 averaged 11.4% Mg (18.6% MgO) over 164.4 meters (540 feet).  Results returned a high purity form of dolomite that is virtually identical with the National Bureau of Standards (�NBS�), �Standard 88B�.

These results indicate that the chemical composition of the Tami-Mosi dolomite is favourable for either of these recovery processes.

In order to provide a comparison of the grade at the Tami-Mosi with several producing magnesium mines throughout the world, the following table is provided:

 

COMPOSITION OF DOLOMITES (wt %)

Deposit

Mg (Low)

MgO (High)

CaO

FeO3 + A1203

SiO2

Mg

Sorford, Norway

 

21.20

30.40

0.10

1.30

12.72

Tochigi, Japan

 

17.40

35.10

0.50

0.15

10.44

Addy, Washington

20.00

21.80

31.50

 

1.50

13.08

Marignal, France

19.00

20.00

34.00

0.50

0.15

12.78

Haley, Canada

 

21.30

30.70

0.10

0.15

12.78

NBS �Standard 88B�

 

21.14

29.79

0.65

1.15

12.68

Tami-Mosi, Nevada

 

20.95

29.91

0.32

1.25

10.51

Drilling

N. Tribe & Associates Ltd. has detailed areas in the NI43-101 report for drilling programs to further develop the Tami-Mosi Magnesium resource.  The report recommends 3,300 meters of reverse circulation drilling in 13 drill holes.

Metallurgical Testing

N. Tribe & Associates Ltd. has recommended that the Company engage a recognized metallurgical laboratory to establish a recovery method, process and cost for producing magnesium metal.

About Magnesium

Magnesium is a widely used industrial metal categorized by its light weight.  The metal is produced in 2 ways: 1) electrolysing the brine in salt water; 2) smelting high grade ore.  The supply of magnesium has undergone dramatic change.  The production of the metal from source has almost ceased in Canada and the United States, only one company in Utah remains.  The Chinese now produce 7/8 of the world�s primary supply.  The total world production is estimated at approximately 800,000 metric tonnes (2008 USGS).  This distortion of the market has led to dumping charges and the incidence of an import duty in the United States; this dependence on virtually only one foreign source presents opportunity.  The price of magnesium is currently US$2,800 a metric tonne or US$1.20 lb (minor metals).  The metal has enjoyed a favourable price for decades and has reached $6,000/tonne in times of demand.

About Molycor Gold Corp.

Molycor is a diversified precious and base metal exploration and development company focusing on magnesium, molybdenum and gold exploration in North America.

This news release was reviewed by Norman L. Tribe, P.Eng, a qualified person under NI 43-101.

On Behalf of Management

Larry W. Reaugh
Chief Executive Officer

 

 

For all Molycor Gold Corp. investor relations needs, investors are asked to visit the Molycor Gold Corp. website at www.molycor.com.

Information Contact

Larry W. Reaugh

Chief Executive Officer

Head Office: 2A 15782 Marine Drive, White Rock, B.C.  V4B 1E6

Telephone: 604-531-9639    Facsimile: 604-531-9634
Email:
info@molycor.com

 

www.molycor.com

 

 

Cautionary Notice:  The Reader is cautioned that the full Cautionary Notice is not attached to this email.  The reader is requested to access the news release on the Company�s website at www.molycor.com or at SEDAR at www.sedar.com to read the full Cautionary Notice.  The full Cautionary Notice is not attached as the recipient�s spam filters frequently block receiving emails containing the full Cautionary Notice.

 

 

 



This message was sent from Pamela Astles to .com. It was sent from: The Reaugh Group, 2a 15782 Marine Drive, White Rock, BC V4B 1E6, Canada. You can modify/update your subscription via the link below.

Email Marketing by
iContact - Try It Free!


<
Data and Statistics for these countries : Canada | France | Japan | Norway | All
Gold and Silver Prices for these countries : Canada | France | Japan | Norway | All

Molycor Gold Corp.

PRODUCER
CODE : MOR.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Molycor Gold is a gold exploration company based in Canada.

Molycor Gold holds various exploration projects in Canada.

Its main asset in production is WINDPASS / SWEETHOME in Canada and its main exploration properties are GRIFFON, BEAVERDELL, DOBBIN I, DOBBIN II, SILVERADO, CROWREA, RIDGE TOP, TKO / HOT DOG RIDGE, FLAP, DAVIS, TAMI-MOSI and EMPRESS in Canada.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Molycor Gold Corp.
7/29/2009Size Makes A Difference - Going To See The Elephant -
Financings of Molycor Gold Corp.
2/24/2011 Closes $ 457,000 Private Placement
2/15/2011Private Placement Update
12/1/2010Closes $ 420 000 Private Placement With the MineralFields Gr...
6/22/2010Closing of its Private Placement
5/1/2010Amends Terms of Non-Brokered Private Placement
3/29/2010Non-Brokered Private Placement
9/10/2009Completes Private Placement
9/4/2009Private Placement Over-Subscribed
7/29/2009Announces Private Placement
11/6/2007Announces $600,000 Private Placement
5/7/2007$500,000 PRIVATE PLACEMENT FOR C
Option Grants of Molycor Gold Corp.
5/9/2008Incentive Stock Options
Project news of Molycor Gold Corp.
7/13/2011(Beaverdell)Drilling Program Completed on Beaverdell Silver Property
6/8/2011(Beaverdell)Phase I Drilling Commences on the Beaverdell Silver Property
4/14/2010(Tami-mosi)Review & Magnesium Exploration Plans
11/4/2009(Windpass)Good Gold Values at Windpass Property
9/10/2009(Windpass)Begins Drilling on Windpass Gold Property
7/27/2009(Windpass)New Gold Zone Identified at Windpass & Beaverdell Silver Pro...
7/23/2009(Tami-mosi)Receives Proposal For Magnesium Metallurgy (Tami-Mosi)
7/8/2009(Tami-mosi)43-101 - 236 Million Tonne Magne
6/2/2009(Davis)New Gold Mineralization Discovered on Davis Gold Property
3/3/2009(Empress)Plans 2009 Drilling on Gold Projects/2008 Company Review
11/24/2008(Davis)Drill Results on Davis Gold Property, Nevada
6/3/2008(Tami-mosi)Drilling Resumes on New Manganese/Magnesium Discoveries
5/16/2008(Empress)/Goldrea Resources - Drilling Resumes on Empress
3/14/2008(Tami-mosi)Magnesium Results Indicating Large Resource In Nevada
2/22/2008High Grade Manganese Discovery in Nevada
2/8/2008(Empress)Goldrea Resources Corp. and Molycor Gold Corp.: Diamond Dril...
1/29/2008(Davis) Assay Results and New Claims Added to the Davis Gold Proper...
11/7/2007Diamond Drilling Update - Crow-Rea West Empress
10/30/2007(Crowrea)Drilling Starts On Crowrea's Empress Molybdenum Property
9/24/2007(Crowrea)Crowrea Drill Results
Corporate news of Molycor Gold Corp.
3/6/2012We invite you to view the Critical Strategic Metals Report f...
2/15/2012to Present a Paper at SME Annual Convention
12/20/2011Corp's reconstructed website is now available
12/15/2011Smartstox Interview with President, Edward Lee and COO, Jame...
9/6/2011is Featured in Magnesium Monthly Review
5/31/2011Smartstox Interview with CEO Larry W. Reaugh & President Edw...
5/31/2011Expands Scope and Adds Additional Consultant to Complete Mag...
4/20/2011(Tami-mosi)Adds Two More Experts and Kemetco Research for Tami-Mosi
8/25/2009Completes The First Portion of Private Placement
7/29/2009Profiled in The Northern Miner
1/20/2009Tami Mosi Magnesium Dolomite Returns High Purity-Results fro...
8/22/2008Saskatchewan Coal Lease Applications: Renegotiatied Macklin ...
7/17/2008Resend with working links Acquires Saskatchewan Coal Permit ...
7/16/2008Acquires Saskatchewan Coal Permit Applications
2/4/2008 Enters Option Agreement
11/29/2007(Video) New Interview with Mr. Larry Reaugh
10/2/2007Drilling Update on Tami-Mosi Gold Property
8/22/2007Drilling Starts on Nevada Gold Property
7/27/2007$1,704,880.00 Financing Completed
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (MOR.V)FRANKFURT (M1V.F)
0.015+50.00%0.113+253.13%
TSX-V
CA$ 0.015
05/09 10:42 0.010
50%
Prev close Open
0.010 0.015
Low High
0.015 0.015
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.015 -%
Volume 1 month var.
52,000 -%
24hGold TrendPower© : 36
Produces Gold
Develops
Explores for Copper - Gold - Lead - Magnesium - Molybdenum - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/30/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.48-0.80%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.55+0.79%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.63-0.75%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.35-2.35%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.26+4.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22-6.52%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.83+5.17%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.42-1.48%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :