VMS Ventures Inc.

Published : January 29th, 2008

6 HOLES INTERSECT NEAR SOLID SULPHIDES; ASSAY RESULTS FOR TWO AT REED LAKE, MANITOBA DISCOVERY ZONE

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

 

 

 

 




6 HOLES INTERSECT NEAR SOLID SULPHIDES; ASSAY RESULTS FOR TWO AT REED LAKE, MANITOBA DISCOVERY ZONE

Vancouver, B.C. January 29, 2008. VMS Ventures Inc. (TSX.V: VMS) (the "Company") is pleased to report assay results and an update on the progress of its ongoing drill program at the Reed Project Discovery Zone near Snow Lake, Manitoba.

 

Highlights:

 

Hole RD 07 07: ������ 26.27m (86.19 feet) of 1.0% Cu & 4.48% Zn

 

����� - Including 2.03 m of 4.06% Cu & 3.8 m of 10.75% Zn

�������������������������

Hole RD 07 10:������� 43.08m (141.34 feet) of 0.72% Cu & 4.27% Zn

 

������ -Including 10.26m of 8.26% Zn

������������������������

Hole RD 07 12: ������ 32.73m (107.38 feet) of Near Solid Sulphide, Assays Pending

�������������������������

Hole RD 08 14: ������ 31.39m (102.99 feet) of Near Solid Sulphide, Assays Pending

 

Hole RD 08 20: ������ 48.39m (158.73 feet) of Near Solid Sulphide, Assays Pending

 

Vice-President of Exploration, Dr. George Gale states "We are very encouraged by the initial follow-up results to the discovery hole announced in October, 2007. We have intersected additional mineralization with similar lengths and values typical of those in operating mines in the area. We have intersections of Near Solid Sulphides at depths as shallow as 30m and as deep as 170m from surface. Preliminary Deep EM results also suggest that the deposit is open at depth. Drill results to date indicate a near vertical dip to the mineralization."

 

Hole #

From

(m)

To

(m)

Int

(m)

Cu

%

Zn

%

Ag

g/tn

Au

g/tn

PULSE

EM

Off Hole

Conductor

RD07-07

123.43

150.10

26.27

1.00

4.48

12.34

0.81

 

 

Inc

127.10

130.90

3.80

0.70

10.75

8.86

0.53

 

 

Inc

134.76

136.24

1.48

3.84

1.88

43.92

1.86

 

 

Inc

141.00

143.03

2.03

4.06

2.30

31.73

1.41

 

 

Inc

143.03

149.54

6.51

0.35

4.38

4.37

0.37

 

 

RD07-08

 

 

NSI

 

 

 

 

Surveyed

YES

RD07-09

 

 

NSI

 

 

 

 

Surveyed

YES

RD07-10

98.28

141.36

43.08

0.72

4.27

9.39

0.62

 

 

Inc

100.23

110.49

10.26

0.68

8.26

14.74

0.52

 

 

Inc

124.05

129.75

5.70

0.27

4.26

3.61

0.07

 

 

RD07-11

 

 

NSI

 

 

 

 

 

 

RD07-12**

172.21

204.94

32.73

 

 

 

 

 

 

RD07-13

 

 

NSI

 

 

 

 

 

 

RD08-14**

70.79

102.18

31.39

 

 

 

 

 

 

RD08-15

 

 

NSI

 

 

 

 

 

 

RD08-16**

63.44

66.46

3.02

 

 

 

 

 

 

RD08-17

 

 

NSI

 

 

 

 

 

 

RD08-18

 

 

NSI

 

 

 

 

 

 

RD08-19

 

 

IP

 

 

 

 

 

 

RD08-20**

41.61

90.00

48.39

 

 

 

 

 

 


    ** = Near Solid Sulphide intercept (assays pending)

    NSI = no significant interval; IP = in progress

 

 

The analysis of the Discovery Zone continues with the following activities, all designed to assist in defining the deposit as quickly and efficiently as possible:

 


UPCOMING DRILL TARGETS:

 

The two drills operating on the discovery zone will continue to test the mineralization on 25m spaced sections to confirm the strike, dip and extent of the body and to explore for additional sulphide lenses. In addition, A third drill has been mobilized onto the Tower Zone area, located approximately 1 km east of the discovery zone, where alteration and minor mineralization typical of VMS deposits were intersected in the summer program in holes RD 07 04, RD 07 05 and RD 07 06.

 

DOWN-HOLE PROBE/PULSE EM

 

Down-hole PULSE EM surveys of holes RD07-08 and RD07-09, (which did not intersect near solid sulphides) indicate the presence of strong off-hole conductors. Late time channel responses, indicative of good conductivity, show off-hole responses near the end of the boreholes. The geophysical responses of the borehole EM surveys are complex and show that extensive conductivity is located near the boreholes. The off-hole anomalies will be tested in this drill program. The Company has left the casing in each completed drill hole and plans to probe a number of these holes when the system returns to the property, anticipated for mid-February.��

 


DEEP EM SURVEY

 

In anticipation of drill testing deeper targets, the Company contracted to utilize a Deep EM ground survey which is capable of detecting more subtle and deeper targets than the VTEM airborne survey. Four lines of a planned twenty-two line ground DEEPEM survey have been completed. The survey is estimated to detect conductive bodies to a depth of at least 300m. The initial four lines of the DEEPEM survey, though only covering 300 meters of the earlier identified 800 meter long VTEM airborne anomaly, indicates a southerly plunging and strongly conductive body. Further drilling will be required to confirm this interpretation.��

 


HLEM SURVEY

Due to the fact that mineralization has been intersected within 30m of surface (hole RD 08 20), a Horizontal Loop EM survey is being sourced to accurately delineate the near surface portion of the deposit. These deposits often occur as multiple sheets, so the HLEM survey will help to identify the presence of additional mineralized lenses near the surface in the area surrounding the discovery. 

 

VTEM SURVEY

 

Geotech is currently flying the southern portions of the Reed Property which were not surveyed in the spring 2007 program. As part of this survey, the area surrounding the discovery is being flown in a north-south orientation to provide greater definition to the original VTEM anomalies.

 

Location of holes drilled on the Reed Project Discovery Zone:

 

HOLE ID

NORTH

EAST

LENGTH

DIP

AZ

RO-07-01

6048741

393926

250.00

-50

325

RO-07-02

6048735

394004

300.00

-45

340

RO-07-03

6048922

393959

200.00

-70

160

RO-07-07

6048759

393998

200.00

-45

340

RD-07-08

6048748

394046

335.00

-45

340

RD-07-09

6048703

394014

329.00

-45

300

RD-07-10

6048784

394005

225.00

-45

340

RD-07-11

6048787

393946

277.00

-45

340

RD-07-12

6048752

393988

284.00

-45

340

RD-07-13

6048784

394061

303.73

-60

340

RD-08-14

6048787

393946

309.98

-45

25

RD-08-15

6048709

394041

316.99

-45

340

RD-08-16

6048787

393946

267.31

-45

45

RD-08-17

6048814

393997

128.00

-45

45

RD-08-18

6048839

393955

111.86

-45

45

RD-08-19

6048814

393997

������� IP

-60

45

RD-08-20

6048817

393940

151.48

-45

45

 

Dr Gale summarizes "Although we are still in the very early stages of delineating this deposit, we are encouraged to find that we have similar textures and compositions to the deposits of the Snow Lake camp. And while it is well known that these deposits are fractured and faulted and difficult to follow, I am impressed by the number of significant intercepts we have been able to discover so far. The challenge now is to maintain momentum, especially in the harsh winter conditions of northern Manitoba. I'm confident our team can meet that challenge. "

 

VMS Ventures Inc. is focused primarily on acquiring, exploring and developing copper-zinc properties in the Flin Flon-Snow Lake VMS Belt. The Company also holds the largest land package considered prospective for nickel-copper mineralization at Lynn Lake, which is to date Canada's third largest nickel producing camp. The Company's project portfolio consists of the Snow Lake VMS project, the Lynn Lake Gabbros nickel-copper project, the Nickel Belt project, the South Bay nickel-copper-cobalt PGE property, and the Eden Lake Carbonatite Complex, Specialty Metals property. All VMS Ventures Inc. properties are located in the mining friendly province of Manitoba, Canada.


ON BEHALF OF THE BOARD OF DIRECTORS

 


John
Roozendaal
B.Sc.

President & Director


 


For further information, Phone (604) 986-2020 or Toll Free 866 816 0118
 or visit our website www.vmsventures.com


The TSX Venture Exchange has not reviewed and does not accept responsibility
for the adequacy or accuracy of this news release.

 


 

 

 

 

VMS Ventures Inc.

EXPLORATION STAGE
CODE : VMS.V
ISIN : CA91828R1091
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

VMS Ventures is a zinc and gold exploration company based in Canada.

VMS Ventures holds various exploration projects in Canada.

Its main exploration properties are REED LAKE, LYNN LAKE GABBROS, PUELLA BAY and COVER in Canada.

VMS Ventures is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 13.9 millions as of today (US$ 11.1 millions, € 9.7 millions).

Its stock quote reached its highest recent level on December 31, 2007 at CA$ 1.76, and its lowest recent point on January 22, 2016 at CA$ 0.05.

VMS Ventures has 146 480 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of VMS Ventures Inc.
3/5/2011VMS Ventures – Focused on Discovery
Financings of VMS Ventures Inc.
11/9/2007ANNOUNCES COMPLETION OF A PRIVATE PLACEMENT
Nominations of VMS Ventures Inc.
7/5/2011Appoints John Pattison Chief Geologist
Project news of VMS Ventures Inc.
1/20/2014Provides Reed Mine December Update
9/23/2013Canada's Next Copper Mine
9/18/2013Reed on plan; exploration stock cycles
8/21/2013(Copper Project)Reed Copper Project Update
7/24/2013(Copper Project)Reed Copper Project Update/New VMS website
7/24/2013(Copper Project)s Progress at the Reed Copper Project
5/24/2013(Copper Project)APRIL AT REED COPPER PROJECT; PRODUCTION EXPECTED IN Q4/13
2/15/2013Reed Mine Tour Pictures
1/31/2013CONTRACTS WESTCORE DRILLING FOR 2013 WINTER DRILL PROGRAM
11/9/2012Global Copper Production Under Stress
10/31/2012Reed Copper Mine Update; Winter Drilling Budget Set
10/31/2012(Copper Project)s the Reed Copper Project Which Remains Within Budget and on...
9/18/2012ANNOUNCES TRENCHING RESULTS AND SURFACE TDEM SURVEY ON ITS S...
9/13/2012(Copper Project)Provides Update on Reed Copper Project in Manitoba
8/21/2012(Copper Project)Reed Copper Project
8/14/2012and Hudbay Break Ground at New Copper Mine in Manitoba
7/19/2012(Copper Project)S PROGRESS AT THE REED COPPER PROJECT NEAR SNOW LAKE, MANITO...
6/21/2012ACQUIRES LARGE LAND PACKAGE ADJACENT TO THE REED COPPER MINE...
5/16/2012(Reed Lake)FILES PREFEASIBILITY STUDY FOR THE REED LAKE DEPOSIT, NEAR S...
5/10/2012Harvest Gold Signs Letter of Intent(LOI) on Esker Project in...
5/10/2012VMS Ventures Updates Progress on the Development of the Reed...
4/26/2012and the Reed Deposit
4/25/2012(Copper Project)REED COPPER PROJECT AND REED NORTH AREA EXPLORATION UPDATE, ...
4/3/2012(Copper Project)Reed Copper Project Positive Pre-Feasibility Study Completed
2/22/2012100% Owned Cowan River Project Drilling begins
2/15/2012Drills 8.90 Metres of 1.00 g/t Gold/NAN PowerPoint
2/6/2012HudBay CEO on Production at Reed and Copper Demand
10/27/2011Introduces Exploration Programs for its Sudbury, Ontario Pro...
7/28/2011INTERSECTS SECOND COPPER OCCURANCE AT COWAN RIVER, SNOW LAKE...
6/8/2011(Sails)Drills 13=2E41 Metres of 1=2E48 g/t Go =?ISO-8859-1?Q?ld=20a...
5/13/2011(Reed Lake)FILES NI 43-101 MINERAL RESOURCE FOR THE REED LAKE DEPOSIT A...
4/20/2011(Cover)Reports on Two Additional Holes at Its Cowan River Copper-Zi...
4/13/2011(Cover)Discovers High Grade Copper Zone Near Surface: 9.81% Copper ...
4/1/2011(Reed Lake)Announces NI 43-101 Mineral Resource for the Reed Lake Depos...
3/22/2011s Progress With Ongoing Exploration Programs on Its 100% Own...
3/17/2011(Reed Lake)Reports 50.08 Metres of 6.85% Copper in Hole RLD030 at Reed ...
2/23/2011(Reed Lake)Reports 37.10 Metres of 5.60% Copper From In-Fill Hole RLD02...
3/10/2008(Reed Lake)Rising on Reed Lake Results
1/29/2008(Reed Lake)6 HOLES INTERSECT NEAR SOLID SULPHIDES; ASSAY RESULTS FOR TW...
10/27/2007(Reed Lake) DISCOVERY EXTENDED, DRILL EQUIPMENT ARRIVES ON REED LAKE PR...
10/16/2007(Reed Lake)2ND DRILL PROGRAM PLANNED AT REED LAKE DISCOVERY ZONE, SNOW ...
10/5/2007(Reed Lake)10.50 METRES of 11.19% COPPER WITHIN 43.05 METRES OF 4.38% C...
9/18/2007(Reed Lake)EXPLORATION UPDATE AT REED LAKE PROPERTY, MANITOBA
8/9/2007(Reed Lake)ANNOUNCES PROPERTY AGREEMENT DEAL WITH HUDBAY MINERALS INC.
Corporate news of VMS Ventures Inc.
4/27/2016Vms Announces Completion of Plan of Arrangement
4/25/2016VMS Announces Shareholder Approval for Plan of Arrangement
4/1/2016VMS Reports Update on Reserves and Resources at Reed Mine
3/31/2016VMS Files Materials in Connection with Special Meeting of Sh...
2/1/2016VMS Ventures Announces Plan of Arrangement With Royal Nickel
11/4/2015VMS Ventures Announces Drill Program Update on Exploration T...
11/2/2015VMS Considers Strategic Options
9/9/2015VMS Ventures Adopts Fixed Option Plan
7/28/2015VMS Ventures Inc. Patrick Evans and Blair Schultz Join VMS B...
4/15/2015VMS Provides Reed Mine Operations Update
4/15/2015Provides Reed Mine Operations Update
4/10/2015VMS Announces Closing of Acquisition of Assean Lake Claims
4/10/2015Announces Closing of Acquisition of Assean Lake Claims
4/1/2015VMS Reports Update on Reserves and Resources at Reed Mine
4/1/2015Reports Update on Reserves and Resources at Reed Mine
3/19/2015Provides Reed Mine Operations Update
3/19/2015VMS Provides Reed Mine Operations Update
2/25/2015VMS Provides Reed Mine Operations Update
2/25/2015VMS Provides Reed Mine Operations Update
2/18/2015VMS ANNOUNCES ACQUISITION OF ASSEAN LAKE CLAIMS
1/22/2015VMS Provides Reed Mine Operations Update
12/18/2014VMS Provides Reed Mine Update
12/18/2014VMS Provides Reed Mine Update
12/3/2014VMS Provides Reed Mine Update
12/3/2014VMS Provides Reed Mine Update
11/24/2014VMS Announces Approval and Adoption of Shareholder Rights Pl...
11/24/2014VMS Announces Approval and Adoption of Shareholder Rights Pl...
11/19/2014VMS Announces Third Quarter Reed Mine Financial Performance
11/19/2014VMS Announces Third Quarter Reed Mine Financial Performance
10/30/2014VMS Provides Reed Mine Update
10/30/2014VMS Provides Reed Mine Update
8/26/2014VMS Appoints Two New Directors to Its Board
7/11/2014VMS Ventures Grants Incentive Stock Options
6/24/2014VMS Reports Reed Mine Update
6/17/2014VMS Ventures Announces Management Changes
6/5/2014VMS Ventures Completes Ore Sales and Purchase Agreement With...
5/29/2014VMS Ventures Inc.: North American Nickel Inc. Closes $9.38M ...
2/13/2014Announces Annual Meeting, Record Date and Adopts Advance Not...
11/13/2013Ahead of the Herd: Copper Catch Up
11/1/2013Provides Update on Reed Mine
10/23/2013(Cover)North American Nickel Discovers High Grade Nickel Sulphide M...
10/10/2013High Grade Nickel-Copper-Cobalt Sulphides Confirmed at Imiak...
10/1/2013(Copper Project)Reed Copper Project Commences Initial Production
9/30/2013Dr. Tony Naldrett, Internationally Acclaimed Expert on Magma...
9/12/2013Mid=2DDay Breaking News From VMS Ventures=2C Freegold=2C Nat...
9/10/2013Base Metals and Bulk Commodities - TOP 10 Reasons the Next U...
8/15/2013(Cover)Media Coverage
7/15/2013North American Nickel Acquiring Additional Ground at the Man...
7/15/2013North American Nickel Acquiring Additional Ground at the Man...
7/15/2013North American Nickel Acquiring Additional Ground at the Man...
6/17/2013ROCK TALK WITH RICK MARK AND NEIL RICHARDSON/PODCAST #5 WITH...
6/11/2013(Cover)Potential for High Nickel Recoveries at Imiak and Spotty Hil...
6/6/2013Mining matters to us all
6/4/2013Jaclyn Ruptash Joins NSMG Team
5/30/2013Ahead of the Herd - Riding A Copper Horse
5/24/2013(Copper Project)s Progress in April at the Reed Copper Project; Production E...
5/16/2013/NAN 2013 Podcast Series: Introduction to John Roozendaal
5/8/2013Introduction to Neil Richardson, COO of VMS and NAN
5/1/2013s 2013 Winter Drill Programs, Snow Lake, Manitoba and Sudbur...
4/25/2013and North American Nickel Inc. in the Metals Report
4/24/2013/North American Nickel Podcast Series
4/22/2013Exercises Full Right of First Refusal Allocation in North Am...
4/11/2013(Copper Project)REED COPPER PROJECT ON TIME/BUDGET FOR Q4 PRODUCTION
3/26/2013(Cover)Media Coverage
2/5/2013Kevin Puil: $4/lb Copper Is on Its Way
1/17/2013Finalizes Upcoming 2013 Winter Drill Program on Its 100% Own...
1/17/2013Finalizes Upcoming 2013 Winter Drill Program on Its 100% Own...
1/9/2013(Copper Project)REED COPPER PROJECT: CONSTRUCTION ON SCHEDULE
11/6/2012Dundee Capital Markets: HudBay Minerals Inc. - three mines u...
10/23/2012Announces Reed Exploration Properties Joint Venture With Hud...
10/16/2012Copper Price Rising?
6/7/2012Files Statement of Defense
5/9/2012Media and Social Media exposure
5/3/2012The TSX Venture is Trading at the Same Level it Did Nearly 9...
4/27/2012Announces Filing of Statement of Claim in Manitoba
4/27/2012Letter to Shareholders Regarding the Dunlop Legal Claim
2/23/2012(Cover)and Media Coverage
2/16/2012Secutor Capital Management Reports on VMS Ventures Inc.
2/8/2012(Sails)Trenching Program Returns Assays of Up To 61.73 g/t Gold at ...
1/31/2012Copper Continues to Confound the Commodities Crowd
1/30/2012Dundee Rates VMS a BUY
1/24/2012Mentioned in The Gold Report, January 18, 2012
1/18/2012Provides Exploration Target Update at the Reed Copper Deposi...
12/20/2011Merry Christmas from the North Shore Mining Group of Compani...
12/19/2011Reed Mine Decision Made/New Geophysical Targets at Reed Copp...
10/25/2011COO,Neil Richardson, is interviewed
9/20/2011ENGAGES HUASHAN CAPITAL TO PROVIDE ADVISORY SERVICES IN ASIA
8/18/2011(Copper Project)Intersects 1.61 Metres Grading 2.13 G/T Gold in Hole CP-11-0...
8/9/2011REPORTS 5.94% COPPER OVER 2.23 METRES IN DRILL HOLE RLE007 F...
7/7/2011Reports HudBay Minerals Completes Exploration Expenditures f...
5/19/2011Commodity Bulls speak; NAN close to trading
5/17/20117=2E44% Copper Over 7=2E18 Metres in Hole RLE006 Located 1=2...
5/9/2011s Progress on its 2011 Exploration Programs in the Flin Flon...
4/27/2011(Copper Project)Discovers Massive Sulphide Horizon With Zinc-Silver-Gold Min...
4/20/2011(Cover)Reports on Two Additional Holes =?ISO-8859-1?Q?=20at=20Its=2...
4/7/2011Al O'Grady interviews Rick Mark
3/17/2011Reports 50=2E08 Metres of 6=2E85% Copp =?ISO-8859-1?Q?er=20i...
2/23/2011(Reed Lake)Reports 37=2E10 Metres of 5=2E60% Copper from In-Fill Hole R...
2/18/2011HudBay Minerals Acquires 6,667,000 Shares of VMS Ventures In...
5/14/2009Discusses exploration strategy and project plans through 201...
2/28/2009(Video) NEW INTERVIEW WITH CEO CLIPS
6/12/2008Proposes to Spin Off Nickel Assets
4/9/2008Discovery Zone Page Launched on VMS Website
2/27/2008Don Coxe's, "The Music of the Metal Markets"
2/19/2008-Holes RD 08-25, RD 08-26 and RD 08-30-30 Intersect Near Sol...
2/8/2008Stock Market Volatility
12/14/2007Additional Information about a VMS Opportunity
11/10/2007(Audio) Interview with President John Roozendaal
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (VMS.V)FRANKFURT (R4E.F)
0.095-5.00%0.018-21.74%
TSX-V
CA$ 0.095
10/12 13:37 -0.010
-5%
Prev close Open
0.100 0.095
Low High
0.095 0.100
Year l/h YTD var.
0.090 -  0.190 -36.67%
52 week l/h 52 week var.
0.090 -  0.190 -%
Volume 1 month var.
32,000 -%
24hGold TrendPower© : 34
Produces
Develops
Explores for Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2023-36.67%0.190.09
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.62-0.13%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 7.27-0.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.67+6.35%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+30.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.13-0.47%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 9.41-3.59%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.22+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.24-2.04%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.44-4.64%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 46.69-0.13%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.02+0.00%Trend Power :