30 January 2009

ASX:WVL

 

ACTIVITIES REPORT

Quarter Ended 31 December 2008

 

 

 

PROJECT DEVELOPMENT

 

 

Construction and Procurement

The Company continues to progress construction of the Windimurra vanadium project.

 

GR Engineering Services (?GRES?) has been engaged to manage construction activities for the site and to support the Windimurra project team.  GRES has seconded key personnel to the project, including the Project Manager. GRES along with its Managing Director, Joe Ricciardo, has a good reputation for the delivery of construction projects.

 

GRES undertook a review of the project schedule and costs in December 2008. The review indicates the project will be progressively commissioned from January 2009, but that schedule slippage in the Vanadium Refinery will result in production ramp-up commencing towards the end of the second quarter of 2009. The project remains on track with this revised schedule.

 

 

At the end of the year all critical equipment items had been delivered to site and more than 350 people were engaged in construction activities. Fabrication of structural steel, piping and platework was essentially complete with a few remaining items due for delivery in January 2009.

 

Apart from the Vanadium Refinery, all aspects of the project are expected to be mechanically complete before the end of the first quarter 2009. These include:

?                borefield ? completed;

?                gas delivery system - completed;

?                crushing and screening plant ? completed;

?                power station ? substantially complete; and

?                magnetite beneficiation plant ? substantially complete.

 

Key milestones going forward are:

?                power station commissioning ? February 2009;

?                ore crushing ? February/March 2009. The crushing and screening plant has been dry commissioned, but requires the power station to be commissioned to enable ore crushing;

?                magnetite beneficiation ? March 2009. Dry commissioning of the beneficiation plant will commence before this date but the tailings storage facility is required to be completed before ore processing can commence; and

?                vanadium processing ? May 2009. Additional construction labour and supervision has been applied to the Vanadium Refinery in order to advance construction as rapidly as possible. By way of example, numbers in the key disciplines of piping and electrical installation have doubled relative to their levels in late 2008.

 

A significant milestone for the project was the commencement of mining in November 2008. Mining activities include development of the pit and building Run-of-Mine (?ROM?) stockpiles to enable the delivery of the optimal ore blend from the start of commissioning of the plant.

 

At the end of the quarter, 73% of the forecast capital cost at completion had been spent compared to 59% at the end of the September 2008 quarter.

 

 

Operational Readiness

In the lead-up to production, the Company has appointed most senior operational roles, with personnel actively engaged in operational readiness planning.  It is anticipated that during operations up to 200 people will be employed by Windimurra either directly or through our contractors.

 

Commissioning plans are well advanced, with pre-commissioning and wet commissioning activities integrated into the construction schedule. 

 

Business systems and processes required for operations are under development.

 

The majority of service and supply contracts are in place and those yet to be signed are now in the final stages of negotiation.  Reagent deliveries will commence in January 2009 with the first consignment of soda ash shipped from Penrice in South Australia to the Port of Geraldton.

 

 

MINERAL RESOURCES AND ORE RESERVES

 

 

2008 has seen a significant improvement in the understanding of the geological controls on mineralisation and metallurgical response of the Windimurra orebody. The drill programs conducted through the year have resulted in a significant increase in the mineral resource and ore reserve. The following drilling programs were completed during 2008.

 

Table 1 ? Drill Programs ? 2008

Drill Type

No of Holes

Metres

Month Drilled

Location & Reason

RC

42

4,959

February

Central Area - infill & depth extensions

Diamond

4

673

July

North & Central Areas - geotechnical & depth extensions

RC

7

977

November

Northern Area - infill in DOIR approved start-up cutback

Total

 53

6,609

 

 

 

This exploration has enabled the mineral resource base to be extended below the 2007, 90m vertical depth, to 150m in the Central area.  It has also quantified the geotechnical and metallurgical inputs required to define the ore reserves from a deeper pit. These designs will increase the proportion of higher recoverable magnetite mill feed.

 

The revised mineral resource statement shows a 19% increase in total tonnes compared to that reported in 2007, with a significant improvement in the measured component, resulting in a 20% increase in total contained vanadium metal.

 

Table 2 - Mineral Resources ? December 2008

Category

Tonnes (Mt)

V205 (%)

V (%)

V (tonnes)

Measured

46.68

0.48

0.27

126,000

Indicated

70.73

0.47

0.26

183,900

Inferred

59.18

0.44

0.25

148,000

Total

176.59

0.46

0.26

457,000

 

 

 

 

 

 

 

 

 

A pit optimisation, mine design and mine schedule exercise was undertaken resulting in a significant improvement in the ore reserve base, with the central core of the defined ore reserve base extending down to a depth of 150m .. This resulted in an improvement of the global ore reserve tonnage status by 24% and a mine life extended out to 25 years at four million tonnes per annum ore feed.

 

The ore reserve study was compiled by the company and independently reviewed by Cube Consulting, as the competent persons.

 


Table 3 - Ore Reserves ? December 2008

Classification

Unit

Central Pit

North Pit

South Pit

Combined

Probable

Ore

Mt

11.3

16.6

29.2

57.1

V2O5

%

0.47

0.47

0.48

0.47

Proven

Ore

Mt

36.2

2.8

1.7

40.7

V2O5

%

0.48

0.44

0.49

0.47

Total

Ore

Mt

47.5

19.4

30.9

97.8

V2O5

%

0.47

0.46

0.48

0.47

 

There exist two listed cultural heritage sites within the expanded ?life of mine? designs. These heritage sites had been approved for removal by the previous operators of the mine. Given that the sites were previously approved for removal and have since been salvaged, the Company is confident of reaching agreement with the relevant authorities to re-establish the approvals.

 

 

FINANCING

 

 

The Company is in negotiation with its key stakeholders for a significant amount of funding, and a draft term sheet has been prepared and provided to them.  As at the date of this release, discussions between the parties were ongoing but no firm commitment to funding had been received by the Company.  The final amount of the capital raising has yet to be determined.

 

The Company has taken a number of measures to conserve cash. These include a hiring freeze, staff reductions and approaches to key contractors to renegotiate terms. All items of construction and operating expenditure have been reviewed. In addition, the rate of production ramp-up to nameplate capacity has been examined by an independent expert to ensure that working capital requirements are minimised.

 

The Company had $71 million in cash at the end of December 2008. 

 

 

MARKETING

 

 

The reduction in steel demand flowing from the global financial crisis has resulted in reduced demand for vanadium.  The vanadium prices have halved from the historically high levels they traded at in 2008. However, relative to several other ferroalloys, vanadium prices have been less affected by the market conditions. The recent decline in the A$:US$ exchange rate has reduced the impact of the decline in US$ denominated vanadium prices, relative to 2007 when  the investment decision on the project was made..

 

 

 

 

Vanadium supply and demand both decreased in the fourth quarter of 2008 and prompt steel production cuts by vanadium co-producers have assisted to stabilise prices at current levels by reducing the supply of vanadium co-produced in slags.

 

The spot vanadium price is being determined by small volume sales. This could lead to some volatility in the short term until consumers have exhausted site inventories and recommence buying at rates matched to production.

 

The Company has reviewed recent economic forecasts from a number of sources. These forecasts reflect steel demand starting to recover in the second quarter of 2009 in Brazil, Russia, India and China and later in the year for developed countries.  Vanadium demand recovery is forecast to commence in association with the recovery in the steel market. Windimurra will not be selling vanadium until the second half of 2009 when the recovery in demand is forecast to have commenced.

 

The consensus of the forecasters is a prediction for strong steel demand growth in 2010/2011 coinciding with the period when Windimurra production ramps up. New vanadium supply sources during the next few years are expected to be constrained by the current difficulties in capital markets.  Vanadium pricing is expected to respond to the supply/demand conditions.

 

 

WINDIMURRA VANADIUM LIMITED                                  

30 January 2009

 

 

 

For further enquiries call:

 

Dr Iain Scott                                                                          Warrick Hazeldine

Managing Director                                                                   Purple Communications

Tel: +61 (0) 8 9423 1900                                                        Tel +61 (0) 89485 1254

                                                                                                0417 944 616

 

Garry Korte

Finance Director

Tel: +61 (0) 8 9423 1900

 

 

COMPETENCY STATEMENT

 

Colin Arthur ? Mineral Resources

The information in this report that relates to exploration activities and mineral resources is based on information compiled by Colin Arthur, who is a Chartered Geologist, Member of The Australasian Institute of Mining and Metallurgy and Fellow of the Geology Society of London. Colin Arthur is a full-time employee of MidWest Vanadium Pty Ltd, (a 90% owned operating subsidiary of Windimurra Vanadium Ltd) in the capacity of Chief Mine Geologist. Colin Arthur has over eighteen years experience in this style of mineralisation and the type of deposit under consideration and related mining method and project evaluation. He has sufficient experience which is relevant to the style of mineralization and to the activity which he is undertaking. He is therefore qualified as a Competent Person as defined in the 2004 Edition of the ?Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves?. Colin Arthur consents to the inclusion in the report of the matters, based on his information in the form and context in which it appears.

 

Scott Jackson ? Mineral Resources

Scott Jackson, Director and Principal Consultant of Quantitative Group (?QG?), has reviewed the June 2008 Windimurra resource estimate and considers it likely to be free of material error. These conclusions come from undertaking a site visit, reviewing the new geological model, a limited review of the data, independent checks on the parameters used in estimation followed by model validation and discussions with Windimurra on resource classification. QG consider the estimation methodology chosen and subsequent implementation to be robust and appropriate. There are three significant changes from the last estimate: i) additional drilling giving greater confidence in the estimate ii) a new geological interpretation that differentiates several ?bands? of waste material in the main ore zone and iii) additional SG data. QG recommends continuing collection of SG data as part of the grade control practices to further confirm the validity of those used in the current estimate.

 

Quinton de Klerk ? Ore Reserves

Information in this report that relates to Ore Reserves has been compiled under the guidance of Quinton de Klerk, Director and Principal Consultant at Cube Consulting Pty Ltd (CUBE).  Quinton de Klerk is a Member of the Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the activity which he is reporting on as a Competent Person as defined in the 2004 Edition of the ?Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves?. Mr de Klerk attended a visit to the Windimurra Mine site in September 2008. Mr de Klerk consents to the inclusion in the report of the matters based on the information compiled by him, in the form and context in which it appears.

 

***

The new Spam Act commenced on 10 April 2004. This Act is aimed at reducing the amount of unauthorised emails you receive. You have been receiving e-mails

containing information and news releases from us on behalf of our clients because you are an important contact of Purple Communications, a boutique stakeholder

communications consultancy. If you do not wish to receive such emails from Purple, please click mailto: purple@purplecom.com.au subject=UNSUBSCRIBE or

reply to this email and put UNSUBSCRIBE in the subject line and we will not email you again.

 

If you do not reply, we will continue sending you relevant news and information via email. However, all future emails will allow you to unsubscribe.

Issued by

 

Purple Communications

Level 3, 28 Kings Park Road, WEST PERTH WA 6005

Ph: 08 6314 6300 Fax: 08 6314 6355

purple@purplecom.com.au

 

 

 

 



Message protected by MailGuard: e-mail anti-virus, anti-spam and content filtering.
http://www.mailguard.com.au/mg
 
 
<
Data and Statistics for these countries : Australia | Brazil | China | India | Russia | All
Gold and Silver Prices for these countries : Australia | Brazil | China | India | Russia | All

Atlantic Limited

CODE : ATI.AX
ISIN : AU000000ATI6
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Atlantic Ltd is a vanadium exploration company based in .

Atlantic Ltd is listed in Australia. Its market capitalisation is AU$ 27.1 millions as of today (US$ 20.4 millions, € 18.3 millions).

Its stock quote reached its highest recent level on April 15, 2011 at AU$ 2.45, and its lowest recent point on May 03, 2013 at AU$ 0.12.

Atlantic Ltd has 154 760 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Nominations of Atlantic Limited
10/2/2007APPOINTS MERRILL LYNCH FOR DEBT FINANCING
Project news of Atlantic Limited
1/4/2008(Windimurra Project)PROJECT UPDATE
12/31/2007(Windimurra Project)2007 Technical report
12/31/2007(Windimurra Project)Key Of Life Mine Plan Parameters
10/29/2007(Windimurra Project)SECURES GAS SUPPLY
5/29/2007(Windimurra Project)Secures Windimurra Gas Supply
Corporate news of Atlantic Limited
8/12/2015Officials feud over potential new Atlantic City tax receipts
1/30/2015Quarterly Cashflow Report
1/30/2015Quarterly Activities Report
1/16/2015Successful Consent Vote - Forbearance to 16 Jan 2015
12/22/2014Monthly Production and Sales Report
12/22/2014Extension of Forbearance Period
12/15/2014Successful Consent Solicitation Vote
11/19/2014Monthly Production and Sales Report
10/31/2014Quarterly Activities Report
10/31/2014Quarterly Cashflow Report
10/20/2014Design and Construct Tender Award
3/25/2014Grant of Waiver from ASX Listing Rule 10.1
3/21/2014Monthly Production and Sales Report
3/18/2014Initial Director's Interest Notice
3/18/2014Final Director's Interest Notice
3/10/2014Atlantic Secures New Funding Facility
2/27/2014Corporate Update
2/21/2014Standard and Poors Rating Review
2/19/2014New $32.6 Million Funding Facility
2/18/2014Corporate Update
1/30/2009Activities Report Quarter Ended 31 December 2008
7/16/2008Construction on Schedule for Completion in Q4 2008
4/23/2008Construction on Schedule for Completion in 2008
3/28/2008raises $25.2m through share placement
1/14/2008SECURES US$127.5M DEBT FUNDING
1/4/2008Resignation of Roderick Smith as a Director
10/26/2007 RECEIVES ENVIRONMENTAL APPROVALS
10/16/2007 CHANGES NAME
10/9/2007PRECIOUS METALS (ASX:PMA) PMA CONCLUDES MAJOR DEVELOPMENT CO...
6/27/2007FOUNDING DIRECTORS IN SHARE SALE DISCUSSIONS
6/21/2007Board and Management Changes
4/30/2007Activity Report
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (ATI.AX)
0.175+0.00%
AUSTRALIA
AU$ 0.175
03/24 02:36 -
0%
Prev close Open
0.175 0.175
Low High
0.175 0.175
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.175 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -37
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 7/21/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72+0.72%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.76+3.66%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.63-3.35%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.50+2.46%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.80+0.84%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.04%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22-2.27%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 2.59+5.71%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 48.54+0.81%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-6.25%Trend Power :