Huntmountain Resources

Published : August 19th, 2008

Additional High-Grade Gold-Silver Intercepts at La Josefina

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Argentina | Canada | Chile | Diamond | G Mexico | Gold | Mexico | Silver |
 
 

August 19, 2008

FOR IMMEDIATE RELEASE

Press Release 08-13

Contact: Steve Taylor

(509) 892-5287

 

HuntMountain Releases Additional High-Grade Gold-Silver Intercepts at La Josefina

(SPOKANE, WA)  HuntMountain Resources Ltd. (OTCBB: HNTM) (Frankfurt: MPT) released additional high-grade assays from its ongoing 25,000 meter Diamond core drilling program at the La Josefina gold-silver project in Santa Cruz Province, Argentina.  The latest results encompass drilling in the broader Veta Norte zone along the high-grade Veta Amanda and Veta Norte vein systems.  Significant assays include:

HOLE

From

To

Interval

Gold

Silver

Gold Equiv.*

#

(m)

(m)

(m)

g/t

g/t

g/t

SVN-D08-117

13.45

19.3

5.85

5.01

77.72

6.28

including

14.8

17.6

2.8

7.86

120.26

9.82

SVN-D08-096

229.6

231.82

2.22

5.93

58.76

6.88

SVN-D08-082

43.36

43.84

0.48

30.0

99.9

31.63

SVN-D08-103

19.08

19.5

0.42

14.05

578.0

23.45

�Veta Amanda continues to yield excellent high-grade gold and silver values,� said Danilo Silva, HuntMountain�s General Manager of South American Operations.  �We have a full pipeline of assay results streaming in weekly, and we are pleased to see the consistency of the gold-silver intercepts as well as the increasing continuity of mineralization within this zone.  These results will be particularly helpful as we begin calculating a resource for La Josefina this fall.�

The La Josefina Gold-Silver Project is located in the north-central portion of Santa Cruz Province in Patagonia�s highly-prospective Deseado Massif and comprises an area of over 52,770 hectares. The property encompasses multiple precious metal occurrences within a 10 km-long hydrothermal alteration belt that is 1-3 km wide.  The region hosts numerous precious metal mines in production and deposits under development.

Certified sample preparation, gold and silver fire assay, and 28 element ICP analysis were carried out by ALS Chemex in Mendoza, Argentina and La Serena, Chile. 

A complete table of drill results can be obtained at www.huntmountain.com on the La Josefina project page and within the NI 43-101 Technical Report.  The most current assays greater than
1 gram/tonne gold are included in the table below:

HOLE NUMBER

From (m)

To (m)

Interval (m)

Au g/t

Ag g/t

 

 

 

 

 

 

VETA NORTE

 

 

 

 

 

SVN-D07-011

33.90

34.50

0.60

2.31

21.40

 

40.90

41.35

0.45

2.68

9.50

 

43.00

43.85

0.85

7.05

8.60

 

48.00

49.00

1.00

1.14

1.70

 

 

 

 

 

 

SVN-D07-012

65.40

66.35

0.95

1.01

8.60

 

89.95

90.70

0.75

2.06

19.70

 

90.70

91.20

0.50

0.39

51.30

 

 

 

 

 

 

VETA AMANDA

 

 

 

 

 

SVN-D08-082

43.36

43.84

0.48

30

99.9

 

49.41

50.17

0.76

2.1

105

 

84.3

84.75

0.45

5.48

135

 

 

 

 

 

 

SVN-D08-083

31.45

32.35

0.90

1.065

46

 

32.7

33.1

0.40

2.37

16.2

 

33.1

33.5

0.40

2.1

8.7

 

34.3

34.75

0.45

2.45

5.8

 

38.3

39.1

0.80

1.35

2.1

 

41.7

42.1

0.40

2.12

2.7

 

42.6

43

0.40

1.72

9.5

 

43

43.5

0.50

1.115

18.6

 

43.5

44

0.50

4.35

85.2

 

49.75

50.2

0.45

0.935

3.4

 

80.1

80.5

0.40

1.21

0

 

94.35

94.75

0.40

0.835

17.1

 

 

 

 

 

 

SVN-D08-095

128.7

129.1

0.40

5.66

51.2

 

129.65

130.4

0.75

2.31

14.3

 

130.4

130.73

0.33

6.87

50.2

 

201.5

201.9

0.4

1.475

6

 

 

 

 

 

 

SVN-D08-096

229.6

230

0.4

0.451

36.3

 

230

230.4

0.4

6.64

90.2

 

230.4

230.8

0.4

2.9

105

 

230.8

231.15

0.35

7.79

39.2

 

231.15

231.82

0.67

9.6

36

 

 

 

 

 

 

SVN-D08-103

12.1

12.6

0.5

10.05

12.7

 

18.07

18.4

0.33

2.71

14.3

 

19.08

19.5

0.42

14.05

578

 

 

 

 

 

 

SVN-D08-104

23.2

23.6

0.40

3.1

5.7

 

25.6

26.25

0.65

1.205

6

 

39

40.45

1.45

2.54

8.8

 

 

 

 

 

 

SVN-D08-105

15.25

15.75

0.50

3.78

7.3

 

18.65

19.15

0.50

3.54

9.8

 

20.15

22.15

2.00

1.01

1.7

 

 

 

 

 

 

SVN-D08-117

7.1

7.5

0.40

1.42

15.2

 

11.85

12.3

0.45

1.735

14.7

 

13.45

13.85

0.40

0.561

23.7

 

13.85

14.8

0.95

0.677

24.8

 

14.8

15.4

0.60

20.2

192

 

15.4

16

0.60

1.465

38.8

 

16

16.6

0.60

9.19

175

 

16.6

17.05

0.45

3.33

99.3

 

17.05

17.6

0.55

3.65

88.3

 

17.6

18.2

0.60

0.965

56.5

 

18.2

18.6

0.40

4.08

74.6

 

18.6

19.3

0.70

6.03

30.2

 

25.9

26.9

1.00

1.26

1

 

27.95

28.4

0.45

1.15

2.8

 

29.2

29.65

0.45

3.6

23.2

 

 

 

 

 

 

SVN-D08-118

6

7

1.00

4.26

17.9

 

9.8

10.2

0.40

1.275

11.5

 

11.25

12

0.75

24.3

84.2

 

13.5

14.25

0.75

1.37

17.7

 

14.25

15.4

1.15

3.12

18

 

17

17.5

0.50

3.31

9.2

 

27.5

27.9

0.40

0.926

10.7

*Gold equivalent grade was calculated by dividing the silver assay result by 61.46 and adding it to the gold value. Gold and silver values reflect prices on 8/15/2008.  Troy ounces/short ton was calculated by dividing grams by 34.29 and rounding to 2 decimal places. Interval calculations are based on a weighted average using a 1.00 g/t cutoff value.

HuntMountain Resources Ltd. is a U.S.-based junior exploration company engaged in acquiring, exploring and developing precious and base metals properties throughout North and South America. The Company currently controls and operates projects in Santa Cruz Argentina, Chihuahua Mexico, Nevada USA, and Quebec Canada.

This news release may contain forward-looking statements within the meaning of Section 27A of the Securities Act and Section 21E of the Exchange Act. Forward-looking statements are inherently subject to risks and uncertainties, many of which cannot be predicted with accuracy, and some of which might not even be anticipated. This news release is neither a prospectus nor an offer to sell securities or stocks in the company. It is intended for informational purposes only.

FOR FURTHER INFORMATION PLEASE CONTACT:
Steve Taylor, Vice President of Corporate Development
HuntMountain Resources
(509) 892-5287
staylor@huntmountain.com
www.huntmountain.com


 

 

� 2008 HuntMountain Resources. All rights reserved

Visit HuntMountain.com

 
 


Gold and Silver Prices for these countries : Argentina | Canada | Chile | Mexico | All

Huntmountain Resources

DEVELOPMENT STAGE
CODE : HNTM.OB
ISIN : US4468961028
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Huntmountain is a lead and zinc exploration company based in United states of america.

Huntmountain develops lead, zinc and gold in Argentina, and holds various exploration projects in Canada.

Its main asset in development is BAJO POBRE in Argentina and its main exploration properties are EL CAPITAN and DUN GLEN in Mexico, EL GATEADO in Argentina and LAC À L'EAU JAUNE and MALARTIC SURIMAU in Canada.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Nominations of Huntmountain Resources
6/12/2008Appoints Vice President of Corporate Development
3/6/2008 Announces Appointment of James A. Sabala to President
11/13/2007Appoints Bryn Harman Chief Financial Officer
10/9/2007Appoints Michael Mastor to Board of Directors
Project news of Huntmountain Resources
12/17/2008(La Josefina)New High Grade Assays From La Josefina Gold-Silver Project
11/12/2008(El Capitan)Enhances El Capitan Silver-Gold Project by Acquiring Histori...
9/30/2008(La Josefina)New High-Grade Assays From La Josefina Gold-Silver Project
9/9/2008Sierra Madre Exploration Returns High-Grade Silver, Base Met...
8/26/2008(La Josefina)Continues Run of High-Grade Results at La Josefina
8/19/2008(La Josefina)Additional High-Grade Gold-Silver Intercepts at La Josefina
8/13/2008(La Josefina)Drilling Extends High-Grade Zone at La Josefina Gold-Silver ...
7/16/2008(La Josefina)Identifies New High Grade Zone at La Josefina Gold-Silver Pr...
7/2/2008(La Josefina)Best Drill Results to Date at La Josefina Gold-Silver Projec...
6/30/2008Acquires High Grade Silver-Gold Prospect in Mexico?s Sierra ...
6/19/2008(La Josefina)La Josefina Drilling Forges Through Winter Season Based on S...
4/23/2008(La Josefina) La Josefina Drilling Continues to Hit Strong Gold and Silve...
2/19/2008(La Josefina)La Josefina Drilling Hits 19.9 g/t Gold and 2100 g/t Silver
7/30/2007(El Gateado)Discovers Gold Mineralization at its El Gateado Property
4/5/2007(Bajo Pobre)Finalizes Deal for the Bajo Pobre Gold Property in Argentina
Corporate news of Huntmountain Resources
6/24/2009HuntMountain Enters into Letter of Intent on Reverse Takeove...
11/25/2008San Francisco Hard Assets Conference
9/25/2008Interview on Korelin Economics Report
9/12/2008Exhibits at 6th Annual Silver Summit
2/11/2008HuntMountain Secures Surface Rights at La Josefina Gold-Silv...
2/5/2008HuntMountain Substantiates Historical Drill Results at La Jo...
12/4/2007 Argentine Exploration now in Full Swing
8/28/2007Strengthens Board and Hires VP of Investor Relations
8/8/2007 Finalizes Contract to Develop Argentine Gold Property
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
OTC BB (HNTM.OB)FRANKFURT (MPT.F)
0.030-72.73%0.103+0.00%
OTC BB
US$ 0.030
05/23 14:11 -0.080
-72.73%
Prev close Open
0.030 0.030
Low High
0.030 0.030
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.030 172.73%
Volume 1 month var.
1,268 172.73%
24hGold TrendPower© : -27
Produces
Develops Gold
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/4/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :