In the same category

Alexco Resource Corp.

Published : December 05th, 2013

Alexco Releases Positive Preliminary EconomicAssessment for Expanded Silver Production from

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Marketwired
 
 
Alexco Resource Corp.
TSX: AXR
NYSE MKT: AXU
Other Recent News | Printer Friendly Version

December 5, 2013
Alexco Releases Positive Preliminary Economic Assessment for Expanded Silver Production from Eastern Keno Hill Silver District, Yukon
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Dec. 5, 2013) - Alexco Resource Corp. (TSX:AXR)(NYSE MKT:AXU) today announces the release of a National Instrument 43-101 compliant Preliminary Economic Assessment (PEA) for the eastern portion of its 100% owned Keno Hill Silver District in Canada's Yukon Territory. The PEA, which was compiled by SRK Consulting (Canada) Inc. (SRK) with contributions from a team of qualified persons, assesses an expanded operations phase of silver, lead, zinc and gold production in the Eastern Keno Hill Silver District (EKHSD). The study is focused on construction and operation of a new underground mine and ancillary production facilities at the recently defined Flame & Moth silver deposit and consolidates supplemental production initially from the Bellekeno mine and subsequently from the Lucky Queen deposit. The document also includes a revised resource statement for the Bellekeno deposit. The PEA reflects one of a number of production strategies considered, and work is ongoing to optimize the EKHSD plan inputs. Alexco is also considering an expanded surface exploration program in the EKHSD area.

The PEA outlines:

--  A production strategy comprising an initial nine-month construction
    period in 2014, followed by a 5.5 year period of silver production
    anchored by the Flame & Moth deposit. 
--  Annual delivery of an average 3.1 million ounces of payable silver, 6.8
    million pounds of lead, 6.6 million pounds of zinc and 1,050 ounces of
    gold from approximately 150,000 tonnes per year of consolidated mine and
    mill production. 
--  An after tax internal rate of return (IRR) of 38%, an after tax net
    present value (NPV) (5%) of $29.6 million and a 3.5 year payback from
    January 1, 2014. The PEA fully incorporates Alexco's Silver Purchase
    Agreement with Silver Wheaton requiring delivery of 25% of payable
    silver ounces to Silver Wheaton for an agreed payment of $3.90 per
    ounce. 
--  Initial capital requirements of approximately $25 million, with roughly
    half the initial capital deployed to drive a decline and establish
    underground infrastructure at the Flame & Moth deposit, which is planned
    to deliver 73% of the tonnes in the current plan. The balance of the
    initial capital is planned for mill upgrades, additional surface
    facilities, and recommissioning of the Bellekeno mine. 
--  Approximately 17% or 163,000 tonnes of mineable resource, primarily at
    Bellekeno and Flame & Moth, has been eliminated from the PEA mine plan
    and remains to be considered should underlying costs and obligations be
    further optimized.
 
Alexco's President and Chief Executive Officer, Clynt Nauman, said, "Earlier in 2013, in the face of declining silver prices and reduced operating margins, we elected to suspend winter operations at our Bellekeno mine and mill facilities at Keno Hill. We did so with the knowledge that we had a rapidly growing silver resource at our recently defined Flame & Moth deposit, and that a revised operations strategy was required to integrate production from known and previously developed deposits (i.e. Bellekeno, Lucky Queen) with the new and larger but as yet undeveloped Flame & Moth deposit. In addition, simple economics drive us to fully utilize our mill capacity when re-initiating silver production. To do that, the PEA outlines a strategy to initiate development of the Flame & Moth mine in 2014 as a first step to achieving commercial production from this deposit in 2015. Meanwhile, we would begin recommissioning the Bellekeno mine later in 2014 and have it ready to simultaneously go into production along with Flame & Moth near the beginning of 2015. Bellekeno production would eventually be replaced by higher grade, lower volume silver production from the Lucky Queen mine in 2017."

Nauman continued, "By following this plan, we would also retain short term optionality to accelerate Bellekeno production or development at Lucky Queen should conditions warrant in 2014. Concurrently in 2014, we intend to mobilize an expanded exploration program to evaluate previously identified extensions to the Flame & Moth deposit. With 23 million ounces of silver already indicated in resource, the Flame & Moth deposit is the third largest silver deposit discovered at Keno Hill in the last 50 years, and remains open. In my view, when ultimately delineated this deposit will become the cornerstone asset of Alexco's operations in the District, with the potential to anchor future production into the 2020s."

Key PEA metrics and assumptions are as follows:

----------------------------------------------------------------------------
Consolidated production              806,900 tonnes (t)                     
----------------------------------------------------------------------------
Consolidated production grade        745 grams per tonne (gpt) silver (Ag), 
                                     0.4 gpt gold (Au), 2.7% lead (Pb), 4.7%
                                     zinc (Zn)                              
----------------------------------------------------------------------------
Commercial production period         Q2 2015 - Q2 2020                      
----------------------------------------------------------------------------
Development, construction period     Q2 2014 - Q1 2015                      
----------------------------------------------------------------------------
Mill throughput                      Average 406 tonnes per day (tpd)       
----------------------------------------------------------------------------
Mill recoveries                      Ag 93.6%, Au 71.3%, Pb 83.9%, Zn 60.4% 
----------------------------------------------------------------------------
Concentrate produced (6% moisture)   30,685 tonnes Pb con, 51,026 tonnes Zn 
                                     con                                    
----------------------------------------------------------------------------
Total payable metal production       Ag 16.8Moz, Au 5,800oz, Pb 37.7Mlb, Zn 
                                     36.4Mlb                                
----------------------------------------------------------------------------
Production cost (mining, milling                                            
and G&A)                             $253 per tonne of ore                  
----------------------------------------------------------------------------
Net Smelter Return (NSR) per tonne                                          
of ore (after incorporation of                                              
Silver Purchase Agreement)           $419 per tonne of ore                  
----------------------------------------------------------------------------
Total capital (life of mine)         $76 million, including $37 million     
                                     underground development                
----------------------------------------------------------------------------
Initial capital to achieve           $25 million                            
positive cash flow                                                          
----------------------------------------------------------------------------
Net Cash Contribution Pre-Tax        $53.7 million                          
----------------------------------------------------------------------------
IRR Pre-tax                          45%                                    
----------------------------------------------------------------------------
NPV Pre-tax (5%)                     $39.9 million                          
----------------------------------------------------------------------------
Net Cash Contribution After Tax      $41.4 million                          
----------------------------------------------------------------------------
IRR After Tax                        38%                                    
----------------------------------------------------------------------------
NPV After Tax (5%)                   $29.6 million                          
----------------------------------------------------------------------------
Prices Used in PEA                   Ag US$24.00/oz, Pb US$0.95/lb, Zn      
                                     US$0.85/lb, Au US$1,300/oz             
----------------------------------------------------------------------------
 
The 806,900 tonnes of the consolidated mine production is primarily derived from indicated mineral resources, though approximately 6% is derived from inferred mineral resources. Readers are cautioned that mineral resources are not mineral reserves and do not have demonstrated economic viability. Furthermore, the PEA is preliminary in nature; it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves; and there is no certainty that the PEA will be realized.

The PEA contemplates an initial development and construction period beginning in the second quarter of 2014, with startup of commercial production in the second quarter of 2015. Commencement of development and construction remains dependent on Alexco making a development decision, which would be dependent on a number of factors, including but not limited to expectations regarding market prices for silver, lead, zinc and gold as well as the US-Canadian dollar exchange rate, and the availability of development capital. Additionally, a production decision which is made without a feasibility study of mineral reserves demonstrating economic and technical viability carries additional potential risks which include, but are not limited to, the risk that additional detailed work may be necessary with respect to mine design and mining schedules, metallurgical flow sheets and process plant designs, and the inherent risks noted above pertaining to the inclusion of approximately 6% inferred mineral resources in the mine plan.

Bellekeno Mine

The Bellekeno Mine achieved commercial production under Alexco ownership in January 2011. In the period from January 2011 until August 2013, the mine produced 223,552 tonnes of ore with an average grade of 768 gpt Ag, 9.2% Pb and 4.9% Zn, producing 31,838 tonnes of lead concentrate and 16,036 tonnes of zinc concentrate. Metal recoveries to concentrate over the 32-month operating period were 5.58 million ounces of silver, 44.96 million pounds of lead and 16.34 million pounds of zinc.

Revised Bellekeno Resource Statement

Over the course of 2012, the mineral resources for the Bellekeno Mine were revised using a combination of original resource data, new drilling, underground production data, and revised pricing and recoveries. A revised mineral resource statement for the Bellekeno deposit is tabulated below and is reported relative to a cut-off value of C$185/tonne.

Mineral Resource Statement(i), Bellekeno Deposit, GeoStrat Consulting       
Services Inc., September 30, 2012                                           
----------------------------------------------------------------------------
                                          Ag       Pb       Zn            Ag
Vein      Class             Tonnes      (gpt)      (%)      (%)           Oz
----------------------------------------------------------------------------
SW        Indicated        195,000       602     6.7%     5.7%     3,773,000
          Inferred         136,000       427     4.5%     3.5%     1,871,000
----------------------------------------------------------------------------
99        Indicated         95,000       760     4.0%     3.5%     2,320,000
          Inferred          20,000       715     4.1%     2.9%       455,000
----------------------------------------------------------------------------
East      Indicated         75,000       675     3.3%     6.9%     1,635,000
          Inferred          87,000       364     3.4%     8.1%     1,013,000
----------------------------------------------------------------------------
Total     Indicated        365,000       658     5.3%     5.3%     7,728,000
          Inferred         243,000       428     4.1%     5.1%     3,338,000
----------------------------------------------------------------------------
(i) Reported at a cut-off value of C$185.00/t considering metal prices of   
    US$22.50/oz for Ag, US$0.85/lb for Pb, and US$0.95/lb for Zn; and       
    recovery of 96% for Ag, 97% for Pb, and 88% for Zn. All numbers have    
    been rounded to reflect the relative accuracy of the estimates. Mineral 
    resources are not mineral reserves and have not demonstrated economic   
    viability. Confidence in the estimate of Inferred mineral resources is  
    insufficient to allow the meaningful application of technical and       
    economic parameters or to enable an evaluation of economic viability    
    worthy of public disclosure.
 
The Bellekeno mineral resource estimate has an effective date of May 31, 2012, based on a mine survey documenting mining progress up to that date.

As noted by SRK pursuant to Alexco reports, since the effective date of the Bellekeno deposit mineral resource statement, actual tonnes processed from the Bellekeno Mine totalled 124,000 tonnes at average grades of 701 gpt silver, 8.3% lead and 4.3% zinc (from June 1, 2012 to the temporary suspension of operations on September 1, 2013).

Mining

The PEA lays out a mine plan centered on Flame & Moth production with supplemental mine production coming from the Bellekeno deposit early in the production period followed by Lucky Queen mine production later in the period. The life of mine (LOM) production schedule from January 1, 2015 averages 406 tpd for 5.5 years through to mid-2020. Nominal production rates are 250 tpd for Bellekeno, 100 tpd for Lucky Queen and 320 to 370 tpd for Flame & Moth which also supplies about 73% of the mill feed over the study period. In designing the production schedule, approximately 163,000 tonnes of mineable resources were eliminated from the plan for various reasons, but remain as future resource.

In production, mined resources from underground will be extracted using a combination of mining methods depending on the characteristics of the resource zone and ground control conditions. The PEA anticipates a variety of mining methods based on deposit characteristics: Lucky Queen would be primarily a mechanized cut and fill mining operation, whereas Bellekeno would be mined primarily by long-hole stoping and mechanized cut and fill mining. Flame & Moth would use a combination of mechanized cut and fill, long-hole stoping and drift and fill methods.

Processing and Infrastructure

The Alexco mill facility has a nameplate capacity of 407 tonnes per day and employs conventional crushing, grinding, differential flotation and dewatering processes to produce a lead concentrate, a zinc concentrate and a filtered tailings product for storage in an established dry stacked tailings facility. Silver and lead minerals are recovered together in the silver-lead bulk concentrate and zinc minerals in a separate zinc concentrate.

The current process flowsheet includes the following main unit operations:

--  a crushing unit consisting of a jaw crusher, cone crusher and screen 
--  primary grinding circuit 
--  silver-lead flotation and concentrate regrinding circuit 
--  zinc flotation circuit 
--  pyrite flotation unit 
--  concentrate dewatering circuit 
--  tailings dewatering
 
Prior to resumption of concentrate production in 2015, an additional 1.8 meter x 3 meter, 130kW ball mill will be retrofit to provide expanded grinding capacity ahead of the flotation circuit.

Metallurgical recoveries in the PEA were determined by SRK using a combination of historical performance and test work from each of the deposits slated for production in the EKHSD project.

All of the regulatory approvals required for mining activities associated with the Bellekeno and Lucky Queen deposits are currently in place. Preliminary mine planning has been completed for the Flame & Moth deposit, and permitting for development and production from the deposit is underway.

In terms of infrastructure, the EKHSD project is supported by an already established modern camp with capacity for approximately 150 people. The project is on the Yukon electric grid and is serviced by all-weather roads. Concentrates are shipped in sealed aluminum containers by road to the Port of Skagway in Alaska and transloaded to southbound tug and barge service for ultimate delivery to smelter facilities.

Next Steps

The PEA reflects one of a number of production strategies being considered by Alexco. Work is ongoing to optimize various aspects of this project, including a careful review of underlying fixed costs and existing third party arrangements. As with most smaller, higher grade deposits, consolidated mine economics are sensitive to commodity price, the tenor and grade of ore delivered to the mill, and efficiency with which the mill operates. At Keno Hill, achieving and maintaining proper mine output and mill throughput is also paramount and Alexco is continuing to investigate specific production strategies to further improve the efficiency of mine and mill operations.

An equally important Company objective is to continue expansion of the Keno Hill silver resource inventory through exploration, a strategy which has met with considerable success and remains unchanged from prior years.

National Instrument 43-101 and Qualified Persons

The PEA has been prepared in compliance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (NI 43-101), and was compiled by SRK Consulting (Canada) Inc. with contributions from a team of Qualified Persons as defined by NI 43-101. The Bellekeno resource estimate update has been completed by David Farrow, P.Geo. (BC), of GeoStrat Consulting Services Inc., a Qualified Person independent of Alexco, based upon data that was reviewed, verified and compiled by Laura Battison, P.Geo., former Senior Mine Geologist with Alexco and also a Qualified Person. The mineral resource is classified following the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resource and Mineral Reserves (December 2005), in accordance with the CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines and with NI 43-101 guidelines. An NI 43-101 compliant technical report is in the process of being prepared in support of the PEA and Bellekeno mineral resource update, which Alexco expects will be filed on SEDAR no later than 45 days from the date hereof.

The disclosure of scientific and technical information about Alexco's mineral projects contained in this news release has been reviewed and approved by Ken Reipas, P.Eng., Principal Mining Engineer with SRK, Mr. Farrow and Ms. Battison.

Conference Call

Alexco will be holding a conference call and webcast to further discuss the information contained in the PEA. The conference call will be held at 8 a.m. Pacific time (11 a.m. Eastern) tomorrow, Friday, December 6, 2013. The webcast may be accessed at www.alexcoresource.com. To participate in the live call, please use one of the following methods:

Dial toll free from Canada or the US: 1-877-407-8031

Dial from outside Canada or the US: 1-201-689-8031

Live audio webcast: www.alexcoresource.com

Participants should connect five to ten minutes before the call.

The conference call will be recorded, and an archived audio webcast will be available at www.alexcoresource.com. Through January 5, 2014, a replay of the call will be available by telephone at the following:

Dial toll free from Canada or the US: 1-877-660-6853

Dial from outside Canada or the US: 1-201-612-7415

Replay Passcodes: Conference ID #13573332

About Alexco

Alexco Resource Corp. owns the Bellekeno silver mine, one of several mineral properties held by Alexco which encompass substantially all of the historical Keno Hill Silver District located in Canada's Yukon Territory. Bellekeno, which commenced commercial production at the beginning of calendar year 2011, was Canada's only operating primary silver mine from 2011 to 2013. Alexco recently announced a suspension of operations at Bellekeno in order to decrease costs and reposition the District for long-term, sustainable operations. The Keno Hill Silver District lies within the traditional territory of the First Nation of Na-Cho Nyak Dun who have a fully settled land claim agreement with the Government of Canada and the Yukon, and Alexco operates within the District under a comprehensive cooperation and benefits agreement with the First Nation. Alexco's primary near-term exploration objective is to unlock value in the silver-rich Keno Hill District, and is focused on growth by advancing its promising District properties to development decisions. Employing a unique business model, Alexco also provides mine-related environmental services, remediation technologies and reclamation and mine closure services to both government and industry clients through the Alexco Environmental Group, its wholly-owned environmental services division.

Keno Hill Silver District History

Between 1921 and 1988, the Keno Hill Silver District was a world-class silver producer, with more than 217 million ounces of silver produced at average grades of 40.5 ounces per ton silver, 5.6% lead and 3.1% zinc (Yukon Government's Minfile database). These historical production grades would rank Keno Hill in the top 3% by grade of today's global silver producers.

Please visit the Alexco website at www.alexcoresource.com.

Some statements ("forward-looking statements") in this news release contain forward-looking information concerning the Company's anticipated results and developments in the Company's operations in future periods, planned exploration and development of its properties, plans related to its business and other matters that may occur in the future, made as of the date of this news release. Forward-looking statements may include, but are not limited to, statements with respect to future remediation and reclamation activities, future mineral exploration, the estimation of mineral reserves and mineral resources, the realization of mineral reserve and mineral resource estimates, future mine construction and development activities, future mine operation and production, the timing of activities and reports, the amount of estimated revenues and expenses, the success of exploration activities, permitting time lines, requirements for additional capital and sources and uses of funds. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results and timing of exploration and development activities; actual results and timing of mining activities; actual results and timing of environmental services activities; actual results and timing of remediation and reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of silver, gold, lead, zinc and other commodities; possible variations in mineable resources, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; First Nation rights and title; continued capitalization and commercial viability; global economic conditions; competition; and delays in obtaining governmental approvals or financing or in the completion of development activities. Forward-looking statements are based on certain assumptions that management believes are reasonable at the time they are made. In making the forward-looking statements included in this news release, the Company has applied several material assumptions, including, but not limited to, the assumption that market fundamentals will result in sustained silver, gold, lead and zinc demand and prices. There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as otherwise required by applicable securities legislation.

CONTACT INFORMATION:
Alexco Resource Corp.
Clynton R. Nauman
President and Chief Executive Officer
(604) 633-4888

or

Alexco Resource Corp.
Vicki Veltkamp
Vice President Investor Relations
(604) 633-4888
Fax: (604) 633-4887
info@alexcoresource.com
www.alexcoresource.com
INDUSTRY: Manufacturing and Production - Mining and Metals

If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click .
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Alexco Resource Corp.

PRODUCER
CODE : AXR.TO
ISIN : CA01535P1062
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Alexco Resources is a silver development stage company based in Canada.

Alexco Resources produces silver, gold, lead and zinc in Canada, and holds various exploration projects in Canada.

Its main asset in production is KENO HILL (BELLEKENO) in Canada and its main exploration properties are BREWERY CREEK, LUCKY QUEEN YUKON, SPROGGE YUKON, HARLAN, KLONDIKE, MCQUESTEN, FLAME AND MOTH and BERMINGHAM in Canada.

Alexco Resources is listed in Canada and in United States of America. Its market capitalisation is CA$ 218.3 millions as of today (US$ 165.2 millions, € 147.5 millions).

Its stock quote reached its highest recent level on April 29, 2011 at CA$ 9.75, and its lowest recent point on March 13, 2015 at CA$ 0.34.

Alexco Resources has 93 680 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Alexco Resource Corp.
6/14/2011(Keno Hill (bellekeno))Reports Grid Power Outage Affecting Keno Hill
Annual reports of Alexco Resource Corp.
Annual report 2007
Financings of Alexco Resource Corp.
4/16/2013Alexco Amends Terms of $7 Million Flow-Through Financing
12/23/2009Closes $9.5 Million Flow-Through Private Placement
3/9/2009Flow-Through Private Placement
12/11/2007Closes Flow-Through Private Placement
11/22/2007Announces Flow-Through Private Placement
Option Grants of Alexco Resource Corp.
12/13/2011Alexco Amends Stock Option Plan for Annual General Meeting
12/13/2011Amends Stock Option Plan for Annual General Meeting
Nominations of Alexco Resource Corp.
1/28/2010Appoints Jim Harrington to President President
12/14/2009New Management Appointments
Financials of Alexco Resource Corp.
3/25/2015Reports Fourth Quarter and Year End 2014 Results
11/14/2013Alexco Reports Third Quarter 2013 Financial Results
8/15/2013Alexco Reports Second Quarter 2013 Financial Results
8/14/2013Reports Second Quarter 2013 Financial Results
5/8/2013Alexco Reports First Quarter 2013 Financial Results
5/8/2013Reports First Quarter 2013 Financial Results
3/27/2013Alexco Reports Financial Results for Year Ended December 31,...
3/27/2013Reports Financial Results for Year Ended December 31, 2012
11/5/2012Alexco Reports Third Quarter 2012 Financial Results
11/5/2012Reports Third Quarter 2012 Financial Results
8/7/2012Alexco Reports Second Quarter 2012 Financial Results
5/7/2012Alexco Reports First Quarter 2012 Earnings
5/7/2012Reports First Quarter 2012 Earnings
11/28/2011Alexco Reports First Fiscal Quarter Financial Results
11/28/2011Reports First Fiscal Quarter Financial Results
9/15/2011Reports Increased Revenue, Cash From Operations, Earnings an...
5/10/2010(Keno Hill (bellekeno))Bellekeno Silver Mine Project on Schedule for Third Quarter ...
Project news of Alexco Resource Corp.
12/5/2013Alexco Releases Positive Preliminary EconomicAssessment for ...
1/31/2013Alexco Expands Flame & Moth Indicated Resource to 22=2E9 Mil...
9/27/2012Alexco Completes Sale of Remaining Interest in Brewery Creek
9/27/2012(Brewery Creek)Completes Sale of Remaining Interest in Brewery Creek
6/28/2012Alexco Announces Initial Resource Estimates for Flame & Moth...
6/25/2012Alexco Reports Bellekeno Production Back Online After Wildfi...
6/25/2012Reports Bellekeno Production Back Online After Wildfire Disr...
2/22/2012Alexco Intersects Silver Mineralization to 26 Meters True Th...
2/22/2012(Bermingham)Intersects Silver Mineralization to 26 Meters True Thickness...
2/14/2012(Flame And Moth)Drills 8.9 Meters of 20.2 Ounces Per Ton Silver At Flame & M...
1/23/2012Alexco Silver Production Increases 21% to =?ISO-8859-1?Q?Mor...
12/8/2011Alexco Intersects Multiple Zones of Silver Mineralization to...
12/8/2011(Bermingham)Intersects Multiple Zones of Silver Mineralization to 22.2 M...
9/7/2011Alexco Intersects 6=2E04 Meters of 31=2E5 Ou =?ISO-8859-1?Q?...
9/7/2011(Flame And Moth)Intersects 6.04 Meters of 31.5 Ounces Per Ton Silver at Flam...
7/27/2011Alexco Announces Initial Resource Estimates for Lucky Queen ...
5/4/2011Alexco Releases Initial Production Results for Bellekeno Min...
5/4/2011(Keno Hill (bellekeno))Releases Initial Production Results for Bellekeno Mine; On T...
3/4/2011(Keno Hill (bellekeno))Provides Update on Bellekeno Operations and Outlines 2011 Ex...
3/3/2011Alexco Provides Update on Bellekeno Operations and Outlines ...
2/16/2011Alexco Resource Corp=2E: New Keno Hill Silver Discovery-4=2E...
2/16/2011(Flame And Moth)New Keno Hill Silver Discovery-4.26 Meters of 49.9 Oz Per To...
2/2/2011(Keno Hill (bellekeno))Receives Balance of Assays From Onek Zinc-Silver Deposit Dri...
1/6/2011(Keno Hill (bellekeno))Alexco Achieves Commercial Production at Bellekeno
3/4/2010(Keno Hill (bellekeno))Commences 2010 Expanded Exploration Program at Keno Hill
12/1/2009(Keno Hill (bellekeno))Additional 2009 Drill Results
11/18/2009(Keno Hill (bellekeno))Yukon Issues Quartz Mining License For Bellekeno Mine
11/12/2009(Keno Hill (bellekeno))Completes Positive Bellekeno Mine Development
11/5/2009(Keno Hill (bellekeno))Additional 2009 Drill Results
11/3/2009(Keno Hill (bellekeno))Additional 2009 Drill Results from Lucky Queen
10/15/2009(Keno Hill (bellekeno))Addicional 2009 Drill Results at Keno Hill
10/15/2009Announces Additional 2009 Drill Results at Keno Hill: Drilli...
7/15/2009(Keno Hill (bellekeno))Yukon Government Issues Positive Decision Document for Belle...
6/17/2009Passes Key Milestone in Permitting of the Bellekeno Mine
5/19/2009Intersects 7.8 Meters of 49.4 Ounces Per Ton Silver
5/14/2009(Keno Hill (bellekeno))Outlines 2009 Surface Exploration Plans at Keno Hill
9/19/2008(Keno Hill (bellekeno))Announces Additional 2008 Drill Results at Keno Hill
7/9/2008(Keno Hill (bellekeno))Positive Preliminary Economic Assessment on Bellekeno Deposi...
7/2/2008(Keno Hill (bellekeno))Announces Initial 2008 Drill Results at Keno Hill
3/25/2008(Keno Hill (bellekeno))Outlines 2008 Exploration and Development Plans at Keno Hill
2/13/2008(Keno Hill (bellekeno))Announces Final 2007 Drill Results from Keno Hill
10/23/2007Announces High Grade Native Silver Intercept from Lucky Quee...
10/16/2007Announces Significant High Grade Silver Intercepts From Sout...
9/6/2007Announces Discovery of High Grade Zinc Mineralization with S...
Corporate news of Alexco Resource Corp.
8/1/2016Alexco to Release Second Quarter 2016 Results on August 10, ...
7/29/2016Alexco Files Final Shelf Prospectus and Registration Stateme...
6/9/2016Alexco Reports Voting Results from Annual General Meeting
6/2/2016Alexco Resource Reminds Shareholders of Voting Cut-Off for U...
6/1/2016Alexco Initiates 2016 Bermingham Exploration and Other Work ...
5/17/2016Alexco Closed C$13 Million Non-Brokered Equity Financing
5/11/2016Alexco Reports First Quarter 2016 Results
5/11/2016Alexco Resource reports 1Q loss
5/5/2016Alexco Mails Information Circular in Connection with Annual ...
5/3/2016Alexco to Release First Quarter 2016 Results on May 11, 2016
4/27/2016Alexco Announces up to C$10 Million Non-Brokered Equity Fina...
3/23/2016Alexco Reports Fourth Quarter and Year End 2015 Results
3/23/2016Alexco Resource reports 4Q loss
10/26/2015Edited Transcript of AXR.TO earnings conference call or pres...
9/17/2015Alexco Drills 5 meters (True Width) of 7,462 grams per tonne...
8/11/2015Alexco Reports Second Quarter 2015 Financial Results
8/11/2015Alexco Resource reports 2Q loss
8/11/2015Alexco to Host Second Quarter 2015 Earnings Conference Call ...
5/26/2015Video-Mining Clips Analyst Update with Alexco President & CE...
4/10/2015Annual Report for Alexco Resource Corp.
3/25/2015Alexco Reports Fourth Quarter and Year End 2014 Results
3/13/2015Alexco to Release Fourth Quarter and Year End 2014 Results o...
3/13/2015to Release Fourth Quarter and Year End 2014 Results on March...
2/26/2015Yukon Ranks 1st in Mineral Potential and 9th Overall in the ...
1/20/2015Alexco Intersects 1,483 Grams per Tonne Silver (47.7 Ounces ...
12/23/2014Alexco Updates Positive Preliminary Economic Assessment for ...
11/14/2014Alexco Reports Third Quarter 2014 Financial Results
11/13/2014Alexco Reports Third Quarter 2014 Financial Results
11/13/2014Alexco to Host Third Quarter 2014 Earnings Conference Call a...
11/5/2014Alexco Drills Best Hole Ever: Intersects 5,667 Grams Per Ton...
11/4/2014Alexco to Release Third Quarter 2014 Results on November 13,...
11/3/2014Alexco Announces One Year Extension of Silver Stream Amendme...
8/28/2014Alexco Closes Underwriter's Over-Allotment Option
8/21/2014Completes C$7 Million Bought Deal Financing
7/29/2014Announces C$5 Million Equity Financing
12/12/2013Alexco Files Eastern Keno Hill Silver District Technical Rep...
11/4/2013Alexco to Release Third Quarter Financial Results On Novembe...
11/4/2013to Release Third Quarter Financial Results On November 14, 2...
9/23/2013Alexco Reports Silver Production for Third Quarter 2013
9/23/2013Reports Silver Production for Third Quarter 2013
9/18/2013Extends Flame & Moth to More Than 900 Meters in Strike Lengt...
8/27/2013Alexco Issues Statement on Market Activity
8/27/2013Issues Statement on Market Activity
8/9/2013Alexco to Release Second Quarter Financial Results On August...
8/8/2013to Release Second Quarter Financial Results On August 14, 20...
8/2/2013Alexco to Release Second Quarter Financial R =?ISO-8859-1?Q?...
8/2/2013to Release Second Quarter Financial Results the Week of Augu...
7/23/2013Alexco Announces Amended Environmental Subsidiar =?ISO-8859-...
7/23/2013Announces Amended Environmental Subsidiary Agreement with Ca...
7/17/2013Alexco Reports Increased Silver Production in Second Quarter...
7/17/2013Reports Increased Silver Production in Second Quarter 2013; ...
6/7/2013Alexco Reports Voting Results From Annual General Meeting
6/7/2013Reports Voting Results From Annual General Meeting
5/31/2013Alexco Implements Cost Savings Measures
5/31/2013Implements Cost Savings Measures
5/20/2013Alexco Receives Water Licence Amendment
5/20/2013Receives Water Licence Amendment
5/2/2013Alexco Adopts Advance Notice Policy
4/23/2013Alexco Reports Closing of $7 Million Flow-Through Financing
4/23/2013Reports Closing of $7 Million Flow-Through Financing
4/12/2013Alexco Reports First Quarter 2013 Production Results
4/12/2013Reports First Quarter 2013 Production Results
4/1/2013Alexco Arranges Fully Subscribed Flow-Through
3/15/2013Alexco Files Flame & Moth Technical Report
3/15/2013Files Flame & Moth Technical Report
1/31/2013Expands Flame & Moth Indicated Resource to 22.9 Million Ounc...
1/17/2013Alexco Reports 16% Increase in Silver Production for Fourth ...
1/14/2013Alexco Further Expands Flame & Moth Deposi =?ISO-8859-1?Q?t,...
1/14/2013Further Expands Flame & Moth Deposit, Robust Silver Grades a...
10/15/2012Alexco Reports 12% Increase in Silver Production for Third Q...
10/15/2012Reports 12% Increase in Silver Production for Third Quarter ...
10/9/2012Expands Flame & Moth Deposit: Reports Grades Up to 71 Ounces...
8/9/2012Alexco Files Flame & Moth and Bermingham Technical Reports
7/16/2012Alexco Reports Silver Production for Second Quarter 2012
7/16/2012Reports Silver Production for Second Quarter 2012
5/24/2012Alexco Commemorates Over Five Years at Keno Hill
5/24/2012Commemorates Over Five Years at Keno Hill
5/3/2012Alexco to Release Financial Results for Firs =?ISO-8859-1?Q?...
5/2/2012to Release Financial Results for First Quarter of 2012 on Ma...
4/16/2012Alexco Reports Silver Production Results for First Quarter 2...
4/16/2012Reports Silver Production Results for First Quarter 2012
3/29/2012Alexco Reports Fiscal Results for Six Months Ended December ...
3/26/2012=?ISO-8859-1?Q?Alexco=20to=20Release=20December=2031,=202011...
3/26/2012to Release December 31, 2011 Year End Financial Results on M...
3/5/2012Alexco Expands 2012 Surface and UndergroundExploration Plans...
3/5/2012Expands 2012 Surface and Underground Exploration Plans For K...
2/14/2012Alexco Drills 8=2E9 Meters of 20=2E2 Ounces =?ISO-8859-1?Q?=...
1/23/2012Silver Production Increases 21% to More Than 600,000 Ounces ...
9/15/2011=?ISO-8859-1?Q?Alexco=20Reports=20Increased=20Revenue,=20Cas...
9/9/2011Alexco to Release Fiscal 2011 Results on S =?ISO-8859-1?Q?ep...
8/3/2011Alexco Reports Increased Production in Second Quarter of Cal...
8/3/2011Reports Increased Production in Second Quarter of Calendar 2...
7/27/2011Announces Initial Resource Estimates for Lucky Queen and One...
6/17/2011Alexco Provides Update on Impact of Grid Power Outage at Ken...
6/15/2011Alexco Reports Grid Power Outage Affecting Keno Hill
5/12/2011Alexco Reports Net Income of $3=2E5M and Operating Cash Flow...
5/12/2011Reports Net Income of $3.5M and Operating Cash Flows of $7.2...
3/8/2010Awards Mining Services Contract
1/20/2010Terms of Equity Financing
6/29/2009Environmental Services Group Awarded Contract
1/8/2009Completes Disposition of Alexco Shareholding
5/22/2008 and the First Nation of the Na-Cho Nyak Dun Sign Cooperatio...
2/6/2008CLARIFIES TECHNICAL DISCLOSURE
1/15/2008Corporate Continuation Under Business Corporations Act
12/6/2007FINALIZES PURCHASE OF KENO HILL, FOCUSES ON BELLEKENO DEVELO...
11/16/2007Secures Water Licence for Care & Maintenance Work at Keno Hi...
11/13/2007Increases Bellekeno Resource in Keno Hill District: Initial ...
10/17/2007Corrects Website Problem
9/25/2007and First nation of the Na-Cho Nyak Dun Conclude Negatiation...
9/20/2007 Additional Bellekeno Project results at Keno Hill
9/18/2007Announces Additional 2007 Keno Drill results
9/17/2007Announces Approval to List its Common Share on the American ...
8/27/2007Continues to Advance the Keno Hill Project
8/21/2007Comments on Na-Cho Nyak Dun’s Suspension of Regulatory Dialo...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (AXR.TO)OTHER OTC (AXORF)
2.33-3.72%4.15+0.00%
TORONTO
CA$ 2.33
08/09 17:00 -0.090
-3.72%
Prev close Open
2.42 2.43
Low High
2.33 2.45
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  2.33 -%
Volume 1 month var.
172,544 -%
24hGold TrendPower© : 8
Produces Gold - Lead - Silver - Zinc
Develops
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/6/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.11+2.21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.47+3.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.25-3.42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.79-3.76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.57+0.84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :