Alexco Reports Third Quarter 2013 Financial Results

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Marketwired
 
 
Alexco Resource Corp.
TSX: AXR
NYSE MKT: AXU
Other Recent News | Printer Friendly Version

November 14, 2013
Alexco Reports Third Quarter 2013 Financial Results
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Nov. 14, 2013) - Alexco Resource Corp. (TSX:AXR)(NYSE MKT:AXU) today reports its financial results for the third quarter of 2013. All figures are expressed in Canadian dollars unless otherwise stated. For the three months ended September 30, 2013, Alexco recorded income before taxes of $3.1 million and net income of $2.2 million or $0.04 per share.

Third Quarter Highlights

--  Contained metal production of 452,392 ounces silver, 3.7 million pounds
    lead and 1.1 million pounds zinc in a shortened operating quarter
    comprising 64 operational days 
--  Bellekeno mine revenue of $17.0 million and gross profit of $2.1
    million, on payable metal sales of 596,167 ounces of silver, 4.4 million
    pounds of lead and 1.0 million pounds of zinc 
--  As of early September, completed previously-announced interim suspension
    of Bellekeno mine and mill operations over the winter season to focus on
    cost cutting and permitting measures, as well as new plans including
    potential development of the Flame & Moth deposit. 
--  Recognized metal prices during the quarter averaged US$22.06 per ounce
    silver, US$0.96 per pound lead and US$0.86 per pound zinc 
--  Second quarter cash costs of production(1) of $12.93 per ounce of
    payable silver produced, net of by-product credits 
--  Alexco Environmental Group (AEG) third quarter 2013 gross profit of $4.2
    million compared to $1.0 million in 2012 
--  Announced an Amended and Restated Environmental Subsidiary Agreement
    with Canada in July, leading to approximately $2.4 million in resultant
    gains that are included in AEG's gross profit for the quarter 
--  Exploration drilling extended the Flame & Moth mineralized strike length
    to more than 900 meters, and identified a significant mineralized
    structure at the new (2012) Flame & Moth West discovery approximately
    one half kilometer west of Flame & Moth 

        (1) Cash costs of production per ounce of payable silver produced is
            a non-IFRS measure with no standardized meaning prescribed under
            IFRS. See page 13 of Alexco's September 30, 2013 Management's
            Discussion and Analysis (MD&A) for explanation and
            reconciliation.
 
Alexco's President and Chief Operating Officer, Clynt Nauman, said, "Our third quarter results were solid, especially given the fact that we only operated essentially two out of the three months of the quarter before suspending operations as previously planned. Most importantly, mill throughput increased 13% to a record 321 tonnes per day (tpd) relative to the prior quarter. The professionalism and performance of our operators during this phase-down period has been outstanding and an orderly suspension of operations achieved. Our financial results are also largely a result of a strong performance by our environmental business, which continues to grow with good operating margins, and was instrumental in enabling us to preserve our quarter-end working capital position at $15.4 million."

Nauman continued, "Our ongoing efforts have focused on putting an overall preliminary economic assessment together that encompasses Bellekeno, Lucky Queen and Flame & Moth. We also continue to talk to our third party agreement participants in efforts to lower the fixed costs to operate in the District. As well, we are evaluating underground exploration results from the latter part of the season. As these items are accomplished, we will be releasing reports on our progress."

Summary Financial Results and Information

---------------------------------------------------------------------------
(expressed in thousands of                                                 
 dollars, except per share and                                             
 recognized metal price            Three Months Ended     Nine Months Ended
 amounts)                                September 30          September 30
                                      2013       2012       2013       2012
---------------------------------------------------------------------------
                                                                           
Revenue from mining operations      17,038     17,310     42,449     57,828
Gross profit (loss) from mining                                            
 operations                          2,102      4,017       (229)    11,991
                                                                           
Revenue from environmental                                                 
 services                            6,356      2,779     11,821      6,571
Gross profit from environmental                                            
 services                            4,189      1,014      6,431      1,998
                                                                           
Revenue from all operations         23,394     20,089     54,270     64,399
Gross profit (loss) from all                                               
 operations                          6,291      5,031      6,202     13,989
                                                                           
Income (loss) before taxes           3,080      7,250    (61,574)     7,242
Net income (loss)                    2,219      5,265    (49,319)     3,939
Adjusted net income (loss)(1)        2,219      5,265     (3,182)     3,939
Total comprehensive income                                                 
 (loss)                              2,181      5,570    (49,466)     4,247
Earnings (loss) per share -                                                
 basic and diluted                   $0.04      $0.09     ($0.82)     $0.06
Cash flows from operating                                                  
 activities                          1,389      2,176       (747)    16,122
                                                                           
Recognized metal prices:(2)                                                
  Silver (USD per ounce)            $22.06     $34.18     $24.00     $31.80
  Lead (USD per pound)               $0.96      $0.96      $0.98      $0.93
  Zinc (USD per pound)               $0.86      $0.88      $0.88      $0.89
---------------------------------------------------------------------------

(1) Adjusted net income (loss) excludes amounts recorded with respect to
    impairment charges, and is a non-IFRS measure with no standardized
    meaning prescribed under IFRS. See page 14 of Alexco's September 30,
    2013 MD&A for explanation and reconciliation.
(2) Recognized metal prices represent average metal prices for revenue
    recognized over the period, weighted by dollar of revenue recognized.
 
Bellekeno Mine Operations

Average mill throughput in the three month period ended September 30, 2013 was 321 tpd compared to 270 tpd in the third quarter of calendar 2012 and 283 tpd during the three months ended June 30, 2013. Total mine production in the third quarter of 2013 was lower due to the shortened operating period, although production on a per-operating-day basis was higher as less sustaining development was undertaken in anticipation of the planned suspension of operations. Cash costs of production for the quarter were $12.93 per ounce of payable silver, compared to $10.48 in the third quarter of calendar 2012 and $13.10 in the immediately preceding quarter. Cost-per-ounce gains from higher production throughput in the current quarter were offset by lower absorption of fixed costs by the reduced sustaining development activity.

Comparative operating statistics for Bellekeno for the quarter and year-to-date are summarized as follows:

---------------------------------------------------------------------------
                                   Three Months Ended     Nine Months Ended
                                         September 30          September 30
                                    2013(1)      2012     2013(1)      2012
---------------------------------------------------------------------------
                                                                           
Ore tonnes mined                    19,551     24,237     65,206     64,905
Ore tonnes processed                20,520     24,573     66,297     68,033
Mill throughput (tonnes per                                                
 day)                                  321        270        271        249
Grade of ore processed:                                                    
  Silver (grams per tonne)             717        691        705        761
  Lead                                8.6%       8.9%       7.7%       9.6%
  Zinc                                4.1%       4.5%       3.8%       5.0%
Recoveries:                                                                
  Silver                               96%        94%        94%        93%
  Lead in lead concentrate             95%        93%        92%        90%
  Zinc in zinc concentrate             60%        51%        61%        54%
Concentrate production:                                                    
  Lead concentrate:                                                        
    Tonnes produced                  2,674      3,152      7,796      9,482
     Concentrate grade:                                                    
      Silver (grams per tonne)       5,134      4,957      5,458      4,914
      Lead                             62%        64%        60%        63%
  Zinc concentrate:                                                        
    Tonnes produced                  1,108      1,189      3,450      4,133
    Concentrate grade:                                                     
      Silver (grams per tonne)         308        326        360        429
      Zinc                             46%        47%        45%        45%
Production - contained metal:                                              
  Silver (ounces)                  452,392    514,879  1,408,164  1,555,136
  Lead in lead con (pounds)      3,665,305  4,471,580 10,324,978 13,063,304
  Zinc in zinc con (pounds)      1,112,594  1,227,269  3,443,855  4,083,612
Sales volumes by payable metal:                                            
  Silver (ounces)                  596,167    437,890  1,433,831  1,510,927
  Lead (pounds)                  4,369,672  3,628,904 10,731,089 12,827,972
  Zinc (pounds)                    989,535  1,016,365  3,094,840  3,688,825
Cash costs of production(2)                                                
  Per ounce of payable silver                                              
   produced                         $12.93     $10.48     $14.00     $12.18
---------------------------------------------------------------------------

(1) The three and nine months ended September 30, 2013 represent shortened
    operating periods encompassing 64 and 245 days respectively.
(2) Cash costs of production per ounce of payable silver produced is a non-
    IFRS measure with no standardized meaning prescribed under IFRS. See
    page 13 of Alexco's September 30, 2013 MD&A for explanation and
    reconciliation.
 
Keno Hill Exploration and Development

Exploration drilling carried out at Flame & Moth during summer 2013 confirmed a further 220 meter extension of the mineralized Flame Vein to the southwest of the currently defined resource (see news release dated September 18, 2013 entitled "Alexco Extends Flame & Moth to More Than 900 Meters in Strike Length; Silver Grades to 28.8 Ounces per Ton Over 5.6 Meters"). The deposit remains open down plunge to the southwest, and the hosting structure to the northeast. In addition, results from 2013 surface drilling at the Flame & Moth West prospect (formerly called the Bulldozer prospect), approximately one-half kilometer west of the Flame & Moth deposit, returned up to 28.7 ounces per ton silver over 0.85 meters true width on a separate but probably related structure. This confirmation of the 2012 discovery indicates the presence of a locally mineralized NNE-SSW trending corridor that is prospective over two kilometers in the immediate Christal Lake area and that may extend a further six kilometers northeast to the Sadie Ladue deposit.

In January 2013, Alexco announced an updated resource estimate for the Flame & Moth property incorporating drill results from the 2012 exploration program (see news releases dated January 31, 2013 entitled "Alexco Expands Flame & Moth Indicated Resource to 22.9 Million Ounces of Silver; Resource Grade Increased, Deposit Remains Open" and March 15, 2013 entitled "Alexco Files Flame & Moth Technical Report"). The current resources estimated for Flame & Moth comprise 1,378,000 tonnes indicated grading 516 grams per tonne silver, 1.72% lead and 5.70% zinc plus another 107,000 tonnes inferred grading 313 grams per tonne silver, 0.86% lead and 4.21% zinc.

Alexco Environmental Group

AEG had an excellent quarter, recording revenues of $6.4 million and gross profit of $4.2 million, compared to revenue of $2.8 million in the second quarter of 2012 and gross profit of $1.0 million. In July 2013, an Amended and Restated Subsidiary Agreement ("ARSA") was executed with the Government of Canada. As a result of that execution, included in current quarter revenues is $1.5 million in retroactive fees, and included in cost of sales is an almost $0.9 million reduction in Alexco's environmental services contract loss provision. The additional improvement in AEG revenues is attributed primarily to growth in AEG's client base within the US market. Excluding the impacts from the execution of the ARSA, in the third quarter of 2013 AEG achieved a solid gross margin of 37.9%, compared to 36.4% in the third quarter of 2012.

Outlook

Mining operations are targeted for re-start in 2014, depending on improvements in silver markets and the results of Alexco's efforts over winter to improve the underlying fixed cost structure of the operation. In light of the decision to suspend production from Bellekeno through winter, the full-year 2013 production guidance previously provided has been withdrawn.

Alexco is also nearing completion of an updated preliminary economic analysis for the Bellekeno mine, which will incorporate into the project mine plan both the Flame & Moth and Lucky Queen deposits with the objective of providing mine production to feed the full 407 tpd rated nameplate capacity of the mill and significantly increase the project life of mine. It is anticipated that one of the most significant factors that may lead to an improvement in the underlying fixed cost structure of the Bellekeno mine project will be an increase in mill throughput to full capacity.

Financial Position

Alexco's cash and cash equivalents at September 30, 2013 totaled $7.9 million compared to $10.9 million at June 30, 2013, while net working capital totaled $15.4 million compared to $15.6 million for the same dates respectively. The decrease in cash relative to net working capital is primarily a timing issue, reflecting the relative increase in accounts receivable as a result of the elevated deliveries of concentrate during September following the suspension of Bellekeno mine operations, and the additional amounts billable by AEG following execution of the ARSA.

Financial Report and Conference Call for Third Quarter 2013

Full details of the financial and operating results for the third quarter of 2013 are described in Alexco's interim condensed consolidated financial statements with accompanying notes and related Management's Discussion and Analysis. These documents and additional information on Alexco are available on the Company's website at www.alexcoresource.com and on SEDAR at www.sedar.com and on EDGAR at www.sec.gov/edgar.shtml.

Alexco is holding an audio webcast conference call to discuss these results at 11:00 a.m. Eastern (8:00 a.m. Pacific) on Friday, November 15, 2013. To participate in the live call, please use one of the following methods:

Dial toll free from Canada or the US: 1-877-407-8031

Dial from outside Canada or the US: 1-201-689-8031

Live audio webcast: www.alexcoresource.com

Participants should connect five to ten minutes before the call.

The conference call will be recorded, and an archived audio webcast will be available at www.alexcoresource.com. Through December 15, 2013, a replay of the call will be available by telephone at the following:

Dial toll free from Canada or the US: 1-877-660-6853

Dial from outside Canada or the US: 1-201-612-7415

Replay Passcodes: Account #286, Conference ID #100282

Qualified Persons

The disclosure in this news release of scientific and technical information regarding exploration projects on Alexco's mineral properties has been reviewed and approved by Alan McOnie, FAusIMM, Vice President, Exploration, while that regarding mine development and operations has been reviewed and approved by Scott Smith, P.Eng., former Bellekeno Mine Manager, both of whom are Qualified Persons as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

About Alexco

Alexco Resource Corp. owns the Bellekeno silver mine, one of several mineral properties held by Alexco which encompass substantially all of the historical Keno Hill Silver District located in Canada's Yukon Territory. Bellekeno, which commenced commercial production at the beginning of calendar year 2011, was Canada's only operating primary silver mine from 2011 to 2013. Alexco recently announced a suspension of operations at Bellekeno in order to decrease costs and reposition the District for long-term, sustainable operations. The Keno Hill Silver District lies within the traditional territory of the First Nation of Na-Cho Nyak Dun who have a fully settled land claim agreement with the Government of Canada and the Yukon, and Alexco operates within the District under a comprehensive cooperation and benefits agreement with the First Nation. Alexco's primary near-term exploration objective is to unlock value in the silver-rich Keno Hill District, and is focused on growth by advancing its promising District properties to development decisions. Employing a unique business model, Alexco also provides mine-related environmental services, remediation technologies and reclamation and mine closure services to both government and industry clients through the Alexco Environmental Group, its wholly-owned environmental services division.

Keno Hill Silver District History

Between 1921 and 1988, the Keno Hill Silver District was a world-class silver producer, with more than 217 million ounces of silver produced at average grades of 40.5 ounces per ton silver, 5.6% lead and 3.1% zinc (Yukon Government's Minfile database). These historical production grades would rank Keno Hill in the top 3% by grade of today's global silver producers.

Please visit the Alexco website at www.alexcoresource.com.

Some statements ("forward-looking statements") in this news release contain forward-looking information concerning the Company's anticipated results and developments in the Company's operations in future periods, planned exploration and development of its properties, plans related to its business and other matters that may occur in the future, made as of the date of this news release. Forward-looking statements may include, but are not limited to, statements with respect to future remediation and reclamation activities, future mineral exploration, the estimation of mineral reserves and mineral resources, the realization of mineral reserve and mineral resource estimates, future mine construction and development activities, future mine operation and production, the timing of activities and reports, the amount of estimated revenues and expenses, the success of exploration activities, permitting time lines, requirements for additional capital and sources and uses of funds. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results and timing of exploration and development activities; actual results and timing of mining activities; actual results and timing of environmental services activities; actual results and timing of remediation and reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of silver, gold, lead, zinc and other commodities; possible variations in mineable resources, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; First Nation rights and title; continued capitalization and commercial viability; global economic conditions; competition; and delays in obtaining governmental approvals or financing or in the completion of development activities. Forward-looking statements are based on certain assumptions that management believes are reasonable at the time they are made. In making the forward-looking statements included in this news release, the Company has applied several material assumptions, including, but not limited to, the assumption that market fundamentals will result in sustained silver, gold, lead and zinc demand and prices. There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as otherwise required by applicable securities legislation.

CONTACT INFORMATION:
Alexco Resource Corp.
Clynton R. Nauman
President and Chief Executive Officer
(604) 633-4888
Fax: (604) 633-4887
info@alexcoresource.com
www.alexcoresource.com

or

Alexco Resource Corp.
Vicki Veltkamp
Vice President Investor Relations
(604) 633-4888
Fax: (604) 633-4887
info@alexcoresource.com
www.alexcoresource.com
INDUSTRY: Manufacturing and Production - Mining and Metals

If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click .
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Alexco Resource Corp.

PRODUCER
CODE : AXR.TO
ISIN : CA01535P1062
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Alexco Resources is a silver development stage company based in Canada.

Alexco Resources produces silver, gold, lead and zinc in Canada, and holds various exploration projects in Canada.

Its main asset in production is KENO HILL (BELLEKENO) in Canada and its main exploration properties are BREWERY CREEK, LUCKY QUEEN YUKON, SPROGGE YUKON, HARLAN, KLONDIKE, MCQUESTEN, FLAME AND MOTH and BERMINGHAM in Canada.

Alexco Resources is listed in Canada and in United States of America. Its market capitalisation is CA$ 218.3 millions as of today (US$ 165.2 millions, € 147.5 millions).

Its stock quote reached its highest recent level on April 29, 2011 at CA$ 9.75, and its lowest recent point on March 13, 2015 at CA$ 0.34.

Alexco Resources has 93 680 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Alexco Resource Corp.
6/14/2011(Keno Hill (bellekeno))Reports Grid Power Outage Affecting Keno Hill
Annual reports of Alexco Resource Corp.
Annual report 2007
Financings of Alexco Resource Corp.
4/16/2013Alexco Amends Terms of $7 Million Flow-Through Financing
12/23/2009Closes $9.5 Million Flow-Through Private Placement
3/9/2009Flow-Through Private Placement
12/11/2007Closes Flow-Through Private Placement
11/22/2007Announces Flow-Through Private Placement
Option Grants of Alexco Resource Corp.
12/13/2011Alexco Amends Stock Option Plan for Annual General Meeting
12/13/2011Amends Stock Option Plan for Annual General Meeting
Nominations of Alexco Resource Corp.
1/28/2010Appoints Jim Harrington to President President
12/14/2009New Management Appointments
Financials of Alexco Resource Corp.
3/25/2015Reports Fourth Quarter and Year End 2014 Results
11/14/2013Alexco Reports Third Quarter 2013 Financial Results
8/15/2013Alexco Reports Second Quarter 2013 Financial Results
8/14/2013Reports Second Quarter 2013 Financial Results
5/8/2013Alexco Reports First Quarter 2013 Financial Results
5/8/2013Reports First Quarter 2013 Financial Results
3/27/2013Alexco Reports Financial Results for Year Ended December 31,...
3/27/2013Reports Financial Results for Year Ended December 31, 2012
11/5/2012Alexco Reports Third Quarter 2012 Financial Results
11/5/2012Reports Third Quarter 2012 Financial Results
8/7/2012Alexco Reports Second Quarter 2012 Financial Results
5/7/2012Alexco Reports First Quarter 2012 Earnings
5/7/2012Reports First Quarter 2012 Earnings
11/28/2011Alexco Reports First Fiscal Quarter Financial Results
11/28/2011Reports First Fiscal Quarter Financial Results
9/15/2011Reports Increased Revenue, Cash From Operations, Earnings an...
5/10/2010(Keno Hill (bellekeno))Bellekeno Silver Mine Project on Schedule for Third Quarter ...
Project news of Alexco Resource Corp.
12/5/2013Alexco Releases Positive Preliminary EconomicAssessment for ...
1/31/2013Alexco Expands Flame & Moth Indicated Resource to 22=2E9 Mil...
9/27/2012Alexco Completes Sale of Remaining Interest in Brewery Creek
9/27/2012(Brewery Creek)Completes Sale of Remaining Interest in Brewery Creek
6/28/2012Alexco Announces Initial Resource Estimates for Flame & Moth...
6/25/2012Alexco Reports Bellekeno Production Back Online After Wildfi...
6/25/2012Reports Bellekeno Production Back Online After Wildfire Disr...
2/22/2012Alexco Intersects Silver Mineralization to 26 Meters True Th...
2/22/2012(Bermingham)Intersects Silver Mineralization to 26 Meters True Thickness...
2/14/2012(Flame And Moth)Drills 8.9 Meters of 20.2 Ounces Per Ton Silver At Flame & M...
1/23/2012Alexco Silver Production Increases 21% to =?ISO-8859-1?Q?Mor...
12/8/2011Alexco Intersects Multiple Zones of Silver Mineralization to...
12/8/2011(Bermingham)Intersects Multiple Zones of Silver Mineralization to 22.2 M...
9/7/2011Alexco Intersects 6=2E04 Meters of 31=2E5 Ou =?ISO-8859-1?Q?...
9/7/2011(Flame And Moth)Intersects 6.04 Meters of 31.5 Ounces Per Ton Silver at Flam...
7/27/2011Alexco Announces Initial Resource Estimates for Lucky Queen ...
5/4/2011Alexco Releases Initial Production Results for Bellekeno Min...
5/4/2011(Keno Hill (bellekeno))Releases Initial Production Results for Bellekeno Mine; On T...
3/4/2011(Keno Hill (bellekeno))Provides Update on Bellekeno Operations and Outlines 2011 Ex...
3/3/2011Alexco Provides Update on Bellekeno Operations and Outlines ...
2/16/2011Alexco Resource Corp=2E: New Keno Hill Silver Discovery-4=2E...
2/16/2011(Flame And Moth)New Keno Hill Silver Discovery-4.26 Meters of 49.9 Oz Per To...
2/2/2011(Keno Hill (bellekeno))Receives Balance of Assays From Onek Zinc-Silver Deposit Dri...
1/6/2011(Keno Hill (bellekeno))Alexco Achieves Commercial Production at Bellekeno
3/4/2010(Keno Hill (bellekeno))Commences 2010 Expanded Exploration Program at Keno Hill
12/1/2009(Keno Hill (bellekeno))Additional 2009 Drill Results
11/18/2009(Keno Hill (bellekeno))Yukon Issues Quartz Mining License For Bellekeno Mine
11/12/2009(Keno Hill (bellekeno))Completes Positive Bellekeno Mine Development
11/5/2009(Keno Hill (bellekeno))Additional 2009 Drill Results
11/3/2009(Keno Hill (bellekeno))Additional 2009 Drill Results from Lucky Queen
10/15/2009(Keno Hill (bellekeno))Addicional 2009 Drill Results at Keno Hill
10/15/2009Announces Additional 2009 Drill Results at Keno Hill: Drilli...
7/15/2009(Keno Hill (bellekeno))Yukon Government Issues Positive Decision Document for Belle...
6/17/2009Passes Key Milestone in Permitting of the Bellekeno Mine
5/19/2009Intersects 7.8 Meters of 49.4 Ounces Per Ton Silver
5/14/2009(Keno Hill (bellekeno))Outlines 2009 Surface Exploration Plans at Keno Hill
9/19/2008(Keno Hill (bellekeno))Announces Additional 2008 Drill Results at Keno Hill
7/9/2008(Keno Hill (bellekeno))Positive Preliminary Economic Assessment on Bellekeno Deposi...
7/2/2008(Keno Hill (bellekeno))Announces Initial 2008 Drill Results at Keno Hill
3/25/2008(Keno Hill (bellekeno))Outlines 2008 Exploration and Development Plans at Keno Hill
2/13/2008(Keno Hill (bellekeno))Announces Final 2007 Drill Results from Keno Hill
10/23/2007Announces High Grade Native Silver Intercept from Lucky Quee...
10/16/2007Announces Significant High Grade Silver Intercepts From Sout...
9/6/2007Announces Discovery of High Grade Zinc Mineralization with S...
Corporate news of Alexco Resource Corp.
8/1/2016Alexco to Release Second Quarter 2016 Results on August 10, ...
7/29/2016Alexco Files Final Shelf Prospectus and Registration Stateme...
6/9/2016Alexco Reports Voting Results from Annual General Meeting
6/2/2016Alexco Resource Reminds Shareholders of Voting Cut-Off for U...
6/1/2016Alexco Initiates 2016 Bermingham Exploration and Other Work ...
5/17/2016Alexco Closed C$13 Million Non-Brokered Equity Financing
5/11/2016Alexco Reports First Quarter 2016 Results
5/11/2016Alexco Resource reports 1Q loss
5/5/2016Alexco Mails Information Circular in Connection with Annual ...
5/3/2016Alexco to Release First Quarter 2016 Results on May 11, 2016
4/27/2016Alexco Announces up to C$10 Million Non-Brokered Equity Fina...
3/23/2016Alexco Reports Fourth Quarter and Year End 2015 Results
3/23/2016Alexco Resource reports 4Q loss
10/26/2015Edited Transcript of AXR.TO earnings conference call or pres...
9/17/2015Alexco Drills 5 meters (True Width) of 7,462 grams per tonne...
8/11/2015Alexco Reports Second Quarter 2015 Financial Results
8/11/2015Alexco Resource reports 2Q loss
8/11/2015Alexco to Host Second Quarter 2015 Earnings Conference Call ...
5/26/2015Video-Mining Clips Analyst Update with Alexco President & CE...
4/10/2015Annual Report for Alexco Resource Corp.
3/25/2015Alexco Reports Fourth Quarter and Year End 2014 Results
3/13/2015Alexco to Release Fourth Quarter and Year End 2014 Results o...
3/13/2015to Release Fourth Quarter and Year End 2014 Results on March...
2/26/2015Yukon Ranks 1st in Mineral Potential and 9th Overall in the ...
1/20/2015Alexco Intersects 1,483 Grams per Tonne Silver (47.7 Ounces ...
12/23/2014Alexco Updates Positive Preliminary Economic Assessment for ...
11/14/2014Alexco Reports Third Quarter 2014 Financial Results
11/13/2014Alexco Reports Third Quarter 2014 Financial Results
11/13/2014Alexco to Host Third Quarter 2014 Earnings Conference Call a...
11/5/2014Alexco Drills Best Hole Ever: Intersects 5,667 Grams Per Ton...
11/4/2014Alexco to Release Third Quarter 2014 Results on November 13,...
11/3/2014Alexco Announces One Year Extension of Silver Stream Amendme...
8/28/2014Alexco Closes Underwriter's Over-Allotment Option
8/21/2014Completes C$7 Million Bought Deal Financing
7/29/2014Announces C$5 Million Equity Financing
12/12/2013Alexco Files Eastern Keno Hill Silver District Technical Rep...
11/4/2013Alexco to Release Third Quarter Financial Results On Novembe...
11/4/2013to Release Third Quarter Financial Results On November 14, 2...
9/23/2013Alexco Reports Silver Production for Third Quarter 2013
9/23/2013Reports Silver Production for Third Quarter 2013
9/18/2013Extends Flame & Moth to More Than 900 Meters in Strike Lengt...
8/27/2013Alexco Issues Statement on Market Activity
8/27/2013Issues Statement on Market Activity
8/9/2013Alexco to Release Second Quarter Financial Results On August...
8/8/2013to Release Second Quarter Financial Results On August 14, 20...
8/2/2013Alexco to Release Second Quarter Financial R =?ISO-8859-1?Q?...
8/2/2013to Release Second Quarter Financial Results the Week of Augu...
7/23/2013Alexco Announces Amended Environmental Subsidiar =?ISO-8859-...
7/23/2013Announces Amended Environmental Subsidiary Agreement with Ca...
7/17/2013Alexco Reports Increased Silver Production in Second Quarter...
7/17/2013Reports Increased Silver Production in Second Quarter 2013; ...
6/7/2013Alexco Reports Voting Results From Annual General Meeting
6/7/2013Reports Voting Results From Annual General Meeting
5/31/2013Alexco Implements Cost Savings Measures
5/31/2013Implements Cost Savings Measures
5/20/2013Alexco Receives Water Licence Amendment
5/20/2013Receives Water Licence Amendment
5/2/2013Alexco Adopts Advance Notice Policy
4/23/2013Alexco Reports Closing of $7 Million Flow-Through Financing
4/23/2013Reports Closing of $7 Million Flow-Through Financing
4/12/2013Alexco Reports First Quarter 2013 Production Results
4/12/2013Reports First Quarter 2013 Production Results
4/1/2013Alexco Arranges Fully Subscribed Flow-Through
3/15/2013Alexco Files Flame & Moth Technical Report
3/15/2013Files Flame & Moth Technical Report
1/31/2013Expands Flame & Moth Indicated Resource to 22.9 Million Ounc...
1/17/2013Alexco Reports 16% Increase in Silver Production for Fourth ...
1/14/2013Alexco Further Expands Flame & Moth Deposi =?ISO-8859-1?Q?t,...
1/14/2013Further Expands Flame & Moth Deposit, Robust Silver Grades a...
10/15/2012Alexco Reports 12% Increase in Silver Production for Third Q...
10/15/2012Reports 12% Increase in Silver Production for Third Quarter ...
10/9/2012Expands Flame & Moth Deposit: Reports Grades Up to 71 Ounces...
8/9/2012Alexco Files Flame & Moth and Bermingham Technical Reports
7/16/2012Alexco Reports Silver Production for Second Quarter 2012
7/16/2012Reports Silver Production for Second Quarter 2012
5/24/2012Alexco Commemorates Over Five Years at Keno Hill
5/24/2012Commemorates Over Five Years at Keno Hill
5/3/2012Alexco to Release Financial Results for Firs =?ISO-8859-1?Q?...
5/2/2012to Release Financial Results for First Quarter of 2012 on Ma...
4/16/2012Alexco Reports Silver Production Results for First Quarter 2...
4/16/2012Reports Silver Production Results for First Quarter 2012
3/29/2012Alexco Reports Fiscal Results for Six Months Ended December ...
3/26/2012=?ISO-8859-1?Q?Alexco=20to=20Release=20December=2031,=202011...
3/26/2012to Release December 31, 2011 Year End Financial Results on M...
3/5/2012Alexco Expands 2012 Surface and UndergroundExploration Plans...
3/5/2012Expands 2012 Surface and Underground Exploration Plans For K...
2/14/2012Alexco Drills 8=2E9 Meters of 20=2E2 Ounces =?ISO-8859-1?Q?=...
1/23/2012Silver Production Increases 21% to More Than 600,000 Ounces ...
9/15/2011=?ISO-8859-1?Q?Alexco=20Reports=20Increased=20Revenue,=20Cas...
9/9/2011Alexco to Release Fiscal 2011 Results on S =?ISO-8859-1?Q?ep...
8/3/2011Alexco Reports Increased Production in Second Quarter of Cal...
8/3/2011Reports Increased Production in Second Quarter of Calendar 2...
7/27/2011Announces Initial Resource Estimates for Lucky Queen and One...
6/17/2011Alexco Provides Update on Impact of Grid Power Outage at Ken...
6/15/2011Alexco Reports Grid Power Outage Affecting Keno Hill
5/12/2011Alexco Reports Net Income of $3=2E5M and Operating Cash Flow...
5/12/2011Reports Net Income of $3.5M and Operating Cash Flows of $7.2...
3/8/2010Awards Mining Services Contract
1/20/2010Terms of Equity Financing
6/29/2009Environmental Services Group Awarded Contract
1/8/2009Completes Disposition of Alexco Shareholding
5/22/2008 and the First Nation of the Na-Cho Nyak Dun Sign Cooperatio...
2/6/2008CLARIFIES TECHNICAL DISCLOSURE
1/15/2008Corporate Continuation Under Business Corporations Act
12/6/2007FINALIZES PURCHASE OF KENO HILL, FOCUSES ON BELLEKENO DEVELO...
11/16/2007Secures Water Licence for Care & Maintenance Work at Keno Hi...
11/13/2007Increases Bellekeno Resource in Keno Hill District: Initial ...
10/17/2007Corrects Website Problem
9/25/2007and First nation of the Na-Cho Nyak Dun Conclude Negatiation...
9/20/2007 Additional Bellekeno Project results at Keno Hill
9/18/2007Announces Additional 2007 Keno Drill results
9/17/2007Announces Approval to List its Common Share on the American ...
8/27/2007Continues to Advance the Keno Hill Project
8/21/2007Comments on Na-Cho Nyak Dun’s Suspension of Regulatory Dialo...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (AXR.TO)OTHER OTC (AXORF)
2.33-3.72%4.15+0.00%
TORONTO
CA$ 2.33
08/09 17:00 -0.090
-3.72%
Prev close Open
2.42 2.43
Low High
2.33 2.45
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  2.33 -%
Volume 1 month var.
172,544 -%
24hGold TrendPower© : 8
Produces Gold - Lead - Silver - Zinc
Develops
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/6/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :