Katanga Mining Announces 2012 Third Quarter Results and Appoints New Director

ZUG, SWITZERLAND, Nov. 14, 2012 /CNW/ - Katanga Mining Limited (TSX: KAT) ("Katanga" or the "Company") today announces its financial results for the third quarter of 2012. Katanga's Financial Statements and Management's Discussion and Analysis will be filed on SEDAR, www.sedar.com.

Highlights during the three and nine months ended September 30, 2012, and Outlook

Mining

  • During the three months ended September 30, 2012 ("Q3 2012"), the Company mined 1,596,822 tonnes of ore (29% higher than the three months ended September 30, 2011 ("Q3 2011")) at a grade of 4.29% resulting in contained copper in ore mined of 68,563 tonnes, approximately 274,000 tonnes on an annualized basis.  During the nine months ended September 30, 2012 ("Q3 YTD 2012"), the Company mined 4,128,283 tonnes of ore, 15% higher than the nine months ended September 30, 2011 ("Q3 YTD 2011"), at a grade of 4.04% resulting in contained copper in ore mined of 166,708 tonnes.
  • Ore mined and hoisted at KTO Underground Mine during Q3 2012 was a record 505,008 tonnes, a 27% increase over Q3 2011.  The average copper grade for Q3 2012 was 3.64%.  During Q3 YTD 2012, ore mined and hoisted was 1,377,893 tonnes, a 15% increase over Q3 YTD 2011.  The average copper grade for Q3 YTD 2012 was 3.65%.
  • Ore mined at KOV Open Pit during Q3 2012 was a record 1,091,814 tonnes, 30% above Q3 2011. The copper grade of ore mined from KOV Open Pit for Q3 2012 averaged 4.59%.  During Q3 YTD 2012, the Company mined 2,750,390 tonnes of ore, 38% above Q3 YTD 2011.  The copper grade of ore mined averaged 4.24%.
  • Higher grade ore has become available during Q3 2012 in Cut 1D as mud has been removed from the bottom of KOV Open Pit.

Processing

  • Ore milled at the Kamoto Concentrator ("KTC") during Q3 2012 was a production record of 1,274,850 tonnes, an increase of 24% from Q3 2011.  During Q3 YTD 2012, 3,511,566 tonnes were milled, an increase of 17%.
  • Notwithstanding the power availability issues detailed below, copper produced in metal and concentrate for Q3 2012 totalled a production record of 25,868 tonnes, and an increase of 9% compared to Q3 2011. For Q3 YTD 2012, 68,929 tonnes were produced, with copper metal produced increasing by 14%.
  • Cobalt produced totalled 521 tonnes for Q3 2012.  During Q3 YTD 2012, 1,591 tonnes were produced.
  • Copper and cobalt production continued to be adversely affected by recurrent general power disruptions in the DRC. During Q3 2012, approximately 516 production hours were lost across the operation due to power disruptions. This amounts to approximately 21 days of lost production and includes the time from the power disruption until equipment is operating at pre power disruption capacity. The lost production hours across the operation during Q3 YTD 2012 amounted to approximately 1,187 hours or 49 days. The lost production time excludes the adverse impact on equipment availability due to the unplanned shut downs and subsequent start ups of the equipment due to the power disruptions. The new convertor as part of the World Bank power project and the new synchronous condenser as part of the refurbishment of the DRC's power generating, transmission and distribution systems are expected to be commissioned during the fourth quarter of 2012.  Commissioning has been affected by the transport industry strike in South Africa during September and October 2012 as well as the strike at the Kasumbalesa border post during October 2012.
    Post commissioning, the Company expects power disruptions to decrease. In the medium to long term, improvements in infrastructure as a result of the Power Project are expected to improve the reliability and stability of electricity supplies generally.

Financial

  • Total sales for Q3 2012, were $133.6 million and for Q3 YTD 2012 were $370.8 million.
  • The sales value of oxide concentrate available to be shipped but not invoiced as at September 30, 2012, amounted to approximately $124.7 million and the sales value of copper nodules available to be shipped as at September 30, 2012, amounted to approximately $98.7 million.  The Company commenced exporting copper nodules during Q3 2012.
  • For Q3 2012, the Company generated a net income attributable to shareholders of $14.8 million, and for Q3 YTD 2012, the Company generated a net income of $31.6 million.
  • Cash and cash equivalents as at September 30, 2012, amounted to $33.8 million.

Outlook

  • Due primarily to the strikes in South Africa and at the Kasumbalesa border post, the Company expects the first copper cathode production through the new Solvent Extraction "SX" plants and converted copper Electro-Winning "EW" facility during the fourth quarter of 2012. Mechanical completion of the Updated Phase 4 Expansion is expected in the third quarter of 2013.
  • The first phase of the feasibility study for the potential T17 underground mine is expected to be completed during the first quarter of 2013. This will potentially allow for the exploitation of additional T17 mineral resources below the bottom of the current open pit through underground mining techniques.

Katanga also announces that Mr. Cornelis Erasmus, non-executive Director and Member of the Audit Committee of the Company, has resigned to pursue other opportunities.

Mr. Liam Gallagher has joined Katanga as non-executive Director and Member of the Audit Committee. Mr. Gallagher is currently employed with Glencore International AG and also serves as Director of Mutanda Mining Sprl. He holds an Honours degree in Commerce from Stellenbosch University and is qualified as a Chartered Accountant of South Africa. Mr. Gallagher was appointed for a term expiring at the next annual general meeting of shareholders of the Company in 2013.

This Press Release was prepared under the supervision of Tim Henderson, Technical Consultant, Katanga and a "qualified person" as such term is defined in NI 43-101. Mr. Henderson has reviewed and approved the contents of this press release.

About Katanga Mining Limited
Katanga Mining Limited operates a major mine complex in the Democratic Republic of Congo producing refined copper and cobalt. The Company has the potential to become Africa's largest copper producer and the world's largest cobalt producer. Katanga is listed on the Toronto Stock Exchange under the symbol KAT.

Forward Looking Statements
This press release may contain forward-looking statements, including, but not limited to, the value of oxide concentrate available to be shipped but not invoiced, the sales value of copper nodules available to be shipped, the increase in copper and cobalt production levels, the first copper cathode production through the new SX plants, the mechanical completion of the Updated Phase IV expansion, the commencement of the export of copper nodules, the anticipated decrease in power disruption relating to the upgrade in power infrastructure and the completion of the feasibility study for the potential T17 underground mine. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, the actual results of current exploration activities; actual results and interpretation of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of copper and cobalt; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of exploration, development or construction activities, as well as those factors disclosed in the Company's current annual information form and other publicly filed documents. Although Katanga has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events, or otherwise, except in accordance with applicable securities laws.

 

SOURCE: Katanga Mining Limited

For further information:

Jeff Best
CEO
Tel: +41 (041) 766 71 10
 
Nico Paraskevas
CFO
Tel: +41 (041) 766 71 10

Data and Statistics for these countries : South Africa | Switzerland | All
Gold and Silver Prices for these countries : South Africa | Switzerland | All

Katanga Mining Limited

PRODUCER
CODE : KAT.TO
ISIN : CA4858471077
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Katanga is a copper development stage company based in United kingdom.

Katanga produces copper, cobalt in Congo Dem. Rep. of, develops cobalt and copper in Congo Dem. Rep. of, and holds various exploration projects in Congo Dem. Rep. of.

Its main asset in production is KAMOTO UNDERGROUND in Congo Dem. Rep. of, its main assets in development are KINSEVERE and KOV in Congo Dem. Rep. of and its main exploration properties are MASHAMBA EAST, LAILU, GREENFIELD, KAMOTO CONCENTRATOR, KANANGA, MUSONOIE and KOLWEZI in Congo Dem. Rep. of.

Katanga is listed in Canada and in United States of America. Its market capitalisation is CA$ 295.6 millions as of today (US$ 220.0 millions, € 195.0 millions).

Its stock quote reached its highest recent level on March 02, 2007 at CA$ 9.98, and its lowest recent point on April 03, 2020 at CA$ 0.05.

Katanga has 1 907 380 413 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Katanga Mining Limited
2/21/2019Suspended cobalt sales, higher costs fuel Katanga's Q4 loss
12/18/2018Glencore's Katanga says it agreed settlement in Canadian pro...
12/13/2017Shares in Toronto-listed Katanga Mining surge 50% on Congo m...
11/21/2017Top Glencore executive quits Katanga board after accounting ...
4/10/2008Announces Agreement on Transfer of Mashamba West and Dikuluw...
Annual reports of Katanga Mining Limited
2007 Annual Report
Nominations of Katanga Mining Limited
9/25/2013appoints new Chief Operating Officer
9/22/2011Announces Appointment of New CEO
5/9/2011(KAT.TO) Press release: Katanga Mining appoints new COO
4/7/2011APPOINTS NEW CFO
12/22/2009Appointment of CEO
11/5/2009(KAT.TO) Press Release: KAT Announces Appointment of New Dir...
5/29/2007Appoints Agent for Copper and Cobalt Marketing
Financials of Katanga Mining Limited
11/14/2014Announces 2014 Third Quarter Financial Results, Commitment o...
8/8/2014announces 2014 second quarter financial results
5/9/2011(KAT.TO) Press release: Katanga Mining announces First Quart...
2/11/2011 Katanga Mining announces 2010 Fourth Quarter and Year End R...
8/6/2010Q2 Financial Results
2/10/20102009 Fourth Quarter and Year-End Resuls
5/19/2009(KAT.TO) Press Release: KAT Announces First Quarter Results
Project news of Katanga Mining Limited
3/8/20162 dead, 5 missing after landslide at Congo copper mine
6/8/2011(KAT.TO) Press release: Interest Payment on Katanga Notes
8/12/2008(Kamoto Underground)Project Update & 2Q 2008 Financials
12/18/2007(Kamoto Underground) Successfully Produces First Copper Cathode
Corporate news of Katanga Mining Limited
6/7/2016Katanga Mining Announces Resignation of Chief Operating Offi...
5/13/2016Katanga Mining Announces 2016 First Quarter Results and Elec...
5/4/2016Katanga Mining Announces First Quarter 2016 Production Resul...
11/3/2015Katanga Mining Announces Third Quarter 2015 Production Resul...
11/3/2015Katanga Mining Announces Third Quarter 2015 Production Resul...
9/11/2015Katanga Mining Announces Suspension of Copper and Cobalt Pro...
9/11/2015IIROC Trade Resumption - KAT
9/11/2015IIROC Trading Halt - KAT
9/6/2015Katanga Mining Announces Review of Business
8/13/2015Katanga Mining Announces 2015 Second Quarter Financial Resul...
8/12/2015Katanga Mining announces 2015 second quarter results
2/12/2015Katanga Mining Announces 2014 Year End Financial Results and...
2/11/2015Katanga Mining announces 2014 year end financial results and...
2/11/2015Katanga Mining Announces 2014 Year End Operational Highlight...
2/11/2015Katanga Mining Annoucnes Ore Reserves and Mineral Resources
2/10/2015Katanga Mining Announces Ore Reserves and Mineral Resources
2/10/2015Katanga Mining Announces 2014 Year End Operational Highlight...
1/5/2015Katanga Mining Appoints New Chief Operating Officer
1/5/2015Katanga Mining Appoints New Chief Operating Officer
11/26/2014Katanga Mining Announces Execution of Extended and Increased...
11/26/2014Katanga Mining announces execution of extended and increased...
11/26/2014announces execution of extended and increased loan facilitie...
11/14/2014Katanga Mining Announces 2014 Third Quarter Financial Result...
11/3/2014Katanga Mining announces third quarter 2014 production resul...
11/3/2014announces third quarter 2014 production results and date for...
5/15/2014announces 2014 first quarter results and election of directo...
5/5/2014announces first quarter 2014 production results and date for...
2/10/2014announces 2013 year end operational highlights, and outlook
11/14/2013announces 2013 third quarter financial results and appoints ...
10/30/2013announces Q3 2013 production results and date for release of...
8/12/2013announces Q2 2013 production results and date for release of...
5/10/2013announces 2013 first quarter results and election of directo...
2/11/2013announces 2012 year end operational highlights, outlook and ...
11/14/2012Announces 2012 Third Quarter Results and Appoints New Direct...
10/30/2012Announces Q3 2012 Production Results and Date for Release of...
9/1/2011Completes Continuance to the Yukon Territory
8/22/2011Proceeds to Procure Long-Lead Items for the Phase 4 Expansio...
8/5/2011announces departure of CEO
3/31/2011ANNOUNCES FILING OF AIF AND INDEPENDENT TECHNICAL REPORT
6/8/2010Interest Payment on Katanga Notes
10/7/2009(KAT.TO) Press Release: KAT Announces Termination of Remaini...
9/23/2009KAT Completes Acquisition of KOL
9/8/2009(KAT.TO) Press Release: KAT Announces Accelerated Developmen...
8/28/2009(KAT.TO) Press Release: KAT Announces Signing of Share Purch...
7/27/2009Signing of Finalised Joint Venture Agreement
6/17/2009(KAT.TO) Press Release: KAT Extends Deadline for Ineligible ...
6/11/2009(KAT.TO) Press Release: KAT Completes US$172.3 Million Early...
6/2/2009(KAT.TO) Press Release: KAT Announces Exchange of US$265.3 M...
5/14/2009(KAT.TO) Press Release: KAT Comments on Trading of Common Sh...
2/11/2009(KAT.TO) Press Release: Convertible Loan Facility
1/12/2009(KAT.TO) Press Release: Loan Facility
1/12/2009(KAT.TO) Press Release: Authorized Share Capital
1/7/2009(KAT.TO) Press Release: Proxy Cut-off
12/24/2008(KAT.TO) Press Release: Convertible Loan Facility
11/26/2008Luilu plant resumes copper and cobalt metal production
11/21/2008(KAT:TO) Press Release: Kolwezi Concentrator Update 21 Nov 2...
11/12/2008(KAT.TO) Press Release: Damage to Luilu Transformer
11/4/2008KAT Project Update & 3Q Financials Call November 7
6/16/2008Announces Intended Resignation of CEO
6/12/2008Interest Payment on KAT Notes June 12
2/21/2008Receives Summary Findings of DRC Mining Contract Review
2/8/2008Announces Agreement on Transfer of Mashamba West and Dikuluw...
1/29/2008(KAT.TO) Press Release: KAT Progresses Consolidation of Join...
1/22/2008Operations Integrated
1/11/2008(KAT.TO) Press Release: KAT Completes Merger with Nikanor to...
12/10/2007Interest Payment on KAT Notes
11/27/2007 Starts Luilu Metallurgical Plant on Schedule
11/6/2007 Recommended Merger of Katanga and Nikanor to Create a Leadi...
11/5/2007 Announce Completion of US$150 Million Loan
11/2/2007Receives Shareholder Approval for Increase in Authorized Sha...
10/11/2007 Site Progress Update
10/4/2007Announces US$150 Million Loan Following Review of Strategic ...
9/6/2007Response to Withdrawal of Unsolicited Offer
8/29/2007Recommends No Action in Response to Unsolicited Offer
8/22/2007Sets Special Meeting Date
8/9/2007Continues to Protect Shareholders from Creeping Takeover Att...
8/2/2007Site Progress Update
7/18/2007Announces Concentrator Commissioning
7/17/2007Clarifies Interest Capitalization on Unsecured Subordinated ...
7/6/2007Statement Regarding Letter from CAMEC
6/28/2007Change in Shareholdings
5/22/2007Site Update from Katanga Mining Limited (KAT.TO)
5/18/2007Focused on Growth Strategy
5/15/2007Clarification Statement
5/10/2007Enacts Shareholder Rights Plan to Prevent Creeping Takeover
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (KAT.TO)Other OTC (KATFF)
0.155+0.00%0.117+0.00%
TORONTO
CA$ 0.155
06/05 14:19 -
0%
Prev close Open
0.155 0.160
Low High
0.155 0.160
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.155 -%
Volume 1 month var.
130,625 -%
24hGold TrendPower© : 23
Produces Cobalt - Copper
Develops Cobalt - Copper
Explores for Cobalt - Copper - Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/9/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202024.00%0.160.05
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :