In the same category
Alacer announces attributable gold production of 90,951 ounces for third quarter 2012 & on track to meet 2012 guidance
Published : October 23, 2012
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Alacer announces attributable gold production of 90,951 ounces for third quarter 2012 & on track to meet 2012 guidance

TORONTO, Oct. 23, 2012 /CNW/ - Alacer Gold Corp. ("Alacer" or the "Company") [TSX: ASR] and [ASX: AQG] is pleased to announce third quarter 2012 mine production for its operations in Turkey and Australia. Third quarter 2012 financial statements and the related management's discussion and analysis are planned to be released on November 14, 2012 (North America) and November 15, 2012 (Australia).

Third Quarter 2012 Highlights

Gold Production   Q3
2011
Q4
2011
Q1
2012
Q2
2012
Q3
2012
Q3 vs Q2
2012
Çöpler (100%) (oz) 53,200 57,800 44,564 51,212 40,843 -20%
Higginsville (oz) 35,018 34,263 33,329 35,227 32,357 -8%
SKO (incl. 49% of Frogs Leg) (oz) 24,462 21,798 22,397 19,787 25,920 31%
Total (oz) 112,680 113,861 100,290 106,226 99,120 -7%
Total (Alacer attributable1) (oz) 110,020 110,971 91,377 95,984 90,951 -5%

  • Attributable gold production totalled 90,951 ounces and attributable gold sold totalled 99,355 ounces for the quarter.
  • Attributable Çöpler gold production of 32,674 ounces for the quarter was in line with the revised mining plan to pursue more competent and harder rock in the Manganese and Marble Pits. Mining progressed through lower grade areas of Manganese and Marble Pits during the quarter with higher grade areas scheduled to be mined during Q4 2012.
  • Gold production from Higginsville of 32,357 ounces for the quarter was slightly lower than forecast primarily as a result of the cessation of mining low grade pits and lower grade ore than forecast being mined from the Trident underground mine.
  • Chalice underground mine development proceeded ahead of schedule, with the initial stope mined in the Atlas Lode during September 2012.
  • Gold production from South Kalgoorlie Operations ("SKO") for the quarter increased to 25,920 ounces, largely due to higher mined grades from both the Triumph open pit and the Frog's Leg underground mine.

David Quinlivan, President and CEO of Alacer, stated "Improving production performance at the Australian mines and expected higher grades at Çöpler in the last quarter of 2012 means we should be on track to meet our full-year 2012 production guidance. We have also implemented the first of a number of cost savings initiatives in Australia by demobilizing two mining fleets at South Kalgoorlie and laying off all workers associated with the operation and maintenance of those fleets.  We expect to implement additional cost-savings measures in Australia over the course of the coming months." 

_________________________________
1Attributable gold production reflects Alacer's 80% ownership in 2012 and 95% in 2011 of the Çöpler Gold Mine.

Operations

Çöpler Gold Mine

Çöpler Gold Mine   Q3
2011
Q4
2011
Q1
2012
Q2
2012
Q3
2012
Ore treated (100%) (tonnes) 1,777,562 1,939,879 1,776,559 1,618,228 1,747,816
Head grade (g/t) 2.06 1.70 1.69 1.67 1.55
Recovery1 (%) 65.0% 65.0% 57.9% 57.3% 61.1%
Total gold produced (100%) (oz) 53,200 57,800 44,564 51,212 40,843
Alacer ownership (%) 95% 95% 80% 80% 80%
Attributable gold produced (oz) 50,540 54,910 35,651 40,970 32,674
1 Gold recovery rate is indicative of the modeled recovery of ore placed on the heap-leach pad
during the respective quarter.
  • Attributable Çöpler gold production decreased to 32,674 ounces for the quarter (Q2 attributable: 40,970 ounces) in line with the revised mining plan to pursue more competent and harder ore from the Manganese and Marble open pits and less clay-rich ore from the Main open pits.
  • Mining of higher-grade ore from the 1120 to 1130mRL benches in the Manganese open pit and the 1250mRL bench in the Marble open pit commenced in September 2012 and, in line with the revised mining plan, is scheduled to continue during Q4 2012.
  • During the quarter, ore was mined from the Manganese open pit (1,008,687 tonnes), the Marble open pit (328,626 tonnes) and the Main open pits (431,988 tonnes). Crusher throughput increased during the quarter as the clay-rich ore from the Main pit being fed into the crusher at the start of the quarter was progressively substituted with more competent and harder ore from the Manganese and Marble open pits. 
  • A total of 1,110,774 tonnes of ore at 2.0g/t gold were crushed and stacked on the leach pad during the quarter (Q2: 926,361 tonnes crushed at 2.1g/t). Ore crushed and stacked during the month of September totaled 436,143 tonnes at 3.2g/t gold.
  • The increased amount of ore crushed from the Manganese and Marble open pits also contributed to the modeled gold recovery increasing to 61.1% for the quarter (Q2: 57.3%).  The majority of gold from the higher grade ore stacked in late Q3 2012 is expected to be recovered in Q4 2012.
  • Run-of-mine ore placed directly on the heap-leach pad totaled 637,042 tonnes at 0.8g/t gold (Q2: 691,867 tonnes at 1.1g/t).
  • Detailed design work for a new clay-sizing circuit, that will operate in parallel with the existing crushing circuit and a new larger capacity agglomeration circuit at Çöpler continued during the quarter. The new crushing and agglomeration facilities will allow ore to be sized, crushed and agglomerated at a targeted throughput rate of 20,000 tonnes per day. Projects to increase the capacity of the carbon-in-column tanks are also being evaluated.
  • The Çöpler Sulfide Feasibility Study remains on track for completion in late 2012. The outcomes from this study will be released in Q1 2013.
  • An updated Çöpler resource estimate was released during the quarter. The Measured and Indicated Resources increased to 182.6 million tonnes at a grade of 1.4g/t gold, containing a total of 8.0 million ounces (inclusive of reserves) as at June 30, 2012.

Higginsville Gold Operations (100% owned)

Higginsville Gold
Operations
  Q3
2011
Q4
2011
Q1
2012
Q2
2012
Q3
2012
Ore treated (tonnes) 318,752 349,927 332,299 345,134 355,554
Head grade (g/t) 3.47 3.13 3.23 3.26 2.92
Recovery (%) 96.8% 97.2% 96.5% 97.3% 96.9%
Gold produced (oz) 35,018 34,263 33,329 35,227 32,357

  • Higginsville gold production decreased to 32,357 ounces of gold for the quarter (Q2: 35,227 ounces), primarily due to lower grade ore being processed.
  • Ore mined from Trident was 241,214 tonnes (Q2: 254,736 tonnes) at an average grade of 3.5g/t gold for the quarter (Q2: 3.8g/t). The lower Trident grade was due to mining lower grade stopes in the Apollo Lode within the mining schedule, excessive dilution of one large Athena Lode stope as a result of failure of the ultramafic hangingwall and localized negative grade reconciliations.
  • The Trident decline reached the 640mRL at the end of the quarter, with the first ore from the Helios and Artemis Lodes being expected on the 600mRL.
  • At Chalice, mining of the initial Atlas Lode stope commenced in September 2012.  Chalice contributed a total of 25,888 tonnes (Q2: 4,936 tonnes) mined at an average grade of 2.1g/t gold for the quarter (Q2: 2.3g/t).  Chalice tonnes and grade are planned to increase in Q4 2012 with more stoping ore being mined.
  • The focus for Chalice mine development is now on advancing the main decline in order to access the higher grade Olympus and Grampian Lodes during 2013.  The Chalice decline reached the 1,055mRL at the end of the quarter.
  • Construction of surface infra-structure for the Chalice mine was completed during the quarter.
  • Ore will be sourced entirely from the Trident and Chalice underground mines during Q4.
  • A detailed review of several initiatives to control costs and better manage cash flow were undertaken at Higginsville during the quarter, including the deferral of the exploration decline to access the Corona deposit.

South Kalgoorlie Operations (100% owned except for 49% interest in Frog's Leg Mine)

SKO
(including 49% of Frog's Leg)
Q3
2011
Q4
2011
Q1
2012
Q2
2012
Q3
2012
Ore treated (tonnes) 316,605 309,654 325,626 333,959 327,452
Head grade (g/t) 2.20 2.01 2.36 2.02 2.67
Recovery (%) 91.6% 92.0% 90.7% 91.0% 92.2%
Gold produced (oz) 24,462 21,798 22,397 19,787 25,920


  • Gold production from SKO (including Frog's Leg ore) increased to 25,920 ounces for the quarter (Q2: 19,787 ounces) due to improved head grade and gold recovery.
  • Gold production from processing Frog's Leg ore increased to 14,666 ounces (Q2: 10,858 ounces), due to processing 97,209 tonnes (Q2: 76,076 tonnes) at a higher grade of 5.1g/t gold (Q2: 4.9g/t).
  • Alacer's 49% share of ore mined at Frog's Leg during the quarter totalled 74,461 tonnes (Q2: 88,584 tonnes) at an average grade of 6.2g/t gold (Q2: 5.0g/t).
  • Gold production from processing South Kalgoorlie open-pit ore increased to 11,254 ounces (Q2: 8,929 ounces), as a result of processing lower tonnage of 230,243 tonnes (Q2: 257,883 tonnes) at a higher grade of 1.7g/t gold (Q2: 1.2g/t).
  • Ore mined from the Triumph and Pernatty open pits totalled 228,595 tonnes at 1.8g/t gold (Q2: 175,249 tonnes at 1.5g/t) during the quarter. Grade improved from these pits as less peripheral low-grade ore was mined and the high-grade core of these orebodies was accessed.
  • Mining of the Triumph open pit is planned to be completed in late October 2012. SKO now has only one active open-pit mining fleet at Pernatty, thus reducing ongoing fixed costs.

Third Quarter 2012 Production Statistics

        SKO South
Kalgoorlie
Alacer
Gold
    Çöpler Higginsville Frog's
Leg
(49%)
Other Operations
Total
Total
U/G ore mined (tonnes) - 267,102 74,461 - 74,461 341,563
U/G mined grade (g/t) - 3.38 6.15 - 6.15 3.99
U/G mined ounces (ounces) - 29,064 14,728 - 14,728 43,792
O/P ore mined (tonnes) 1,769,301 12,063 - 228,595 228,595 2,009,959
O/P waste mined (tonnes) 5,759,423 47,023 - 2,102,163 2,102,163 7,908,609
O/P mined grade (g/t) 1.59 5.11 - 1.78 1.78 1.64
O/P ounces mined (ounces) 90,629 1,983 - 13,115 13,115 105,727
Total tonnes mined (tonnes) 1,769,301 279,165 74,461 228,595 303,056 2,351,522
Total mined grade (g/t) 1.59 3.46 6.15 1.78 2.86 1.98
Total mined ounces (ounces) 90,629 31,047 14,728 13,115 27,843 149,519
Ore treated (tonnes) 1,747,816 355,554 97,209 230,243 327,452 2,430,822
Head grade (g/t) 1.55 2.92 5.09 1.65 2.67 1.87
Recovery1 (%) 61.1 96.9 92.2 92.2 92.2 80.9
Gold produced2 (oz) 40,843 32,357 14,666 11,254 25,920 99,120
Gold sold (oz) 44,777 36,875 15,072 11,586 26,658 108,310
Attributable gold
produced3
(oz) 32,674 32,357 14,666 11,254 25.920 90,951
Attributable gold
sold3
(oz) 35,822 36,875 15,072 11,586 26,658 99,355
1For Çöpler, recovery rate is indicative of the modeled recovery of ore placed on the heap-leach pad
during the respective quarter.
2Ounces produced is gold poured and includes net change of gold‐in‐circuit, except Çöpler which is
ounces poured.
3Attributable gold reflects Alacer Gold's 80% ownership of Çöpler.

Financial Results and Conference Call

Third quarter 2012 financial statements and management's discussion and analysis are planned to be released on Wednesday, November 14 (North America) and Thursday, November 15 (Australia). Alacer will host a conference call on Wednesday, November 14 at 6:00 pm (North America Eastern Standard Time) and Thursday, November 15 at 9:00 am (Australian Eastern Standard Time).

You may participate in the conference call by dialing:

1-888-401-4689   for U.S. and Canada
1-800-094-765   for Australia
800-968-103   for Hong Kong
800-120-3236   for Singapore
0-800-404-7656   for United Kingdom
1-719-325-2216   for International
7488352   Conference ID

If you are unable to participate in the call, a recording of the call will be available on Alacer's website at www.AlacerGold.com or through replay until November 28, 2012 by using passcode 7488352 and calling:

1-888-203-1112   for U.S. and Canada
1-800-154-669   for Australia
800-901-108   for Hong Kong
800-101-2009   for Singapore
0-808-101-1153    for United Kingdom 
1-719-457-0820   for International

About Alacer

Alacer Gold Corp. is a leading intermediate gold mining company with interests in multiple mines which provide ore to three processing facilities in Australia and Turkey:

  • 80% interest in the Çöpler Gold Mine;
  • 100% interest in the Higginsville Gold Operations;
  • 100% interest in the South Kalgoorlie Gold Operations; and
  • 49% interest in the Frog's Leg Gold Mine.

Alacer's operations produced a total of 411,193 attributable ounces of gold during 2011.

Alacer Gold is executing a growth strategy through the use of cash flows to grow production and cash margins to generate strong capital returns. While the primary objective is organic growth, the Corporation also identifies and evaluates strategic transactions that will add shareholder value.

Qualified Persons

The information in this report which relates to Mineral Resources is based on information prepared by Lisa Bascombe, a full-time employee of Alacer and a Member of the Australian Institute of Geoscientists.

The information in this report which relates to Mineral Resources has been reviewed by Chris Newman, a full-time employee of Alacer, who is a Member of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists.

Ms. Bascombe and Mr. Newman have sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which is being undertaken to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" and a qualified person pursuant to National Instrument 43-101 of the Canadian Securities Administrators.  Ms. Bascombe and Mr. Newman consent to the inclusion in this release of the matters based on this information in the form and context in which it appears.

Cautionary Statements

Except for statements of historical fact relating to Alacer, certain statements contained in this press release constitute forward-looking information, future oriented financial information, or financial outlooks (collectively "forward-looking information") within the meaning of Canadian securities laws. Forward-looking information may be contained in this document and other public filings of Alacer. Forward-looking information often relates to statements concerning Alacer's future outlook and anticipated events or results and, in some cases, can be identified by terminology such as "may", "will", "could", "should", "expect", "plan", "anticipate", "believe", "intend", "estimate", "projects", "predict", "potential", "continue" or other similar expressions concerning matters that are not historical facts.

Forward-looking information includes statements concerning, among other things, matters relating to proposed exploration, communications with local stakeholders and community relations, status of negotiations of joint ventures, weather conditions at our operations, commodity prices, mineral resources, mineral reserves, realization of mineral reserves, existence or realization of mineral resource estimates, the development approach, the timing and amount of future production, timing of studies and analyses, the timing of construction of proposed mines and process facilities, capital and operating expenditures, economic conditions, availability of sufficient financing, exploration plans and any and all other timing, exploration, development, operational, financial, budgetary, economic, legal, social, regulatory and political factors that may influence future events or conditions. Such forward-looking information and statements are based on a number of material factors and assumptions, including, but not limited in any manner to, those disclosed in any other of Alacer's filings, and include exploration results and the ability to explore, the ultimate determination of mineral reserves, availability and final receipt of required approvals, titles, licenses and permits, sufficient working capital to develop and operate the mines, access to adequate services and supplies, commodity prices, ability to meet production targets, foreign currency exchange rates, interest rates, access to capital markets and associated cost of funds, availability of a qualified work force, ability to negotiate, finalize and execute relevant agreements, lack of social opposition to the mines, lack of legal challenges with respect to the property of Alacer and the ultimate ability to mine, process and sell mineral products on economically favorable terms. While we consider these factors and assumptions to be reasonable based on information currently available to us, they may prove to be incorrect.

You should not place undue reliance on forward-looking information and statements.  Forward-looking information and statements are only predictions based on our current expectations and our projections about future events.  Actual results may vary from such forward-looking information for a variety of reasons, including but not limited to risks and uncertainties disclosed in Alacer's filings at www.sedar.com and other unforeseen events or circumstances. Other than as required by law, Alacer does not intend, and undertakes no obligation to update any forward-looking information to reflect, among other things, new information or future events. 

 

 

 

 

SOURCE: ALACER GOLD CORP.

For further information:

Lisa Maestas - North America at +1-303-292-1299
Roger Howe - Australia at +61-2-9953-2470

Data and Statistics for these countries : Australia | Canada | Hong Kong | Singapore | Turkey | United Kingdom | All
Gold and Silver Prices for these countries : Australia | Canada | Hong Kong | Singapore | Turkey | United Kingdom | All

Alacer Gold Corp.

PRODUCER
CODE : ASR.TO
ISIN : CA0329001022
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Alacer Gold is a gold producing company based in United states of america.

Alacer Gold produces gold, copper and silver in Australia and in Turkey, and holds various exploration projects in Australia and in Turkey.

Its main assets in production are HIGGINSVILLE - CHALICE, SOUTH KALGOORLIE GOLD MINE, HIGGINSVILLE - TRIDENT, HIGGINSVILLE - FAIRPLAY, HIGGINSVILLE - PALAEOCHANNELS and TRIDENT GOLD MINE in Australia and ÇÖPLER GOLD PROJECT in Turkey and its main exploration properties are KARAGOZ, BURSA EAST, TORUL, BAYBURT, IKIZTEPE - SARP, KEN-FOL, ARTVIN, KARAKARTAL, CEVIZLIDERE and YENIPAZAR in Turkey, MT FISHER in Canada and REDHILL, MT ZEPHYR and MUNGARI in Australia.

Alacer Gold is listed in Australia, in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 5.9 millions as of today (US$ 5.5 millions, € 3.8 millions).

Its stock quote reached its lowest recent point on September 14, 2009 at CA$ 0.02, and its highest recent level on October 21, 2011 at CA$ 9.99.

Alacer Gold has 292 850 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Alacer Gold Corp.
2007 Annual report
Financings of Alacer Gold Corp.
5/22/2011ANNOUNCES AMENDMENT TO PROPOSED RESTRICTED STOCK UNIT PLANS
Nominations of Alacer Gold Corp.
9/15/2014announces the appointment of two new independent directors t...
6/30/2014announces changes to its Board of Directors
9/10/2013Announces changes to the Board of Directors
10/2/2011Chief Strategic Officer Rohan Williams steps down
8/11/2011Chief Financial Officer To Depart
4/21/2011TurkPower Corporation Appoints James Davidson to Its Board o...
2/20/2008Appoints Edward C. Dowling Jr. as New President and Chief Ex...
Financials of Alacer Gold Corp.
7/27/2015Announces Second Quarter 2015 Operating and Financial Result...
4/28/2014announces 2014 first quarter results
3/13/2013announces 2012 year-end financial results
11/1/2012Announces Third Quarter 2012 Financial Statements and Relate...
5/12/2011FILES FIRST QUARTER FINANCIAL RESULTS AND THE RELATED MANAGE...
5/6/2011ANNOUNCES 2011 FIRST QUARTER FINANCIAL RESULTS RELEASE DATE ...
4/29/2011ANNOUNCES FIRST QUARTER OPERATING RESULTS
Project news of Alacer Gold Corp.
12/5/2013announces a further 10% increase in 2013 production guidance...
9/23/2013announces a 15% increase in 2013 production guidance at Çöpl...
1/17/2013achieves strongest quarterly production of the year of 103,4...
10/23/2012announces attributable gold production of 90,951 ounces for ...
6/1/2011(Çöpler Gold Project)ANNOUNCES SIGNFICANT EXTENSION TO SULFIDE MINERALIZATION AT ...
4/11/2011(Çöpler Gold Project)ACHIEVES COMMERCIAL PRODUCTION AT ITS ÇÖPLER MINE
3/29/2011(Çöpler Gold Project)REPORTS POSITIVE SULFIDE PREFEASIBILITY STUDY AND INCREASES ...
9/23/2008(Çöpler Gold Project)Commences Çöpler Gold Mine Construction
8/25/2008(Çöpler Gold Project)MANDATES LEAD ARRANGER FOR SENIOR PROJECT FINANCING
8/19/2008(Çöpler Gold Project)RECEIVES ÇÖPLER FORESTRY PERMIT
8/11/2008(Çöpler Gold Project)PROVIDES ÇÖPLER GOLD PROJECT UPDATE
5/20/2008(Çöpler Gold Project)OUTLINES STRATEGY FOR ÇÖPLER MINE DEVELOPMENT
4/16/2008(Çöpler Gold Project)Approved for Anatolia's Copler Gold Project
2/25/2008(Çöpler Gold Project)PROVIDES ÇÖPLER GOLD PROJECT UPDATE
2/6/2008(Çöpler Gold Project)FILES SULFIDE SCOPING STUDY FOR 2.3 MILLION OUNCES AT ÇÖPLER...
12/21/2007 POSITIVE SCOPING STUDY FOR 2.3 MILLION OUNCES OF ÇÖPLER GOL...
5/30/2006(Çöpler Gold Project)2006 Technical report
Corporate news of Alacer Gold Corp.
7/24/2016Alacer Gold Announces Second Quarter 2016 Operating & Financ...
7/17/2016Alacer Gold Comments on Recent Events in Turkey
7/13/2016AGM Vote Results 2016
7/7/20162016 07 07 Q2 Earnings Conference Call Details
7/7/2016Alacer Gold Announces Release Date for Second Quarter 2016 O...
6/24/2016Alacer Gold Continues to De-Risk Sulfide Project with Execut...
6/17/2016Alacer Gold Signs $350 Million Project Finance Facility
6/2/2016Alacer Gold Announces Appointment of Chief Operating Officer
5/27/2016Voting Results
5/26/2016Alacer Gold Announces Results of Annual and Special Meeting ...
5/12/20162016 12 05 Q1 2016 Earnings Release FINAL
5/12/2016Alacer Gold Announces First Quarter 2016 Operating & Financi...
5/12/2016Alacer Gold Announces Çöpler Sulfide Project Approval
5/5/20162016 05 05 Q1 Earnings Conference Call Details FINAL
5/5/2016Alacer Gold Announces Release Date for Çöpler Sulfide Projec...
4/20/2016Alacer Gold Receives Approval of Numerous Land Use Permits f...
4/20/20162016 04 20 Receipt of Final LUP - FINAL2
3/31/2016Alacer Gold Announces Further Exploration Results for The Çö...
3/31/2016Appendix to Exploration Announcement
3/30/2016Appendix to Exploration Announcement
1/25/2016Alacer Gold Announces 2015 Year-end Operating & Financial Re...
1/25/2016Alacer Gold announces 2015 year-end operating and financial ...
1/15/2016Alacer Gold Meets 2015 Production Guidance, Provides 2016 Gu...
1/14/2016Alacer Gold Meets 2015 Production Guidance, Provides 2016 Gu...
10/25/2015Alacer Gold Announces Third Quarter 2015 Operating and Finan...
10/9/2015Alacer Gold Announces Third Quarter 2015 Operating & Financi...
10/9/2015Alacer Gold announces third quarter 2015 operating & financi...
10/7/20152 Metals Stocks BMO Analysts Are Downgrading
9/21/2015Alacer Gold Signs $250 Million Project Finance Facility
8/20/2015Alacer Gold Announces Its One Millionth Ounce of Gold Poured...
7/29/2015Edited Transcript of ASR.TO earnings conference call or pres...
7/27/2015Alacer Gold Announces Second Quarter 2015 Operating & Financ...
7/27/2015Alacer Gold Announces Second Quarter 2015 Operating and Fina...
7/14/2015Alacer Gold Announces Second Quarter Operating & Financial R...
7/14/2015Alacer Gold Announces Second Quarter 2015 Operating & Financ...
7/14/2015Announces Second Quarter 2015 Operating & Financial Results ...
7/9/2015Alacer Gold Announces Results of Annual and Special Meeting ...
7/9/2015Announces Results of Annual and Special Meeting of Sharehold...
4/9/2015Alacer Gold Announces Release Date for First Quarter 2015 Fi...
4/9/2015Announces Release Date for First Quarter 2015 Financial Resu...
4/9/2015Alacer Gold's Board Approves Advancement of Çöpler Sulfide P...
3/30/2015Appendix 1 - JORC Code Table 1
3/30/2015Alacer Gold Increases its Life-of-Mine Gold Production Profi...
2/11/2015Alacer Gold Announces 2014 Year-end Operating & Financial Re...
2/11/2015Alacer Gold Announces 2014 Year-end Operating & Financial Re...
2/2/2015Alacer Gold announces 2014 year-end operating & financial re...
1/20/2015Alacer Exceeds 2014 Production Guidance and Provides 2015 Gu...
1/20/2015Alacer exceeds 2014 production guidance and provides 2015 gu...
1/12/2015Alacer Gold Announces Çöpler Sulfide Project Development Tea...
1/12/2015Alacer Gold Announces Çöpler Sulfide Project Development Tea...
12/28/2014Alacer Gold Receives Approval of the Environmental Impact As...
12/28/2014Alacer Gold receives approval of the Environmental Impact As...
12/18/2014Alacer Gold Increases Heap Leach Pad Capacity by 14% at Çöpl...
12/18/2014Alacer Gold increases heap leach pad capacity by 14% at its ...
12/15/2014Alacer Gold Commissions Chemical Facility with SART Plant Se...
12/15/2014Alacer Gold Commissions Chemical Facility with SART Plant - ...
12/15/2014Alacer Gold Commissions Chemical Facility with Sart Plant
12/15/2014Commissions Chemical Facility with Sart Plant
10/27/2014Alacer Gold Reports 27% Increase In Gold Production At Lower...
10/27/2014Reports 27% Increase in Gold Production at Lower Costs for T...
10/14/2014Alacer Gold announces release date for third quarter 2014 fi...
9/18/2014Alacer Responds to Market Activity
7/29/2014announces results for second quarter 2014 and files NI 43-10...
7/14/2014Announces Release Date for Second Quarter 2014 Financial Res...
6/12/2014announces conference call on The Çöpler Sulfide Project Defi...
4/15/2014announces release date for first quarter 2014 financial resu...
3/12/2014announces 2013 year-end financial results and declares annua...
2/24/2014announces results of exploration in Turkey
1/27/2014announces President Howard Stevenson to resign
11/4/2013to pursue POX as sulfide ore processing method
10/24/2013Announces Approval of Australian Business Unit Sale
10/16/2013announces release date for third quarter 2013 financial resu...
8/12/2013announces leadership changes and update on Australian asset ...
7/22/2013announces release date for second quarter 2013 financial res...
6/12/2013announces decision to pursue sale of Australian assets
4/2/2013announces December 2012 Resources and Reserves statement
3/26/2013Significant Results from Alacer's Australian Exploration Pro...
2/10/2013announces completion of major strategic review
11/13/2012announces updated North American conference call time and di...
11/13/2012announces updated North American conference call time and di...
9/10/2012Çöpler Resource estimate increases by 27% or 2.2 million oun...
8/22/2011Extends Çöpler Mineralization Including 100.1m @ 4.1g/t in ...
7/4/2011RECEIVES ASX LISTING RULE WAIVERS
2/20/2011Anatolia and Avoca Resources complete merger to become Alace...
7/25/2008MR. RICHARD GRAFF NAMED TO ANATOLIA BOARD
5/9/2008ANNOUNCES PRESENTATION BY EDWARD C. DOWLING, PRESIDENT AND C...
12/20/2007CEO, Richard C, Moores, II, announces resignation for person...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ASR.TO)AUSTRALIA (AQG.AX)
0.020+100.00%9.40+0.00%
TORONTO
Prev close Open
Low High
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  - -100.00%
Volume 1 month var.
-100.00%
Produces Gold
Develops
Explores for Copper - Gold - Lead - Molybdenum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/8/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202039.47%9.9810.02
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.83+1.69%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.32-15.27%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.68+9.32%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65+0.38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.94+0.57%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+7.50%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.99+8.15%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.85+0.57%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04-5.26%Trend Power :