Dundee Precious Metals Announces Capital Projects and New Commercial Arrangements at Its Tsumeb Smelter in Namibia
Published : December 19, 2012
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

TORONTO, ONTARIO--(Marketwire - Dec. 19, 2012) - Dundee Precious Metals Inc. (News - Market indicators)(TSX:DPM.WT.A) ("DPM" or the "Company") announces plans to proceed with two significant capital projects at its Tsumeb smelter in Namibia as well as commercial developments related to a new concentrate tolling arrangement and a Memorandum of Understanding for the sale of acid.

In addition, construction relating to Project 2012, a fugitive dust management improvement project aimed at improving off-gas capture and workplace conditions to better comply with national standards, is substantially complete with commissioning expected to take place in January 2013.

Sulphuric Acid Plant

As part of its long term strategy to bring the smelter to internationally accepted environmental standards and consistent with the directives issued by the Namibian government earlier this year, DPM has entered into a definitive turnkey fixed price Engineering, Procurement, and Construction Management ("EPCM") contract with Outotec for the construction and installation of a sulphuric acid plant, which is expected to begin in early 2013 and be completed in the third quarter of 2014. Outotec is a Finnish engineering firm and the global leader in sulphuric acid plant design and delivery. After careful evaluation, the acid plant was determined to be the best solution to capture and process the off-gases from the copper smelter, and, in turn, reduce emissions and considerably improve working and living conditions around the smelter. The acid produced from this plant is expected to be sold to domestic and international markets primarily through long-term off-take agreements. 

Following completion of detailed engineering and cost estimates by Outotec, the capital cost on a fixed price basis is expected to be approximately US$204 million. 

Based on expected annual smelter production capacity, the plant will produce between 230,000 - 320,000 tonnes of sulphuric acid. In conjunction with Protea Chemicals (Pty) Limited, a leading industrial chemicals company with significant presence in Sub-Saharan Africa, Namibia Custom Smelters (Pty) Ltd. ("NCS"), a wholly-owned subsidiary that owns and operates the smelter, has entered into a Memorandum of Understanding with Rio Tinto Rössing in connection with a long-term purchase arrangement for the acid produced by NCS. Rössing currently imports sulphuric acid for processing at its Rössing uranium mine in Namibia. The acid is expected to be shipped by rail directly to Rössing from NCS. DPM and Rössing are currently negotiating the commercial details and expect to finalize definitive documentation during the first quarter of 2013.  

Electric Arc Furnace

In addition, an electric holding furnace will be installed to temporarily store and upgrade copper matte until it can be transferred to a converter furnace for final processing. 

Based on the feasibility study recently completed by Hatch South Africa, the capital cost is estimated to be US$66 million, which includes a US$10 million contingency. Engineering design will commence in the first quarter of 2013. Construction is expected to commence in the second quarter of 2013, with a targeted completion date of late 2014 or early 2015. 

The project is expected to generate an attractive return based on operating cost savings of approximately US$5 million per year, capital expenditure savings of US$10 to $15 million over two years, with ongoing sustaining capital savings, and improved metal recoveries of approximately 1% to 2%. Additional benefits include near-zero emissions and the eventual decommissioning of the current slag mill and reverberatory furnace, which further improves the long term sustainability of the smelter.

Copper Concentrate Off-Take Arrangements

NCS has entered into an agreement with Louis Dreyfus Commodities Metals Suisse SA ("LDC"), the exclusive concentrate supplier and blister offtaker, on smelting terms for an additional 200,000 tonnes of third party copper concentrate to be supplied by LDC from 2014 to 2016. The new terms provide substantially better pricing than the existing contractual arrangements which were established prior to the acquisition of NCS by DPM in 2010 and better reflect the operating and capital requirements of the smelter. LDC has also agreed to rollback a portion of the increased pricing by amending the pricing on the final 100,000 tonnes under the existing arrangements forecast to be processed during 2013 and the first half of 2014 to enable NCS to begin realizing a portion of the benefits from this increased pricing sooner.

Financial Summary

These projects are expected to be financed primarily from DPM's current cash position and free cash flow generation and supplemented, if necessary, with a US$150 million committed revolving credit facility expected to be in place in early January 2013. With the new tolling arrangements in place, the blended revenue per tonne from Chelopech and third party concentrate is expected to increase to approximately $550 per tonne by the end of 2013, compared to $360 per tonne in 2011, with further increases over the balance of the contracted volumes.

Jonathan Goodman, President and CEO of DPM, stated "These important capital initiatives and commercial arrangements not only illustrate our commitment to the health and safety of the Namibian people, they also reposition NCS as a sustainable and profitable enterprise that will benefit of all our stakeholders."

DPM is a Canadian based, international gold mining company engaged in the acquisition, exploration, development, mining and processing of precious metals. The Company's principal operating assets include the Chelopech operation, which produces a gold, copper and silver concentrate, located east of Sofia, Bulgaria; the Deno Gold operation, which produces a gold, copper, zinc and silver concentrate, located in southern Armenia; and the Tsumeb smelter, a concentrate processing facility located in Namibia. DPM also holds interests in a number of developing gold properties located in Bulgaria, Serbia, and northern Canada, including interests held through its 51.4% owned subsidiary, Avala Resources Ltd., its 47.3% interest in Dunav Resources Ltd. and its 10.7% interest in Sabina Gold & Silver Corp.

FORWARD-LOOKING STATEMENTS

This news release contains "forward-looking statements" that involve a number of risks and uncertainties. Forward-looking statements include, but are not limited to, statements with respect to the future price of gold and silver, the estimation of mineral reserves and resources, the realization of mineral estimates, the timing and amount of estimated future production and output, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, currency fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, limitations on insurance coverage and timing and possible outcome of pending litigation. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.
Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made, and they involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any other future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: the actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold, copper, zinc and silver; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, fluctuations in metal prices, as well as those risk factors discussed or referred to in documents filed from time to time with the securities regulatory authorities in all provinces and territories of Canada and available at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Unless required by securities laws, the Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. Accordingly, readers are cautioned not to place undue reliance on forward-looking statements.



Dundee Precious Metals Inc.
Jonathan Goodman
President & Chief Executive Officer
(416) 365-2408
jgoodman@dundeeprecious.com
or
Dundee Precious Metals Inc.
Lori Beak, Senior Vice President,
Investor & Regulatory Affairs and Corporate Secretary
(416) 365-5165
lbeak@dundeeprecious.com
Data and Statistics for these countries : Armenia | Bulgaria | Canada | Namibia | Serbia | South Africa | All
Gold and Silver Prices for these countries : Armenia | Bulgaria | Canada | Namibia | Serbia | South Africa | All

Dundee Precious Metals Inc

PRODUCER
CODE : DPM.TO
ISIN : CA2652692096
CUSIP : 265269-20-9
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Dundee Precious Metals is a zinc and gold producing company based in Canada.

Dundee Precious Metals produces zinc, gold, copper and silver in Armenia, develops copper, gold and silver in Bulgaria.

Its main asset in production is KAPAN in Armenia, its main assets in development are CHELOPECH and KRUMOVGRAD in Bulgaria and its main exploration property is SURDULICA in Bulgaria.

Dundee Precious Metals is listed in Canada. Its market capitalisation is CA$ 1.9 billions as of today (US$ 1.5 billions, € 1.3 billions).

Its stock quote reached its lowest recent point on January 22, 2016 at CA$ 0.84, and its highest recent level on April 16, 2024 at CA$ 10.54.

Dundee Precious Metals has 178 440 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Dundee Precious Metals Inc
2/27/2019Exyn introduces robots into Dundee Precious Metals' gold min...
4/13/2010Discovers New Gold Deposits in Bulgaria
Financings of Dundee Precious Metals Inc
10/9/2013Issued Shares and Warrants of Sabina Gold & Silver Corp. on ...
6/11/2013Announces Result of Early Warrant Exercise Program
Nominations of Dundee Precious Metals Inc
3/21/2013DPM Board Announces Executive Transition and Senior Officer ...
11/14/2012DPM Board Announces Senior Appointment
9/19/2012Eira Thomas Joins Dundee Precious Metals' Board of Directors
Financials of Dundee Precious Metals Inc
10/15/2013NOTICE: DPM 2013 Third Quarter Financial Results
8/1/2013Announces 2013 Second Quarter Results
7/10/2013NOTICE: DPM 2013 Second Quarter Financial Results
5/9/2013Announces 2013 First Quarter Results
4/17/2013NOTICE: DPM 2013 First Quarter Financial Results
2/15/2013Announces 2012 Fourth Quarter and Annual Results and 2013 Gu...
1/24/2013NOTICE: DPM Fourth Quarter and Year End 2012 Results
11/7/2012Announces 2012 Third Quarter Results
10/18/2012NOTICE: Dundee Precious Metals 2012 Third Quarter Results
8/1/2012Announces 2012 Second Quarter Results and Updated 2012 Guida...
7/9/2012NOTICE: DPM 2012 Second Quarter Results
5/8/2012DPM First Quarter 2012 Financial Results
10/14/2011NOTICE: DPM Third Quarter 2011 Results
7/11/2011NOTICE: DPM Second Quarter 2011 Results
4/27/2011Notice: DPM Annual General Meeting and 2011 First Quarter Re...
2/23/2011DPM Reports Fourth Quarter 2010
Project news of Dundee Precious Metals Inc
9/16/2013s 2013 Production Guidance
5/16/2013(Chelopech)Confirms Fundamentals Unchanged; Chelopech Mine Operating at...
9/10/2012(Chelopech)DPM Files Technical Report on Chelopech Pyrite Recovery Proj...
1/13/2012(Krumovgrad)Files Technical Report on Krumovgrad Gold Project
11/24/2011(Krumovgrad)Bulgarian Government Approves EIA for DPM's Krumovgrad Gold ...
2/23/2011(Chelopech)DPM Reports Fourth Quarter 2010 and Year-End Results and Upd...
Corporate news of Dundee Precious Metals Inc
7/28/2016Dundee Precious Metals Announces 2016 Second Quarter Results
7/25/2016Dundee Precious Metals Announces Power Blackout in Namibia R...
7/11/2016DPM Announces Closing of C$54.65 Million Bought Deal Financi...
7/7/2016Dundee Precious Metals Announces Second Quarter Production R...
6/20/2016DPM Announces C$50 Million Bought Deal Financing
12/21/2015Dundee Precious Metals Announces 15% Increase to Measured an...
12/21/2015AVALA RESOURCES STARTS DRILLING ON THE LENOVAC PROJECT
11/30/2015AVALA RESOURCES ANNOUNCES EARN-IN AND JOINT VENTURE AGREEMEN...
11/19/2015Dundee Precious Metals Announces Approval of Main Detailed D...
11/5/2015Dundee Precious Metals Announces 2015 Third Quarter Results
11/4/2015Dundee Precious Metals Announces Changes to Board of Directo...
10/8/2015Dundee Precious Metals Announces Third Quarter Production Re...
9/15/2015Dundee Precious Metals Announces Maintenance of the Tsumeb S...
7/30/2015Dundee Precious Metals Announces 2015 Second Quarter Results
7/9/2015Dundee Precious Metals Announces Second Quarter Production R...
4/14/2015Dundee Precious Metals Announces First Quarter Production Re...
4/14/2015Announces First Quarter Production Results and Provides Noti...
3/31/2015Dundee Precious Metals Announces Reserve and Resource Update...
3/31/2015Announces Reserve and Resource Update for 2015
3/18/2015Dundee Precious Metals Announces Commencement of Annual Tsum...
3/18/2015Announces Commencement of Annual Tsumeb Smelter Shutdown
2/26/2015AVALA RESOURCES PROVIDES AN EXPLORATION UPDATE
2/18/2015Tags to Riches: Mining Company Tracks Production With Sensor...
2/13/2015Dundee Precious Metals Announces 2014 Fourth Quarter and Ann...
2/13/2015Dundee Precious Metals Announces 2014 Fourth Quarter and Ann...
1/22/2015NOTICE: Dundee Precious Metals 2014 Fourth Quarter and Year ...
1/14/2015Dundee Precious Metals Announces Record Fourth Quarter Produ...
1/14/2015(Chelopech)Announces Record Fourth Quarter Production at Chelopech and ...
11/6/2014Dundee Precious Metals Announces 2014 Third Quarter Results
11/5/2014Dundee Precious Metals Announces 2014 Third Quarter Results
10/16/2014NOTICE: Dundee Precious Metals 2014 Third Quarter Results
10/16/2014NOTICE: Dundee Precious Metals 2014 Third Quarter Results
10/8/2014Dundee Precious Metals Announces a Favourable Preliminary Ec...
10/8/2014Dundee Precious Metals Provides Third Quarter 2014 Productio...
10/3/2014Dundee Precious Metals Acquires Shares and Warrants of Avala...
7/30/2014Dundee Precious Metals Announces 2014 Second Quarter Results
7/14/2014NOTICE: DPM 2014 Second Quarter Results
7/10/2014Dundee Precious Metals Announces Krumovgrad Municipal Counci...
7/10/2014Dundee Precious Metals Announces Krumovgrad Municipal Counci...
6/26/2014Dundee Precious Metals Increases Revolving Credit Facility b...
5/20/2014Dundee Precious Metals Strengthens Senior Management Team
8/29/2013Announces First Underground Mineral Resource Estimate for th...
7/24/2012Reports on Progress of Acid Plant at Smelter in Namibia
4/30/2012Receives First Contact from Namibian Government on Tsumeb Sm...
4/23/2012DPM Exercises Warrants of Dunav Resources Ltd.
2/16/2012DPM Announces 2011 Deno Gold Open Pit Project and Undergroun...
1/26/2012(Krumovgrad)Bulgarian Court Dismisses Appeal of DPM's Krumovgrad Mining ...
11/30/2011(Krumovgrad)DPM: New Krumovgrad Feasibility Study Confirms Low Cash Cost...
9/15/2011Improves Safety and Operational Efficiency With AeroScout Re...
9/2/2011Dunav Resources and Dundee Precious Metals Complete Transact...
8/23/2011DPM to Acquire Shares and Warrants of Dunav Resources Ltd. o...
5/10/2011(Chelopech)DPM and Chelopech Mining Raise Final US$14.5 Million of Chel...
3/23/2011DPM Exercises Warrants of Avala Resources Ltd.
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (DPM.TO)
10.54+0.48%
TORONTO
CA$ 10.54
04/16 17:00 0.050
0.48%
Prev close Open
10.49 10.48
Low High
10.32 10.65
Year l/h YTD var.
7.98 -  10.62 25.03%
52 week l/h 52 week var.
7.98 -  10.63 2.93%
Volume 1 month var.
493,571 5.51%
24hGold TrendPower© : -11
Produces Copper - Gold - Silver - Zinc
Develops Copper - Gold - Silver
Explores for Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202424.15%
202330.41%9.9210.00
2022-14.00%8.415.41
2021-17.27%9.956.99
202058.30%9.9610.03
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.76-1.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04-1.95%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56-3.12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.44-2.01%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.23-1.17%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.23-4.17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-7.14%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.76+2.03%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.18-0.95%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :