Alhambra Resources Ltd. Announces Dombraly Drilling Leads to Discovery of Four New Zones of Gold Mineralization and Proves Significant Gold Contained in Low-Grade Stockpile and Open Pit Back Fill
Published : May 19, 2011
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

CALGARY, ALBERTA--(Marketwire - May 19, 2011) - Alhambra Resources Ltd. (News - Market indicators)(PINK SHEETS:AHBRF)(FRANKFURT:A4Y) ("Alhambra" or the "Corporation"), an international gold producer and explorer, announces that its Diamond drilling program at Dombraly has resulted in the discovery of four new zones of gold mineralization. In addition, reverse-circulation drilling intersected significant gold mineralization in both the low-grade stockpile and material used to back fill the old open pit. The former Dombraly gold mine ("Dombraly") is located within Alhambra's 100% owned Uzboy Project in Kazakhstan (see Figure 1).

HIGHLIGHTS

  • The successful Diamond drilling program intersected four new zones of gold mineralization (see Figure 2),
  • The new zones of gold mineralization located south of the Dombraly open pit have increased the strike length of the Dombraly mineralized zone by 300 metres ("m"). Mineralization is mainly oxide with average gold grades ranging from 0.45 to 3.95 grams per tonne ("g/t") and a high peak sulfide gold grade of 40.50 g/t over 1.0 m,
  • The new zone located north of the Dombraly open pit is outside of the previously known areas of gold mineralization, is open to the north, is estimated to be more than 100 m long and varies in width from 9 to 14 m. Mineralization is sulfide with average gold grades range from 0.48 g/t over 10.0 m to 4.08 g/t over 4.3 m included in a gold grade of 2.06 g/t over 10.3 m and a high peak gold grade of 10.30 g/t,
  • RC drilling intersected significant gold mineralization in both the low-grade stockpile and the material used to back fill the old open pit (see Figures 3a and 3b). The low-grade stockpile gold grades ranged from less than 0.1 to 19.3 g/t while the back fill material gold grades ranged from 0.1 to 11.2 g/t.

Mr. John J. Komarnicki, Alhambra's Chairman and Chief Executive Officer stated, "The discovery of four new zones of gold mineralization at Dombraly has very exciting implications for Alhambra! Dombraly was one of our 2010 priority exploration targets and will continue to be a priority for 2011. We are very excited about this drilling program for the positive results should allow us to re-classify the historical Soviet resource and reserve data (which has been acknowledged by the Kazakhstan State Reserve Committee) into a compliant National Instrument 43-101 resource estimate for Dombraly, as it should be."

DRILLING PROGRAM OBJECTIVE

Alhambra's focus was to further define the extent and continuity of the gold mineralization at Dombraly, leading to a National Instrument ("NI") 43-101 compliant resource estimate (see News Release dated May 10, 2010). Alhambra has engaged the independent geological and mining consultants, ACA Howe International Limited to consult on the drilling program in preparation for the resource estimate.

DRILLING PROGRAM SUMMARY

The 2010 drilling program at Dombraly consisted of 8,511 m (see News Release dated May 3, 2011) of core and non-core drilling (see Figure 2). Three different types of drilling were conducted and the meterages are as follows:

  • 3,788 m of Diamond drilling (a 15 core hole program),
  • 883 m of reverse-circulation ("RC") drilling (37 holes), and
  • 3,840 m of rotary air-blast ("RAB") drilling (192 holes).

1. Diamond DRILLING

Of the 3,788 m of Diamond drilling, 1,682 m were drilled south of the known zones of gold mineralization where the gold mineralization is open-ended and 2,106 m were drilled at the northern flank of the Dombraly main zone of gold mineralization.

Three new zones of gold mineralization were discovered south of the mineralization that has been explored by previous core drilling (see Figure 2). These new zones, mainly represented by shallow oxide material, have increased the known mineralization strike length by 300 m and are up to 7 m in width with average gold grades ranging from 0.45 to 3.95 g/t (see Table 1). However, DDD 00-03 also intersected sulfide mineralization with a gold grade of 40.50 g/t over 1.0 m. At least one of the zones could be extended further to the south with additional drilling and all together, they could significantly add to the resources at Dombraly.

Drilling north of the open pit resulted in the discovery of a new zone of sulfide gold mineralization (see Figure 2). As this zone was open to the north, it could only be approximated as being more than 100 m. Its total width ranges from 9 to 14 m and is traced up to 250 m along the dip. This new zone, intersected in DDH 48-03, has an average gold grade of 4.08 g/t over 4.3 m included in an interval with a gold grade of 2.06 g/t over 10.3 m (see Table 1). Individual gold grades ranged from 0.13 to 10.3 g/t. This zone is a blind zone (not outcropping on the surface) and being established northward of the known limit of the mineralization, could significantly increase the size potential of the Dombraly deposit. This northern extension has revealed a new expanded area for further exploration drilling.

2. RC DRILLING

The gold mineralization in the existing low-grade stockpile and associated open pit back-fill, generated by a mining cooperative in the mid 1980s, was drilled via RC drilling to validate and reclassify the historical Soviet resource and reserve data. Alhambra anticipates this data would be included in a NI 43-101 resource estimate (Note: Soviet resources and reserves are not compliant with NI 43-101 and, although meaningful, no resources or reserves to date have been defined at Dombraly). Another objective of the RC drilling was to check for near surface oxide gold mineralization northward of the open pit.

The locations of the 37 RC holes completed at Dombraly are shown in Figures 2 and 3. The depth of the RC holes ranged from 40 to 57 m.

Gold grades in the low-grade stockpile are not homogeneous in distribution (see Table 2 and Figure 3a) and ranged from less than 0.1 g/t to 19.3 g/t. The significant range in gold concentration suggests a significant nugget effect. The thickness of the mineralized intervals in the low-grade stockpile outlined using a 0.1 g/t gold cut-off varies from 2 to 20 m. It is anticipated that the data from this RC drilling program would be used in an initial NI 43-101 resource estimate.

The open pit back fill material ranged in depth from 24 m to 74 m (see Table 3 and Figure 3b). The objective of this drilling was to prove the presence of a significant amount of gold in the material used to back fill the old open pit. The average gold concentration of the back fill material is approximately the same as in the low-grade stockpile and ranges from 0.1 g/t to 11.2 g/t. The gold distribution in the back fill material is more homogenous than the low-grade stockpile.

3. RAB DRILLING

RAB drilling was completed south of the low-grade stockpile, as well as 900 m north-east of the open pit, to follow-up gold anomalies in both rock and soil. Previously reported grab rock samples in these areas returned up to 5.6 g/t gold. Alhambra will announce the results of the RAB drill program upon receipt and interpretation of drill assays.

Table 1 – Summary Dombraly Diamond Drilling Results

Zone   Sec-
tion
  DDH
#
  Len-
gth
  Azi-
mu-
th
  Dip   From
(m)
  To
(m)
  In-
ter-
val
(m)
  Gra-
de
Au(g/t)
  Min-
eral-iza-
tion
Type
Main Zone Southern Extension   0   DDD
00-01
  201.00   90   -60   17.50   22.50   5.00   0.50   Oxide
                    184.00   185.00   1.00   1.55   Sulfide
0   DDD
00-02
  120.70   270   -60   26.00   42.00   16.00   1.01   Oxide
                inclu-
ding
  26.00   30.00   4.00   2.13   Oxide
                    96.80   98.80   2.00   0.62   Tran-
sition
0   DDD
00-03
  200.30   270   -60   33.50   40.50   7.00   1.09   Oxide
                    106.90   107.90   1.00   1.07   Sulfide
                    110.90   111.90   1.00   40.50   Sulfide
7   DDD
07-02
  130.00   270   -60   97.70   101.70   4.00   3.62   Oxide
7   DDD
07-03
  200.30   270   -60   18.00   23.60   5.60   1.16   Oxide
                inclu-
ding
  19.00   22.00   3.00   3.95   Oxide
                    187.60   190.00   2.40   0.89   Sulfide
15   DDD
15-01
  200.00   90   -60   23.00   24.00   1.00   1.88   Oxide
                    39.00   43.00   4.00   1.49   Oxide
                    72.00   75.00   3.00   0.45   Oxide
                    81.00   82.00   1.00   1.29   Oxide
                    94.00   95.00   1.00   1.15   Oxide
                    151.00   156.00   5.00   0.68   Sulfide
15   DDD
15-02
  120.10   270   -60   0.00   1.00   1.00   2.03   Oxide
                    44.00   47.00   3.00   0.84   Oxide
                    103.00   105.00   2.00   1.85   Oxide
15   DDD
15-03
  203.20   270   -60   75.00   77.00   2.00   0.76   Oxide
Main Zone Northern Extension   48   DDD
48-03
  450.00   270   -60   216.10   226.40   10.30   2.06   Sulfide
                inclu-
ding
  222.10   226.40   4.30   4.08   Sulfide
                    296.50   298.50   2.00   0.54   Sulfide
48   DDD
48-04
  510.20   270   -60   218.00   224.00   6.00   0.27   Sulfide
                    298.60   303.60   5.00   0.64   Sulfide
                    312.60   322.60   10.00   0.48   Sulfide
                    329.60   332.60   3.00   0.68   Sulfide
                    415.40   417.40   2.00   3.06   Oxide
 
The intervals set out in the above table are not true widths and the assay results are uncut.
 
Table 2 – Summary Dombraly RC Drilling Results – Stockpile
                       
Section DDH
#
  Length   From
(m)
  To
(m)
  Interval
(m)
  Grade Au
(g/t)
1 RCW 01-01   20.00   2.00   9.00   7.00   0.37
          16.00   19.00   3.00   0.60
  RCW 01-02   20.00   0.00   11.00   11.00   0.25
  RCW 01-03   20.00   0.00   4.00   4.00   0.26
          12.00   19.00   7.00   0.27
2 RCW 02-01   20.00   0.00   4.00   4.00   0.62
          13.00   19.00   6.00   0.38
  RCW 02-02   20.00   0.00   7.00   7.00   0.63
  RCW 02-03   20.00   0.00   3.00   3.00   0.66
  RCW 02-04   20.00   12.00   17.00   5.00   0.20
3 RCW 03-01   20.00   0.00   2.00   2.00   0.46
  RCW 03-02   20.00   0.00   20.00   20.00   1.42
4 RCW 04-01   10.00   0.00   10.00   10.00   0.58
  RCW 04-02   10.00   0.00   10.00   10.00   2.24
  RCW 04-03   10.00   0.00   1.00   1.00   1.37
          5.00   8.00   3.00   0.30
5 RCW 05-01   10.00   0.00   10.00   10.00   3.20
  RCW 05-02   10.00   0.00   10.00   10.00   0.34
  RCW 05-03   10.00   0.00   10.00   10.00   1.24
  RCW 05-04   10.00   0.00   10.00   10.00   1.01
  RCW 05-05   10.00   0.00   2.00   2.00   0.35
6 RCW 06-01   10.00   0.00   8.00   8.00   0.50
  RCW 06-02   10.00   0.00   9.00   9.00   1.60
  RCW 06-03   10.00   0.00   5.00   5.00   0.64
  RCW 06-04   10.00   0.00   9.00   9.00   0.60
  RCW 06-05   10.00       NSR        
7 RCW 07-01   10.00   0.00   7.00   7.00   0.93
  RCW 07-02   10.00   0.00   9.00   9.00   1.02
  RCW 07-03   10.00   2.00   10.00   8.00   0.22
                       
Table 3 – Summary Dombraly RC Drilling Results – Open Pit Back Fill
 
Secti-on DDH
#
  Length   Azimuth   Dip From
(m)
  To
(m)
Interval
(m)
  Grade Au(g/t)   Mineralization
Type
14 RCD 14-01   30.00   0   90 0.00   3.00 3.00   0.35   Back fill
  RCD 14-02   29.00   270   -60 1.00   29.00 28.00   0.67   Back fill
  RCD 14-03   56.00   270   -60 0.00   45.00 45.00   0.62   Back fill
                49.00   52.00 3.00   0.51   In situ
  RCD 14-04   48.00   270   -60 0.00   48.00 48.00   1.31   Back fill
  RCD 14-05   74.00   270   -60 0.00   14.00 14.00   0.63   Back fill
8 RCD 08-01   26.00   270   -60 0.00   26.00 26.00   1.06   Back fill
  RCD 08-02   24.00   270   -60 0.00   8.00 8.00   0.67   Back fill

Based on the results of the 2010 Diamond drilling program at Dombraly, the Corporation anticipates a more aggressive 2011 drilling program at Dombraly including a large number of core holes.

As a part of Alhambra's 9,800 square kilometre ("km2") mineral license located within the Central Asia-Chinese Altayshan Gold Belt traversing northern Kazakhstan, the Corporation controls at least 50 kilometres ("kms") of a rapidly emerging significant gold trend. This trend extends from the gold mineralization exposed at North Balusty in the north to Shirotnaia in the south and includes the Dombraly gold deposit and gold mineralization exposed at Kerbay (see Figure 4 and previous news releases made by Alhambra regarding North Balusty, Shirotnaia and Kerbay). This gold trend extends south of Alhambra's license and hosts the multi-million ounce Aksu and Quartzite Hills gold deposits held by KazakhGold Group Limited located approximately 3 kms southeast of Alhambra's Shirotnaia Project.

DRILLING AND SAMPLING PROCEDURES

For the core drilling, an NQ Diamond drilling core barrel was utilized and average core recovery was 99%. The core was split by the drilling contractor under the supervision of the Corporation's geologists with one half used for sampling and another half left for references. Every meter of core was sampled and the exact borders of the sampling interval were determined according to the lithological contacts. The average sample weight was 2 kilograms.

For the RC drilling, a standard technique was utilized and sample recovery was excellent. The rock chips coming to the cyclone through dual tubes were split using a riffle splitter by the drilling contractor under the supervision of the Corporation's geologists. Every meter of hole was sampled. The average sample weight was 5 kilograms.

Sample preparation was completed by Stewart Assay and Environmental Laboratories located in Kyrgyzstan using the following procedure: samples were crushed to minus 2 mm, mixed and split into two 200 gram sub-samples. One sub-sample was pulverized to – 200 mesh and the other sub-sample was retained for reference purposes. A 30 gram sample of the –200 mesh material was used for fire assay atomic absorption finish. Stewart Assay and Environmental Laboratories is independent of Alhambra and does have an International Standard Organization ("ISO") 17025 accreditation.

QUALITY ASSSURANCE QUALITY CONTROL

The Kyrgyzstan Stewart Assay and Environmental Laboratories, as a part of Stewart Group, have stringent quality assurance and quality control ("QA/QC") procedures. Alhambra also follows a rigorous QA/QC program consisting of inserting standards, blanks and duplicates into the sample stream submitted to the laboratory for analysis to ensure that the sampling and analysis of all samples is conducted in accordance with the best possible practices.

Elmer B. Stewart, MSc. P. Geol., a technical consultant, is the Corporation's nominated Qualified Person as defined by National Instrument 43-101, and has reviewed and verified the technical information contained in this news release.

ABOUT DOMBRALY

Dombraly is one of Alhambra's 2011 drilling targets within the Corporation's 100% owned, 2.4 million acre (9,800 km2), Uzboy Project located in north central Kazakhstan (see location map, Figure 1). Dombraly is located approximately 90 kms southeast of Alhambra's Uzboy gold deposit and 60 kms north of the city of Stepnogorsk, Alhambra's Kazakhstan operating base. It is a former producing open pit gold mine.

ABOUT ALHAMBRA

Alhambra is a Canadian based international exploration and gold production corporation celebrating its eighth year of operations in the Republic of Kazakhstan. Alhambra holds exploration and exploitation rights to a 2.4 million acre (9,800 km2), 100% owned, license called the Uzboy Project, located in the Northern Kazakhstan Metallogenic Province which hosts numerous world-class gold deposits. Over 100 mineral targets, including 5 advanced exploration plays are contained within the Uzboy Project.

Alhambra common shares trade in Canada on The TSX Venture Exchange under the symbol ALH, in the United States on the Over-The-Counter Pink Sheets Market under the symbol AHBRF and in Germany on the Frankfurt Open Market under the symbol A4Y. The Corporation's website can be accessed at www.alhambraresources.com.

Forward-Looking Statements

Certain statements contained in this news release constitute "forward-looking statements" as such term is used in applicable Canadian and US securities laws. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management. In particular, statements concerning the reclassification of Soviet resource and reserve data into western compliant NI 43-101 resources and the anticipated 2011 exploration drilling program, and other factors and events described in this news release should be viewed as forward-looking statements to the extent that they involve estimates thereof. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans, "estimates" or "intends", or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and should be viewed as "forward-looking statements". Such forward looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Corporation to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such risks and other factors include, among others, lack of certainty that the Soviet resource and reserve data can be reclassified into western compliant NI 43-101 resources and what the anticipated 2011 exploration drilling program will be, the availability of capital to fund exploration; political, social and other risks inherent in carrying on business in a foreign jurisdiction and such other business risks as discussed herein and other publicly filed disclosure documents. Although the Corporation has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could vary or differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements contained in this news release.

Forward looking statements are made based on management's beliefs, estimates and opinions on the date the statements are made and the Corporation undertakes no obligation to update forward-looking statements and if these beliefs, estimates and opinions or other circumstances should change, except as required by applicable law.

This news release contains forward-looking statements based on assumptions, uncertainties and management's best estimates of future events. When used herein, words such as "intended" and similar expressions are intended to identify forward-looking statements. Forward-looking statements are based on assumptions by and information available to the Corporation. Investors are cautioned that such forward-looking statements involve risks and uncertainties. Actual results may differ materially from those currently anticipated. The forward-looking statements contained herein are expressly qualified by this cautionary statement.

To view Figure 1, 2 and 3, please visit the following link:

http://media3.marketwire.com/docs/alh_fgs_519.pdf

Neither the TSX Venture Exchange Inc. nor its Regulation Services Provider (as that term is defined in the Policies of the TSX Venture Exchange Inc.) accepts responsibility for the adequacy or accuracy of this release.

Alhambra Resources Ltd.
Ihor P. Wasylkiw
VP & Chief Information Officer
+1 (403) 508-4953
or
Alhambra Resources Ltd.
John J. Komarnicki
Chairman & CEO
+1 (403) 228-2855
www.alhambraresources.com
Data and Statistics for these countries : Canada | Germany | Kazakhstan | Kyrgyzstan | All
Gold and Silver Prices for these countries : Canada | Germany | Kazakhstan | Kyrgyzstan | All

Alhambra Resources Ltd.

DEVELOPMENT STAGE
CODE : ALH.V
ISIN : CA0159021090
CUSIP : 015902
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Alhambra Res. is a gold producing company based in Canada.

Its main asset in development is UZBOY PROJECT in Kazakhstan.

Alhambra Res. is listed in Canada and in Germany. Its market capitalisation is CA$ 1.6 millions as of today (US$ 1.1 millions, € 1.0 millions).

Its stock quote reached its highest recent level on December 29, 2006 at CA$ 3.00, and its lowest recent point on December 15, 2015 at CA$ 0.02.

Alhambra Res. has 104 130 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Alhambra Resources Ltd.
3/5/2007Special Situation
Annual reports of Alhambra Resources Ltd.
2007 Annual Report
Financings of Alhambra Resources Ltd.
11/12/2013(ALH - TSX Venture) News Release dated November 12, 2013 - A...
1/29/2013(ALH - TSX Venture) News Release dated January 29, 2013; MIN...
1/29/2013Announces That MINT Approves a Lower Financing Floor Price
9/13/2012Announces MINT Waives Its Pre-Emptive Right to Participate i...
2/2/2012(ALH - TSX Venture) News Release dated February 1, 2012; War...
12/12/2011(ALH - TSX Venture) News Release dated December 9, 2011; War...
7/12/2007Plans $2 million Private Placement for Dot upon Reorganizati...
Option Grants of Alhambra Resources Ltd.
1/24/2011Alhambra Res. granting of 3.050.000 stock options to directo...
12/18/2009Granting of Stock Options
11/17/2009Granting of Stock Options
Nominations of Alhambra Resources Ltd.
10/18/2012Announces Appointment of a New Director
11/8/2010Retains Investor Relations Consultant
5/5/2008 Appointment of New Director
Financials of Alhambra Resources Ltd.
8/30/2013Financial and Operating Results for Second Quarter Ending Ju...
6/26/2013(ALH - TSX Venture) News Release dated June 26, 2013 - Alham...
6/26/2013Prepares to File Year 2012 and First Quarter 2013 Financial ...
9/3/2012(ALH - TSX Venture) News Release dated August 30, 2012; Seco...
6/1/2012(ALH - TSX Venture) News Release dated May 31, 2012; First Q...
12/1/2011(ALH - TSX Venture) News Release dated November 30, 2011; Fi...
8/29/2011Financial and Operating Results for Second Quarter ending Ju...
6/1/2011(ALH - TSX Venture) News Release dated May 31, 2011; RESENDI...
5/31/2011Announces First Quarter 2011 Financial and Operational Resul...
5/8/2011Year 2010 Financial and Operational Results
6/4/2010First Quarter 2010 Financial and Operational Results
12/1/2009Financial and Operating Results for Third Quarter ending Sep...
12/10/2008Third Quarter 2008 Interim Report
9/2/20082008 Second Quarter Financials
7/22/2008Second Quarter 2008 Operational Results
6/2/20082008 First Quarter Financials & Operations
1/17/2008Fourth Quarter & Year 2007 Operational Results
11/29/2007Financial Results for Third Quarter
11/19/2007(Uzboy Project)Third Quarter Operational Updates
6/7/2007 First Quarter Financials, Production and Exploration Update
Project news of Alhambra Resources Ltd.
7/3/2013(ALH - TSX Venture) News Release dated July 3, 2013 - Alhamb...
11/14/2012(ALH - TSX Venture) News Release dated November 14, 2012; Al...
4/16/2012(ALH - TSX Venture) News Release dated April 16, 2012; Maide...
3/23/2012(ALH - TSX Venture) News Release dated March 23, 2012; Maide...
10/5/2011(Uzboy Project)(ALH - TSX Venture) News Release dated October 5, 2011; 2011...
8/27/2011KGK Drilling at North Balusty Discovers Gold Mineralized Cor...
6/7/2011(Uzboy Project)Announces 35,700 Metre 2011 Exploration Drilling Program
5/20/2011(Uzboy Project)Dombraly Drilling Leads to the Discovery of Fou
4/29/2011(Uzboy Project)Drilling Results Expand Shirotnaia Gold Mineralization
2/28/2011(ALH - TSX Venture) News Release dated February 28, 2011; 20...
2/23/2011(Uzboy Project)More than 10,300 Metres Drilled in 4Q10
2/22/2011(Uzboy Project)New Export Licenses Approved and Received - Drill Samples Pr...
5/17/2010(Uzboy Project)Announces Exploration Updates at Zhanatobe
12/14/2009(Uzboy Project)Positive Results From Its Uzboy Gold Deposit Scoping Study
9/23/2008(Uzboy Project)New Zone of Gold Mineralization Discovered at Uzboy
6/5/2008(Uzboy Project)Increases Proven and Probable Reserves
4/8/2008(Uzboy Project)Gold Resource Icreased at Uzboy
3/25/2008(Uzboy Project)Uzboy and Kirtoge Drill Results
11/15/2007 Encouraging Drilling Results from Aygabak
9/6/2007High Grade Gold Mineralization Intersected at Uzboy
6/28/2007Shirotnaia Drilling Results
Corporate news of Alhambra Resources Ltd.
3/21/2016Alhambra Commences International Arbitration Against The Gov...
12/15/2015Actions By Kazakhstan Government Leads To Bankruptcy of Alha...
4/16/2015Alhambra Not Able To File Its 2014 Audited Financial Stateme...
9/2/2014Financial and Operating Results for Second Quarter Ending Ju...
7/4/2014Alhambra Resources Ltd. Financial and Operating Results for ...
7/3/2014Alhambra Resources Ltd. Year 2013 Financial and Operational ...
6/27/2014Alhambra Resources Ltd. Prepares to File Year 2013 and First...
6/13/2014Alhambra Provides Audit Status Progress
5/30/2014Alhambra Provides Progress Report on Audit Status
5/16/2014Alhambra Provides Progress Report on Audit Status
5/2/2014Alhambra Announces Management Cease Trade Order
4/11/2014Alhambra Not Able to File Its 2013 Audited Financial Stateme...
11/29/2013(ALH - TSX Venture) News Release dated November 29, 2013 - A...
9/25/2013Diamond Drilling Intersects Best Gold Drill Intercepts to Da...
8/30/2013(ALH - TSX Venture) News Release dated July 4, 2013 - Alhamb...
7/26/2013DOT Resources Ltd (DOT - TSX Venture) News Release dated Jul...
6/12/2013(ALH - TSX Venture) News Release dated June 12, 2013 - Alham...
6/12/2013Provides Audit Status Progress
6/12/2013Provides Audit Status Progress
5/15/2013(ALH - TSX Venture) News Release dated May 15, 2013 - Alhamb...
5/15/2013Provides Progress Report on Audit Status
5/3/2013(ALH - TSX Venture) News Release dated April 19, 2013 - Alha...
5/2/2013Announces Management Cease Trade Order
4/19/2013(ALH - TSX Venture) News Release dated April 19, 2013 - Alha...
1/16/2013Vancouver Conference Invitation Jan 20 & 21, 2013
11/14/2012Expands Shirotnaia Discovery and Drills 135.6 Metres at 1.12...
11/6/2012DOT Resources Ltd (DOT - TSX Venture) News Release dated Nov...
10/25/2012DOT Resources Ltd (DOT - TSX Venture) News Release dated Oct...
10/18/2012dated October 18, 2012
9/13/2012(ALH - TSX Venture) News Release dated September 13, 2012; M...
8/28/2012(ALH - TSX Venture) News Release dated August 28, 2012; Boar...
7/26/2012DOT Resources Ltd (DOT - TSX Venture) News Release dated Jul...
5/3/2012(ALH - TSX Venture) News Release dated May 3, 2012; Alhambra...
5/1/2012(ALH - TSX Venture) News Release dated May 1, 2012; Year 201...
4/24/2012(ALH - TSX Venture) News Release dated April 24, 2012; Drill...
4/10/2012(ALH - TSX Venture) News Release dated April 10, 2012; Surve...
2/28/2012(ALH - TSX Venture) News Release dated February 28, 2012; Ma...
2/7/2012(ALH - TSX Venture) News Release dated February 7, 2012; Mai...
2/3/2012(ALH - TSX Venture) News Release dated February 3, 2012; Sur...
12/14/2011(ALH - TSX Venture) News Release dated December 14, 2011; Sh...
8/10/2011(ALH - TSX Venture) News Release dated August 10, 2011; Uzbo...
8/4/2011(ALH - TSX Venture) News Release dated August 4, 2011; Alham...
7/26/2011(ALH - TSX Venture) News Release dated June 26, 2011; Zhanat...
5/19/2011Announces Dombraly Drilling Leads to Discovery of Four New Z...
5/9/2011(ALH - TSX Venture) News Release dated May 9, 2011; Filing o...
3/23/2011Announces IFRS Conversion
12/1/2010(ALH-TSX-V) - December 1, 2010 Launches Web Blog
8/19/2010Closes US$4.6 Million First Tranche of US$6.0 Million Equity...
8/18/2010(ALH - TSX.V) News Release dated August 18, 2010; Alhambra b...
7/31/2010Begins Drilling at Shirotnaia
7/30/2010Announces Proposed Equity Financing
7/22/2010Begins Drilling at Zhanatobe
5/10/2010Announces Exploration Updates at Dombraly
5/3/2010Year 2009 Financial and Operational Results
4/20/2010Conference Participation and Investor Tour
4/19/2010to be Featured on CEO Clips on the Biography Channel
4/15/2010Exploration Updates - Shirotnaia
3/4/2010Exploration and Operational Updates
10/30/2009Warrant Exercise Retires Subordinated Secured Promissory Not...
9/22/2009Saga Creek Shares Re-registered Back into Alhambra’s Name
8/21/2009Debenture Refinancing
8/12/2009Supreme Court of Kazakhstan Rules in Favor of Alhambra’s App...
6/26/2009Provides Bi-Weekly Status Report and Prepares to File Year 2...
6/12/2009Provides Bi-Weekly Status Report
5/29/2009Provides Bi-Weekly Status Report
3/11/2009Announces Loan Financing
2/13/2009Saga Creek Re-registered in Name of Claimants
12/29/2008(ALH - TSX.V) News Release dated December 29, 2008
11/26/2008(ALH - TSX.V) News Release dated November 26, 2008
11/18/2008Hearing Regarding Legal Claim Adjourned Until November 24, 2...
10/1/2008Kemerkol Oil and Natural Gas Subsoil License Dispute
9/5/2008(ALH - TSX.V) News Release dated September 4, 2008
8/11/2008$1,000,000 Debenture Financing
7/14/2008Fraser Mackenzie Report Update
7/10/2008New Gold Anomalies Discovered at Shirotnia
6/18/2008Asia Pacific Gold Forum 2008
5/15/2008Governmnt Approves Bulk Test at Dombraly
4/29/2008 Year 2007 Financials
2/26/2008Richard K. Gorton joins Board of Directors
2/7/2008New Gold Anomalies Discovered at Shirotnaia
12/11/2007John J. Komarnicki, Chairman & CEO WebCast
10/31/2007 Officer Resigns
9/6/2007 Resumes Trading, DOT Resources Ltd Begins Trading
8/31/2007 Resumption of Trading
8/31/20072007 2nd Quarter Financials
8/30/2007 Plan of Arrangement Completed
8/2/2007Plan Of Arrangement Receives Shareholder and Court Approval
7/12/2007Correction to Today's Earlier News Release
7/11/200792% Recovery from East Zone
6/20/2007Proposed Corporate Reorganization
6/14/2007Metallurgy Results from Primary Gold Mineralization
5/7/2007Financials for 2006
5/3/2006Financial statements , year ended Dec 31, 2005
3/23/2006RAB drilling leads to significant new gold discoveries
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (ALH.V)FRANKFURT (A4Y.F)
0.015+0.00%0.510+0.00%
TSX-V
CA$ 0.015
12/15 15:58 -
0%
Prev close Open
0.015 0.020
Low High
0.015 0.020
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.015 -%
Volume 1 month var.
18,000 -%
24hGold TrendPower© : -37
Produces
Develops Gold
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/3/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.87-3.12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56+0.18%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-4.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.79-0.32%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.86+0.54%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.13+0.58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :