| | Published : February 10th, 2014 | Announces Drill Intercept of 16.3 g/t Gold Over 39 Metres at Borden Gold; Commencement of On-Ice Dri |
|
Article
|
Comments
|
Comment this article
|
Rating
|
♥
Follow Company
|
|
Re: News Releases - Monday, February 10, 2014 Title: Probe Mines Announces Drill Intercept of 16.3 g/t Gold Over 39 Metres at Borden Gold; Commencement of On-Ice Drilling Program and Regional Exploration Program
Highlights:
� Infill drilling within High-Grade Zone ("HGZ") returned the highest grade interval to date from Hole BL14-573 on Section 1850mSE: - 39.0 metres averaging 16.3 g/t gold Including 19.4 metres grading 31.6 g/t gold Including 8.4 metres grading 66.3 g/t gold Including 2.0 metres grading 238 g/t gold;
� On-ice drilling program commenced with four drills, focused on expanding the HGZ
Toronto, February 10, 2014 -- PROBE MINES LIMITED (TSX-V: PRB) ("Probe" or the "Company") is pleased to announce that it has received results for its on-going drilling program from the Company's Borden Gold project near Chapleau, Ontario. Results for ten (10) new infill Diamond drill holes, BL13-568 to BL14-577, and two (2) extended holes BL13-493 and BL13-567W, were received and were successful in demonstrating the continuity and consistency of the high-grade gold mineralization, as well as the significant potential for increasing grade as drilling continues to define the mineralization to the southeast. Notably, Hole BL14-573 returned the most impressive grades observed within the deposit to date with an intersection of 39 metres grading 16.3 g/t Au, including a 19.4 metre interval of 31.6 g/t Au. Importantly, hole 573 was drilled only 150 metres from the furthest drilled section of the deposit to the southeast suggesting that the system is still very robust and has considerable potential for expansion.
The Company is also pleased to announce that its winter, on-ice drilling program, targeting further expansion of the High-Grade Zone ("HGZ") of the Borden deposit from Section 2000mSE, has commenced. Additionally, a regional geophysical program on Probe's East Limb Project to the East of Borden is currently underway.
High-Grade Zone
Results from the twelve (12) infill drill holes in the HGZ were received and continue to show the remarkable consistency of the zone with significant intersections of thick, high-grade gold mineralization. Within the results, Hole BL14-573 drilled on Section 1850mSE returned what is considered to be the most significant mineralized section observed to date, consisting of a 19.4-metre interval grading 31.6 g/t gold ("Au") within an even broader mineralized envelope of 39 metres averaging 16.3 g/t. The importance of this intersection is further enhanced by its location only 150 metres from Section 2000mSE, the last section drilled on the deposit leading up to the ice drilling expansion program.
Other highlights from the drill results include the discovery of a new gold mineralized interval in the extension of Hole BL13-493, consisting of 3.0 metres grading 14.7 g/t Au; and the expansion of the gold zone in previously reported hole BL13-567 (see News Release dated January 7, 2014) from 13.5 metres averaging 6.6 g/t Au to 44.9 metres averaging 2.5 g/t Au, including 15.3 metres averaging 4.7 g/t Au in Hole BL13-567W on Section 1950mSE.
The following table shows selected drill results for the HGZ. Drilling includes the shallow and deep holes necessary to bracket the gold mineralized structure in order to more accurately define its boundaries. No top-cut was used in calculating the gold intervals. The assay data for Hole BL14-573 can be found on the Company's website at http://www.probemines.com/s/Borden_Lake.asp?ReportID=622593&_Type=Borden-Gold. Although the HGZ mineralization displays remarkable consistency along strike, it is anticipated that any future Resource Estimates will employ a top-cut in their calculation. Depths of the mineralized zones are between 380 and 660 metres vertical depth. All intervals approximate true width. Updated plan and section maps for all holes are also available on the Company's website at http://www.probemines.com/s/Borden_Lake.asp?ReportID=569319:
High-Grade Zone Drill Results High-Grade Zone Drill Results
DDH |
Section |
From (m) |
To (m) |
Width (m) |
Au (g/t) |
BL13-493* |
2000m SE |
598.0 |
601.0 |
3.0 |
14.7 |
BL13-567W** |
1950m SE |
487.1 |
532.0 |
44.9 |
2.5 |
|
including |
487.1 |
502.4 |
15.3 |
4.7 |
|
including |
492.6 |
502.4 |
9.8 |
6.2 |
|
also including |
525.2 |
530.8 |
5.6 |
4.8 |
BL13-568 |
1950m SE |
491.0 |
509.5 |
18.5 |
2.8 |
|
including |
498.5 |
509.5 |
11.0 |
4.4 |
BL13-568 |
|
525.5 |
538.0 |
12.5 |
3.1 |
BL13-569 |
1900m SE |
470.0 |
503.0 |
33.0 |
2.9 |
|
including |
488.8 |
491.0 |
2.2 |
18.5 |
BL13-570 |
1850m SE |
439.0 |
500.0 |
61.0 |
1.1 |
|
including |
456.3 |
474.2 |
17.9 |
2.3 |
|
including |
461.0 |
468.1 |
7.1 |
3.2 |
BL13-571 |
1850m SE |
481.0 |
521.0 |
40.0 |
1.0 |
BL14-572 |
1800m SE |
480.0 |
492.2 |
12.2 |
4.5 |
|
including |
488.5 |
491.0 |
2.5 |
12.8 |
BL14-573*** |
1850m SE |
458.0 |
497.0 |
39.0 |
16.3 |
|
including |
465.0 |
484.4 |
19.4 |
31.6 |
|
including |
476.0 |
484.4 |
8.4 |
66.3 |
|
including |
480.0 |
482.0 |
2.0 |
238 |
BL14-574 |
2000m SE |
653.0 |
662.0 |
9.0 |
1.1 |
BL14-575 |
1950m SE |
559.5 |
577.2 |
17.7 |
2.7 |
|
including |
564.5 |
572.8 |
8.3 |
3.4 |
BL14-576 |
1800m SE |
510.0 |
520.3 |
10.3 |
2.3 |
BL14-577 |
1850m SE |
515.4 |
538.7 |
23.3 |
1.3 |
|
including |
529.0 |
538.7 |
9.7 |
2.0 | *Hole BL13-493 represents an extension of a previously announced hole (see NR dated Jan 7, 2014) **Hole BL13-567W was a wedge hole drilled from a previously lost hole (BL13-567, see NR dated Jan 7, 2014) ***no top cut was applied to the assays in Hole BL14-573, however, it is anticipated that any Resource Estimate calculated from this data will employ a top-cut for assay sample results
On-Ice Drilling Program
The Company has mobilized four (4) Diamond drill rigs onto the ice of Borden Lake to commence the expansion drilling program of the HGZ. The drills are targeting the southeast strike extent of the high-grade gold mineralization delineated from Section 1000mSE to Section 2000mSE, and will start drilling on Sections 2100mSE, 2200mSE, 2300mSE and 2400mSE, respectively. The Company is hoping to expand the deposit to at least Section 2600mSE during the Winter Program, which is highly weather dependent. Encouraging results from the most southeasterly sections, 1850mSE to 2000mSE, including the 39-metre interval grading 16.3 g/t Au in hole BL13-573, suggest a strong potential for expansion of the high-grade zone.
Winter Regional Exploration Program
As a result of the discovery of the Borden Gold Deposit, the Company believes there is significant exploration potential in the previously unexplored Borden Lake Belt. Probe is now applying its understanding of the Borden deposit to regional exploration and crews are currently mobilizing to commence a winter ground geophysical program on selected regional targets. The program will consist of Induced Polarization ("IP"), Magnetic and Very Low Frequency ("VLF") geophysical surveys on five separate grids, targeting six priority areas, which returned coincident Airborne, Geological and Soil Geochemical anomalies delineated by the 2013 regional exploration program. The program is designed to delineate drill targets for the 2014 Spring/Summer exploration season. It is expected that the surveys will take between two and three months to complete.
Dr. David Palmer, President and CEO of Probe, comments "Once again the Borden Deposit has surprised us with even greater results. Hole BL14-573 is arguably the best hole drilled in the deposit to-date and is even more encouraging as it occurs only 150 metres from our furthest drilled section to the southeast. This bodes well for the high-grade expansion program which has just commenced on Borden Lake and which will follow the high-grade zone along strike. In addition to what is rapidly becoming one of the best new gold deposits, the project also has significant upside in its regional exploration potential. Our regional program is based on the premise that where you find one deposit you tend to find others associated with the same mineralizing system, much like the World-class Timmins gold camp less than two hours to the east of us. 2014 is shaping up to be a pivotal year and we will continue to maintain our focus on advancing the Borden Gold project."
Probe has instituted a strict quality assurance and quality control ("QA-QC") program for the Borden Gold drill core sampling, with each fire assay furnace batch of 40 samples including two certified reference materials (standards), one blank sample and one core duplicate sample. Quality control guidelines and ongoing QAQC monitoring are being carried out by Probe personnel.
About Probe Mines: Probe Mines Limited is a Canadian precious metals exploration company whose key asset is the Borden Gold Zone in Ontario, Canada. As of October 31, 2013, the Company is well-positioned with approximately $33.4 million in treasury. The Company is actively exploring a significant new gold resource on its Borden Gold Zone near Chapleau, Ontario and has 100% interest in the Black Creek chromite deposit located in Northern Ontario. The Company's shares trade on the TSX Venture Exchange under the symbol PRB.
David Palmer, Ph.D., P.Geo., is the qualified person for all technical information in this release. To find out more about Probe Mines Limited, visit our website at www.probemines.com.
On behalf of Probe Mines Limited,
Dr. David Palmer, President & Chief Executive Officer
For further information, please contact:
Karen Willoughby, Director of Corporate Communications Tel: (866) 936-6766 Email: info@probemines.com Patrick Langlois, Vice President, Corporate Development Tel: (416) 777-6703 Email: patrick@probemines.com
Forward-Looking Statements
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release includes certain "forward-looking statements". These statements are based on information currently available to the Company and the Company provides no assurance that actual results will meet management's expectations. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Actual results relating to, among other things, results of exploration, project development, reclamation and capital costs of the Company's mineral properties, and the Company's financial condition and prospects, could differ materially from those currently anticipated in such statements for many reasons such as: changes in general economic conditions and conditions in the financial markets; changes in demand and prices for minerals; litigation, legislative, environmental and other judicial, regulatory, political and competitive developments; technological and operational difficulties encountered in connection with the activities of the Company; and other matters discussed in this news release. This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements. These and other factors should be considered carefully and readers should not place undue reliance on the Company's forward-looking statements. The Company does not undertake to update any forward-looking statement that may be made from time to time by the Company or on its behalf, except in accordance with applicable securities laws.
Copyright � 2014 PROBE MINES LIMITED (TSX-V:PRB) All rights reserved. For more information visit our website at http://www.probemines.com/ or send email to info@probemines.com .. Message sent on Mon Feb 10, 2014 at 4:44:36 AM Pacific Time
Data and Statistics for these countries : Canada | All Gold and Silver Prices for these countries : Canada | All
5/28/2013 | Announces Closing of $15.0 Million Bought Deal Brokered Priv... |
10/25/2011 | Announces C$5 Million Bought Deal Financing |
6/8/2010 | Announces Closing of $1,000,000 Non-Brokered Private Placeme... |
4/27/2010 | Announces $1,000,000 Non-Brokered Private Placement with Min... |
2/3/2010 | Announces Closing of $250,000 Non-Brokered Private Placement |
2/12/2008 | Closes $2,000,000 Non-Brokered Private Placement |
2/5/2008 | Announces $2,000,000 Non-Brokered Private Placement with th... |
11/6/2007 | Announces Closing of $3,500,000 Non-Brokered Private Placeme... |
10/26/2007 | Announces Increase in Size of Non-Brokered Private Placement |
10/22/2007 | Announces $3,000,000 Non-Brokered Private Placement to Explo... |
|
|
|
3/17/2015 | Probe Metals Inc. Commences Trading on the TSX Venture Excha... |
3/16/2015 | S&P Dow Jones Indices Announces Changes to the S&P/TSX Canad... |
3/13/2015 | Goldcorp Completes Acquisition of Probe Mines |
3/11/2015 | Shareholders Approve Plan of Arrangement |
3/11/2015 | Probe Mines Shareholders Approve Plan of Arrangement |
2/27/2015 | Leading Independent Advisory Firms ISS And Glass Lewis Recom... |
2/27/2015 | Leading Independent Advisory Firms ISS and Glass Lewis Recom... |
2/9/2015 | Tahoe Resources to buy Rio Alto Mining for $1.12 bln |
1/27/2015 | Goldcorp Completes Acquisition of Additional Interest in Pro... |
1/19/2015 | Probe Mines to be Acquired by Goldcorp |
1/19/2015 | Goldcorp to buy Probe Mines for about $440 million |
1/19/2015 | Goldcorp expands Porcupine district with acquisition of Prob... |
1/19/2015 | Probe Mines to be Acquired by Goldcorp |
12/18/2014 | Probe Mines Announces Grant of Options |
12/18/2014 | Probe Mines Announces Grant of Options |
12/10/2014 | Probe Mines Consolidates 100% Ownership of the Borden Gold D... |
12/10/2014 | Probe Mines Consolidates 100% Ownership of the Borden Gold D... |
12/9/2014 | Probe Mines President & CEO, Dr. David Palmer,Honoured with ... |
12/9/2014 | Probe Mines President & CEO, Dr. David Palmer, Honoured with... |
11/3/2014 | Probe Mines Limited Announces Results of Shareholder Meeting |
9/16/2014 | Probe Mines Appoints Jamie Sokalsky as Director and Chairman... |
9/3/2014 | Probe Mines Adds John Haflidson as Senior Mining Advisor |
8/6/2014 | Probe Mines Completes $26 Million Flow-Through Private Place... |
7/25/2014 | Probe Mines Files NI 43-101 Technical Report for the Borden ... |
7/15/2014 | Probe Mines to Complete $26 Million Flow-Through Private Pla... |
7/7/2014 | Probe Mines Announces High-Grade Infill Drilling Results at ... |
2/18/2014 | Announces High-Grade Infill Drill Intercepts, including 7.0 ... |
2/10/2014 | Announces Drill Intercept of 16.3 g/t Gold Over 39 Metres at... |
1/7/2014 | Reports Additional High-Grade Gold Intersections on its Bord... |
11/21/2013 | Announces Excellent Metallurgical Recoveries |
11/8/2013 | Honoured with Ontario Prospectors Association 2013 Ontario P... |
10/15/2013 | Continues to Intersect High-Grade Gold on its Borden Gold Pr... |
9/19/2013 | Announces Annual and Special Shareholder Meeting; Nominates ... |
8/21/2013 | Announces Continued High-Grade Assay Results for its Borden ... |
8/14/2013 | Continues to Define High-Grade Gold Zone on its Borden Gold ... |
6/18/2013 | Continues to Intersect High-Grade Gold on its Borden Gold Pr... |
5/24/2013 | Enters Into Underwriting Agreement and Announces Investment ... |
5/10/2013 | Announces $15.0 Million Bought Deal Brokered Private Placeme... |
4/25/2013 | Announces Update on Metallurgical Program for its Borden Gol... |
4/9/2013 | Drills 500-Metre High-Grade Step-Out Holes at Borden Gold Pr... |
1/8/2013 | Announces Additional Assay Results for its Borden Gold Proje... |
9/26/2012 | to Attend the Toronto Resource Investment Conference Septemb... |
9/18/2012 | (Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ... |
9/18/2012 | (Borden Lake)Announces Additional Assay Results for Its Borden Lake Gold ... |
7/31/2012 | (Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ... |
6/7/2012 | (Borden Lake)Appoints Gordon McCreary to its Board of Directors and Retai... |
6/5/2012 | (Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ... |
1/30/2012 | (Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ... |
12/6/2011 | (Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ... |
9/19/2011 | (Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ... |
8/9/2011 | (Borden Lake)Commences Metallurgical Testwork at Borden Lake |
7/21/2011 | (Borden Lake)Announces Additional Assay Results for its Borden Lake Gold ... |
6/22/2011 | Announces Assay Results for the Cree Lake Gold Project, Sway... |
6/7/2011 | (Borden Lake)Announces Assay Results for its Borden Lake Gold Project nea... |
4/21/2011 | Announces Closing of Brokered Private Placement Raising C$25... |
4/4/2011 | ANNOUNCES PRICING AND UPSIZES BROKERED PRIVATE PLACEMENT TO ... |
3/28/2011 | ANNOUNCES PRIVATE PLACEMENT FOR UP TO C$15,000,000 |
3/15/2011 | (Borden Lake)Announces Assay Results for its Borden Lake Project near Cha... |
8/10/2010 | to Acquire 100% interest in Black Creek Chromite Deposit and... |
6/15/2010 | to Begin Summer Drilling Operations |
6/8/2010 | Provides Exploration Update |
4/26/2010 | to Acquire the Borden Lake Gold Project, Chapleau, Ontario |
4/21/2010 | to Option the Cree Lake Gold Project, Swayze Belt, Ontario f... |
10/21/2009 | Completes Phase II Drilling on its Black Creek Chromite Disc... |
9/22/2009 | Commences Phase II Drilling on its Black Creek Chromite Disc... |
5/26/2009 | Identifies 800m-long Airborne Anomaly on the Probe-Noront Jo... |
11/20/2008 | Corporate and Exploration Updates |
8/7/2008 | CEO Interview |
7/8/2008 | Commences First-Phase Drilling on its McFauld's West Propert... |
6/3/2008 | Announces Discussions With Noront Resources Inc. and Mobiliz... |
4/1/2008 | President & CEO David Palmer on the AOL Small Cap Show |
1/14/2008 | IDENTIFIES SIGNIFICANT NI-CU-AG-CO SOIL GEOCHEMICAL ANOMALIE... |
8/29/2007 | Reports on Property Adjacent to Noront's Copper Discovery in... |
|
|