Golden Dawn Minerals Inc.

Published : September 01st, 2011

Announces Drilling Program on Boundary Falls

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Copper | Diamond | Gold | Lead | Precious Metals | Silver | Zinc |
Email not displaying correctly? View it in your browser.
Golden Dawn Minerals Prepares for Drilling May Mac Mine Area, Boundary Falls Property, Greenwood Mining District, British Columbia, Canada


Vancouver, September 1st, 2011 � Golden Dawn Minerals Inc. (TSX-V: GOM; FRANKFURT: 3G8), (the �Company� or �Golden Dawn�) is pleased to announce that final soil geochemical results have been received along with a National Instrument 43-101 Technical Report for its 100% owned Boundary Falls Property, west of Greenwood, British Columbia, Canada.

Golden Dawn has approved and is preparing to conduct a 3,000 m surface Diamond drilling program during the upcoming months to test, not only anomalies associated with the historic Skomac vein system and the May Mac Mine workings, but also a number of newly identified targets. The drilling program will be accompanied by follow-up ground geophysical surveys, trenching and surface sampling to evaluate the historic showings and the newly identified targets.

The Boundary Falls property is contiguous to the south of the Wild Rose Property, where the Company has delineated 279,300 ounces of gold as an inferred mineral resource (see news release of July 13, 2011). The area of this inferred resource is about 2-4 km north of the May Mac Mine on the Boundary Falls Property.  Golden Dawn has started the next phase of its drilling program on the Wild Rose Property to expand this known resource.


Historic May Mac Mine Workings (Skomac Vein System)

The original May Mac showing, discovered and staked in 1894, was developed by several shafts and three adit tunnels (Adits #�s 1, 2 & 3) on what is presently termed the Lower Skomac Vein. Some 32 tonnes (metric) (35 tons) of mineral were shipped over the subsequent nine years, grading 319 grams per tonne (g/t) gold (9.3 ounces per ton [oz/ton]). By 1904, a new parallel vein, termed the Upper Skomac, was discovered, developed by a new adit tunnel (Adit #4) and mined, sporadically yielding 670 tonnes (790 tons) over the ensuing 33 years, grading in the range of 3,000 g/t (100 oz/ton) silver. Between 1937 and 1960, no development or production was recorded.

Skomac Mines Ltd. acquired the property in 1960. Between 1961 and 1965, a fifth adit tunnel (Adit #5) was developed on the Upper Skomac vein, from which some 553 tonnes (609 tons) of mineral were extracted, averaging 1.37 g/t (0.04 oz/ton) gold, and 185 g/t (5.41 oz/ton) silver, plus 2.1% lead and 1% zinc. During the same period, a Diamond drill hole apparently intersected a new vein, with an intersected width of six feet, grading 21.5 g/t (0.62 oz/ton) gold, 14,400 g/t (420 oz/ton) silver, 19.9% lead and 2.1% copper. To date, no follow-up work has been done to further investigate this vein which lies a short distance west of the underground workings. However, follow-up ground geophysical surveys, trenching and Diamond drilling are being planned at this target during the upcoming months. 

In 1972, Robert Mine Ltd. acquired the property and between 1974 and 1976, developed another tunnel (Adit #6) on the Upper Skomac vein. Four mineral shoots were encountered and mined above the Adit #6, producing 950 tonnes (1,050 tons) of mineral averaging 3.66 g/t (0.107 oz/ton) gold, 593 g/t (17.3 oz/ton) silver, 3.2% lead, 2.0% zinc and 0.25% copper. The following year, another adit tunnel (Adit #7) was collared and driven for some 215 m (700 ft). According to verbal communication with the operator who owned the mine at that time, a vein was encountered some 60 m (200 ft) in the tunnel from the portal, which averaged in the range of 15 g/t (0.43 oz/ton) gold over a length of 15 m (50 ft) and an average width of 60 cm (2 ft). No silver values were mentioned. Due to the narrow width and low grades at that time, it was not further developed. This new vein has not been inspected, sampled or assayed, however, a program of underground sampling is being considered for the upcoming exploration program. 

Underground Diamond drilling by Robert Mine Ltd. in 1977 and 1978 consisted of several short holes which intersected three additional, parallel, hanging wall veins within ten meters of the Upper Skomac vein. While the narrow veins encountered contained only low precious metals values, it is typical in epithermal deposits of this type, that narrow low grade veins can blossom out into high grade veins of mineable width. 

An 80 tonne per day flotation mill (90 tons/day) was installed in 1982. In 1983, some 1,570 tons of low grade ore were milled, yielding 100 tonnes (110 tons) of bulk concentrate averaging 15.5 g/t (0.43 oz/ton) gold, 2,194 g/t (64 oz/ton) silver, plus lead and zinc. The mine has been inactive since that time. The May Mac Mine, mill and tailings pond are all currently permitted. Should the Company decide to reactivate mine, safety and environmental features to today�s standards will have to be implemented.


2011 Soil Sampling Survey

Although the property is almost entirely covered by a thin mantle of overburden, some thirteen parallel quartz veins are known to outcrop within a favorable meta-sediment/volcanic complex measuring some 200 m in width and stretching for a strike length of well over one kilometer. 

During the history of the property, operations have been consistently under-funded. As a result, little surface drilling and exploration have been performed at the property. The Company commissioned a property wide soil geochemical survey during June, 2011. A total of 2,211 standard B-horizon soil samples were collected at a line spacing of 100 m with sample stations at 25 m covering the bulk of the Boundary Property west of Highway 3. A total of 132 soil samples yielded gold assays greater than or equal to 50 parts per billion (ppb) with a total of 22 samples yielding assays between 100 ppb and 9,614 ppb gold (9.614 g/t). A total of 84 samples yielded copper assays greater than or equal to 200 parts per million (ppm) copper up to 542 ppm copper. A total of 63 samples assayed greater than or equal to 200 ppm zinc up to 15,700 ppm (1.57%) zinc. Anomalous gold-in soil samples show an excellent correlation with anomalous concentrations of arsenic, copper and zinc.

The 2011 soil survey yielded more than 20 discreet gold-in soil target areas. A number of the high priority soil geochemical anomalies are spatially associated with or are adjacent to the present May Mac Mine workings and vein system. There are also a number of other soil anomalies that are not associated with any known surface mineralization but are spatially associated with discreet electromagnetic and/or magnetic anomalies of interest identified in the prior Aeroquest airborne geophysical survey.

Future Work

The Company has planned a 3,000 m surface Diamond drilling program along with a $250,000 exploration program. The program will include one or more of follow-up close-spacing ground geophysical surveys, the excavation of up to thirty cross-trenches, along with underground geological mapping and sampling. The objectives of the program include expanding the known vein systems within and near the historical mine workings, and the discovery of several new mineralized zones within this strongly geochemically anomalous property. A Notice of Work application has been filed with the British Columbia Ministry of Energy and Mines. Once the appropriate permits are received, the planned work program will be commenced.

There are no known mineral resources on the Boundary Falls Property. Historical references are related here for background information only. There can be no assurance that any mineral resource will be located on the property, or if located that such mineral resource might be profitably mined.

This press release was prepared by Wayne Ash, P.Eng. of Ash and Associated Consulting Ltd. and Michael Dufresne, P.Geol., of APEX Geoscience Ltd., both Qualified Persons as defined by National Instrument 43-101. Mr. Ash and Mr. Dufresne have reviewed and verified the contents of this release. National Instrument 43-101 technical report, authored by Mr. Ash, has been filed on SEDAR.

 

On behalf of the Board of Directors:

GOLDEN DAWN MINERALS INC.


�Wolf Wiese�

_______________________________

Wolf Wiese

Chief Executive Officer

 

For Further Information, please contact:

Mike Poulin

Investor Relations

604-630-6793

mike@goldendawnminerals.com


THIS PRESS RELEASE WAS PREPARED BY MANAGEMENT WHO TAKES FULL RESPONSIBILITY FOR ITS CONTENTS. NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. THIS DOCUMENT CONTAINS CERTAIN FORWARD LOOKING STATEMENTS WHICH INVOLVE KNOWN AND UNKNOWN RISKS, DELAYS, AND UNCERTAINTIES NOT UNDER THE COMPANY�S CONTROL WHICH MAY CAUSE ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS OF THE COMPANY TO BE MATERIALLY DIFFERENT FROM THE RESULTS, PERFORMANCE, OR ACHIEVEMENTS IMPLIED BY THESE FORWARD LOOKING STATEMENTS. WE SEEK SAFE HARBOR.



About Golden Dawn Minerals

Golden Dawn Minerals Inc. is a junior exploration company with a well positioned portfolio of properties prospective for precious and base metals in British Columbia, Canada. If you would like to learn more about us, please visit www.goldendawnminerals.com. You can also visit us on Twitter: www.twitter.com/goldendawninc


You are receiving this email because you a) are a shareholder b) have signed up on our website to receive updates. If we have mistakenly sent you an email without your permission, please click the unsubscribe button to be removed from our contact list.

.com from this list | Forward to a friend | Update your profile
Our mailing address is:
Golden Dawn Minerals
575 1111 West Hastings Street
Vancouver, BC V6E 2J3

Add us to your address book

Copyright (C) 2011 Golden Dawn Minerals All rights reserved.
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Golden Dawn Minerals Inc.

EXPLORATION STAGE
CODE : GOM.V
ISIN : CA3808956070
CUSIP : 380895 10 2
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Golden Dawn is a gold exploration company based in Canada.

Golden Dawn holds various exploration projects in Canada.

Its main exploration properties are TAM O'SHANTER, CENTRAL CATHARINE, 80 FOOT FALL, LINK-CATHARINE and WILD ROSE BC in Canada.

Golden Dawn is listed in Canada and in Germany. Its market capitalisation is CA$ 3.1 millions as of today (US$ 2.4 millions, € 2.1 millions).

Its stock quote reached its highest recent level on May 27, 2011 at CA$ 2.85, and its lowest recent point on October 17, 2014 at CA$ 0.01.

Golden Dawn has 101 870 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Golden Dawn Minerals Inc.
5/8/2013Announcing Proposed Private Placement
4/4/2013Private Placement of $66,810
1/8/2013Private Placement of $ 162,156
11/6/2012Closing of Private Placement of $140,500
Nominations of Golden Dawn Minerals Inc.
12/19/2013Results of AGM - Appointment of New Director
2/15/2011Announces New Appointment to Board
Project news of Golden Dawn Minerals Inc.
1/25/2016Golden Dawn reports final results of 2015 drilling at May-Ma...
12/11/2012Receives Updated Inferred Mineral Resource for Deadwood Gold...
1/25/2012Announces Exploration & Bulk Sampling Intentions on its Gree...
9/1/2011Announces Drilling Program on Boundary Falls
8/19/2011Announces Drilling Program on Wild Rose, Tam O'Shanter
8/4/2011and Nass Valley Gateway Announce NI 43-101
7/13/2011Receives Technical Report for NI 43-101
5/26/2011Receives Initial Mineral Resource Estimate
5/2/2011Renews Mine Evaluation at May Mac Mine
4/21/2011Schedules Resource Calculation
4/4/2011Intersects 127m Grading 0.43 g/t Gold
Corporate news of Golden Dawn Minerals Inc.
6/2/2016Golden Dawn Minerals Inc. Appoints New Executive Director & ...
5/12/2016Golden Dawn Drilling Intersects Gold And Silver Values Below...
4/25/2016Golden Dawn Completes Second Of Three Phases Of Huakan Green...
4/13/2016Golden Dawn Reports Positive Preliminary Economic Assessment...
4/13/2016Golden Dawn Signs Option Agreement With Huakan And Solicits ...
12/18/2015Closing of the Second Tranche of the Company’s Private Place...
12/18/2015Golden Dawn Minerals Inc.: Closing of the Second Tranche of ...
12/17/2015Golden Dawn Confirms Mineralized Zone Extends Below #6 And #...
11/23/2015IIROC Trading Resumption - GOM
11/23/2015Golden Dawn Drilling Intersects Mineralized Zone from #6 to ...
11/23/2015IIROC Trading Halt - GOM
10/22/2015Golden Dawn Minerals Inc. Assays Rock Channel Samples at 529...
10/15/2015GOLDEN DAWN MINERALS INC. STARTS DRILLING AT GREENWOOD PRECI...
10/14/2015Completion of the Financing for $268,147.40
10/13/2015Golden Dawn Minerals Inc.: Completion of the Financing for $...
10/1/2015GOLDEN DAWN MINERALS INC. SAMPLES 12.97 G/T GOLD OVER 0.87 M...
9/24/2015GOLDEN DAWN MINERALS INC. APPOINTS DR MATHEW BALL TO MANAGE ...
9/24/2015Golden Dawn Minerals Inc. Appoints Dr. Mathew Ball to Manage...
9/12/2015Golden Dawn Minerals Inc. Drops Tam O’Shanter Property
9/12/2015Golden Dawn Minerals Inc. Drops Tam O'Shanter Property
9/8/2015Golden Dawn Minerals Inc. Appoints a New German Director
9/2/2015Golden Dawn Minerals Inc. Upgrades Its Current Frankfurt Lis...
8/15/2015Completion of the Financing for $207,600
8/14/2015Golden Dawn Minerals Inc.: Completion of the Financing for $...
7/17/2015Golden Dawn Minerals Inc. Options Tam O'Shanter Property fro...
7/8/2015Golden Dawn Minerals Inc.: Completion of the Financing for $...
6/13/2015Closing of the First Tranche of the Company’s Non-Brokered P...
6/13/2015Golden Dawn Provides Update for Greenwood Exploration and Bu...
4/13/2015Golden Dawn Minerals Inc. Purchases 100% of Amigo Property, ...
4/13/2015Golden Dawn Minerals Inc. Granted Stock Options
4/2/2015Golden Dawn Minerals Inc. Granted Stock Options
3/26/2015Golden Dawn Minerals Inc. Purchases 100% of Amigo Property, ...
3/11/2015Closing of Private Placement
3/6/2015Company Update
2/5/2015Golden Dawn Announces Development Of Greenwood Project, Brit...
1/9/2015Final Tranche Closing of Private Placement
12/30/2014Closing the Private Placement of $ 65,250
10/28/2014Golden Dawn Announces Private Placement to Existing Sharehol...
4/17/2014Golden Dawn Drops Tam O' Shanter Property
4/4/2014Golden Dawn Announces the Resignation of Director
1/7/2014Announces Consolidation
6/12/2013News Release
3/14/2013Purchases the Boundary Falls Property Hosting the May Mac Mi...
1/29/2013Files National Instrument 43-101 Technical Report For Update...
12/11/2012News Release
10/2/2012News Release
10/2/2012s Exploration and Sampling Schedules for Greenwood Project W...
5/30/2012News Release
5/29/2012News Release
5/14/2012News Release
3/22/2012News Release
1/23/2012News Release
10/24/2011News Release
10/24/2011News Release
9/23/2011signs with Lichtfield
5/10/2011Schedules Drilling on Royal Attwood
5/9/2011s from Golden Dawn
5/9/2011SCHEDULES DRILLING OF MULTIPLE PRIORITY TITAN 24 GEOPHYSICAL...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (GOM.V)FRANKFURT (3G8.F)
0.030+0.00%0.029+0.00%
TSX-V
CA$ 0.030
10/14 10:30 -
0%
Prev close Open
0.030 0.030
Low High
0.030 0.030
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.030 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : 25
Produces
Develops
Explores for Copper - Gold - Nickel - Platinum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2022-80.00%0.210.03
20213.45%0.310.11
202026.09%0.200.04
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.36%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.11+2.21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.47+3.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.25-3.42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+5.26%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.79-3.76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.57+0.84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :