Soho Resources Announces Drilling Results From The
Cinco De Mayo Zone And Trend Plus Three Additional Holes From The El
Creston Zone
Since its last news release, Soho has completed 15 Diamond drill
holes along the Cinco de Mayo Trend over an approximate 900 meter strike
length near the Cinco De Mayo adits. Results have been received for six of
these holes. Hole DDH07-085, which is at the southern limit of the
drill pattern, cut the best grade material. DDH07-085 returned 4.90
meters of 3.54 g/t Au, 164.0 g/t Ag, 1.09% Cu, 1.40% Pb and 4.09%
Zn. DDH07-087 returned 6.70 meters of 1.01g/t Au, 110.7g/t Ag, 0.74%
Cu, 0.55% Pb, 0.63% Zn. One more hole is in progress on this
target.
Recent drilling results
confirm limited past drilling along the Cinco de Mayo Trend with strongly
mineralized results under the Cinco De Mayo south adit and lower grade
material northward along trend, with most holes cutting significant widths
of greater than 1% combined Pb/Zn.
Results from three
additional holes testing the El Creston zone and three holes targeting the
El Perdido Zone are listed in the table below. Since the Company's last
news release 11 drill holes have been completed testing the El Creston
zone with one is currently in progress.
Samples for all
completed holes are either in transit or have been submitted to the lab
for analysis.
Please visit the
Company's web by visiting the following link http://www.sohoresources.ca/pdf/DrillHoleSurfacePlanJune2007.pdf to view a drill hole surface location plan for the holes reported
in this press release.
All of the remaining
1000 meters on the 18000 meter drill program in progress will be targeted
on the El Creston Target.
A 3,000 meter,
helicopter supported, drill program will be carried out in July and August
on the El Creston zone targeting the structural intersection of the El
Creston structure and El Perdido structure. The El Perdido structure
is thought to be the same continuous minimum 2.4 km long structure,
hosting both the Cinco De Mayo Zone in the south and the Santiago Zone to
the north.
On completion of the
helicopter supported drill program Soho will have all the data necessary
for the calculation of its initial resource estimate to be completed in
the final calendar quarter of 2007.
The exploration program is being conducted under the direction of
Hall Stewart, Vice-President of Exploration, P.Geo., a qualified geologist
as defined under National Instrument 43-101. Mr. Stewart authorized
this news release.
CAUTIONARY STATEMENT
The TSX
Venture Exchange does not accept responsibility for the adequacy or
accuracy of this release. No stock exchange, securities commission or
other regulatory authority has approved or disapproved the information
contained herein. This News Release includes certain "forward-looking
statements". All statements other than statements of historical fact,
included in this release, including, without limitation, statements
regarding potential mineralization and reserves, exploration results, and
future plans and objectives of Soho Resources, Corp. are forward-looking
statements that involve various risks and uncertainties. There can be no
assurance that such statements will prove to be accurate and actual
results and future events could differ materially from those anticipated
in such statements. Important factors that could cause actual results
to differ materially from Soho Resources, Corp's expectations are
exploration risks detailed herein and from time to time in the filings
made by Soho with securities
regulators.